Draft RSA Report - 2nd Construction Stage - Khammam - Devarapalle - PKG - 2 - 7.7.23
Draft RSA Report - 2nd Construction Stage - Khammam - Devarapalle - PKG - 2 - 7.7.23
Draft RSA Report - 2nd Construction Stage - Khammam - Devarapalle - PKG - 2 - 7.7.23
India
December 2023
TABLE OF CONTENTS
1. INTRODUCTION................................................................................................................ 2
2. AUDIT TEAM..................................................................................................................... 2
3. PROJECT BACKGROUND...................................................................................................4
4. AUDIT DETAILS................................................................................................................. 6
5. SAFETY AUDIT...................................................................................................................7
6 CERTIFICATION............................................................................................................... 19
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
LIST OF TABLES
LIST OF FIGURES
Figure 3-1: Project Location Map.............................................................................................5
LIST OF ANNEXURES
1. INTRODUCTION
Project stretch falls in the state of Telangana, which is situated in the Southern region of
India. It is the Twelfth-most populous state and the Eleventh-largest state by area in India.
Covering an area of 1,14,840 Sq. Km Part of the Telangana of the Indian subcontinent.
Telangana is surrounded by Maharashtra and Chhattisgarh in the North, Karnataka in the
West and Andhra Pradesh in the South and East directions. Major cities of the state include
Hyderabad, Warangal, Nizamabad and Karim nag. Telangana is a semi-arid area and has a
predominantly hot and dry climate.
National Highway Authority (NHAI) of India entrusted the assignment of Safety Consultancy
Services for Safety Consultancy Services for “Construction of 4 lane Access Controlled New
Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km
from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under
Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity mode in the state of
Telangana (Package-II)”.
1
“Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam Draft Safety Audit Report
– Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km (3rd Construction Stage)
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
NHAI has appointed M/s CivilBaba InfraConsultant Pvt. Ltd. for the above work to carry out
the Safety Audit Services for “Construction Stage and Maintenance Stage”.
2. AUDIT TEAM
The team of the safety consultant comprises of the following personnel:
Table 2-1: Safety Audit Team
3. Sr. Road Safety Auditor cum Project co-ordinator Mr. Upendra Kumar
Construction zone is that area of the road, which is affected by the works, traffic flow, safety
of workers and road users. In this context, it can also be called ‘Traffic Control Zone’. In rural
areas, problem at these zones is accentuated by the reduced availability of carriageway,
acquisition of land for diversions, etc. In urban areas, the problems are even more acute as
diversions may have to be over adjacent road street of the road network as well as the
sharing of road space by different categories of road users. Traffic control zone can be
divided into five major components i.e., Advance Warning Zone, Approach Transition Zone,
Work/ Activity Zone, Terminal Transition Zone and Work Zone End. The Indian Roads
Congress publishes manual on Traffic Management at Construction Zones in IRC: SP: 55-
2014. Steps involved in Construction Stage Audit are given below -
2
“Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam Draft Safety Audit Report
– Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km (3rd Construction Stage)
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
Advance Warning Zone, Approach Transition Zone, Work/ Activity Zone, Terminal
Transition Zone and Work Zone End
Motorists need to know about safe driving requirements in construction zones. Major
problems in work zones are attentiveness and speed. It is necessary to help the drivers to be
more attentive by using signage, rumble strips and anything that brings alertness and gets
them to realize that there is something different about this stretch of road and there would
be lower speed limits in the work zones. Work zone safety measures should be aggressive
and comprehensive. It should include public service announcements, safety training for
workers in work zones, lower speed limits in work zones, rumble strips and other speed
reducing measures, proper signage, flagman to control and guide traffic, stepped-up
enforcement.
The diagram shows the checklist for the construction stage audit is given below.
3
“Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam Draft Safety Audit Report
– Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km (3rd Construction Stage)
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
3. PROJECT BACKGROUND
The project road starts at Km 33+604 (Somavaram village) and ends at km 63+117
(Chintagudem village). The project is green field alignment and the section of NH- 365BG
(Khammam to Devarapalle). The project falls in the state of Telangana. The length of the
project road is 29.513 Km.
Table 3-2: Project Details
4
“Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam Draft Safety Audit Report
– Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km (3rd Construction Stage)
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
4. AUDIT DETAILS
The relevant guidelines/codes of practices were considered for the safety audit with special
emphasis given to IRC: SP: 88-2019 - Manual on Road Safety Audit, Indian Road Congress,
New Delhi. Further, Ministry of Road Transport & Highways, Govt. of India (MoRTH) circulars
that have safety considerations are considered by the road safety expert to more-in-depth
review.
