NX Weekly Percentage
NX Weekly Percentage
3% 4. Claim Slip has been received. Waiting for the S.O.A this week
3. Installation of Sprinkler Heads
5. Hydrostatic Test & Leak Test 1%
6. Testing & Commissioning 1%
3% 4. Claim Slip has been received. Waiting for the S.O.A this week
3. Installation of Sprinkler Heads
5. Hydrostatic Test & Leak Test 1%
6. Testing & Commissioning 1%
PENDENT SPRINKLER 77
UPRIGHT SPRINKLER 583
PENDENT SPRINKLER 77
UPRIGHT SPRINKLER 583
PENDENT SPRINKLER 77
UPRIGHT SRPINKLER 583 435
NX LOGISTICS PHILIPPINES INC. May 02, 2024
Lima Technology Center, Brgy. Santiago, Malvar Batangas Date
WEEKLY PROJECT STATUS REPORT
Supply, Design and Installation of Fire
Project Name Sprinkler System at NLID P.O. Number
WAREHOUSE 3 & 4
Department FPM and GP Plant
Critical Milestone Recent Progress
Milestone Baseline Actual RAG
Mechanical Works: 1. Fabrication of Crossmain and Branchline Pipes at NLID warehouse 3 & 4.
1. Fabrication of Pipes and
Supports 30% 34.00% 2. Installation of Crossmain and Branchline Pipes at NLID warehouse 3 & 4.
SPICE AREA
PENDENT SPRINKLER 28 28
UPRIGHT SPRINKLER 453 453
325470
678625
260592
1264687
66000
86720
21680
54290
12000
54000
294690
1559377
100.00%
NX LOGISTICS PHILIPPINES INC. May 13, 2024
Lima Technology Center, Brgy. Santiago, Malvar Batangas Date
WEEKLY PROJECT STATUS REPORT
Department Plant P3
Critical Milestone Recent Progress
Milestone Baseline Actual RAG 1. TESTING AND COMMISIONING
Mechanical Works: 2. TURN OVER OF THE SYSTEM TOGETHER WITH BFP PERSONEL
1. Fabrication of Pipes and 35% 35.00%
Supports
2. Installation of Pipes, Fittings, 60% 60.00%
Valves and Supports
3% 3.00%
3. Installation of Sprinkler Heads
4. Hydrostatic Test & Leak Test 1% 1.00%
5. Testing & Commissioning 1% 1.00%
Department Plant P3
+
Department Plant P3