EOP For Loss of Extraction Steam System
EOP For Loss of Extraction Steam System
Scope: This procedure will cover all the actions to be taken during the Loss of Extraction Steam system.
Table of Contents
Chapters Description
2.
3.
4.
5.
Parameter SOL
1 Turbine extraction controller Auto maintain extraction steam pressure as per given CRS
set point
2 Extraction controller will trip in case of ST d-synch or trip. CRS
3 Extraction line to LP header pneumatic NRV air supply loss will result closing of CRS/FO
NRV
3 Loss of extraction resulting LP header steam supply loss. CRS
5 Manage steam flow through second unit extraction (if in service) CRS
1 Both STs will trip, resulting loss of extraction supply, try to reset the
protections and restart the unit, prepare PRDS-1/2 for recharging of LP FO/ CRS
header
10.0 Records: