Scope of Work:
a) The content for the training module in English. and the contractor would be
required to convert the training material in the local language.
Task 4- Reporting
c) The contractor will ensure filling the physical feedback form from the participant
farmer. An overview of the provided feedback will be given and include in the summary
report.
d) The contractor will ensure the online interest form for applying in KUSUM - A from
each participant farmer.
e) The contracting agency will identified potential opportunities and challenges specific
to smallholder farmers and new implementation design solutions. Specific needs to
promote farmer centric agriPV shall be identified and included with concrete actions for
future actions.
a) The contractor is responsible for selecting, preparing, training, and steering the
experts (international and national, short, and long term) assigned to perform the
advisory tasks.
b) The contractor makes available equipment and supplies (consumables) and
assumes the associated operating and administrative costs.
c) The contractor manages costs and expenditures, accounting processes and
invoicing in line with the requirements of Tender Inviting Authority.
d) The contractor reports regularly to Tender Inviting Authority.
e) The contractor is required to draw up a personnel assignment plan with
explanatory notes that lists all the experts proposed in the tender; the plan
includes information on assignment dates (duration and expert months) and
locations of the individual members of the team complete with the allocation of
work steps.
f) The Contractor is required to describe its backstopping concept. The following
services are part of the standard backstopping package, which (like ancillary
personnel costs) must be factored into the fee schedules of the staff listed in the
tender.
• Service-delivery control.
• Ensuring the flow of information between the contractor and Tender Inviting Authority.
List of Deliverables:
• Implementation plan
Period of assignment: from 1st July 2024 until 31st March 2025.
Eligibility Criteria:
Note: Bidders has to submit the documentary evidence for the criteria’s specified
below.
The eligibility criteria for the firms include the following points:
Commercial Eligibility
1) The average annual turnover for the last three financial years should be at least
150,000 EURO.
2) The number of employees as on 31st Dec of the previous year has to be minimum
10.
Technical Eligibility
The Contractor is required to provide personnel who are suited to filling the positions
described, on the basis of their CVs, the range of tasks involved and the required
qualifications.
The below specified qualifications represent the requirements to reach the maximum
number of points in the technical assessment.
Team leader
• Overall responsibility for development of the training module & training material for
dissemination
• Coordinating and ensuring communications for the project.
Education/training:
• Reviewing different ongoing and upcoming schemes of central and state government
• Developing training module (ToT Master trainers and Cocreation workshops for
farmers) and training material for dissemination.
Tasks of expert 2
Qualifications of expert 2
For the technical assessment, an average of the qualifications of all specified members
of the expert pool is calculated.
• Coordination with KVK Coordinators from the given states and districts.
Important notes:
The contractor must specify and share detailed CVs of proposed project staff as per
above requirements.
The Contractor must also specify the location and base of the proposed staff.