Microwave LOS Survey Report

Disiapkan Oleh <<Contractor Name(Mark732695020)>> Nama Proyek #REF!

Customer - Project Name


Tanggal Kunjungan : <<Survey Date(Mark732697020)>>
Pelaksana Survey : <<Survey PIC Name(Mark732698020)>>
Nomer Telepon : <<Survey PIC Phone(Mark732699020)>>
Email : <<Survey PIC email(Mark732700020)>>

1. Informasi Desain Link Microwave


Site A ID Site B ID Site A Antenna Site B Antenna
Frequency Configurasi dan Kapasitas Ukuran Ant (Main) Ukuran Ant (SD) Peta Digital
(Near End) (Far End) Suport Suport

<<Site ID A(NE)(Mark733908020)>>
<<Site ID B(FE)(Mark733909020)>>
<<Frequency(Mark733910020)>>
<<Configuration & Capacity(Mark733911020)>>
<<Ant Size (main)(Mark733912020)>> <<Ant Size (SD)(Mark733913020)>>
<<Site A Antenna <<Site
Suport(Mark733914020)>>
B Antenna Suport(Mark733915020)>>
<<Digital Map(Mark733916020)>>

Kandidat Site Path Length Site A Azimuth Site B Azimuth Site A Site B Site A Sudut Site A Tinggi Site A Tinggi Site B Tinggi Site B SD Tinggi
Kadidat Site A Site B Sudut Vertical ( ° )
B (Km) (Deg) (Deg) Elevation (m) Elevasi (m) Vertical ( ° ) Antenna Antenna SD Antenna Antenna SD

<<Path <<Site A
<<Site ID <<Site A <<Site B <<Site A <<Site B <<Site A Ant <<Site A Ant <<Site B Ant <<Site B Ant
Length Sudut Vertical
A(NE) Azimuth (Deg) Azimuth (Deg) Elevation (m) Elevation (m) <<Site B Sudut Vertical height (main) Height(SD) Height(main) Height(SD)
<<Site ID B(FE)(Mark733909020)>>
(Mark7339080
(Km)
(Mark7339180 (Mark7339190 (Mark73392002 (Mark7339210
(°)
( ° )(Mark733923020)>> (Mark733924020 (Mark73392502 (Mark733926020 (Mark73392702
(Mark73391 (Mark7339220
20)>> 20)>> 20)>> 0)>> 20)>> )>> 0)>> )>> 0)>>
7020)>> 20)>>

(*) Site bisa saja memiliki lebih dari 1 link ke site lain, tapi kontraktor cukup mengisi informasi untuk uplink site saja.
Site A adalah site terdekat kearah terminal, Site B adalah site terdekat kearah POI (Northbound).
2. Path Profile Desktop Contour

<<Path Profile(Mark734031020)>> <<Desktop Contour(Mark734032020)>>

CATATAN :
1=Kandidat Site 2=Alternatif 1 3=Alternatif 2

3. Hasil Survey LOS


Site A Latitude (DD Format) <<Site A Latitude (DD Format)(Mark734139020)>>
Site A Longitude (DD Format) <<Site A Longitude (DD Format)(Mark734140020)>>
Site B Latitude (DD Format) <<Site B Latitude (DD Format)(Mark734141020)>>
Site B Longitude (DD Format) <<Site B Longitude (DD Format)(Mark734142020)>>
Site A Tipe Tower <<Site A Tower Type(Mark734143020)>>
Site A Tinggi Tower <<Site A Tower Height(Mark734144020)>>
Site B Tipe Tower <<Site B Tower Type(Mark734145020)>>
Site B Tinggi Tower <<Site B Tower Height(Mark734146020)>>
Rata-rata Tinggi Pohon (Asumsi +/- Mtr) <<Average Tree Height (Assumption +/- Mtr)(Mark734147020)>>
Site A Proposed tinggi min Antenna (Main) <<Site A Proposed Ant Height Min (Main)(Mark734148020)>>
Site A Proposed tinggi min Antenna (SD) <<Site A Proposed Ant Height Min (SD)(Mark734149020)>>
Site B Proposed tinggi min Antenna (Main) <<Site B Proposed Ant Height Min (Main)(Mark734150020)>>
Site B Proposed tinggi min Antenna (SD) <<Site B Proposed Ant Height Min (SD)(Mark734151020)>>

