Professional Documents
Culture Documents
Ammonia Process
Ammonia Process
A FD-4)
POR 101-OT NNF X C
152
9I EXHAUST TO IÐ1-6 20007
AMBIENT
AIR TO GT
)Y (10-) Y (199-) MP STEAIM
OM HEADER
102C
STEAMDXUM
NOTE NOTEA NOTE 6
BEEORVEP HP STEAM
VENT WASTE HEAT BOALER SUPERHEATER
1728)
|157
FURIRER
WASTE GAS
10DA
371
9) 371
NYDROTREATER TO BATURATED IP
REFORMER STACK
CoMo: 252mY 8TEAM HEADER 44.3 JACKET
10-DC 108-DE
DMMM HPSTM
102
(so7]
STM S39
WATER BFW FR9M
(ED
DESULFURIZER/ DESULFURIZER (70)
Zno 25.0m 189.7
T1304
BFW FROM IP STEAM RADMANT
SAFLUS SYNGAs FD-S) BFW REFORMER COIL DUMES. Galh
349 799
0090006Ù
FROV 1603 RISER
HOT WATER DUTY3 23.11 MDKED FEED COIL
TO 121-L FD-5
250 74.58
PSTEAM 13.56 AIR COILS
950 45.48 STEAM SUPERHEAT COILS CONVERTE
Cat vlRs
101-8
1018J PRIMARY REFORMER 11.39 FEED PREHEAT COLS 109-C1C2
ID FAN GATALYSTVOLUME: 40,3.m²Z
-RECYCLE H2 3a53
FROM 175-J .44) IP STEM SUPERHEAT coL
c CIRCULATING
(FD-5) 349 AP.(415)
(NOTE 1)
START-UP (20.08 P STEAM COIL (130-L) START-UP
201LAMB
NG GT FUEL
NH3FOR STARTUP VENT
N2 FOR FRO 120
ALTER
HEATING B.S0 HOT WATER COIL (TBC By Fumace)
(FD-5)
CONVERTR
From LTS starup
Blower (FD-5)
1100
NOTES:
1. A.P. REFERS TO ANCHOR POINT
FUE Z. NATORAL GAS CONTAINS MAX. TOTAL SULFUR OF 10PPMW (AS H2S +ORGANIC SULFUR), No HG SHOULD RE |27
(FD 143 NATURAL GAS SUPPLY CONDITIONS AT AMMONIA UNIT B.L. DWG FD-2
MAX/NORI MIN PRESSURE =54.0/ 45.9/40,8 Kglcm2A, TEMPERATURE MAX/NORIMIN =S.o 130.0 /0.0 *c TO 131-C L
3. BAROMETRIC PRESsUREIS 1.016 KelCM2A DESIGN AIRTEMPERA TURE POR AIR CORESSOR AND GAS
SNG TO 12:o 110
STEA (O.s3) 4. JREFERS TO DESIGN VALUE.ALL THE PFDS/ MASS BALANCEISFOR EOR CONDITONS. STRIPPED STEAM
1 FROM 130-D
higte 5. FOR DETAILS ON IP STEAMIHOT WATER COIL SEE FD-S/ FD-5.
6. cONDENSATE TO BE ROUTED TO COOLING TOWER. DWG, FD5
135C
7. NG FUEI BE FINALIZED AFTER GT VENDOR SELECTION.
(O.66
CoNDENSATE
KEY Authorized DWG. FD4
202-D STREAM ID
RECYCE HYDROGEN
30
IP STM
51.
427
A TEMPERATURE, "c
PRESSURE, kg/cm'(A)
KBR HINDUSTAN URVARAK AND RASAYAN LTD
Engineering Services by
KBR Technical Services, Inc.
