PROPOSED DIAMOND JUBILEE BLOCK FOR

STANES SCHOOL AT COIMBATORE


SCHEME DRAWINGS
A
UPS & BATTERY ROOM
24'-9" X 24'-0"

CLASS ROOM CLASS ROOM COMPUTER LAB


24'-0" X 20'-0" 24'-0" X 20'-0" 48'9" X 20'0"

BOY'S
TOILET
8'421" X 16'0"

WATER

17 19 21 23 25 01 03 05 07 09 11 13
SCREEN WALL
UP
PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE 15
15

UP

13 11 09 07 05 03 01 25 23 21 19 17

V. PRICIPAL/ AHM ROOM


16'-0" X 12'-0"

STAFF ROOM
LIFT 7'-3" X 10'-412"
8'0"X10'0"

ENTRANCE LOBBY
24'-421" X 14'-0"

03 +3'6" lvl 03
02 02
01 01

RAMP UP RAMP UP

+3'6" lvl
+0'6"lvl 01 +0'6"lvl
02
03
STEP UP STEP UP
+2'0" lvl

ENTRANCE GATE
01
02
03

03
02
01
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
ROAD
±0'0" lvl COIMBATORE
DRAWN : Ar.Shobana
SCHEME PLAN - GROUND FLOOR A' CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - SC- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
A

BALCONY

BALCONY
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0"

GIRL'S
TOILET
8'421" X 16'0"

WATER

17 19 21 23 25 01 03 05 07 09 11 13
SCREEN WALL
UP
PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE 15
15

UP

13 11 09 07 05 03 01 25 23 21 19 17

V. PRICIPAL/ AHM ROOM


16'-0" X 12'-0"
STAFF ROOM
7'-3" X 10'-412"
LIFT
8'0"X10'0"

03 03
02 02
01 01

CLASSROOM
24'-421" X 18'-0"
RAMP UP RAMP UP

+0'6"lvl
02
03
STEP UP
+2'0" lvl

ENTRANCE GATE
01
02
03

03
02
01
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
ROAD
±0'0" lvl COIMBATORE
DRAWN : Ar.Shobana
SCHEME PLAN - FIRST FLOOR A' CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - SC- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
A
TOILET TO DETAIL

BALCONY

BALCONY
CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM
24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0"
TOILET
TO DETAIL
8'421" X 14'3"

17 19 21 23 25 07 09 11 13

DN
PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE
15
15

DN

13 11 09 07 25 23 21 19 17

BALCONY BALCONY

STAFF ROOM STAFF ROOM


16'-0" X 12'-0" 7'-3" X 10'-412"
LIFT
8'0"X10'0"

03 03
02 02
01 01

LANGUAGE ROOM
24'-421" X 18'-0"
RAMP UP RAMP UP

+0'6"lvl
02
03
STEP UP

+2'0" lvl

ENTRANCE GATE
01
02
03

03
02
01
ROAD
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
ROAD
±0'0" lvl COIMBATORE
DRAWN : Ar.Shobana
SCHEME PLAN - SECOND FLOOR A' CHECKED : Ar.Shobana
DATE ISSUED : 14 May 2024
DRAWING NO : 104 R - SC- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
A
SECOND FLOOR'S HIPPED ROOF TO DETAIL GABLE ROOF ABOVE THE WATER TANK
UPS ROOM'S ROOF BELOW
TO DETAIL

3'-0"
45.0

45.0

3'-0"

WATER TANK
TO DETAIL

HIPPED ROOF HIPPED ROOF


45.0

° 0
45.0

BALCONY BELOW BALCONY BELOW

PERGOLA BELOW FLAT ROOF FLAT ROOF PERGOLA BELOW

03 GABLE ROOF 03
02 02
01 01

RAMP UP RAMP UP

+0'6"lvl

STEP UP SECOND FLOOR'S GABLE ROOF TO DETAIL

ENTRANCE GATE
01
02
03

03
02
01
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
ROAD
±0'0" lvl COIMBATORE
DRAWN : Ar.Shobana
SCHEME PLAN - TERRACE A' CHECKED : Ar.Shobana
DATE ISSUED : 14 May 2024
DRAWING NO : 104 R - SC- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
LOGO TO DETAIL
1 2 3 4 4a 5 6 7 8 9
WATER TANK TO DETAIL
(Height to be confirmed)