Kesimpulan Hasil dari Survey LOS <<Survey LOS Result/Conclusion(Mark734152020)>>

3. Foto Foto GPS dan Tower

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
<<Foto GPS Site A(Mark734351020)>> <<Foto GPS Site B(Mark734366020)>>

Foto GPS @ Site A Foto GPS @ Site B


4. Foto Tower SITE A

<<Foto Tower Site A(Mark734352020)>>

5. Proposed Lokasi Antenna MW @ SITE A (As Plan Drawing)

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
<<Proposed Lokasi Antenna MW SITE A (As Plan Drawing)(Mark734353020)>>

6. Foto Panoramic (0 deg to 150 deg) SITE A


*Foto tidak boleh di Zoom

<<Site A Panoramic 0 degree(Mark734354020)>> <<Site A Panoramic 30 degree(Mark734355020)>>

0 derajat 30 derajat

<<Site A Panoramic 60 degree(Mark734356020)>> <<Site A Panoramic 90 degree(Mark734357020)>>

60 derajat 90 derajat

<<Site A Panoramic 120 degree(Mark734358020)>> <<Site A Panoramic 150 degree(Mark734359020)>>

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
<<Site A Panoramic 120 degree(Mark734358020)>> <<Site A Panoramic 150 degree(Mark734359020)>>

120 derajat 150 derajat


7. Foto Panoramic (180 deg to 330 deg) SITE A

<<Site A Panoramic 180 degree(Mark734360020)>> <<Site A Panoramic 210 degree(Mark734361020)>>

180 derajat 210 derajat

<<Site A Panoramic 240 degree(Mark734362020)>> <<Site A Panoramic 270 degree(Mark734363020)>>

240 derajat 270 derajat

<<Site A Panoramic 300 degree(Mark734364020)>> <<Site A Panoramic 330 degree(Mark734365020)>>

300 derajat 330 derajat


8. Foto Tower di SITE B

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
<<Foto Tower Site B(Mark734367020)>>

9. Proposed Lokasi Antenna MW @ SITE B (As Plan Drawing)

<<Proposed Lokasi Antenna MW SITE B (As Plan Drawing)(Mark734368020)>>

10.A. Foto Panoramic (0 deg to 150 deg) dari SITE B


*Foto harus diambil tanpa zoom

<<Site B Panoramic 0 degree(Mark734369020)>> <<Site B Panoramic 30 degree(Mark734370020)>>

0 derajat 30 derajat

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880

<<Site B Panoramic 60 degree(Mark734371020)>> <<Site B Panoramic 90 degree(Mark734372020)>>


<<Site B Panoramic 60 degree(Mark734371020)>> <<Site B Panoramic 90 degree(Mark734372020)>>

60 derajat 90 derajat

<<Site B Panoramic 120 degree(Mark734373020)>> <<Site B Panoramic 150 degree(Mark734374020)>>

120 derajat 150 derajat


10.B. Foto Panoramic (180 deg to 330 deg) dari SITE B

<<Site B Panoramic 180 degree(Mark734375020)>> <<Site B Panoramic 210 degree(Mark734376020)>>

180 derajat 210 derajat

<<Site B Panoramic 240 degree(Mark734377020)>> <<Site B Panoramic 270 degree(Mark734378020)>>

240 derajat 270 derajat

<<Site B Panoramic 300 degree(Mark734379020)>> <<Site B Panoramic 330 degree(Mark734380020)>>

300 derajat 330 derajat


11. Foto Line Of Sight (LOS)
Dari: To: Azimuth:
Foto di ambil dari SITE A ke arah SITE B (tanpa zoom)

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880

<<Photo SITE A to SITE B (No zoom)(Mark734512020)>>


<<Photo SITE A to SITE B (No zoom)(Mark734512020)>>

*Tunjukan dengan tanda Panah untuk informasi Obstacle / Blocking Area


Gambar diambil dari Site A ke Site B dengan zoom

<<Photo SITE A to SITE B (With zoom)(Mark734513020)>>

*Tunjukan dengan tanda Panah untuk informasi Obstacle / Blocking Area


di Site A dan Halangan nya
From: To: Azimuth:
Foto di ambil dari Site B ke arahSITE A (Tanpa zoom)

<<Photo SITE B to SITE A (No zoom)(Mark734514020)>>

*Tunjukan dengan tanda Panah untuk informasi Obstacle / Blocking Area Site B
Foto di ambil dari Site B ke arahSITE A (Dengan zoom)