KBR License No.: F-xI*
124-0 (FD-6)
30 Aug 18 Issue far Firal 8ED GORAKHPUR, UP (INDIA)
PRESSURE, kg/cmG) s per Client's commens
2200 MTPD AMMONA PLANT
NATURAL
NG FLTER Inittal RN RL
GAS DESULFURZATION., REFORMING & SHIFT
A HEAT DUTY, Gcal/hr No. DATE DESCRIPTION CHK APP
PROCESS FLOW DIAGRAM (E.O.R)- NORMAL OPERATION
NITROGEN REVISIONS &APPROVALS
FOR
SSTART-UP cOND FEED GAS COMPRESSOR MASS FLOVw, kghr
(FD-6) HOS6-PR-oWG-PFD-FD1 H296 FD-1
Sprgnimy
DOCUNIENT NUMBER JOB NUMBER DRAMNG NUMBER
Po,-t
VENT TO
FROM 1402
Co, PRODUCT
110-c TO UREA PLANT
2870 MTPO AS 100 co2
(1.67)
TO 122-0t
111-40 FROM 1094
ASNGAK
7A
108-JIJA ANTLFOAM
CW INJECTION TO 117-JJA
TO 103-cs 16.5 11655 TO 108-JA
8IP STEAM 12201
BFW FROM LP FLASH 110JJA
104Js (FD6) cOLUMN 214 /ogMIN
b WATER
(FD-6) 3500 7 WASH WATER
TO 109-L SNGAS
OASE SOLuTON HP FLAS 122-D2 TO FUEL
STORAGE TANK COLUMN CO, STRIPPER OTE DWG FD
108-C
112C 10A
9.08 108-C
(2.20) 2751) 789 cw
ANT 163-D1
DWG. FDJ
FOAM TO 1 4
115 125 762.2 FROM
DMM
109-L
NG tom 174-0
(EDA (FO-1)
956.7
37
STARTP
N2
CIRCULATION
TO 150
4 167 56 pg
1104
15
125 MJAHT PROCESS
cONDENSATE
FROM 12
DWG FD3
34
70
OASE
DRANs
105-C
106-C NOTE I)
TO toF
Ior Authorized
KEY
KSTREAM ID
TEMPERATURE, 'G
lssue for Final ASn
KBR HINDUSTAN URVARAK AND RASAYANLTD
Engineering Servics by
KBR Technical Services, Inc.
KBR L0Cense No: F
30 Aug 18
PRESSURE, kg/cmA) 1 GORAKHPUR, UP (INDIA)
2 May 1a Revisad as per Clhant's cumments
12 Mar 18 Initial ssue 2200 MTPD AMMONIA PLANT
NOTES:
)HEAT DUTY, Gcalht No. DATE DESCRIP TION CNKRe 02 REMOVAL (TWO STAGE)
1)cONTAINS TRACE AMOUNTS OF H2. N2, CHA. AI, cO AND C02. REVISIONS & APPROVAI PROCESS FLOW DAGRAM (E.0.R)- NORMAL OPERATION
2) FILTERE PER VBR MASs FLOW, kgihr
HC96-PR-OWG PFD-FD H296 FD-2
7MASs FLOW, TIhr
DocUNENT NUMBER JO8 NUMBER DRAMNG NUMBER
PURIFIED
SYNTHESIs GAS
We-FO
TO 103-J
44L
DWa FD
WASTE AS TO ANALZER
101-8 FVEL
START UP
4-N,
G
MP
STM
1544LALB
17.1 1.1|n
14-D
115C CW
2464
G
(FD-4)
130-C1C2
Note-2
(35.8
FR 3.46
(FD-4)
FROM 1202
R1)X PUR EERANAGE
EXPANDER PURIFIER
DwG FD2 EXPANDER
GENERATOR ..
lote 4
NOTES: N2 PURGe
HP PURGE GAS
FROM 1240 EFERS To DESIGN VALUE
2. DUTIES: 130-C1= 1.78: 130-c2= 1.68 GCaVh
DWG FD4 3. STREAM INCLUDES MOISTURE PICKED UP DURING DRYER REGENERATION.
NNE
4 cONBIDER SEALGAS RECOVERY TO FUEL (OPTION ONLY) AFTER MACHINE SELECTION
Authorized
KEY
DWG FD
Eng T e c e h l e y
KBR
TO 101-8 FUEL STREAM ID
TEMPERATURE, "C
KBR KBR Lcense No: F a
0.36
123C AMMONA
74 VAPOR FROM
STORAGE
MP STM geg 950
211
124 124-C1/C2 CW
(28,53 UNTED ue
16.83
21 TO STEAM
D0o0o:
441.5| .A.P. REFERS TO ANCHOR PoINT. 120 cONDENSATE
3. cONSIDER SEAL GAS RECoVERY TO FUEL (OPTION ONLY) FROM 112
122C1 122C2 AFTER MACHINE SELECTION
TO 125-O
wARM NH
TO UREA PLANT