RCC GUTTER
TO DETAIL
8'-941"

22.50°
22.50°
DIAMOND JUBILEE 1862 - 2022
6"
12'-0"
6"
12'-0"

HANDRAIL
TO DETAIL
6"

MURAL TO DETAIL
12'-0"

STONE WALL STONE WALL


6"1'-6"1'-6"
3'-6"

FGL
GL

24'-9" 16'-721" 26'-121" 16'-721"

108'-1021"

NOTES:
1 2 3 3a 4 5 5a 6 7 8
FRONT ELEVATION 9

1.ALL WINDOW GLAZING TO OWNER : ARCHITECT :


BE REFLECTIVE / TINTED GLASS ENTRANCE DOOR TO DETAIL AR.SHOBANA
DIAMOND JUBILEE BLOCK
2.REST OF GLAZING TO BE STANE'S SCHOOL @
CLEAR GLASS COIMBATORE
DRAWN : Ar.Shobana
FRONT ELEVATION CHECKED : Ar.Shobana
DATE ISSUED : 14 May 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
C
D

A
B
E

6"
12'-0"
6"
12'-0"
6"
12'-0"
6"1'-6"1'-6"
3'-6"
FGL
GL

20'-9" 8'-9" 10'-9" 5'-3" 5'-3" 10'-0" 4'-0"

NORTH ELEVATION
C
D

A'

A
B
E

OWNER : ARCHITECT :
AR.SHOBANA
NORTH ELEVATION DIAMOND JUBILEE BLOCK
STANE'S SCHOOL @
COIMBATORE
DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
A'
A

E
6"
12'-0"
6"
12'-0"
6"
12'-0"

TO DETAIL
6"1'-6"1'-6"
3'-6"

FGL
GL

4'-0" 10'-0" 5'-3" 5'-3" 10'-9" 8'-9" 20'-9"

SOUTH ELEVATION
A

E
OWNER : ARCHITECT :
AR.SHOBANA
SOUTH ELEVATION DIAMOND JUBILEE BLOCK
STANE'S SCHOOL @
COIMBATORE
DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
C
D

A
B
E
WATER TANK TO DETAIL

TERRACE
6"

LADIES STAFF TOILET


12'-0"

LANGUAGE ROOM

PASSAGE 6'-0" WIDE


2" SUNKEN
6"

GIRL'S TOILET
12'-0"

CLASSROOM

2" SUNKEN
6"

BOY'S TOILET
12'-0"

ENTRANCE LOBBY

2" SUNKEN +3'6" LVL +3'6" LVL +3'6" LVL


6"1'-6"1'-6"

+2'0" LVL
3'-6"

ROAD
FGL
GL +0'0" LVL

20'-9" 8'-9" 10'-9" 10'-6"


SECTION-AA
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
SECTION A-A' STANE'S SCHOOL @
COIMBATORE
DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
131'-6"

11'-334" 3'-6" 18'-6" 6'-3" 18'-6"


1
2'-9" 2'-114" 4'-0" 2'-1141" 2'-9" 18'-6" 6'-7" 5'-9" 15'-11" 11'-334"
9"

108'-1021"

BUILDING FOOT PRINT OF JUBILEE BLOCK


30'-3"

30'-3"
40'-3"

JUBILEE BLOCK

24'-9" 24'-9"
61'-921"

10'-9"

10'-9"
16'-9" 16'-941" FENCING OF 5' - 6'
HEIGHT
03 03
02 02
01 01

5'-234"

5'-234"
5'-234"

25'-1041"

RAMP UP RAMP UP

+3'6" lvl
9'-634"

+0'6"lvl 01 +0'6"lvl
02
03
STEP UP STEP UP
+2'0" lvl
6'-0"

ENTRANCE GATE
9'-
5"

01
02
03

03
02
01
6'-0" 46'-8" 1'-0" 5'-1" 1'-0" 12'-0" 1'-0" 5'-1" 1'-0" 46'-8" 6'-0"
COLUMN TO STRUCTURAL DETAIL

ROAD
±0'0" lvl

SITE PLAN

GATE TO DETAIL

LIGHT

CORNICE TO DETAIL
MARBLE WALL / FENCING TO DETAIL MARBLE WALL / FENCING TO DETAIL
6'-0" 6'-0"
321"
3"

