Latih Tubi T2

You might also like

Download as doc, pdf, or txt
Download as doc, pdf, or txt
You are on page 1of 2

SOALAN LATIH TUBI 2024 (TOPIK 2: FIELD PROBLEMS)

DCG20033: CADASTRAL SURVEYING 1

QUESTION 1
SOALAN 1

a) Explain the condition to emplace the new boundary mark.


[5 marks]

b) Based on Diagram 2B(b), explain the surveying process to replant the boundary mark
7.

Diagram 2B(b)
[10 marks]

c) Ahmad discovered an obstruction between survey lines BKL4 and BKL6, as shown in
Diagram B2(c). Explain briefly the procedures involved in solving the problem.

4 BUILDING
6

BKL BKL

Diagram B2(c): Obstruction line

[10 marks]

2
SOALAN LATIH TUBI 2024 (TOPIK 2: FIELD PROBLEMS)
DCG20033: CADASTRAL SURVEYING 1

You might also like