THE GREATER KAMPALA METROPOLITAN AREA (GKMA) TRANSMISSION SYSTEM
IMPROVEMENT PROJECT AND ASSOCIATED SUBSTATIONS
SITE: BULOBA SUBSTATION
INSPECTION DATE: 8/04/2025
No. parameter status TIME LINE
1. Provision of waste collection bin/area. Waste bins available on NA site. 2. Provision of proper Personal Protective All workers have been NA Equipment (PPE) for all members on site. provided with PPE
3. Installation of site signage. Site signages have been 9/04/2024
procured and has been installed 4. Pinning of NEMA Certificate on Signage. NEMA Certificate is now 15/04/2024 available on site. And it has been pinned and the sign board is available on site. 5. Provision of temporary site offices for the A temporary site is being 15/04/2024 Employer, Consultant, and Contractor. set up.
6. Shade for workers has 22/04/2024
Establishment of a dining canteen/Shade for been established workers.
7. Proper barricading of exposed excavations. Excavated area has been NA
barricaded. 8. Provision of proper ablution facilities. Only one toilet has been 12/04/2024 installed .and another one will be installed in the due course. 9. Installation of handwash facilities. Hand wash facilities have 12/04/2024 been installed 10. Maintenance of an Incident/Accident logbook. Accident log books will 9/04/2024 be available on site. 11. Maintenance of a Grievance resolution book. Community sensitization 12/04/2024 is being organized and GRC will be formed during the meeting. 12. Provision of clean drinking water. clean drinking water is 12/04/2024 provide on site 13. Ensuring signed work/labour contracts for all Not yet, ALL 22/04/2024 workers on site. WORKERS will signed contracts. 14. Availability of a first aid person and kit 2 First aid boxes have 9/04/2024 been procured. A site nurse is on site 15. Arrangement of a community meeting to Community sensitization 12/04/2024 establish a Grievance Redress Mechanism is being organized and (GRM) committee GRC will be formed during the meeting. 16. Obtaining proper consent for the dumping area. Dump site permit is NA available 17. Acquisition of a NEMA permit from suppliers of Certificate NA the gravel/murram to be used during site levelling NO.NEMA/EIA/16852 & compaction for the substation and access road Has been given. PENDING ISSUES 1. COMMUNITY SENSITATION 2. MOU WITH THE HOSPITAL 3. MOU WITH WASTE HANDLER 4. EMERGENCE CONTACTS 5. NSP FOR HIV/AIDS