<<Photo SITE B to SITE A (With zoom)(Mark734515020)>>

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
*Tunjukan dengan tanda Panah untuk informasi Obstacle / Blocking Area di Site B dan Halangan nya
12. Path Profile

<<Path Profile(Mark734031020)>>

13. Peta Lokasi keseluruhan / Global Map

<<Capture Global Map(Mark734517020)>>


Network Diagram sampai ke POI

14. Perkiraan Link Budget (Capture-an Tools)

<<Capture Link Budget(Mark734519020)>>

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polres)
halaman ……. dari ……..
1 Tanggal Survey
2 Nama Gedung
3 Lokasi
4 PIC Anggota Polda
5 Denah layout lantai dengan skala Layout Lantai : Ada / Tidak Ada
6 Jarak per lantai
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Nama Gedung / Jumlah lantai / Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
7
Urutan Lantai Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
ISP existing Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:
Mengecek Kondisi Network
8 Existing Yang Ada Di dalam Network Satker… Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:
Polres
Network Satker…. Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:

9 Topologi/LLD Network Existing ada/tidak - mohon dilampirkan atau digambarkan

Mengecek Kesiapan Kelistrik Jarak ke sumber Listrik : Daya Listrik Polda :


10 Power Panel : Ada / Tidak
Untuk PDU Rack di ruang Server Kebutuhan PAM IT di Ruang Server : 306 watt

Mengecek kondisi Grounding


11 Foto : Ada / Tidak Kondisi: Baik/Tidak baik
Existing

Merk :…..............
Mengecek Kesiapan UPS Utilisasi :
12 Foto : Tipe : ….............
Existing (terpakai untuk perangkat apa)
KVA : ….............

Mengecek kondisi raise floor


13 Ada/Tidak Kondisi: Baik/Tidak baik Foto :
Existing

Mengecek Kondisi Perangkat


14 Ada/Tidak Kondisi: Baik/Tidak baik Suhu :
Pendingin Ruangan Existing

Mengecek Kondisi Jalur Kabel Kabel Tray: Ada/Tidak


15 Bobokan: Ada/Tidak
Data Existing Kapasitas Kabel Tray: Memadai/Tidak

Lokasi penempatan Perangkat Access Point Indoor di Area Polda


(Lokasi Penempatan beserta keterangan ruangan dan nama gedung dan lantai dan foto long lat)
Panjang Kabel ke Switch :
1 Indoor Access Point 1 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
2 Indoor Access Point 2 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
3 Indoor Access Point 3 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
4 Indoor Access Point 4 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
5 Indoor Access Point 5 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
6 Indoor Access Point 6 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
7 Indoor Access Point 7 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
8 Indoor Access Point 8 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
9 Indoor Access Point 9 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
10 Indoor Access Point 10 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
11 Indoor Access Point 11 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
12 Indoor Access Point 12 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
13 Indoor Access Point 13 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
14 Indoor Access Point 14 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polres)
halaman ……. dari ……..
Panjang Kabel ke Switch :
15 Indoor Access Point 15 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
16 Indoor Access Point 16 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
17 Indoor Access Point 17 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
18 Indoor Access Point 18 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
19 Indoor Access Point 19 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
20 Indoor Access Point 20 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :
Panjang Kabel ke Switch :
21 Indoor Access Point 21 Gedung/Lantai/Ruangan : …....................... Foto :
Panjang Konduit :

Lokasi penempatan Perangkat Access Point Outdoor dan Tiang di Area Polda
(Mandatory Foto Tempat Penanaman Tiang dan Instalasi Access Point Outdoor, Tiang untuk Access Point Outdoor dan koordinat)
Panjang Kabel ke Switch : ….............
Area :
1 Outdoor Access Point 1 Kebutuhan bobokan/kedalaman galian Panjang Proteksi Kabel :….............
Foto dan Koordinat :
Galian : …......................
Panjang Kabel ke Switch : ….............
Area :
2 Outdoor Access Point 2 Kebutuhan bobokan/kedalaman galian Panjang Proteksi Kabel :….............
Foto dan Koordinat :
Galian : …......................
Panjang Kabel ke Switch : ….............
Area :
3 Outdoor Access Point 3 Kebutuhan bobokan/kedalaman galian Panjang Proteksi Kabel :….............
Foto dan Koordinat :
Galian : …......................

