Controlled Construction: Additions To CR3 Distribution Schematic

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

C-GEN1

400V
2.0MVA C-TX1 C-TX2 C-TX3 C-TX4 C-TX7 C-TX8 C-TX6 C-TX5
11kV / 400V 11kV / 400V 11kV / 400V 11kV / 400V 11kV / 400V 11kV / 400V 11kV / 400V 11kV / 400V
2.5MVA 2.5MVA 2.5MVA 2.5MVA 2.5MVA 2.5MVA 2.5MVA 2.5MVA

3200A
TPN ACB

C-LV1 3200A 3200A 3200A C-LV2 3200A 3200A C-LV3 3200A 3200A C-LV4 3200A 3200A
ESSENTIAL TPN ACB 4p ACB 4p ACB UPS INPUT 4p ACB 4p ACB UPS INPUT 4p ACB 4p ACB PLANT SWITCHBOARD 4p ACB 4p ACB
SWITCHBOARD NON AUTO SD SD
SWITCHBOARD SD SD
SWITCHBOARD SD SD SD SD

(BLUE) PM PM 3200A PM PM 3200A PM PM 3200A PM PM 3200A PM

4p ACB 4p ACB 4p ACB 4p ACB


800A 800A 800A 630A 100A 400A 100A 100A 250A 100A 400A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 800A 1000A 630A 800A 800A 1000A 1000A 800A 200A 100A 800A
3200A 3p 3p 3p 3p 3p 3p 3200A 3p 3p 3p 3p 3p 3p 3200A 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p
3p 3p 3p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p
4p ACB FS SW FS SW FS SW FS SW FS SW FS SW 4p ACB FS SW FS SW FS SW FS SW FS SW FS SW 4p ACB FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW
FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW MCCB FS SW FS SW

PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM PM

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
SPARE

SPARE
SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
C-UPS1 C-UPS25 C-UPS3
EXTERNAL
BYPASS

500kVA 500kVA 500kVA


450kW 450kW 450kW
97% EFF 97% EFF 97% EFF

C-PDU 3 C-PDU 4 C-PDU 5 C-PDU 6 C-PDU 7 C-PDU 8 C-PDU 9 C-PDU 10

C-LV5 C-PDU-1
UPS OUTPUT 800A
SWITCHBOARD 3200A
4p
800A 800A 800A ISOL
(BLUE) 4p 4p 4p 4p ACB
ISOL ISOL ISOL NONAUTO
800A 800A 400A 800A 100A 200A 200A 200A 200A
4p 4p 4p 4p 4p 4p 4p 4p 4p
FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW
SPARE

SPARE

C-PDU-11 800A
4p
ISOL

PM

CHILLER C-1 DISTRIBUTION REMOTE REMOTE REMOTE


CHILLER C-4
132kW BOARD C-LP1 PFC UNIT 200A 200A 200A 200A PFC UNIT PFC UNIT
4p 4p 4p 4p
FS SW FS SW FS SW FS SW

SPARE
24WAY TPN 100A
(SMALL POWER & CHILLER C-2 CHILLER C-3
DISTRIBUTION LIGHTING)
C-PDU 2
BOARD C-FS

SPARE
12WAY TPN 100A
(CRITICAL SUPPLY
POWER )

C-MP1 PLANT 400A C-MP2 PLANT 400A C-MP3 PLANT 800A C-MP4 PLANT 200A
4p 4p 4p 4p
SWITCHBOARD ISOL
SWITCHBOARD ISOL
SWITCHBOARD ISOL
SWITCHBOARD ISOL
(BLUE) (BLUE)
PM PM PM

100A 100A 100A 100A 100A 100A 100A 100A 100A 100A 100A 100A 100A 125A 100A 100A 100A 100A 100A 100A 100A 50A 50A 50A 50A 50A 100A 100A 100A 50A 50A 50A 50A 50A
4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p
FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW
SPARE FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW FS SW

COOLING COOLING COOLING COOLING COOLING COOLING

SPARE

SPARE

SPARE
COMPUTER COMPUTER CONDENSER CONDENSER AIR HANDLING
CH/W PUMP1 CH/W PUMP2
PUMP 1 PUMP 2 PUMP1 TOWER1 TOWER2 TOWER10 TOWER12 PUMP3 UNIT TOWER 5 TOWER 7
37kW 37kW
30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW
SPARE

SPARE

SPARE

SPARE
COMPUTER CONDENSER COOLING COOLING COOLING COOLING CONDENSER COOLING COOLING COOLING
CH/W PUMP3 CH/W PUMP4 DIST BD
PUMP 3 PUMP2 TOWER3 TOWER9 TOWER11 TOWER13 PUMP4 TOWER 4 TOWER 6 TOWER 8
37kW 37kW C-MP2/1
30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW 30kW
12 WAY TPN 125A
(12No CCUs - 4.89kW)