5
“Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam Draft Safety Audit Report
– Devarapalle) of length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km (3rd Construction Stage)
33+604 to 63+117) under Inter Corridor Route Under Bharatmala Pariyojana on Hybrid Annuity
mode in the state of Telangana (Package-II)”.
Road safety audit performed to spot deficiencies for the safe and efficient movement of all
road users. The road safety consultant team visited the site along with representative of
Concessionaire/Contractor from 11th to 12th December 2023. The traffic flow was normal
under pleasant weather.
It was observed that the Concessionaire/Contractor has installed various features related to
safety aspect as per the IRC standard and requirement of the project. However, as per
observations at site, major recommendations were given on missing of advance sign boards
before diversion location, Barricading, PPE kit, missing of OHM and delineator Post. The
details of the road safety observations and appropriate recommendations are given in
section 5.
6
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
5. SAFETY AUDIT
7
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
5.3.2 At km 39+700
Delineators are missing at this location, High Appropriate safety measures should be Highly
which can be safety hazard for road taken along with placing of delineators Desirable
users/construction workers.
at this location as per clause 5.2.1 of
IRC: SP: 55-2014, (Fig- 5.10 of the
code, Page-47 - Refer Annexure-A
5.3.3 At km 40+100
Delineators are missing at this location, High Appropriate safety measures should be Highly
which can be safety hazard for road taken along with placing of delineators Desirable
8
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
5.3.4 At km 43+700
Delineators with cautionary tape are missing Appropriate safety measures should be Highly
which can be a safety hazard at night time. High taken along with placing of delineators Desirable
with cautionary tape at this location as
per clause 5.2.1 of IRC: SP: 55-2014,
(Fig- 5.10 of the code, Page-47 - Refer
Annexure-A
5.3.5 At km 44+100
Advanced sign board are partially placed at High People at work, Speed limit , No Highly
this location, which can be safety hazard for overtaking , OHM sign board should Desirable
9
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
5.3.6 At km 45+500
Delineators are missing with cautionary tape, High Appropriate safety measures should be Highly
which can be a safety hazard at night time. taken along with placing of delineators Desirable
with cautionary tape at this location as
per clause 5.2.1 of IRC: SP: 55-2014,
(Fig- 5.10 of the code, Page-47 - Refer
Annexure-A
10
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
6.3.7 At km 47+600
Advanced sign board are partially placed at High Speed limit , No overtaking , OHM Highly
this location, which can be safety hazard for sign board should be placed at this Desirable
road users as it can lead to road crash. location for the safety of road users/
construction workers as per clause
10.2 of IRC: SP: 55- 2014 (Fig: 10.15 of
the code, Page: 111) – Refer Annexure
-B
6.3.8 At km 47+700
11
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
6.3.9 At km 39+900
Delineators with cautionary tape are missing, High Appropriate safety measures should be Highly
which can be a safety hazard at night time. taken along with placing of delineators Desirable
at both sides with cautionary tape at
this location as per clause 5.2.1 of IRC:
SP: 55-2014, (Fig- 5.10 of the code,
Page-47 - Refer Annexure-A
12
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
6.4.2 At km 58+600
Advanced sign board are partially placed High Men at work, OHM sign board should be Highly
before the diversion, which can be safety placed at this location for the safety of Desirable
hazard for road users as it can lead to road
road users/ construction workers as per
crash.
clause 10.2 of IRC: SP: 55- 2014 (Fig:
10.15 of the code, Page: 111) – Refer
Annexure –B
13
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
14
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Section of NH-365BG (Khammam – Devarapalle) of Draft Safety Audit
Report (3rd Construction
length 29.513 km from Somavaram village to Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under Bharatmala Stage)
Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
5.11.1
Note: The above observations were given for a few locations. However, the concessionaire or contractor is requested to comply with appropriate
recommendations on other similar observations in the project section.
15
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
6 CERTIFICATION
The Audit Team has carried out this worksite safety according to the IRC Manual on Road
Safety Audit and Guidelines for Traffic Management for Work zones (IRC: SP: 55-2014).
16
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
3. Speed Control
17
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
18
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
19
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
20
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
21
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
22
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
23
Safety Consultancy Services for “Construction of 4 lane Access Controlled New Greenfield Highway Draft Safety Audit Report
Section of NH-365BG (Khammam – Devarapalle) of length 29.513 km from Somavaram village to (3rd Construction Stage)
Chintagudem village (Design Ch. km 33+604 to 63+117) under Inter Corridor Route Under
Bharatmala Pariyojana on Hybrid Annuity mode in the state of Telangana (Package-II)”.
24