Lokasi penempatan Perangkat Distribution Switch di Area Polda

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
1 Switch 1 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
2 Switch 2 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
3 Switch 3 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
4 Switch 4 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
5 Switch 5 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Jenis Kabel :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
6 Switch 6 Gedung/Lantai/Ruangan : …....................... Foto :
Jenis Galian :
Panjang Galian :
Bobokan :

Lokasi penempatan Rack Wallmount

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


1 Ruangan : Foto :
Rack 12U 1 Jarak ke Outlet Listrik :

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


2 Ruangan : Foto :
Rack 12U 2 Jarak ke Outlet Listrik :

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


3 Ruangan : Foto :
Rack 12U 3 Jarak ke Outlet Listrik :

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


4 Ruangan : Foto :
Rack 12U 4 Jarak ke Outlet Listrik :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polres)
halaman ……. dari ……..

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


5 Ruangan : Foto :
Rack 12U 5 Jarak ke Outlet Listrik :

Lokasi Penempatan Wallmount Gedung/Lantai : ….......................


6 Ruangan : Foto :
Rack 12U 6 Jarak ke Outlet Listrik :

Catatan Tambahan :

Menyetujui,
Team Survey User

NRP:
Bayu Edo
Tanggal: Tanggal:

Mengetahui,
PM National PM Wilayah TJS

Budi Andi Edo


Tanggal: Tanggal: Tanggal:

Catatan:
1. untuk Polda Paling minim Kabid TI
2. Untuk Polres Paling minim Wakapolres/Kapolres

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
1 Tanggal Survey
2 Nama Gedung
3 Lokasi
4 PIC Anggota Polda
5 Denah layout lantai dengan skala Layout Lantai : Ada / Tidak Ada
6 Jarak per lantai
7 Nama Gedung / Jumlah lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Urutan Lantai Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
Panjang ….. Lebar …. Panjang ….. Lebar …. Panjang ….. Lebar ….
8 Mengecek Kondisi Network ISP existing Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:
Existing Yang Ada Di dalam
Kompleks Mako Polda Network Satker… Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:
Network Satker…. Perangkat: Router/Switch ….. Interkoneksi via FO atau UTP:
9 Topologi/LLD Network Existing ada/tidak - mohon dilampirkan atau digambarkan

10 Lokasi Ruang Server untuk Gedung : …................. Lantai : …............ Ruang : …................
penempatan Rack Server 42U
dengan PDU, NGFW, Core
Switch
11 Mengecek Kesiapan Kelistrik Jarak ke sumber Listrik : Power Panel : Ada / Tidak Daya Listrik Polda :
Untuk PDU Rack Server 42U Kebutuhan PAM IT di Ruang Server : 306 watt

12 Mengecek kondisi Grounding Foto : Ada / Tidak Kondisi: Baik/Tidak baik


Existing

Mengecek Kesiapan UPS Foto : Merk :….............. Utilisasi :


Existing Tipe : …............. (terpakai untuk perangkat apa)
KVA : ….............

Mengecek kondisi raise floor Ada/Tidak Kondisi: Baik/Tidak baik Foto :