OWNER : ARCHITECT :
5'-812"
6'-6"
4'-3"
5'-0"

DIAMOND JUBILEE BLOCK AR.SHOBANA


6"

6"

11'-414" 24'-9" 16'-8" 5'-1012" 1'-0" 12'-6" 1'-0" 5'-1021" 16'-8" 24'-9" 11'-441"

STANE'S SCHOOL @
COIMBATORE
BOUNDARY WALL & GATE DETAIL DRAWN : Ar.Shobana
SITE PLAN CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - SC- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
PROPOSED DIAMOND JUBILEE BLOCK FOR
STANES SCHOOL AT COIMBATORE
WORKING DRAWINGS
1 2 3 4 4a 5 6 7 8 9 SCHEDULE OF JOINERY

A
CODE DESCRIPTION SIZE

9"
2'-121"
MD MAIN DOOR 12'0"X10'0"

108'-1021" D DOOR 3'0"X8'0"


UPS & BATTERY ROOM
D1 DOOR 4'0"X8'0"
12'-412" X 8'-3"
4'-421" 3'-721" 2'-1141" 2'-1141"

4'-6"
4'-0" 8'-9" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" 4'-0" 4'-0" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" W WINDOW 3'0"X8'0"
12'-421"

2'-121"
W1 WINDOW 3'0"X4'6"

W5 W5 W5 W5 V W5 W5 W5 W5 W2 WINDOW 4'0"X6'6"
E E W3 WINDOW 4'0"X8'6"
3'-721" 8'-9" 3'-721" 3'-721" 8'-9" 3'-721" 4'-0" 8'-0" 8'-9" 8'-0" 4'-0" 11'-334"
4'-9"

3'-3"
4'-0"

4'-0"

4'-0"
W4 WINDOW 12'0"X8'0"

6'-1021"
W5 WINDOW 4'0"X6'6"

3'-3"
V VENTILATOR 4'0"X3'0"
4'-3" 1'-6" O OPENING TO BEAM BOTTOM

COMPUTER LAB AREA DETAILS

5'-0"
20'-0"

20'-0"

20'-0"
12'-0"

W4 CLASS ROOM CLASS ROOM W4


48'9" X 20'0"
24'-0" X 20'-0" 24'-0" X 20'-0"

8'-9"
4'-3" 1 GROUND FLOOR 4088 sq.ft
BOY'S
TOILET 2 FIRST FLOOR 4207 sq.ft
8'421" X 16'0"
1
5'-42" 3 SECOND FLOOR 4207 sq.ft

TOTAL 12502 sq.ft

8'-121"
D
4'-0"

4'-0"
4'-421"
6'-9"

6'-9"
18'-0" 2'-0" 2'-0" 12'-0" 2'-0" 2'-0" 12'-0" 4'-9" 18'-0"
41'-0"

40'-3"
D D
17 19 21 18'-0"
23 25 D1 4'-9" D1 D1 2'-9" 2'-9" D1 D1 01 03 05 07 09 11 13
2'-0"

2'-0"
W5
SCREEN WALL
4'-0"

4'-0"
TREAD - 1'-0" UP
RISER - 0'-6" PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE 15
4'-0"

W3 W3
15
6'-121" 4'-421"
2'-3" D W2 1'-11" 8" 1'-3" D 121" TREAD - 1'-0"
4'-0"

4'-0"
UP RISER - 0'-6"

1'-721" 9'-1021"
2'-0"

2'-0"
2'-421"

2'-
10
1'-3" 10" O O 10" 18'-0"

"
13 11 09 07 05 03 01

4'-0"
25 23 21 19 17
C C
6'-121"

6'-121"
3'-9"
5'-421"

18'-0" 2'-0" 1'-6" 1'-6"


W2 W2

3'-9"
V. PRICIPAL/ AHM ROOM
3'-421"

3'-421"

3'-421"
16'-0" X 12'-0"

12'-241"
12'-0"
STAFF ROOM
7'-3" X 10'-412"
4'-0"

