Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 2

Tippler

1 End rings
Rack Gressing
Rack Fixing bolt Tightening
2 Platen
Rail alignment platfor to ground
3 Side Beam
Wear pads Conditions
5 Clamps
Gripping with Wagon during operation
Pads Conditions
Pins Greasing
Cylinder operation
Up Down Proxy Switch During Operation
6 Drives
Backlesh of rack & pinion
Brake Operation
Pinion Status and wear pattern
Rack Wear pattern
7 Load cell
Load cell structure
Tie rods
Trunion Bracket
8 Power pack
Cooler- oil
Lekage
No load pressure
Working Pressure
Working speed observation
Interlock, Limit switch Level switch & temp Switch
Encoder
9 Cleness
10 Run back Stop operation
11 Clicking Stop operation

Side Arm Charger


1 Main Frame/Platform & arm
Examine all bolted connections and ensure they are securely fastened.
Visually inspect all welded connection

2 Hydraulic motor
Check for any oil leakage,
Check for smooth operation,
Check for any noise during operation,
Check for smooth start and stop.
3 Rack & pinion Wear
4 Arm luff support
Check the smooth movement and final position of arm – hoist.
5 Arm Luffing Hydraulic Cylinder
Check for any oil leakage
Check for smooth operation
Check for any noise during operation
Check for smooth start and stop.
6 Arm head buffer

a Proper alignment and smooth functioning of springs need to be checked.


7 Pump Pressure & Hyd Motor Brake pressure
8 Any Lekage
9 Hose Conditions
10 Tank Oil Level
11 Interlock

You might also like