Existing

13 Mengecek Kondisi Perangkat Ada/Tidak Kondisi: Baik/Tidak baik Suhu :


Pendingin Ruangan Existing

14 Mengecek Kondisi Jalur Kabel Kabel Tray: Ada/Tidak Bobokan: Ada/Tidak


Data Existing Kapasitas Kabel Tray: Memadai/Tidak

Lokasi penempatan Perangkat Access Point Indoor di Area Polda


(Lokasi Penempatan beserta keterangan ruangan dan nama gedung dan lantai dan foto long lat)
1 Indoor Access Point 1 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
2 Indoor Access Point 2 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
3 Indoor Access Point 3 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
4 Indoor Access Point 4 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
5 Indoor Access Point 5 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
6 Indoor Access Point 6 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
7 Indoor Access Point 7 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
8 Indoor Access Point 8 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
9 Indoor Access Point 9 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
10 Indoor Access Point 10 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
11 Indoor Access Point 11 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
12 Indoor Access Point 12 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
13 Indoor Access Point 13 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
14 Indoor Access Point 14 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
15 Indoor Access Point 15 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
16 Indoor Access Point 16 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
17 Indoor Access Point 17 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
18 Indoor Access Point 18 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
19 Indoor Access Point 19 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
20 Indoor Access Point 20 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
21 Indoor Access Point 21 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
22 Indoor Access Point 22 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
23 Indoor Access Point 23 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
24 Indoor Access Point 24 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
25 Indoor Access Point 25 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
26 Indoor Access Point 26 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
27 Indoor Access Point 27 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
28 Indoor Access Point 28 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
29 Indoor Access Point 29 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
30 Indoor Access Point 30 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
31 Indoor Access Point 31 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
32 Indoor Access Point 32 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
33 Indoor Access Point 33 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
34 Indoor Access Point 34 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
35 Indoor Access Point 35 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
36 Indoor Access Point 36 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
37 Indoor Access Point 37 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
38 Indoor Access Point 38 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
39 Indoor Access Point 39 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
40 Indoor Access Point 40 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
41 Indoor Access Point 41 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
42 Indoor Access Point 42 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
43 Indoor Access Point 43 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
44 Indoor Access Point 44 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
45 Indoor Access Point 45 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
46 Indoor Access Point 46 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
47 Indoor Access Point 47 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
48 Indoor Access Point 48 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
49 Indoor Access Point 49 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
50 Indoor Access Point 50 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
51 Indoor Access Point 51 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
52 Indoor Access Point 52 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
53 Indoor Access Point 53 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
54 Indoor Access Point 54 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
55 Indoor Access Point 55 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
56 Indoor Access Point 56 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
57 Indoor Access Point 57 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
58 Indoor Access Point 58 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
59 Indoor Access Point 59 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
60 Indoor Access Point 60 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
61 Indoor Access Point 61 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
62 Indoor Access Point 62 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
63 Indoor Access Point 63 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
64 Indoor Access Point 64 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
65 Indoor Access Point 65 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
66 Indoor Access Point 66 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
67 Indoor Access Point 67 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
68 Indoor Access Point 68 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
69 Indoor Access Point 69 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
70 Indoor Access Point 70 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
71 Indoor Access Point 71 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
72 Indoor Access Point 72 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
73 Indoor Access Point 73 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
74 Indoor Access Point 74 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
75 Indoor Access Point 75 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
76 Indoor Access Point 76 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
77 Indoor Access Point 77 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
78 Indoor Access Point 78 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
79 Indoor Access Point 79 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
80 Indoor Access Point 80 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
81 Indoor Access Point 81 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
82 Indoor Access Point 82 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
83 Indoor Access Point 83 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
84 Indoor Access Point 84 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
85 Indoor Access Point 85 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
86 Indoor Access Point 86 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
87 Indoor Access Point 87 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
88 Indoor Access Point 88 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
89 Indoor Access Point 89 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
90 Indoor Access Point 90 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
91 Indoor Access Point 91 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
92 Indoor Access Point 92 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
93 Indoor Access Point 93 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
94 Indoor Access Point 94 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
95 Indoor Access Point 95 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
96 Indoor Access Point 96 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
97 Indoor Access Point 97 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
98 Indoor Access Point 98 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
99 Indoor Access Point 99 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
100 Indoor Access Point 100 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
101 Indoor Access Point 101 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
102 Indoor Access Point 102 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
103 Indoor Access Point 103 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
104 Indoor Access Point 104 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
105 Indoor Access Point 105 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
106 Indoor Access Point 106 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
107 Indoor Access Point 107 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
108 Indoor Access Point 108 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
109 Indoor Access Point 109 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
110 Indoor Access Point 110 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
111 Indoor Access Point 111 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
112 Indoor Access Point 112 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
113 Indoor Access Point 113 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
114 Indoor Access Point 114 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
115 Indoor Access Point 115 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
116 Indoor Access Point 116 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
117 Indoor Access Point 117 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
118 Indoor Access Point 118 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
119 Indoor Access Point 119 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
120 Indoor Access Point 120 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
121 Indoor Access Point 121 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
122 Indoor Access Point 122 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
123 Indoor Access Point 123 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
124 Indoor Access Point 124 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
125 Indoor Access Point 125 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
126 Indoor Access Point 126 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
127 Indoor Access Point 127 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
128 Indoor Access Point 128 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
129 Indoor Access Point 129 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
130 Indoor Access Point 130 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
131 Indoor Access Point 131 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
132 Indoor Access Point 132 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
133 Indoor Access Point 133 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
134 Indoor Access Point 134 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
135 Indoor Access Point 135 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
136 Indoor Access Point 136 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
137 Indoor Access Point 137 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
138 Indoor Access Point 138 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
139 Indoor Access Point 139 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
140 Indoor Access Point 140 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
141 Indoor Access Point 141 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
142 Indoor Access Point 142 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
143 Indoor Access Point 143 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
144 Indoor Access Point 144 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
145 Indoor Access Point 145 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
146 Indoor Access Point 146 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
147 Indoor Access Point 147 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
148 Indoor Access Point 148 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
149 Indoor Access Point 149 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
150 Indoor Access Point 150 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
151 Indoor Access Point 151 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
152 Indoor Access Point 152 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
153 Indoor Access Point 153 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
154 Indoor Access Point 154 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
155 Indoor Access Point 155 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
156 Indoor Access Point 156 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
157 Indoor Access Point 157 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
158 Indoor Access Point 158 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
159 Indoor Access Point 159 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
160 Indoor Access Point 160 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
161 Indoor Access Point 161 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
162 Indoor Access Point 162 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
163 Indoor Access Point 163 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
164 Indoor Access Point 164 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
165 Indoor Access Point 165 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
166 Indoor Access Point 166 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
167 Indoor Access Point 167 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
168 Indoor Access Point 168 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
169 Indoor Access Point 169 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
170 Indoor Access Point 170 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
171 Indoor Access Point 171 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
172 Indoor Access Point 172 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
173 Indoor Access Point 173 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
174 Indoor Access Point 174 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
175 Indoor Access Point 175 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
176 Indoor Access Point 176 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
177 Indoor Access Point 177 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
178 Indoor Access Point 178 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
179 Indoor Access Point 179 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
180 Indoor Access Point 180 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
181 Indoor Access Point 181 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
182 Indoor Access Point 182 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
183 Indoor Access Point 183 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
184 Indoor Access Point 184 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
185 Indoor Access Point 185 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
186 Indoor Access Point 186 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
187 Indoor Access Point 187 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
188 Indoor Access Point 188 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
189 Indoor Access Point 189 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
190 Indoor Access Point 190 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
191 Indoor Access Point 191 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
192 Indoor Access Point 192 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
193 Indoor Access Point 193 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
194 Indoor Access Point 194 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
195 Indoor Access Point 195 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
196 Indoor Access Point 196 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
197 Indoor Access Point 197 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
198 Indoor Access Point 198 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
199 Indoor Access Point 199 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :
200 Indoor Access Point 200 Gedung/Lantai/Ruangan : …....................... Panjang Kabel ke Switch : Foto :
Panjang Konduit :

