Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

UNIVERSITI TEKNOLOGI MARA (UiTM) SHAH ALAM

COLLEGE OF BUILT ENVIRONMENT (CBE)

PROGRAMME SCIENCE (HONOR) CONSTRUCTION MANAGEMENT


(CFAP246)

SEMESTER II SESSION 2023/2024

Questionnaire Form :

SUSTAINABLE URBAN DRAINAGE SYSTEM (SUDS) PROJECT FOR


TOWNSHIP FLOOD MANAGEMENT

Information to respondent
We are conducting this survey to fulfil our studies of the Soil Mechanics, Earthwork,
and Retaining Structures course (CMA423). The aim is to study the drainage systems
utilized in an urban area to control and manage the municipality during floods. All
information provided will be kept confidential and will only be used for research
purposes.

PART A : RESPONDENT DEMOGRAFIC DATA


Directions : Mark (/) inside the box given.

1) GENRE
Male ( ) Female ( )
2) AGE
Under 18 years old ( ) 19 – 25 years old ( )
26 – 30 years old ( ) 30 years old and above ( )
3) RACE
Melayu ( ) Cina ( )

India ( ) Lain-lain ( )

4) POSITION :

5) CONTRACTOR GRED :
PART B : RESEARCH QUESTION

1) Company Name :

_____________________________________________________________________

2) Location :

______________________________________________________________________

______________________________________________________________________

3) Company Established Date :

______________________________________________________________________

4) Type of Drainage System :

______________________________________________________________________

5) Date of Installation :

______________________________________________________________________

6) Last Maintenance Date :

______________________________________________________________________

7) ⁠ What type of building system (in-situ/precast) that company execute to build Drainage
System and why it is chosen?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

8) What is the elements of the Drainage System are used in this company ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________
9) What is the important of this Drainage System to community and environment ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

10) Size and Dimension of Drainage System :

Length : _______________________________________________________________

Wide : ________________________________________________________________

Width : _______________________________________________________________

Diameter : _____________________________________________________________

11) What type of material and machines that company used ?

1. Material

(a)
(b)
(c)
(d)
(e)
(f)

2. Machines

(a)
(b)
(c)
(d)
(e)
(f)
12) Scope Project : ______________________________________________________

______________________________________________________________________

13) Who are the responsibility (leader) in handling this Drainage System project ?

______________________________________________________________________

14) Who approves the project management plan of Drainage System in this urban area ?

______________________________________________________________________

15) Which SUDS features did the company applied ? (e.g. swales, ponds, wetlands and
others)

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

16) What is the environment issues that company faced during the process to build Drainage
System project ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

17 ) How often are the maintenance checks performed?

______________________________________________________________________

______________________________________________________________________
______________________________________________________________________

______________________________________________________________________

18) Have there been any incident of blockages,overflow or system failures in the past year ?
If yes, please provide the corrective actions taken :

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

⁠19) Have you experienced flooding in your area ? If so, how often and how was the company
solved the issues through the Drainage System ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

You might also like