1. One Number of AC is not sufficient kindly provide min.
3Nos.
2. Kindly include isolator and watch man cabin load also.
Isolators will be decided based on AC SLD.
3. Include DC battery bank(backup of min. 4hrs) and battery
charger(FCBC).

4. Kindly include RO plant and industrial socket(2kw).


5. Min. 0.9pf shall be considered for all loads and KVA will be
kw/pf.

6. Kindly check whether it is for each block or entire plant.

7. Kindly include PC, WMS also and UPS backup for min.4hrs.

8. it is CCTVs(not CCTV server) kindly check the quantity also.


SLD
1. Kindly update the SLD as per the comment given in
auxiliary transformer load calculation.
2. Connection from HT panel
3. As per tender voltage rating shall be 33KV/415V.
4. Kindly provide accuracy 0.2S class
5. Kindly mention MFM class
Action taken by Suntechnologies
Sizing sheet
Two Number os AC's provided, 1 for SCADA Room and 1 For
Conference Room.

complied.
Since one HT VCB, we are Providing Power pack along with
VCB.

As per water test report we will update the requirement, In


sizing calculations we are having additional future load for
future extension.

Noted.

Pump Sizing calculation will be shared saperately.

complied.

complied.
SLD

complied.
Connection Proposed from Four pole structure
complied.
For LT Level 0.5 Class is sufficient.
Mentioned.