PERT CPM PROPOSED PERFORMANCE ART CENTER

1. PRE CONSTRUCTION
1.1 GENERAL REQUIREMENTS
Permit Acquisition
Mobilization
Temporary Facilities
Survey Works

2. CONSTRUCTION
2.1 EARTHWORKS
Clearing and Grubbing
Excavation
Hauling and Disposal
Backfilling and Compaction
Soil Poisoning
Gravel Bedding
2.2 STRUCTURAL
Reinforcing Steel Works
Formworks
Concrete Works
2.3 ARCHITECTURAL
2.3.1 Wet Works
Masonry
Plastering
Tiling Works
2.3.2 Dry Works
Ceiling Works
Door and Windows
2.3.3 Finishing Works
Finish Carpentry
Paint Works
2.4 MEPF WORKS
2.4.1 Plumbing Works
Plumbing
2.4.2 Electrical Works
Electrical

3. POST CONSTRUCTION
Punchlisting and Close Out