DSG Global ElectricalsMALEWADI, TARADGAON, PHALTAN, SATARA,Satara, Satara, Maharashtra, 415528GSTIN

Quotation No.
1

BILL TO
TRIMURTI STAINLINK EQUIPMENT PVT LTD
Address: Gat No 757 Village Velu Pune - Bangalore Highway Tal Bhor Dist-Pune 412205, GSTIN: 27AAECT1241M1Z9 State: Maharashtra
Mobile: 9028787301

S.NO. SERVICES QTY.

1 GI Perfortated Tray (Size - 50 x 75 x 50 mm) Fitting along-with necessary bracket 1 MTR


fittment & welding
2 GI Perfortated Tray (Size - 50 x 150 x 50 mm) Fitting along-with necessary bracket 1 MTR
fittment & welding
3 GI Perfortated Tray (Size - 75 x 300 x 75 mm) Fitting along-with necessary bracket 1 MTR
fittment & welding
4 8 Way SPN DB Fittintment including input and output MCB fixing (I/P - DP MCB 1 NOS
10A, O/P - SP MCB 2A) (Lighting)
5 Laying and termination work for Flexible Polycab Cable Size - 1.5 Sqmm x 3C 1 MTR

6 Laying and termination work for Flexible Polycab Cable Size - 2.5 Sqmm x 3C 1 MTR

7 12 Way TPN DB Fittintment including input and output MCB fixing (I/P - 4P MCB 1 NOS
63A, O/P - 4P MCB 32A) (RPDB)
8 Laying and termination work for Flexible Polycab Cable Size - 4 Sqmm x 5C 1 MTR

9 Laying and termination work for Flexible Polycab Cable Size - 6 Sqmm x 4C 1 MTR

10 Laying and termination work for Flexible Polycab Cable Size - 10 Sqmm x 4C 1 MTR

11 Installaion of 80/100W LED Light Fiting including fixing and elecrical connecion 1 NOS

12 Installaion of 200/250W LED Light Fiting including fixing and elecrical connecion 1 NOS

13 Cable laying and end termination work for Cable - 4C X 300 Sqmm Aluminum 1 NOS
Armoured Cable
14 Cable laying and end termination work for Cable - 4C X 185 Sqmm Aluminum 1 PCS
Armoured Cable
15 Cable laying and end termination work for Cable - 4C X 150 Sqmm Aluminum 1 PCS
Armoured Cable
16 Cable laying and end termination work for Cable - 4C X 95 Sqmm Aluminum 1 PCS
Armoured Cable
17 Cable laying and end termination work for Cable - 4C X 70 Sqmm Aluminum 1 PCS
Armoured Cable
18 Cable laying and end termination work for Cable - 4C X 50 Sqmm Aluminum 1 PCS
Armoured Cable
19 Cable laying and end termination work for Cable - 4C X 35 Sqmm Aluminum 1 PCS
Armoured Cable
20 Cable laying and end termination work for Cable - 4C X 95 SqmmCopper Flexible 1 PCS
Cable
21 Cable laying and end termination work for Cable - 4C X 70 SqmmCopper Flexible 1 PCS
Cable
22 Cable laying and end termination work for Cable - 4C X 50 SqmmCopper Flexible 1 PCS
Cable
23 Cable laying and end termination work for Cable - 4C X 25 SqmmCopper Flexible Cable 1 PCS
Cable laying and end termination work for Cable - 4C X 16 SqmmCopper Flexible Cable
Laying and termination work for Earthstrip - GI 50 X 6 Laying and termination work for Earthstrip - GI 25 X 3
Laying and termination work for Earthstrip - Cu 25 x 3
24 Cable laying and end termination work for Cable - Earthing 1C X 35 Sqmm Cable laying and end termination 1 PCS
work for Cable - Earthing 1C X 16 Sqmm Cable laying and end termination work for Cable - Earthing 1C X 6
Sqmm Cable laying and end termination work for Cable - Earthing 1C X 4 Sqmm Cable laying and end
25 termination work for Cable - Earthing 1C X 2.5 Sqmm 1 PCS
Installation of Changeover switch including fittment of panel , MCCB and cable end termination work - 250A
26 offload changeover 1 PCS
Installation of MCCB box including fittment of box, MCCB and cable end termination work - 125A
27 Installation of MCCB box including fittment of box, MCCB and cable end termination work - 100A 1 PCS
Installation of MCCB box including fittment of box, MCB and cable end termination work - 63A
Installation of MCCB box including fittment of box, MCB and cable end termination work - 32A
28 1 PCS
Installation of Energymeter Panel inculding fittment and end termination work
Cable laying and end termination work for Cable - 4C X 35 SqmmCopper Flexible Cable
29 CGST @9% SGST @9% 1 PCS

