Professional Documents
Culture Documents
Aux SLD Compiance Sheet
Aux SLD Compiance Sheet
Sizing sheet
1. One Number of AC is not sufficient kindly provide min.
3Nos.
2. Kindly include isolator and watch man cabin load also.
Isolators will be decided based on AC SLD.
3. Include DC battery bank(backup of min. 4hrs) and battery
charger(FCBC).
7. Kindly include PC, WMS also and UPS backup for min.4hrs.
complied.
Since one HT VCB, we are Providing Power pack along with
VCB.
Noted.
complied.
complied.
SLD
complied.
Connection Proposed from Four pole structure
complied.
For LT Level 0.5 Class is sufficient.
Mentioned.