PROJECT : BILL OF QUANTITIES BILL PART Nr. PAGE Nr.

INFRASTRUCTURE FACILITIES FOR THE


INDUSTRIAL PLOTS "EAST THE RAILWAY - STORMWATER WORKS SECTION
MADINAT ZAYED" d 9

CESMM4 RATE TOTAL


ITEM ITEM DESCRIPTION UNIT QUANTITY
REF. (AED) AMOUNT (AED)

BILL NO.09 - STORMWATER WORKS

PIPEWORK - PIPES - CLASS I:

Supply and lay uPVC Pipes in trenches with joints including


excavation, backfilling etc. all in accordance with
Specifications and Drawing
Nominal bore: 200 - 300mm

9.01 Nominal bore: 300mm depth not exceeding 1.5m I 522 m 8,591 248.00 2,130,568.00
9.02 Nominal bore: 300mm depth 1.5 - 2m I 523 m 1,628 273.00 444,444.00
9.03 Nominal bore: 300mm depth 2.5 - 3m I 525 m 90 361.00 32,490.00

Supply and lay GRP Pipes in trenches with joints including


excavation, backfilling etc. all in accordance with
Specifications and Drawing
Nominal bore: 300 - 600mm

9.04 Nominal bore: 400mm depth not exceeding 1.5m I 632.1 m 494 322.00 159,068.00
9.05 Nominal bore: 400mm depth 1.5 - 2m I 633.1 m 481 349.00 167,869.00
9.06 Nominal bore: 400mm depth 2 - 2.5m I 634.1 m 34 379.00 12,886.00
9.07 Nominal bore: 400mm depth 2.5 - 3m I 635.1 m 177 444.00 78,588.00
9.08 Nominal bore: 400mm depth 3.5 - 4m I 637.1 m 142 632.00 89,744.00

Supply and lay GRP Pipes in trenches with joints including


excavation, backfilling etc. all in accordance with
Specifications and Drawing
Nominal bore: 300 - 600mm

9.09 Nominal bore: 500mm depth 1.5 - 2m I 633.2 m 51 455.00 23,205.00


9.10 Nominal bore: 500mm depth 2 - 2.5m I 634.2 m 503 487.00 244,961.00
9.11 Nominal bore: 500mm depth 3 - 3.5m I 636.1 m 277 605.00 167,585.00
9.12 Nominal bore: 500mm depth 3.5 - 4m I 637.1 m 80 748.00 59,840.00

To Part Summary AED 3,611,248.00

Page 1 of 14
PROJECT : BILL OF QUANTITIES BILL PART Nr. PAGE Nr.
INFRASTRUCTURE FACILITIES FOR THE
INDUSTRIAL PLOTS "EAST THE RAILWAY - STORMWATER WORKS SECTION
MADINAT ZAYED" d 9

CESMM4 RATE TOTAL


ITEM ITEM DESCRIPTION UNIT QUANTITY
REF. (AED) AMOUNT (AED)

BILL NO.09 - STORMWATER WORKS (CONT'D)

PIPEWORK (CONT'D)

Nominal bore: 300 - 600mm

9.13 Nominal bore: 600mm depth not exceeding 1.5m I 632 m 230 519.00 119,370.00
9.14 Nominal bore: 600mm depth 2.0 - 2.5m I 634.3 m 170 583.00 99,110.00
9.15 Nominal bore: 600mm depth 2.5 - 3.0m I 635.2 m 80 655.00 52,400.00
9.16 Nominal bore: 600mm depth 3.0 - 3.5m I 636.2 m 81 707.00 57,267.00
9.17 Nominal bore: 600mm depth 4.0 - 4.5m I 637.2 m 217 920.00 199,640.00
9.18 Nominal bore: 600mm depth 4.5 - 5m I 638.3 m 118 1,008.00 118,944.00
9.19 Nominal bore: 600mm depth 5 - 5.5m I 638.4 m 152 1,281.00 194,712.00

Nominal bore: 600 - 1200mm

9.20 Nominal bore: 800mm depth not exceeding 1.5m I 642 m 56 810.00 45,360.00
9.21 Nominal bore: 800mm depth 2.5 - 3m I 645 m 80 949.00 75,920.00
9.22 Nominal bore: 800mm depth 5.0 - 5.5m I 648.1 m 113 1,612.00 182,156.00
9.23 Nominal bore: 800mm depth 5.5 - 6m I 648.2 m 161 1,744.00 280,784.00
-
9.24 Nominal bore: 1200mm depth 3.5 - 4m I 657 m 88 1,836.00 161,568.00
9.25 Nominal bore: 1200mm depth 4.0 - 4.5m I 658.1 m 106 1,916.00 203,096.00
9.26 Nominal bore: 1200mm depth 5.0 - 5.5m I 658.2 m 495 2,345.00 1,160,775.00
9.27 Nominal bore: 1200mm depth 5.5 -6.0m I 658.3 m 307 2,490.00 764,430.00
9.28 Nominal bore: 1200mm depth 6.0 -6.5m I 658.4 m 153 2,813.00 430,389.00

To Part Summary AED 4,145,921.00

Page 2 of 14