30 1 PCS

31 1 PCS

32 1 PCS

33 1 PCS

34 1 PCS

35 1 PCS

36 1 PCS

37 1 PCS

38 1 PCS

39 1 MTR

TOTAL -
Sqmm Cable laying and end
termination work for Cable -
Earthing 1C X 16 Sqmm Cable
laying and end termination work
for Cable - Earthing 1C X 6 Sqmm
Cable laying and end termination
work for Cable - Earthing 1C X 4
Sqmm Cable laying and end
termination work for Cable -
Earthing 1C X 2.5 Sqmm
Installation of Changeover switch
including fittment of panel , MCCB
and cable end termination work -
250A offload changeover
Installation of MCCB box
including fittment of box, MCCB
and cable end termination work -
125A
Installation of MCCB box
including fittment of box, MCCB
and cable end termination work -
Maharashtra
100A
Installation of MCCB box
including fittment of box, MCB
and cable end termination work -
63A
Installation of MCCB box
RATE AMOUNT
including fittment of box, MCB
and cable end termination work -
32A 90 90
Installation of Energymeter Panel
inculding fittment and end
termination work
Cable125
laying and end termination125
work for Cable - 4C X 35
SqmmCopper Flexible Cable
+B22:C40CGST
175 @9% SGST 175
@9%

1,350 1,350

38 38

49 49

2,000 2,000

49 49

55 55

60 60

650 650

650 650

170 170

130 130

120 120

115 115

110 110

90 90

77 77
110 110

99 99

88 88

60 60

50 50

50 50

40 40

40 40

28 28

28 28

22 22

22 22

22 22

3,200 3,200

2,500 2,500

2,500 2,500

2,000 2,000

1,000 1,000

2,700 2,700

90 90

- ₹ 1,867.68

- ₹ 1,867.68

₹ 24,487.36
Quotation
S.NO. SERVICES
1 GI Perfortated Tray (Size - 50 x 75 x 50 mm) Fitting along-with necessary bracket fittment & welding
2 GI Perfortated Tray (Size - 50 x 150 x 50 mm) Fitting along-with necessary bracket fittment & welding
3 GI Perfortated Tray (Size - 75 x 300 x 75 mm) Fitting along-with necessary bracket fittment & welding
4 8 Way SPN DB Fittintment including input and output MCB fixing (I/P - DP MCB 10A, O/P - SP MCB 2A) (Lighting)
5 Laying and termination work for Flexible Polycab Cable Size - 1.5 Sqmm x 3C
6 Laying and termination work for Flexible Polycab Cable Size - 2.5 Sqmm x 3C
7 12 Way TPN DB Fittintment including input and output MCB fixing (I/P - 4P MCB 63A, O/P - 4P MCB 32A) (RPDB)
8 Laying and termination work for Flexible Polycab Cable Size - 4 Sqmm x 5C
9 Laying and termination work for Flexible Polycab Cable Size - 6 Sqmm x 4C
10 Laying and termination work for Flexible Polycab Cable Size - 10 Sqmm x 4C
11 Installaion of 80/100W LED Light Fiting including fixing and elecrical connecion
12 Installaion of 200/250W LED Light Fiting including fixing and elecrical connecion
13 Cable laying and end termination work for Cable - 4C X 300 Sqmm Aluminum Armoured Cable
14 Cable laying and end termination work for Cable - 4C X 185 Sqmm Aluminum Armoured Cable
15 Cable laying and end termination work for Cable - 4C X 150 Sqmm Aluminum Armoured Cable
16 Cable laying and end termination work for Cable - 4C X 95 Sqmm Aluminum Armoured Cable
17 Cable laying and end termination work for Cable - 4C X 70 Sqmm Aluminum Armoured Cable
18 Cable laying and end termination work for Cable - 4C X 50 Sqmm Aluminum Armoured Cable
19 Cable laying and end termination work for Cable - 4C X 35 Sqmm Aluminum Armoured Cable
20 Cable laying and end termination work for Cable - 4C X 95 SqmmCopper Flexible cable
21 Cable laying and end termination work for Cable - 4C X 70 SqmmCopper Flexible cable
22 Cable laying and end termination work for Cable - 4C X 50 SqmmCopper Flexible cable
23 Cable laying and end termination work for Cable - 4C X 35 SqmmCopper Flexible cable
24 Cable laying and end termination work for Cable - 4C X 25 SqmmCopper Flexible cable
25 Cable laying and end termination work for Cable - 4C X 16 SqmmCopper Flexible cable
26 Laying and termination work for Earthstrip - GI 50 X 6
27 Laying and termination work for Earthstrip - GI 25 X 3
28 Laying and termination work for Earthstrip - Cu 25 x 3
29 Cable laying and end termination work for Cable - Earthing 1C X 35 Sqmm
30 Cable laying and end termination work for Cable - Earthing 1C X 16 Sqmm
31 Cable laying and end termination work for Cable - Earthing 1C X 6 Sqmm
32 Cable laying and end termination work for Cable - Earthing 1C X 4 Sqmm
33 Cable laying and end termination work for Cable - Earthing 1C X 2.5 Sqmm
34 Installation of Changeover switch including fittment of panel , MCCB and cable end termination work - 250A offload changeover
35 Installation of MCCB box including fittment of box, MCCB and cable end termination work - 125A
36 Installation of MCCB box including fittment of box, MCCB and cable end termination work - 100A
37 Installation of MCCB box including fittment of box, MCB and cable end termination work - 63A
38 Installation of MCCB box including fittment of box, MCB and cable end termination work - 32A
39 Installation of Energymeter Panel inculding fittment and end termination work
Date: 14.04.2024

