Professional Documents
Culture Documents
LF 1
LF 1
Contract: SN:
Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 14 0 0 914 0 0 928
Project Filename:
Output Filename:
Project: ETAP Page: 2
Contract: SN:
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Contract: SN:
Load
Total Number of Buses: 930 0.443 0.215 12.306 5.960 0.000 0.000 0.000 0.000
0.000 0.000
Project: ETAP Page: 30
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
Line/Cable/Busway Length
Contract: SN:
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
1S/S1-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S2-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S3-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S4-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S05--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S06--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S07--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S1-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S2-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S3-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S4-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S05--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S06--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S07--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
Project: ETAP Page: 57
Contract: SN:
Branch Connections
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
1S/S1-LV-PANEL 0.400 98.734 -1.6 0.000 0.000 -0.002 -0.008 11-SMDP-1 0.168 0.082 272.8 89.8
1S/S2-LV-PANEL2 0.400 98.779 -1.6 0.000 0.000 -0.001 -0.009 12-SMDP-01 0.168 0.082 272.9 89.8
1S/S3-LV-PANEL 0.400 99.008 -1.5 0.000 0.000 -0.001 -0.007 13-SMDP-1 0.151 0.074 244.6 89.8
1S/S4-LV-PANEL 0.400 98.718 -1.6 0.000 0.000 0.000 0.000 14-SMDP-01 0.161 0.079 262.2 89.9
Contract: SN:
1S/S5-LV-PANEL1 0.400 99.808 -1.1 0.000 0.000 0.000 0.000 Bus509 0.716 0.351 1153.6 89.8
1S/S6-LV-PANEL 0.400 99.516 -1.3 0.000 0.000 0.000 -0.001 Bus536 0.659 0.323 1064.5 89.8
1S/S7-LV-PANEL 0.400 99.270 -1.4 0.000 0.000 -0.001 -0.005 17-SMDP-01 0.170 0.083 274.7 89.9
2S/S2-LV-PANEL3 0.400 99.431 -1.3 0.000 0.000 -0.001 -0.004 22-SMDP-01 0.171 0.083 275.2 89.9
2S/S3 0.400 99.108 -1.4 0.000 0.000 -0.001 -0.007 23-SMDP-01 0.151 0.074 245.0 89.8
2S/S4 0.400 98.706 -1.6 0.000 0.000 0.000 0.000 24-SMDP-01 0.165 0.080 268.0 90.0
Contract: SN:
2S/S5 0.400 99.807 -1.1 0.000 0.000 0.000 0.000 Bus1224 0.716 0.351 1153.9 89.8
2S/S6 0.400 100.010 -1.1 0.000 0.000 0.000 0.000 Bus1237 0.665 0.325 1068.5 89.8
2S/S7 0.400 98.794 -1.6 0.000 0.000 -0.002 -0.008 27-SMDP-01 0.168 0.082 273.0 89.8
11-SMDP-1 0.400 98.352 -1.7 0.000 0.000 -0.001 0.000 DB-B01-8 0.056 0.027 90.9 90.0
11-SMDP-2 0.400 98.023 -1.8 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.166 -0.081 271.9 89.9
11-SMDP-3 0.400 98.154 -1.7 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.166 -0.081 272.2 89.9
11-SMDP-04 0.400 97.843 -1.8 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.165 -0.081 271.0 89.9
Contract: SN:
11-SMDP-05 0.400 97.329 -1.9 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.129 -0.063 213.6 89.8
11-SMDP-06 0.400 97.431 -1.9 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.109 -0.053 179.7 89.8
11-SMDP-16 0.400 98.183 -1.7 0.000 0.000 0.000 0.000 1S/S1-LV-PANEL -0.087 -0.042 141.6 90.0
12-SMDP-01 0.400 98.397 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.167 -0.081 272.9 89.9
12-SMDP-02 0.400 98.067 -1.8 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.166 -0.081 272.1 89.9