LIFT
W2

8'-0"
W2 8'0"X10'0"
2'-121"

15'-3"
ENTRANCE LOBBY
2'-121"
2'-721"

2'-721"

2'-721"

2'-721"
3'-421"

3'-421"

3'-421"

3'-421"
6'-6" 6'-6" 24'-421" X 15'-3" 8'-0" NOTES:

B +3'6" lvl B
10'-1021" 2'-1021"
03 03 1.ALL DIMENSIONS ARE IN FEET SYSTEM ONLY
1'-6" 02 7'-3" W1 6'-6" W1 02 1'-6" 2.ALL DIMENSIONS ARE TO FINISHED
01 01 DIMENSIONS

5'-3"
3.ALL TOILETS & WATER TANK TO DETAIL
1'-234" 1'-1121" 1'-1121" 1'-234" 4.DRAWING SHOULD NOT BE SCALED FOR
OBTAINING DIMENSIONS
A' 5.IF ANY DISCREPANCY FOUND IN THE
1'-1134" W MD W 1'-1134" DRAWING
IT IS TO BE BROUGHT TO THE NOTICE OF
RAMP UP RAMP UP THE
ARCHITECT BEFORE THE EXECUTION OF THE
+3'6" lvl WORK
A +0'6"lvl 01 +0'6"lvl A 6.THIS DRAWING TO BE READ ALONG WITH
02 STRUCTURAL, ELECTRICAL,SANITARY AND
PLUMBING DRAWING
03
STEP UP STEP UP 7.SCHEDULE OF JOINERY WILL BE FINALISED
+2'0" lvl AFTER THE ELEVATIONS ARE FINALISED

DATE REVISIONS REV.BY


ENTRANCE GATE
01
02
03

03
02
01
1 2 3 3a 4 5 5a 6 7 8 9

ROAD OWNER : ARCHITECT :


±0'0" lvl AR.SHOBANA
DIAMOND JUBILEE BLOCK
STANE'S SCHOOL @
A' COIMBATORE
GROUND FLOOR PLAN DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
1 2 3 4 4a 5 6 7 8 9 SCHEDULE OF JOINERY

A
CODE DESCRIPTION SIZE

9"
2'-121"
108'-1021" D DOOR 3'0"X8'0"

D1 DOOR 4'0"X8'0"

4'-421" 3'-721" 2'-1141" 2'-1141"

4'-6"
4'-0" 8'-9" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" 4'-0" 4'-0" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" W1 WINDOW 3'0"X4'6"
12'-421"

2'-121"
W2 WINDOW 4'0"X6'6"

W5 W5 W5 W5 V W5 W5 W5 W5 W3 WINDOW 4'0"X8'6"
E E W5 WINDOW 4'0"X6'6"
3'-721" 8'-9" 3'-721" 3'-721" 8'-9" 3'-721" 4'-0" 8'-0" 8'-9" 8'-0" 4'-0" 11'-334"
4'-9"

3'-3"

4'-0"

4'-0"
W6 WINDOW 8'0"XT.B.B
4'-0"

6'-1021"
V VENTILATOR 4'0"X3'0"

FW FRENCH WINDOW 12'0"X9'6"

3'-3"
4'-3" 1'-6"
FW FW
AREA DETAILS
BALCONY

BALCONY
5'-0"
20'-0"

20'-0"

20'-0"
12'-0"

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1 GROUND FLOOR 4088 sq.ft
24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0"

8'-9"
4'-3" 2 FIRST FLOOR 4207 sq.ft
GIRL'S
TOILET
3 SECOND FLOOR 4207 sq.ft
8'421" X 16'0"
5'-421" TOTAL 12502 sq.ft

8'-121"
D WATER
4'-0"

4'-0"
4'-421"
6'-9"

6'-9"
18'-0" 2'-0" 2'-0" 12'-0" 2'-0" 2'-0" 12'-0" 4'-9" 18'-0"
41'-0"

40'-3"
D D
17 19 21 18'-0"
23 25 D1 4'-9" D1 D1 2'-9" 2'-9" D1 D1 01 03 05 07 09 11 13
2'-0"

2'-0"
W5
SCREEN WALL
4'-0"

4'-0"
UP
PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE
15
4'-0"

