Professional Documents
Culture Documents
TrackerBifacialICB Project - VC0 NASA-Report
TrackerBifacialICB Project - VC0 NASA-Report
PVsyst TRIAL
PVsyst - Simulation report
Grid-Connected System
Project: TrackerBifacialICB
Variant: New simulation variant NASA
Trackers single array, with backtracking
System power: 42.5 kWp
PVsyst TRIAL
PVsyst TRIAL
Author
PVsyst TRIAL
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
Project summary
Geographical Site Situation Project settings
ICB/USP Latitude -23.57 °S Albedo 0.20
Brazil Longitude -46.73 °W
Altitude 790 m
Time zone UTC-3
Weather data
ICB/USP
NASA-SSE satellite data 1983-2005 - Synthetic
System summary
PVsyst TRIAL
Grid-Connected System Trackers single array, with backtracking
System information
PV Array Inverters
Nb. of modules 78 units Nb. of units 1 unit
Pnom total 42.5 kWp Pnom total 35.0 kWac
Grid power limit 35.0 kWac
Grid lim. Pnom ratio 1.215
User's needs
Unlimited load (grid)
PVsyst TRIAL
Produced Energy 79506 kWh/year
Table of contents
1870 kWh/kWp/year Perf. Ratio PR 88.26 %
2
General parameters, PV Array Characteristics, System losses 3
Near shading definition - Iso-shadings diagram 5
Main results 6
Loss diagram 7
Predef. graphs 8
Single-line diagram 9
PVsyst TRIAL
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 2/9
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
General parameters
Grid-Connected System Trackers single array, with backtracking
PV Field Orientation
Orientation Tracking algorithm Backtracking array
Tracking plane, horizontal N-S axis Astronomic calculation Nb. of trackers 3 units
Axis azimuth 0° Backtracking activated Single array
Sizes
Tracker Spacing 5.00 m
Collector width 2.28 m
Ground Cov. Ratio (GCR) 45.6 %
Phi min / max. -/+ 55.0 °
PVsyst TRIAL
Backtracking strategy
Phi limits for BT -/+ 62.7 °
Backtracking pitch 5.00 m
Backtracking width 2.28 m
Models used
Transposition Perez
Diffuse Perez, Meteonorm
Circumsolar separate
Bifacial system
Model 2D Calculation
unlimited trackers
PVsyst TRIAL
Bifacial model geometry
Tracker Spacing
Tracker width
GCR
Axis height above ground
5.00
2.28
45.6
2.10
m
m
%
m
Bifacial model definitions
Ground albedo
Bifaciality factor
Rear shading factor
Rear mismatch loss
Shed transparent fraction
0.20
66
5.0
10.0
0.0
%
%
%
%
PV Array Characteristics
PV module Inverter
Manufacturer Generic Manufacturer Generic
PVsyst TRIAL
Model JAM72-D30-545-MB Model GEP35-L-10
(Original PVsyst database) (Original PVsyst database)
Unit Nom. Power 545 Wp Unit Nom. Power 35.0 kWac
Number of PV modules 78 units Number of inverters 6 * MPPT 17% 1 unit
Nominal (STC) 42.5 kWp Total power 35.0 kWac
Modules 6 string x 13 In series Operating voltage 200-650 V
At operating cond. (50°C) Pnom ratio (DC:AC) 1.22
Pmpp 39.0 kWp No power sharing between MPPTs
U mpp 492 V
I mpp 79 A
PVsyst TRIAL
Module area 201 m² Pnom ratio 1.22
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
Array losses
Thermal Loss factor DC wiring losses Module Quality Loss
Module temperature according to irradiance Global array res. 102 mΩ Loss Fraction -0.8 %
Uc (const) 20.0 W/m²K Loss Fraction 1.5 % at STC
Uv (wind) 0.0 W/m²K/m/s
PVsyst TRIAL
1.000 1.000 0.989 0.945 0.890 0.821 0.681 0.439 0.000
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 4/9
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
PVsyst TRIAL
Iso-shadings diagram
PVsyst TRIAL
Orientation #1
PVsyst TRIAL
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 5/9
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
Main results
System Production
Produced Energy 79506 kWh/year Specific production 1870 kWh/kWp/year
Perf. Ratio PR 88.26 %
PVsyst TRIAL
Balances and main results
PVsyst TRIAL
February 145.0 66.64 23.98 178.6 177.2 6723 6573 0.866
March 148.8 63.24 23.24 185.1 183.7 7077 6918 0.879
April 131.7 47.70 22.16 166.4 165.1 6414 6269 0.886
May 112.8 39.37 19.76 146.1 144.4 5793 5666 0.912
June 107.4 31.20 18.80 142.2 140.1 5670 5549 0.918
July 116.9 34.10 18.46 154.8 152.6 6160 6026 0.916
August 139.2 40.61 19.82 180.8 179.5 7113 6954 0.905
September 132.9 55.50 20.65 164.4 163.2 6414 6270 0.897
October 157.8 69.13 21.85 198.6 197.0 7622 7456 0.883
November 166.5 75.30 22.48 204.5 203.0 7692 7520 0.865
December 168.9 82.15 23.26 199.8 198.2 7428 7260 0.855
Year 1693.2 685.54 21.51 2119.1 2099.9 81317 79506 0.883
PVsyst TRIAL
Legends
GlobHor Global horizontal irradiation EArray Effective energy at the output of the array
DiffHor Horizontal diffuse irradiation E_Grid Energy injected into grid
T_Amb Ambient Temperature PR Performance Ratio
GlobInc Global incident in coll. plane
GlobEff Effective Global, corr. for IAM and shadings
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 6/9
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
Loss diagram
1693 kWh/m² Global horizontal irradiation
+25.2% Global incident in coll. plane
Bifacial
PVsyst TRIAL
748 kWh/m² on 442 m²
PVsyst TRIAL
efficiency at STC = 21.11% PV conversion, Bifaciality factor = 0.66
PVsyst TRIAL
-2.17% Inverter Loss during operation (efficiency)
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 7/9
Project: TrackerBifacialICB
Variant: New simulation variant NASA
PVsyst V7.4.6
VC0, Simulation date:
04/06/24 11:14
PVsyst TRIAL
with V7.4.6
Predef. graphs
Daily Input/Output diagram
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL
04/06/24 PVsyst Evaluation mode Page 8/9
PVsyst V7.4.6
PVsyst TRIAL
VC0, Simulation date:
04/06/24 11:14
with V7.4.6
PVsyst TRIAL
PVsyst TRIAL
PVsyst TRIAL