Lokasi penempatan Perangkat Access Point Outdoor dan Tiang di Area Polda
(Mandatory Foto Tempat Penanaman Tiang dan Instalasi Access Point Outdoor, Tiang untuk Access Point Outdoor dan koordinat)
1 Outdoor Access Point 1 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
2 Outdoor Access Point 2 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
3 Outdoor Access Point 3 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
4 Outdoor Access Point 4 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
5 Outdoor Access Point 5 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
6 Outdoor Access Point 6 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
7 Outdoor Access Point 7 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
8 Outdoor Access Point 8 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
9 Outdoor Access Point 9 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
10 Outdoor Access Point 10 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
11 Outdoor Access Point 11 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
12 Outdoor Access Point 12 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
13 Outdoor Access Point 13 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
14 Outdoor Access Point 14 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
15 Outdoor Access Point 15 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
16 Outdoor Access Point 16 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................
17 Outdoor Access Point 17 Area : Kebutuhan bobokan/kedalaman galian Panjang Kabel ke Switch : ….............
Foto dan Koordinat : Panjang Proteksi Kabel :….............
Galian : …......................

Lokasi penempatan Perangkat Distribution Switch di Area Polda


1 Switch 1 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

2 Switch 2 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

3 Switch 3 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

4 Switch 4 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

5 Switch 5 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

6 Switch 6 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

7 Switch 7 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

8 Switch 8 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

9 Switch 9 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..
10 Switch 10 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :
Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

11 Switch 11 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

12 Switch 12 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

13 Switch 13 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

14 Switch 14 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

15 Switch 15 Gedung/Lantai/Ruangan : …....................... Jenis Kabel : Foto :


Panjang Kabel backbone :
Panjang Proteksi Kabel :
Jenis Galian :
Panjang Galian :
Bobokan :