W3 W3
15
6'-121" 4'-421"
2'-3" D W2 1'-11" 8" 1'-3" D 121"
4'-0"

4'-0"
UP
9'-1021"

2'-
2'-0"

2'-0"
2'-421"

10
1'-721" 1'-3" 10" 10" 18'-0"

"
13 11 09 07 05 03 01 D1 D1

4'-0"
25 23 21 19 17
C 9'-941" C
6'-121"

6'-121"
3'-9"
5'-421"

W2 W2 2'-0" 3'-3" 3'-3" 1'-6" 1'-6" W2 W2

3'-9"
3'-421"

3'-421"

3'-421"
V. PRICIPAL/ AHM ROOM
16'-0" X 12'-0"
STAFF ROOM

12'-241"
12'-0"
7'-3" X 10'-412"

15'-3"
W3 W2 W3
4'-0"

LIFT W2

3'-0"
8'-0"
8'0"X10'0"

2'-121" 2'-121"
2'-721"

2'-721"

2'-721"
3'-9"
3'-421"

3'-421"

3'-421"
6'-6" 6'-6" 8'-0" NOTES:

B 03 03 B 1.ALL DIMENSIONS ARE IN FEET SYSTEM ONLY


1'-6" 02 7'-3" 6'-6" 02 1'-6"
10'-1021" 2'-1021"
W1 W1 2.ALL DIMENSIONS ARE TO FINISHED
3'-634"

3'-634"
01 01 DIMENSIONS
3.ALL TOILETS & WATER TANK TO DETAIL
4.DRAWING SHOULD NOT BE SCALED FOR
OBTAINING DIMENSIONS
A' CLASSROOM
5.IF ANY DISCREPANCY FOUND IN THE
W2 W2 DRAWING
24'-421" X 18'-0" IT IS TO BE BROUGHT TO THE NOTICE OF
334" 334"
RAMP UP RAMP UP THE
3'-634"

2'-
" ARCHITECT BEFORE THE EXECUTION OF THE
5'-101"
10
5'-1021"

10
2'-

135
2

"
.00° W6 .00° WORK
135
A A 6.THIS DRAWING TO BE READ ALONG WITH
02 STRUCTURAL, ELECTRICAL,SANITARY AND
PLUMBING DRAWING
03
STEP UP STEP UP 7.SCHEDULE OF JOINERY WILL BE FINALISED
AFTER THE ELEVATIONS ARE FINALISED

DATE REVISIONS REV.BY


ENTRANCE GATE
01
02
03

03
02
01
1 2 3 3a 4 5 5a 6 7 8 9
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
A' COIMBATORE
FIRST FLOOR PLAN DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.
1 2 3 4 4a 5 6 7 8 9 SCHEDULE OF JOINERY

A
CODE DESCRIPTION SIZE

9"
2'-121"
108'-1021" D DOOR 3'0"X8'0"

D1 DOOR 4'0"X8'0"

4'-421" 3'-721" 2'-1141" 2'-1141"

4'-6"
4'-0" 8'-9" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" 4'-0" 4'-0" 4'-0" 8'-0" 4'-0" 8'-9" 4'-0" W1 WINDOW 3'0"X4'6"
12'-421"

2'-121"
W2 WINDOW 4'0"X6'6"

W5 W5 W5 W5 V W5 W5 W5 W5 W3 WINDOW 4'0"X8'6"
E E W5 WINDOW 4'0"X6'6"
2'-214" 2'-21"
3'-721" 8'-9" 3'-721" 3'-721" 8'-9" 3'-721" 4'-0" 8'-0" 8'-9" 8'-0" 4'-0" 11'-334"
4
4'-9"

3'-321"

4'-0"

4'-0"
W6 WINDOW 8'0"XT.B.B
4'-0"

V VENTILATOR 4'0"X3'0"

FW FRENCH WINDOW 12'0"X9'6"

3'-312"
FW FW

14'-3"
AREA DETAILS

3'-321"
BALCONY

BALCONY
20'-0"

20'-0"

20'-0"
12'-0"

CLASS ROOM CLASS ROOM CLASS ROOM CLASS ROOM 1 GROUND FLOOR 4088 sq.ft
24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0" 24'-0" X 20'-0"
2 FIRST FLOOR 4207 sq.ft