Quotation
SERVICES QTY. RATE AMMOUN
T
) Fitting along-with necessary bracket fittment & welding 1 MTR 100 100
m) Fitting along-with necessary bracket fittment & welding 1 MTR 130 130
m) Fitting along-with necessary bracket fittment & welding 1 MTR 185 185
and output MCB fixing (I/P - DP MCB 10A, O/P - SP MCB 2A) (Lighting) 1 NOS 1,550 1550
olycab Cable Size - 1.5 Sqmm x 3C 1 MTR 38 38
olycab Cable Size - 2.5 Sqmm x 3C 1 MTR 49 49
t and output MCB fixing (I/P - 4P MCB 63A, O/P - 4P MCB 32A) (RPDB) 1 NOS 2,100 2100
olycab Cable Size - 4 Sqmm x 5C 1 MTR 49 49
olycab Cable Size - 6 Sqmm x 4C 1 MTR 55 55
olycab Cable Size - 10 Sqmm x 4C 1 MTR 60 60
cluding fixing and elecrical connecion 1 NOS 650 650
ncluding fixing and elecrical connecion 1 NOS 750 750
Cable - 4C X 300 Sqmm Aluminum Armoured Cable 1 NOS 180 180
Cable - 4C X 185 Sqmm Aluminum Armoured Cable 1 MTR 160 160
Cable - 4C X 150 Sqmm Aluminum Armoured Cable 1 MTR 140 140
Cable - 4C X 95 Sqmm Aluminum Armoured Cable 1 MTR 120 120
Cable - 4C X 70 Sqmm Aluminum Armoured Cable 1 MTR 110 110
Cable - 4C X 50 Sqmm Aluminum Armoured Cable 1 MTR 90 90
Cable - 4C X 35 Sqmm Aluminum Armoured Cable 1 MTR 80 80
Cable - 4C X 95 SqmmCopper Flexible cable 1 MTR 110 110
Cable - 4C X 70 SqmmCopper Flexible cable 1 MTR 99 99
Cable - 4C X 50 SqmmCopper Flexible cable 1 MTR 90 90
Cable - 4C X 35 SqmmCopper Flexible cable 1 MTR 87 87
Cable - 4C X 25 SqmmCopper Flexible cable 1 MTR 60 60
Cable - 4C X 16 SqmmCopper Flexible cable 1 MTR 50 50
- GI 50 X 6 1 MTR 50 50
- GI 25 X 3 1 MTR 40 40
- Cu 25 x 3 1 MTR 40 40
Cable - Earthing 1C X 35 Sqmm 1 MTR 28 28
Cable - Earthing 1C X 16 Sqmm 1 MTR 28 28
Cable - Earthing 1C X 6 Sqmm 1 MTR 22 22
Cable - Earthing 1C X 4 Sqmm 1 MTR 22 22
Cable - Earthing 1C X 2.5 Sqmm 1 MTR 22 22
fittment of panel , MCCB and cable end termination work - 250A offload changeover 1 MTR 3200 3200
t of box, MCCB and cable end termination work - 125A 1 MTR 2500 2500
t of box, MCCB and cable end termination work - 100A 1 MTR 2500 2500
t of box, MCB and cable end termination work - 63A 1 MTR 2000 2000
t of box, MCB and cable end termination work - 32A 1 MTR 1000 1000
fittment and end termination work 1 MTR 2700 2700
HSN/SAC Taxable Value CGST SGST
Rate Amount Rate Amount
- 20,752 9% 1,867.68 9% 1,867.68
Total 20,752 1,867.68 1,867.68
Total Amount (in words)
Twenty Four Thousand Four Hundred Eighty Seven Rupees and Thirty Six Paise