Lokasi penempatan Rack Wallmount


1 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 1 Jarak ke Outlet Listrik :
2 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 2 Jarak ke Outlet Listrik :
3 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 3 Jarak ke Outlet Listrik :
4 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 4 Jarak ke Outlet Listrik :
5 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 5 Jarak ke Outlet Listrik :
6 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 6 Jarak ke Outlet Listrik :
7 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 7 Jarak ke Outlet Listrik :
8 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 8 Jarak ke Outlet Listrik :
9 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 9 Jarak ke Outlet Listrik :
10 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 10 Jarak ke Outlet Listrik :
11 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 11 Jarak ke Outlet Listrik :
12 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 12 Jarak ke Outlet Listrik :
13 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 13 Jarak ke Outlet Listrik :
14 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 14 Jarak ke Outlet Listrik :
15 Lokasi Penempatan Wallmount Gedung/Lantai : …....................... Ruangan : Foto :
Rack 12U 15 Jarak ke Outlet Listrik :
Catatan Tambahan :

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (Polda)
halaman ……. dari ……..

Menyetujui,
Team Survey User

NRP:
Bayu Edo
Tanggal: Tanggal:

Mengetahui,
PM National PM Wilayah TJS

Budi Andi Edo


Tanggal: Tanggal: Tanggal:

Catatan:
1. untuk Polda Paling minim Kabid TI
2. Untuk Polres Paling minim Wakapolres/Kapolres

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
Form Survey Proyek PAM IT 2022 (DC Cikeas)
halaman ……. dari ……..
1 Tanggal Survey
2 Nama Gedung
3 Lokasi
4 PIC Anggota DC Cikeas
5 Mengecek Kondisi Network Ip Address:
Existing Yang Ada Di dalam DC
Cikeas

Aplikasi: Nama Aplikasi: IP Aplikasi

Topologi:
6 Mengecek lokasi Ruang Server Type Rack Server: Ketersediaan Power Listrik: Lokasi Core Switch/Rack Core Switch:
untuk penempatan PAM IT
Ketersediaan Kapasitas Rack Server: Jenis Outlet Power Listrik:
Posisi FG 4401 A: Posisi FA 3700 A:
Posisi FG 4401 B: Posisi FA 3700 B:
Posisi FMG 1000F A: Posisi FSA 1000 A:
Posisi FMG 1000F A: Posisi FSA 1000 B:
7 Ketersediaan Port dan SFP FG 4401 A ke Core Existing: SFP Existing: SFP+SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FG 4401 A Ke Router ISP BGP: SFP Router: SFP+ SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FG 4401 B ke Core Existing: SFP Existing: SFP+SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FG 4401 B Ke Router ISP BGP: SFP Router: SFP+ SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FMG 1000F A Ke Core Existing SFP : SFP28 SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FMG 1000F B Ke Core Existing SFP : SFP28 SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FA 3700 A ke Core Existing SFP : SFP28 SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FA 3700 B ke Core Existing SFP : SFP28 SR (Ada/Tidak) Kabel FO MM: Ada/Tidak - Jarak:
FSA 1000F A ke Core Existing Port UTP: (Ada/Tidak) Kabel UTP: Ada/Tidak - Jarak:
FSA 1000F B ke Core Existing Port UTP: (Ada/Tidak) Kabel UTP: Ada/Tidak - Jarak:
Catatan Tambahan :

Menyetujui,
Team Survey User

NRP:
Bayu Edo
Tanggal: Tanggal:

Mengetahui,
PM National PM Wilayah TJS

Budi Andi Edo


Tanggal: Tanggal: Tanggal:

PT XL Axiata Tbk, [EXCL]


XL Axiata Tower JL, H,R, Rasuna Said X5, Kav, 11 - 12 Kuningan Timur, Setiabudi, Jakarta Selatan 12950 – Indonesia Tel : (021) 576 1881 / Fax : (021) 576 1880
R. KP
Legend: 1 Kotak = 1m x 1m

Gudang

Pantry
Legend: 1 Kotak = 1m x 1m
Form Survey Proyek PAM IT 2021 (Polres)

halaman ……. dari ……..