3'-312"
3 SECOND FLOOR 4207 sq.ft
5'-41"
2

TOTAL 12502 sq.ft


D
4'-0"

4'-0"
6'-9"

6'-9"
W5 18'-0" 2'-0" 2'-0" 12'-0" 2'-0" 2'-0" 12'-0" 4'-9" 18'-0"
41'-0"

40'-3"
D D
17 19 21 18'-0"
23 25 D1 4'-9" D1 D1 2'-9" 2'-9" D1 D1 01 03 05 07 09 11 13
2'-0"

2'-0"
W5
4'-0"

4'-0"
DOWN
PASSAGE 6'-0" WIDE PASSAGE 6'-0" WIDE
15
4'-0"

W3 W3
15
6'-121" 4'-421"
2'-3" 1'-11" 8" 1'-3" D 121"
4'-0"

4'-0"
DOWN
9'-1021"

2'-
D1 D1 D1
2'-0"

2'-0"
2'-421"

10
1'-721" 1'-3" 10" 10" 18'-0"

"
13 11 09 07 05 03 01

4'-0"
25 23 21 19 17
C 9'-941" C
6'-121"

6'-121"
3'-9"
5'-421"

W2 W2 2'-0" 3'-3" 3'-3" 1'-6" 1'-6" W2 W2

3'-9"
3'-421"

3'-421"

3'-421"
STAFF ROOM
16'-0" X 12'-0" STAFF ROOM

12'-241"
12'-0"
7'-3" X 10'-412"

15'-3"
W3 W2 W3
4'-0"

LIFT W2

3'-0"
8'-0"
8'0"X10'0"

2'-121" 2'-121"
2'-721"

2'-721"

2'-721"
3'-9"
3'-421"

3'-421"

3'-421"
6'-6" 6'-6" 8'-0" NOTES:

B 03 03 B 1.ALL DIMENSIONS ARE IN FEET SYSTEM ONLY


1'-6" 02 7'-3" 5'-6" 02 1'-6"
10'-1021" 2'-1021"
W1 W1 2.ALL DIMENSIONS ARE TO FINISHED
3'-634"

3'-634"
01 01 DIMENSIONS
3.ALL TOILETS & WATER TANK TO DETAIL
4.DRAWING SHOULD NOT BE SCALED FOR
OBTAINING DIMENSIONS
A' LANGUAGE ROOM
5.IF ANY DISCREPANCY FOUND IN THE
W2 W2 DRAWING
24'-421" X 18'-0"
334" 334" IT IS TO BE BROUGHT TO THE NOTICE OF
RAMP UP RAMP UP THE

2'-
3'-634"

" ARCHITECT BEFORE THE EXECUTION OF THE


5'-1021"
10
5'-101"

10
2'-

135

"
.00° .00° 2 WORK
135 W6
A A 6.THIS DRAWING TO BE READ ALONG WITH
02 STRUCTURAL, ELECTRICAL,SANITARY AND
PLUMBING DRAWING
03
STEP UP STEP UP 7.SCHEDULE OF JOINERY WILL BE FINALISED
+2'0" lvl AFTER THE ELEVATIONS ARE FINALISED

DATE REVISIONS REV.BY


ENTRANCE GATE
01
02
03

03
02
01
ROAD

1 2 3 3a 4 5 5a 6 7 8 9
OWNER : ARCHITECT :
DIAMOND JUBILEE BLOCK AR.SHOBANA
STANE'S SCHOOL @
A' COIMBATORE
SECOND FLOOR PLAN DRAWN : Ar.Shobana
CHECKED : Ar.Shobana
DATE ISSUED : 10 April 2024
DRAWING NO : 104 R - WR- AR-202
PROJECT TITLE: LINK : LINK

3
SCALE : 1" = 32"
PROPOSED DIAMOND JUBILEE BLOCK FOR STANES SCHOOL AT
COIMBATORE © Ar. Shobana (2023)
All rights reserved. This CAD drawing is protected by copyright law. Unauthorized reproduction or
distribution of this drawing, or any portion of it, may result in severe civil and criminal penalties and will
be prosecuted to the maximum extent possible under the law.

You might also like