12-SMDP-3 0.400 98.381 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.114 -0.056 186.8 89.8
12-SMDP-4 0.400 98.167 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.114 -0.056 186.2 89.8
12-SMDP-5 0.400 97.320 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.134 -0.066 221.9 89.8
Contract: SN:
12-SMDP-6 0.400 97.466 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.109 -0.053 179.6 89.8
12-SMDP-7 0.400 97.538 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.172 -0.084 283.0 89.8
13-SMDP-1 0.400 98.665 -1.6 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.150 -0.073 244.6 89.9
13-SMDP-2 0.400 98.426 -1.6 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.163 -0.079 265.7 89.9
13-SMDP-3 0.400 97.763 -1.8 0.000 0.000 -0.002 0.000 1S/S3-LV-PANEL -0.188 -0.092 309.7 89.8
13-SMDP-04 0.400 98.471 -1.6 0.000 0.000 0.000 0.000 1S/S3-LV-PANEL -0.126 -0.061 205.0 89.9
13-SMDP-5 0.400 98.348 -1.6 0.000 0.000 0.000 0.000 1S/S3-LV-PANEL -0.076 -0.037 124.6 89.9
13-SMDP-6 0.400 98.001 -1.7 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.113 -0.055 185.8 89.8
13-SMDP-7 0.400 97.641 -1.8 0.000 0.000 -0.002 0.000 1S/S3-LV-PANEL -0.103 -0.050 168.7 89.8
Project: ETAP Page: 86
Contract: SN:
14-SMDP-01 0.400 97.524 -1.9 0.000 0.000 0.000 0.000 1S/S4-LV-PANEL -0.160 -0.077 262.2 90.1
16-SMDP-2 0.400 97.855 -1.7 0.000 0.000 0.000 0.000 1S/S6-LV-PANEL -0.132 -0.063 215.4 90.1
17-SMDP-01 0.400 98.886 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.169 -0.082 274.7 90.0
17-SMDP-02 0.400 98.555 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.168 -0.081 273.6 90.0
17-SMDP-03 0.400 98.687 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.169 -0.082 274.2 90.0
17-SMDP-04 0.400 98.374 -1.6 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.167 -0.081 273.0 90.0
Contract: SN:
17-SMDP-05 0.400 97.947 -1.7 0.000 0.000 -0.001 0.000 1S/S7-LV-PANEL -0.111 -0.054 181.3 89.9
17-SMDP-6 0.400 98.814 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.071 -0.034 115.6 90.0
17-SMDP-07 0.400 99.270 -1.4 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL 0.000 0.000 0.0 -98.6
21-MDP 0.400 98.793 -1.6 0.000 0.000 -0.002 -0.008 21-SMDP-1 0.168 0.082 273.0 89.8
21-SMDP-1 0.400 98.411 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.167 -0.081 273.0 89.9
21-SMDP-2 0.400 98.081 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.166 -0.081 272.2 89.9
21-SMDP-3 0.400 98.213 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.167 -0.081 272.4 89.9
21-SMDP-04 0.400 97.902 -1.8 0.000 0.000 -0.001 0.000 21-MDP -0.165 -0.081 271.2 89.9
Contract: SN:
21-SMDP-5 0.400 97.386 -1.9 0.000 0.000 -0.001 0.000 21-MDP -0.130 -0.063 213.8 89.8
21-SMDP-6 0.400 97.492 -1.9 0.000 0.000 -0.001 0.000 21-MDP -0.109 -0.053 179.5 89.8
21-SMDP-7 0.400 98.345 -1.7 0.000 0.000 0.000 0.000 21-MDP -0.071 -0.034 115.3 90.1
22-SMDP-01 0.400 99.046 -1.4 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.170 -0.082 275.2 90.0
22-SMDP-02 0.400 98.714 -1.5 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.169 -0.082 274.5 90.0
22-SMDP-03 0.400 99.030 -1.4 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.116 -0.056 188.4 90.0
22-SMDP-04 0.400 98.814 -1.5 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.116 -0.056 187.9 90.0
22-SMDP-5 0.400 98.013 -1.6 0.000 0.000 0.000 0.000 Bus305 0.021 0.010 34.6 90.1
Contract: SN:
22-SMDP-06 0.400 98.106 -1.6 0.000 0.000 -0.001 0.000 2S/S2-LV-PANEL3 -0.111 -0.054 181.4 89.9