1 Tanggal Survey

2 Nama Gedung

Lokasi
3
PIC Anggota Polres
4
Denah layout gedung dan lantai Layout Gedung : Ada / Tidak Ada Layout Lantai : Ada / Tidak Ada
dengan skala
5
Jarak per lantai
6
Panjang x Lebar Lantai
7
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
8 Nama Gedung / Jumlah lantai /
Urutan Lantai
Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai / Gedung …………...……….… / ….. Lantai /
9
ISP existing Perangkat: Koneksi FO atau UTP:
Mengecek Kondisi Network Existing Network Satker… Perangkat: Koneksi FO atau UTP:
Yang Ada Di dalam Kompleks Polres
10 Network Satker…. Perangkat: Koneksi FO atau UTP:
Topologi/LLD Network Existing
11
Lokasi Ruang Server untuk
penempatan Rack Server 42U
12 dengan PDU, NGFW
Mengecek Kesiapan Outlet Listrik
13 Untuk PDU Rack Server
Mengecek kondisi Grounding
14 Existing
15 Mengecek Kesiapan UPS Existing
Mengecek kondisi raise floor Ada/Tidak Kondisi: Baik/Tidak baik
16 Existing
Mengecek Kondisi Perangkat Ada/Tidak Kondisi: Baik/Tidak baik
17 Pendingin Ruangan Existing
Mengecek Kondisi Jalur Kabel Data Kabel Tray: Ada/Tidak Bobokan: Ada/Tidak
18 Existing Kapasitas Kabel Tray: Memadai/Tidak
Lokasi Penempatan Wallmount Rack
19 12U 1
Lokasi Penempatan Wallmount Rack
20 12U 2
Lokasi Penempatan Wallmount Rack
21 12U 3
Lokasi Penempatan Wallmount Rack
22 12U 4
Lokasi Penempatan Wallmount Rack
23 12U 5
Lokasi Penempatan Wallmount Rack
24 12U 6

Lokasi penempatan Perangkat Distribution Switch di Area Polda


25
26 Switch 1
27 Switch 2
28 Switch 3
29 Switch 4
30 Switch 5
31 Switch 6

Lokasi penempatan Perangkat Access Point Indoor di Area Polda


(Lokasi Penempatan beserta keterangan ruangan dan nama gedung dan lantai dan foto)
32
33 Indoor Access Point 1
34 Indoor Access Point 2
35 Indoor Access Point 3
36 Indoor Access Point 4
37 Indoor Access Point 5
38 Indoor Access Point 6
39 Indoor Access Point 7
40 Indoor Access Point 8
41 Indoor Access Point 9
42 Indoor Access Point 10
43 Indoor Access Point 11
44 Indoor Access Point 12
45 Indoor Access Point 13
46 Indoor Access Point 14
47 Indoor Access Point 15
48 Indoor Access Point 16
49 Indoor Access Point 17
50 Indoor Access Point 18
51 Indoor Access Point 19
52 Indoor Access Point 20
53 Indoor Access Point 21
Lokasi penempatan Perangkat Access Point Outdoor dan Tiang di Area Polda
(Mandatory Foto Tempat Penanaman Tiang dan Instalasi Access Point Outdoor dan long lat)
55 Outdoor Access Point 1
56 Outdoor Access Point 2
57 Outdoor Access Point 3
………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
58 Switch baru ………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
59 Switch existing ………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
………... Ged/ ……. FL / ..…. Port / poe - ………... Ged/ ……. FL / ..…. Port / poe - no ………... Ged/ ……. FL / ..…. Port / poe - non poe
Jumlah ruang meeting/kelas lantai ….....Gd / ….FL / ………………..Room / ……..u….....Gd / ….FL / ………………..Room / ……..use….....Gd / ….FL / ………………..Room / ……..user / …… m
60 gedung dan panjang tarikan kabel ….....Gd / ….FL / ………………..Room / ……..u….....Gd / ….FL / ………………..Room / ……..use….....Gd / ….FL / ………………..Room / ……..user / …… m
(dengan info user maksimal
kapasitas) ….....Gd / ….FL / ………………..Room / ……..u….....Gd / ….FL / ………………..Room / ……..use….....Gd / ….FL / ………………..Room / ……..user / …… m
61 Lokasi power source (MCB) gedung

62 Spesifikasi MCB (ampere & voltase)

63 Kabel listrik yang digunakan MCB

64 Jalur kabel UTP ke setiap lantai


gedung dari ruang server (vertical)

65 Jumlah titik AP setelah di Survey

66 Cable Menggunakan Protector


Conduit (Ya [Full/Sebagian] / Tidak)
Catatan Tambahan :

Menyetujui,
Team Survey User

Bayu Edo
Tanggal: Tanggal:

Mengetahui,
PM National PM Wilayah TJS

Budi Andi Edo


Tanggal: Tanggal: Tanggal:

Catatan:
1. untuk Polda Paling minim Kabid TI
2. Untuk Polres Paling minim Wakapolres/Kapolres