Professional Documents
Culture Documents
QCBS
QCBS
Quality and Cost Based Selection methodology with 70:30 ratio (70% weightage for technical score and 30% weightage for fina
followed for the bid evaluation
Case 1
Technical Marks 85 90 92 95
Financial Marks 216,300,000.00 206,300,000.00 210,000,000.00 214,500,000.00
Overall
59.5 63 64.4 66.5
64,890,000.00
b=[(Clow/c).X]+[T/Thigh.(1-X)]
b=[170000000/2463000000]+[85/100][1-100]]
Financial Score
Biddr 1 99 Biddr 1 99
Bidder 2 85 Bidder 2 88
ct at the
gotiation by the UPPCL.
99
203,300,000.00
69.3