Professional Documents
Culture Documents
Concrete Topping Patima
Concrete Topping Patima
TECHNICAL S P E C I F I C A T I O N
1. PROJECT BILLBOARD
A. For the information and guidance of the public about the on-going projects.
B. Standard size of 8ft x 8ft tarpaulin with white background printed all major details
about the project.
2. CONCRETE WORKS
A. Steel forms installed properly and must be in accordance of the dimensions given at
the approved plan.
B. Cement for the concrete shall conform to the requirements of specifications for
Portland Cement (ASTM C-150).
C. Coarse aggregates and fine aggregates shall consist of a hard, durable, clean, uncoated
of any impurities and of good quality. The shape of the particles shall be generally rounded and
reasonably free from the elongated particles.
D. Proportioning of concrete shall conform to A.S.T.M. standard. Concrete shall have
consistency that will be workable in the required position. It shall be of such consistency that
it will flow around the reinforcing steel.
A. In any case where Mixer Truck (transit mixer) is impossible, One Bagger Mixer is
permitted to ensure uniform mixing of concrete in the approved procedure.
Prepared By:
Approved By:
MARVIN M. MARTINEZ
Municipal Mayor