23-SMDP-01 0.400 98.766 -1.5 0.000 0.000 -0.001 0.000 2S/S3 -0.151 -0.073 245.0 89.9
23-SMDP-02 0.400 98.526 -1.6 0.000 0.000 -0.001 0.000 2S/S3 -0.163 -0.079 266.1 89.9
23-SMDP-03 0.400 97.862 -1.7 0.000 0.000 -0.002 0.000 2S/S3 -0.189 -0.092 310.2 89.9
23-SMDP-04 0.400 98.572 -1.6 0.000 0.000 0.000 0.000 2S/S3 -0.126 -0.061 205.3 89.9
23-SMDP-05 0.400 98.448 -1.6 0.000 0.000 0.000 0.000 2S/S3 -0.076 -0.037 124.8 89.9
23-SMDP-06 0.400 98.100 -1.7 0.000 0.000 -0.001 0.000 2S/S3 -0.114 -0.055 186.1 89.9
23-SMDP-07 0.400 98.106 -1.7 0.000 0.000 -0.001 0.000 2S/S3 -0.075 -0.037 123.7 89.8
24-SMDP-01 0.400 97.487 -1.9 0.000 0.000 0.000 0.000 2S/S4 -0.163 -0.078 268.0 90.2
Project: ETAP Page: 90
Contract: SN:
27-SMDP-01 0.400 98.412 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.167 -0.081 273.0 89.9
27-SMDP-02 0.400 98.082 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.166 -0.081 272.2 89.9
27-SMDP-03 0.400 98.214 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.166 -0.081 272.2 89.9
27-SMDP-04 0.400 97.902 -1.8 0.000 0.000 -0.001 0.000 2S/S7 -0.165 -0.081 271.2 89.9
27-SMDP-05 0.400 97.387 -1.9 0.000 0.000 -0.001 0.000 2S/S7 -0.130 -0.063 213.8 89.8
27-SMDP-06 0.400 97.491 -1.9 0.000 0.000 -0.001 0.000 DB-B01-031 0.055 0.027 90.7 90.0
Contract: SN:
27-SMDP-07 0.400 98.347 -1.7 0.000 0.000 0.000 0.000 2S/S7 -0.070 -0.034 114.9 90.0
Bus1 0.400 97.990 -1.8 0.000 0.000 0.000 0.000 11-SMDP-2 0.000 0.000 0.3 90.4
BUS-1S/S-01 13.800 100.000 0.0 0.000 0.000 0.000 0.000 MV SWGR#1 -3.985 -2.054 187.6 88.9
BUS-1S/S-02 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-01 -2.967 -1.533 139.7 88.8
BUS-1S/S-03 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-02 -1.961 -1.017 92.4 88.8
BUS-1S/S-04 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-03 -1.016 -0.534 48.0 88.5
BUS-1S/S-05 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 -0.728 -0.375 34.3 88.9
BUS-1S/S-06 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-05 0.728 0.375 34.3 88.9
BUS-1S/S-07 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 1.535 0.792 72.3 88.9
Bus2 0.400 96.779 -1.8 0.000 0.000 0.021 0.010 11-SMDP-05 -0.021 -0.010 34.4 90.0
BUS-2S/S-1 13.800 100.000 0.0 0.000 0.000 0.000 0.000 MV SWGR#2 -3.773 -1.942 177.5 88.9
BUS-2S/S-2 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-1 -2.771 -1.428 130.4 88.9
BUS-2S/S-3 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-2 -1.938 -1.004 91.3 88.8
Project: ETAP Page: 92
Contract: SN:
BUS-2S/S-4 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-3 -1.019 -0.535 48.2 88.5
BUS-2S/S-5 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 -0.728 -0.375 34.3 88.9
BUS-2S/S-6 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-5 0.728 0.375 34.3 88.9
BUS-2S/S-7 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 1.404 0.721 66.0 88.9
Bus3 0.400 96.886 -2.0 0.000 0.000 -0.001 0.000 DB-B06 0.001 0.000 0.9 99.5
Bus4 0.400 97.900 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 20.8 89.9
Bus5 0.400 98.025 -1.6 0.000 0.000 0.014 0.007 DB-B01-06 -0.014 -0.007 22.8 89.8
Bus6 0.400 97.849 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 20.9 89.9
Bus7 0.400 97.968 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 21.1 89.9
Bus8 0.400 97.378 -1.7 0.000 0.000 0.028 0.014 13-SMDP-3 -0.028 -0.014 46.7 90.1
Bus9 0.400 98.186 -1.7 0.000 0.000 0.003 0.002 DB-B01-06 -0.003 -0.002 5.6 89.1
Bus10 0.400 96.738 -2.0 0.000 0.000 0.022 0.011 DB-B06 -0.022 -0.011 36.9 89.6
Bus11 0.400 96.753 -2.0 0.000 0.000 0.020 0.010 DB-B06 -0.020 -0.010 33.1 89.5
