COST ANALYSES RENAULT FLINS

WINDSOR PRESSES 2 000 T

1. Version with Chesterton Seals

Time of the analyses : 3 years

Complete Seals fourniture : 96 000 Frs 19 200 $

Men Power: 38 000 Frs 7 600 $


3 Days intervention

Hydraulique equipement rental : 3 500 Frs 700 $

Production Lost 3 days


72 hours X 3375 Frs 243 000 Frs 48 600 $

Oil lost 300 Liters X 6 Frs 1 800 Frs 360 $


=============================

Total cost for 3 Years 382 300 Frs 76 460 $

2. Windsor version with Reinforced Rubber Seals

Rebuild frequency : 2 times in three years ( analyses for 3 years )

Complete Windor Seals Kit fourniture : 281 146 Frs 56 230 $


141 573,00 Frs X 2

Men Power: 72 000 Frs 15 200 $


3 Days intervention X 2

Hydraulique equipement rental : 7 000 Frs 1 400 $


2 X 3 500

Production Lost 3 days


72 hours X 3375 Frs X 2 486 000 Frs 97 200 $

Oil lost 300 Liters X 6 Frs X 2 3 600 Frs 720 $


=============================

Total cost for 3 Years 853 746 Frs 168 750 $

SAVINGS IN THREE YEARS PER PRESSE= 853 746 - 382 300 = 471 446 Frs
168 750 - 76 460 = 92 290 $

TIMES TWO FOR THE PRESSES =

SAVINGS PER YEAR Frs. 314 297 or U$ 62 860