Bank Details Payment QR Code


Name: DSG Global Electricals UPI ID:
IFSC Code: UTIB0001325 9405124616@axisbank
Account No: 921020036455045
Bank: Axis Bank,PHALTAN
Terms and Conditions
1) 18% GST EXTRA
2) PAYMENT:- 70% ADVANCE AND BALANCE 30% AFTER DELIVERY
3) BILLING CHARGES WILL BE APPLYING ACCORDING TO ACTUAL MATERIALS
USING AT SITE

Authorised Signatory For DSG Global Electricals


Total Tax Amount

₹ 3,735.36
₹ 3,735.36

horised Signatory For DSG Global Electricals


Quotation
S.NO. SERVICES
1 GI Perfortated Tray (Size - 50 x 75 x 50 mm) Fitting along-with necessary bracket fittment & welding
2 GI Perfortated Tray (Size - 50 x 150 x 50 mm) Fitting along-with necessary bracket fittment & welding
3 GI Perfortated Tray (Size - 75 x 300 x 75 mm) Fitting along-with necessary bracket fittment & welding
4 8 Way SPN DB Fittintment including input and output MCB fixing (I/P - DP MCB 10A, O/P - SP MCB 2A) (Lighting)
5 Laying and termination work for Flexible Polycab Cable Size - 1.5 Sqmm x 3C
6 Laying and termination work for Flexible Polycab Cable Size - 2.5 Sqmm x 3C
7 12 Way TPN DB Fittintment including input and output MCB fixing (I/P - 4P MCB 63A, O/P - 4P MCB 32A) (RPDB)
8 Laying and termination work for Flexible Polycab Cable Size - 4 Sqmm x 5C
9 Laying and termination work for Flexible Polycab Cable Size - 6 Sqmm x 4C
10 Laying and termination work for Flexible Polycab Cable Size - 10 Sqmm x 4C
11 Installaion of 80/100W LED Light Fiting including fixing and elecrical connecion
12 Installaion of 200/250W LED Light Fiting including fixing and elecrical connecion
13 Cable laying and end termination work for Cable - 4C X 300 Sqmm Aluminum Armoured Cable
14 Cable laying and end termination work for Cable - 4C X 185 Sqmm Aluminum Armoured Cable
15 Cable laying and end termination work for Cable - 4C X 150 Sqmm Aluminum Armoured Cable
16 Cable laying and end termination work for Cable - 4C X 95 Sqmm Aluminum Armoured Cable
17 Cable laying and end termination work for Cable - 4C X 70 Sqmm Aluminum Armoured Cable
18 Cable laying and end termination work for Cable - 4C X 50 Sqmm Aluminum Armoured Cable
19 Cable laying and end termination work for Cable - 4C X 35 Sqmm Aluminum Armoured Cable
20 Cable laying and end termination work for Cable - 4C X 95 SqmmCopper Flexible cable
21 Cable laying and end termination work for Cable - 4C X 70 SqmmCopper Flexible cable
22 Cable laying and end termination work for Cable - 4C X 50 SqmmCopper Flexible cable
23 Cable laying and end termination work for Cable - 4C X 35 SqmmCopper Flexible cable
24 Cable laying and end termination work for Cable - 4C X 25 SqmmCopper Flexible cable
25 Cable laying and end termination work for Cable - 4C X 16 SqmmCopper Flexible cable
26 Laying and termination work for Earthstrip - GI 50 X 6
27 Laying and termination work for Earthstrip - GI 25 X 3
28 Laying and termination work for Earthstrip - Cu 25 x 3
29 Cable laying and end termination work for Cable - Earthing 1C X 35 Sqmm
30 Cable laying and end termination work for Cable - Earthing 1C X 16 Sqmm
31 Cable laying and end termination work for Cable - Earthing 1C X 6 Sqmm
32 Cable laying and end termination work for Cable - Earthing 1C X 4 Sqmm
33 Cable laying and end termination work for Cable - Earthing 1C X 2.5 Sqmm
34 Installation of Changeover switch including fittment of panel , MCCB and cable end termination work - 250A offload changeover
35 Installation of MCCB box including fittment of box, MCCB and cable end termination work - 125A
36 Installation of MCCB box including fittment of box, MCCB and cable end termination work - 100A
37 Installation of MCCB box including fittment of box, MCB and cable end termination work - 63A
38 Installation of MCCB box including fittment of box, MCB and cable end termination work - 32A
39 Installation of Energymeter Panel inculding fittment and end termination work
Date: 14.04.2024