DB-16 DB-17 DB-18 DB-19 DB-20


250A 250A 250A 250A 250A
4p 4p 4p 4p 4p
NSX250F NSX250F NSX250F NSX250F NSX250F
MCCB MCCB MCCB MCCB MCCB

32A 32A 32A 32A 32A 63A 32A 63A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 63A 32A 63A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 63A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A
4p 4p 4p 4P 4P 4P 4P 4P 4P 4P 4p 4p 4p 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4P 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p 4p
Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9 Acti9
MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB MCB
SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE
NEW 1x1x5C 6mm² NEW 1x1x5C 6mm² NEW 1x1x5C 6mm² NEW 1x1x5C 6mm² NEW 1x1x5C 6mm²
HO7RN-F FLEX HO7RN-F FLEX HO7RN-F FLEX HO7RN-F FLEX HO7RN-F FLEX
RUBBER CABLE RUBBER CABLE RUBBER CABLE RUBBER CABLE RUBBER CABLE
NEW 1x1x5C 25mm² NEW 1x1x5C 25mm²
HO7RN-F FLEX HO7RN-F FLEX
RUBBER CABLE RUBBER CABLE

32A 32A 32A 32A 63A 63A 32A 63A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 63A 32A 63A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A 32A
RACK SUPPLY

RACK SUPPLY

RACK SUPPLY

RACK SUPPLY

RACK SUPPLY
SUPPLY

SUPPLY

SUPPLY

SUPPLY
COOLING

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY

SUPPLY
ARC CELL 1

ARC CELL 1

ARC CELL 1 COOLING

ARC CELL 1

ARC CELL 1 SUPPLY

ARC CELL 3 SUPPLY

ARC CELL 3

ARC CELL 3

ARC CELL 2

ARC CELL 2 SUPPLY

ARC CELL 2 COOLING

ARC CELL 2

ARC CELL 2 SUPPLY

ARC CELL 4

ARC CELL 4

ARC CELL 4 COOLING

ARC CELL 4 SUPPLY

ARC CELL 4 SUPPLY

ARC CELL 3

ARC CELL 3 COOLING

ARC CELL 3

ARC CELL 2

ARC CELL 2

ARC CELL 2 COOLING

ARC CELL 2

ARC CELL 2

ARC CELL 1

ARC CELL 1

ARC CELL 1 COOLING

ARC CELL 1

ARC CELL 1 SUPPLY

ARC CELL 4 SUPPLY

ARC CELL 4

ARC CELL 4 COOLING

ARC CELL 4 SUPPLY

ARC CELL 4 SUPPLY


DO NOT SCALE FROM THIS DRAWING CONSTRUCTION (DESIGN & MANAGEMENT) REGULATIONS 2015 Revisions: Date: Drn: Revisions: Date: Drn: Client: Issuing Office: Office Locations Drawing Title:

Notes: HEALTH & SAFETY NOTE C01 CONSTRUCTION ISSUE. 21.03.2023 JWM EDINBURGH Glasgow Additions to CR3 Distribution
C02 COMPUTER ROOM No.3 DB SUPPLIES UPDATED 12.05.2023 RWM The University of Edinburgh Rosewell House Aberdeen
Schematic
1. THE ELECTRICAL INSTALLATION SHALL COMPLY IN ALL RESPECTS WITH BS 7671:2018 IET WIRING REGULATIONS EIGHTEENTH EDITION AND THE WORKING WITHIN A LIVE DATA CENTRE
2A Harvest Drive London
C03 FINAL CIRCUIT AMMENDMENTS 16.05.2023 RWM Newbridge EH28 8QJ
LATEST EDITION OF THE SCOTTISH TECHNICAL HANDBOOK
C04 SUPPLY CABLING TO CHILLERS ALTERED AND REMOVED REQUIREMENT 07.11.2023 RMC Tel: +44(0)131 333 8000
Drawn: Approved: Job Number:
FOR NEUTRAL CONDUCTOR. Architect:
2. THE INSTALLATION SHALL COMPLY IN ALL RESPECTS WITH THE UNIVERSITY OF EDINBURGH ENGINEERING GUIDELINES. Email: Website: JWM GF 230031
Enquires@rsp.net www.rsp.net Date: Scale: Revision:
3. DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT SERVICES DRAWINGS, SPECIFICATIONS & SCHEDULES. 21/03/23 NTS @A1 C04
4. DRAWING SHALL BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL & STRUCTURAL DRAWINGS.
Drawing Number:
Project:
Advanced Computer Facility
CONTROLLED
THE ABOVE ARE CONSIDERED SIGNIFICANT RISKS THAT REMAIN DURING AND/OR
AFTER COMPLETION OF THE STAGE INDICATED. Computer Room No.3 CONSTRUCTION 230031-RSP-C3-00-DR-E-60001