182-GZ-E-412104-B0 (Vessel Process Datasheet V182101-V182201 (Feed Surge Drum) )
182-GZ-E-412104-B0 (Vessel Process Datasheet V182101-V182201 (Feed Surge Drum) )
182-GZ-E-412104-B0 (Vessel Process Datasheet V182101-V182201 (Feed Surge Drum) )
ﺒﻋ
ﺭﺪﻨ
ﺑﻔﺖ
ﻧﻳﺶ
ﻻﺎ
ﭘﻛﺖ
ﺮﺷ PHASE:
BANDAR ABBAS OIL REFINERY HEAVY EB
BANDAR ABBAS OIL
REFINING COMPANY
PRODUCTS QUALITY UPGRADING
PROJ. NO. UNIT/ITM: 182/
PROJECT BASED ON USING DELAYED COKER V182101/V182201
1668 :ﻩ
ﮊﻭ
ﺮﭘﻩ
ﺭﺎ
ﻤﺷ 1668
MC:HEIDCO SPEC. NO: SH/OF:
VESSEL PROCESS DATASHEET
182-GZ-E-412104
FOR
DAOT UNIT REV. 0 1 2 B0
DOCUMENT TITLE:
TOTAL PAGES: 2
REVISION REVISION
SHEET SHEET
0 1 2 B0 0 1 2 B0
1 P P P P 51
2 P P P 52
3 53
4 54
5 55
6 56
7 57
8 58
9 59
10 60
11 61
12 62
13 63
14 64
15 65
16 66
17 67
18 68
19 69
20 70
21 71
22 72
23 73
24 74
25 75
26 76
27 77
28 78
29 79
30 80
31 81
32 82
33 83
34 84
35 85
36 86
37 87
38 88
39 89
40 90
41 91
42 92
43 93
44 94
45 95
46 96
47 97
48 98
49 99
50 100
ﺎﺱ
ﺒﻋ
ﺭﺪﻨ
ﺑﻔﺖ
ﻧﻳﺶ
ﻻﺎ
ﭘﻛﺖ
ﺮﺷ PHASE:
BANDAR ABBAS OIL REFINERY HEAVY EB
BANDAR ABBAS OIL
REFINING COMPANY
PRODUCTS QUALITY UPGRADING PROJ. NO. UNIT/ITM: 182/
PROJECT BASED ON USING DELAYED COKER V182101/V182201
1668 :ﻩ
ﮊﻭ
ﺮﭘﻩ
ﺭﺎ
ﻤﺷ 1668
MC:HEIDCO
VESSEL PROCESS DATASHEET SPEC. NO: SH/OF:
182-GZ-E-412104
FOR 2 / 2
DAOT UNIT REV. 0 1 2 B0
1 Process Unit No. 182
2 ITEM V182101 & V182201
3 SERVICE FEED SURGE DRUM
5 TEMPERATURE PRESSURE
CONDITIONS
6 °C Bar g
14 SHELL KCS 3
19 INSULATION HOT
20 TRACING NO
21 CLADDING NO
25 ORIENTATION VERTICAL
26 NOZZLES
32
37
41
44
45
46
47
51
52 NOTES:
53 (1) Feed inlet device type and size shall be specified during detail engineering in mechanical datasheets.
54 (2) Nozzle size shall be finalized during detail engineering based on flare network calculations and PSV vendor data.
61 (9) Material of Fixed Internal (welded to shell) is same as the shell material.
63 (11) MDMT is 2 oC
64
65