Quotation
SERVICES QTY. RATE AMMOUN
T
) Fitting along-with necessary bracket fittment & welding 1 MTR 100 100
m) Fitting along-with necessary bracket fittment & welding 1 MTR 130 130
m) Fitting along-with necessary bracket fittment & welding 1 MTR 185 185
and output MCB fixing (I/P - DP MCB 10A, O/P - SP MCB 2A) (Lighting) 1 NOS 1,550 1550
olycab Cable Size - 1.5 Sqmm x 3C 1 MTR 38 38
olycab Cable Size - 2.5 Sqmm x 3C 1 MTR 49 49
t and output MCB fixing (I/P - 4P MCB 63A, O/P - 4P MCB 32A) (RPDB) 1 NOS 2,100 2100
olycab Cable Size - 4 Sqmm x 5C 1 MTR 49 49
olycab Cable Size - 6 Sqmm x 4C 1 MTR 55 55
olycab Cable Size - 10 Sqmm x 4C 1 MTR 60 60
cluding fixing and elecrical connecion 1 NOS 650 650
ncluding fixing and elecrical connecion 1 NOS 750 750
Cable - 4C X 300 Sqmm Aluminum Armoured Cable 1 NOS 180 180
Cable - 4C X 185 Sqmm Aluminum Armoured Cable 1 MTR 160 160
Cable - 4C X 150 Sqmm Aluminum Armoured Cable 1 MTR 140 140
Cable - 4C X 95 Sqmm Aluminum Armoured Cable 1 MTR 120 120
Cable - 4C X 70 Sqmm Aluminum Armoured Cable 1 MTR 110 110
Cable - 4C X 50 Sqmm Aluminum Armoured Cable 1 MTR 90 90
Cable - 4C X 35 Sqmm Aluminum Armoured Cable 1 MTR 80 80
Cable - 4C X 95 SqmmCopper Flexible cable 1 MTR 110 110
Cable - 4C X 70 SqmmCopper Flexible cable 1 MTR 99 99
Cable - 4C X 50 SqmmCopper Flexible cable 1 MTR 90 90
Cable - 4C X 35 SqmmCopper Flexible cable 1 MTR 87 87
Cable - 4C X 25 SqmmCopper Flexible cable 1 MTR 60 60
Cable - 4C X 16 SqmmCopper Flexible cable 1 MTR 50 50
- GI 50 X 6 1 MTR 50 50
- GI 25 X 3 1 MTR 40 40
- Cu 25 x 3 1 MTR 40 40
Cable - Earthing 1C X 35 Sqmm 1 MTR 28 28
Cable - Earthing 1C X 16 Sqmm 1 MTR 28 28
Cable - Earthing 1C X 6 Sqmm 1 MTR 22 22
Cable - Earthing 1C X 4 Sqmm 1 MTR 22 22
Cable - Earthing 1C X 2.5 Sqmm 1 MTR 22 22
fittment of panel , MCCB and cable end termination work - 250A offload changeover 1 MTR 3200 3200
t of box, MCCB and cable end termination work - 125A 1 MTR 2500 2500
t of box, MCCB and cable end termination work - 100A 1 MTR 2500 2500
t of box, MCB and cable end termination work - 63A 1 MTR 2000 2000
t of box, MCB and cable end termination work - 32A 1 MTR 1000 1000
fittment and end termination work 1 MTR 2700 2700