99901 A-201A FOUNDATION A Check C&S Tag No Tag Desc Doc Type Type 141-083-024B-BFAP-901 FACP-DEVELOPMENT AREA PIR DOCX Mechanical - Mechanical 141-083-024B-BFAP-901 FACP-DEVELOPMENT AREA PIR DOCX Mechanical - Mechanical SubType Unit SKID/ PACKAGE - SKID/ PACKAGE 01 - FIRST 250MMSCFD TRAIN OF KM500 GAS TREATMENT SKID/ PACKAGE - SKID/ PACKAGE 01 - FIRST 250MMSCFD TRAIN OF KM500 GAS TREATMENT System 083 - Fire & Gas Detection and HSSD Sys 083 - Fire & Gas Detection and HSSD Sys SubSystem Workpack No Location 083-031 - Fire Alarm & Fire Suppression Systems & HSSD in PER-03 KM500 - KM50 083-031 - Fire Alarm & Fire Suppression Systems & HSSD in PER-03 KM500 - KM50 Area SubArea Tag Discipline DEVELOPMENT - DEVELOPMENT AREDA1 - CONDENSATE TANK E - Electrical DEVELOPMENT - DEVELOPMENT AREDA1 - CONDENSATE TANK E - Electrical Tag Group Building NumberCWP Completed Completed By Completed Group FALSE FALSE Completed At Approved Approved By Approved At Approved By Group Sheet Revision Parent Tag FALSE 0 FALSE 0 Loop Tag Module Has Competency Checksheet Has MasterSoft Tag Cable Tag Is Loop Printed 0 1 0 0 0 1 0 1 0 0 0 1 Printed At Printed By A Punchlist OutstandingSubSystem Group Contractor Scanned At Man Hours 4/17/2023 Suresh Pasumarth 0 0.00 4/17/2023 Suresh Pasumarth 0 0.00 Scanned By Prim. Drawing FCR Attach Id Duration (Days) Group Progress 0 0 Added Manually Added By 0 JAYA 0 JAYA