Brick work M3 1 Garden wall Reparing for viswakarma puja Earth Excavation Work M3 0.8 Lbr chrg-PLASTERING M2 1 Pit Construction for Air Pipe Line valve Pit Construction for Air Pipe Line valve EA 1 Temporary Brick Soiling for TXRsz Temporary Brick Soiling for TXRsz M2 12 Earth Excavation Work M3 80 Shipyard work for Tent & Keel laying Lbr chrg fr earth shifting M3 80 Dressing & leveling M2 125 Earth Excavation Work M3 0.424 Brick work M3 0.4 Ash Gate construction Lbr chrg-PLASTERING M2 4.24 Net Cement M2 4.24 Locker Unloading & Shifting EA 40 Drain grove cutting Cable laying M 37 Slab construction and fixing EA 6 Floor chipping, cleaning & neat cement M2 360 Floor chipping, cleaning & neat cement M2 120 Floor chipping, cleaning & neat cement M2 230 Weigh bridge pit cleaning & repairing EA 4 Manual Steel unloading EA 1 MISCELLANEOUS WORK Electrical Cable Drum shifting EA 8 Old Brick Cleaning & Stacking Work PC 1298 P2P tower base casting EA 2 Mub cleaing & washing of shipyard road M2 85 DM track Cleaning EA 1 Repairing of Cable trench towards M 25 Back side road repairing with JCB HR 8 Water Spilling Protection work EA 1