Jay Singh Resume

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 3

Jay Kumar Singh

06/03/1991 Indian 662, Ajeet Nagar, Etawah 206001, India 7983915662


jaykumar.dei@gmail.com/jaysingh@powergrid.in

Profile Work experience

Electrical Engineer having over 8.5 years areas in Jhunjhunu (Rajasthan) and Mahendragarh
Experience in Construction of Sub-stations and (Haryana).
Transmission Lines (HT Testing & Commissioning Ensured seamless canal crossing for the project.
under North Eastern Region Power System Managed the smooth shifting of LT Line.
Improvement Project, POWERGRID.
Construction of Khetri- Narela 765kV Transmission 02/2018 – 09/2022 MANIPUR, TRIPURA, INDIA
line under Northern Region-1 Power Grid Field supervisor
Corporation ofIndia Limited. Power Grid Corporation of India Limited
Successfully Commissioned 15 Nos of Sub- Project:North Eastern Region Power System
stations and 3 Nos of Transmission Line (HT & LT) Improvement Project (World Bank Funding) .
under North Eastern Region Power System Roles and Responsibilities:
Improvement Project, POWERGRID. Construction, Erection and Testing &
Commissioning of 132/33 kV Sub-stations, 132 kV
Transmission Lines, 33/11 kV Sub-stations and 33 kV
Work experience Transmission Lines.
Quality Inspection and Monitoring of various
09/2022 – NARNAUL, HARYANA, INDIA construction works including supplied materials
Field supervisor (for approx. 60 sites, 4 contractors and 8
Power Grid Corporation of India Limited packages) under project NERPSIP, Manipur.(12th
Successfully executed preliminary and walk-over Feb 2018 to 28th Feb 2021) & under project
surveys for the Khetri-Narela 765kV Transmission NERPSIP, Tripura (1st Mar 2021 to 22th Sept 2022)
line project in the Northern Region-ITransmission Engagement in both Civil and Electrical works
System Strengthening Scheme for Evacuation of including Preliminary route survey, detailed survey,
Power From Solar Energy Zones in Rajasthan and location clearance, ROW, Forest Clearance,
(8.1GW). Erection, Testing and Commissioning.
Conducted detailed surveys at various crossings Preparation of Pole schedule & execution as per
and undulated areas, ensuring accurate data approved drawing, Preparation of BOQ, BOM etc.
collection and analysis. Erection of Transformers, Equipment, Laying and
Implemented check/spot surveys to verify project termination of Power and Control Cables, Erection
specifications and requirements. of Panels, Laying of Earth Mat, Treated and
Provided comprehensive supervision for tower Untreated earthing of Transformers and Equipment
foundation work, including pit marking, excavation, etc.
bar binding, and casting work. Testing and Commissioning of Power
Oversaw tower erection work, ensuring proper Transformers, Current Transformers, Potential
material segregation, essential tool and equipment Transformers, Circuit Breakers, Isolators, Control
testing, and adherence to super structure and Relay Panels, AC Distribution Boards, Battery
drawings. Sets along with Charger, Bay Marshalling Kiosk etc.
Implemented derrick fixing with meticulous Erection of 33 kV and 132 kV Gantry Towers &
attention to proper guys arrangements. Gantry Beams, 33 kV Transmission Line Poles, 132
Ensured effective grounding by implementing rod kV Transmission Line Towers, Stringing,
type and pipe type earthing for tower footings. OPGW/ADSS etc.
Successfully obtained statutory clearances for line Civil works including Survey of Transmission Line,
crossings at 132/220/400/765kV Power TL and Contouring, Point identification, Transformer
NH crossings on NH-11. Foundation, Tower Foundation, and Construction of
Facilitated forest clearances for protected forest Control Room Building etc.
Work experience Work experience

Checking JMC (for both Civil and Electrical works) assessments of electrical installations, identifying
and RA Bills for both Supply and Service for and resolving any issues to ensure optimal
Contractors and Parking Bills in SAP. performance and functionality.
Communication with various State and Central Managed a team of electricians and technicians,
Government authorities for project related works. providing guidance and overseeing their work to
Providing Compensation to Land owners in case of ensure timely completion of projects within
765kV & 132 kV Transmission Lines as per the allocated budgets and resources.
norms of POWERGRID as well as State
Government Authorities wherever applicable.
Applying for clearance from various authorities like Education
Forest, Railway, PTCC, Defense etc for ROW of
Transmission Lines. 07/2008 – 05/2011 AGRA, INDIA
Preparation and submission of Detailed Progress Diploma in Electrical Engineering
Reports to Regional Head Quarter on weekly, Dayal Bagh Educational Institute
monthly and quarterly basis. Diploma in Electrcal Engineering with First Class with
Comply with relevant IS codes, POWERGRID 63.3% marks.
Standard Field Quality Plan, World Bank norms etc.
07/2006 – 05/2007 E TAWAH, INDIA
12/2013 – 06/2016 GUNA, INDIA Science | Intermediate
Site Engineer (Electrical) HMS Islamia Inter Collage
Archon Engicon Limited Intermediate with First Class with 64% Marks.
Project: Construction of 132kV Transmission Line.
Client: Madhya Pradesh Power Transmission 07/2004 – 05/2005 E TAWAH, INDIA
Company Limited (A Government of India Enterprise) Science | Highschool
Roles and Responsibilities: HMS Islamia Inter Collage
Construction, Erection 132kV Transmission Lines. Intermediate with First Class with 65% Marks.
Civil works including Preliminary route survey,
detailed survey and preparation of drawings.
To Implement Plants and Drawings at site of Strengths
concerned packages and improve the designs in
consultation with client, if required.
Technical skills Problem-solving
PERSONAL PROFILE
Erection of 132 kV Gantry Towers & Gantry Beams,
Adaptability Communication Leadership
Line Poles, 132 kV Transmission Line Towers,
Stringing etc.
Time management
Civil works including Survey of Transmission Line,
Contouring, Point identification, Transformer
Effectively managing multiple projects
Foundation, Tower Foundation etc.
Preparation of Proposals for additional works as
per site requirements.
Preparation of JMCs. Skills
Preparation and submission of Detailed Progress
Reports on weekly, monthly and quarterly basis for L ANGUAGES
onward submission to the client. English
Hindi
09/2011 – 11/2013 AURAIYA, INDIA
Site Engineer (Electrical) COMPUTER SKILLS
Hythro Power Corporation Limited Microoft Office
Project: Construction of 132kV Transmission Line. Social Media
Client: Uttar Pradesh Power Transmission Company Powerpoint
Limited (A Government of India Enterprise)
Executed and supervised the installation and Technical Expertise
testing of electrical systems on multiple Problem-solving
construction sites, ensuring compliance with Communication
industry standards and safety regulations. Project Management
Collaborated with project managers, architects,
and contractors to develop and review electrical
plans and specifications, ensuring compatibility
with the overall project objectives.
Conducted regular inspections and quality control
Hobbies

Exploring Getting lost in a Capturing


distant lands good book moments

Feeling the Every kind of


music sport

Declaration:
I do hereby declare that the foregoing information is
correct and true to the best of my knowledge
and belief.

Place: Narnaul, Haryana


JAY KUMAR SINGH

You might also like