Bus12 0.400 96.763 -2.0 0.000 0.000 0.018 0.009 DB-B06 -0.018 -0.009 30.5 89.5
Bus13 0.400 98.021 -1.6 0.000 0.000 0.015 0.007 DB-B03-02 -0.015 -0.007 24.1 89.8
Bus14 0.400 96.737 -2.0 0.000 0.000 0.041 0.020 DB-B06 -0.041 -0.020 68.8 89.6
Bus15 0.400 98.034 -1.6 0.000 0.000 0.013 0.006 21-SMDP-7 -0.013 -0.006 20.6 90.0
Bus17 0.400 97.399 -1.9 0.000 0.000 0.023 0.011 12-SMDP-7 -0.023 -0.011 37.1 90.2
Bus18 13.800 100.000 0.0 0.000 0.000 0.001 -0.006 BUS-1S/S-03 -0.945 -0.483 44.4 89.0
Bus20 0.400 97.138 -1.9 0.000 0.000 0.012 0.006 DB-B01-15 -0.012 -0.006 20.6 89.7
Bus21 0.400 96.966 -1.8 0.000 0.000 0.014 0.007 DB-B01-15 -0.014 -0.007 22.6 89.9
Bus22 0.400 97.208 -1.9 0.000 0.000 0.012 0.006 DB-B01-15 -0.012 -0.006 20.6 89.5
Bus23 0.400 97.064 -1.8 0.000 0.000 0.013 0.006 DB-B01-15 -0.013 -0.006 20.8 89.8
Bus24 0.400 97.318 -1.7 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.7 89.9
Project: ETAP Page: 93
Contract: SN:
Bus25 0.400 97.497 -1.7 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.7 89.7
Bus26 0.400 97.438 -1.6 0.000 0.000 0.014 0.007 DB-B01-09 -0.014 -0.007 22.7 89.8
Bus28 0.400 97.362 -1.6 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.7 89.9
Bus29 0.400 97.309 -1.6 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.9 89.9
Bus30 0.400 97.532 -1.7 0.000 0.000 0.003 0.002 DB-B01-09 -0.003 -0.002 5.6 89.6
Bus31 0.400 97.692 -1.7 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 20.7 89.8
Bus33 0.400 97.633 -1.7 0.000 0.000 0.014 0.007 DB-B01-10 -0.014 -0.007 22.7 89.8
Bus37 0.400 97.556 -1.7 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 20.8 89.9
Bus38 0.400 97.504 -1.6 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 21.0 89.9
Bus39 0.400 97.888 -1.7 0.000 0.000 0.009 0.005 DB-B02-4 -0.009 -0.005 15.1 89.7
Bus40 0.400 97.726 -1.7 0.000 0.000 0.003 0.002 DB-B01-10 -0.003 -0.002 5.7 89.7
* Bus42 13.800 100.000 0.0 6.180 3.176 0.000 0.000 MV SWGR#2 6.180 3.176 290.7 88.9
Bus44 0.400 97.888 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 20.8 89.8
Bus46 0.400 97.889 -1.6 0.000 0.000 0.009 0.004 DB-B02-02 -0.009 -0.004 15.1 89.8
Bus47 0.400 97.717 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 20.8 89.9
Bus48 0.400 97.843 -1.6 0.000 0.000 0.014 0.007 DB-B01-7 -0.014 -0.007 22.8 89.8
Bus50 0.400 97.964 -1.6 0.000 0.000 0.010 0.005 DB-B02-02 -0.010 -0.005 17.1 89.7
Bus74 0.400 97.667 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 20.8 89.9
Bus75 0.400 97.785 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 21.0 89.9
Bus76 0.400 98.003 -1.7 0.000 0.000 0.003 0.002 DB-B01-7 -0.003 -0.002 5.6 89.1
Bus77 0.400 97.535 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 20.7 89.9
Bus78 0.400 97.660 -1.6 0.000 0.000 0.014 0.007 DB-B01-8 -0.014 -0.007 22.7 89.8
Bus79 0.400 97.485 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 20.8 89.9
Bus80 0.400 97.603 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 21.0 89.9
Bus81 0.400 97.821 -1.6 0.000 0.000 0.003 0.002 DB-B01-8 -0.003 -0.002 5.6 89.0
Bus82 0.400 97.828 -1.7 0.000 0.000 0.014 0.007 DB-B01-11 -0.014 -0.007 22.8 89.8
Bus83 0.400 97.752 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 20.8 89.9
Bus84 0.400 97.209 -1.7 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.7 89.9
Bus85 0.400 97.333 -1.7 0.000 0.000 0.014 0.007 DB-B01-03 -0.014 -0.007 22.6 89.8
Bus86 0.400 97.158 -1.6 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.7 89.9
Bus87 0.400 97.276 -1.7 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.9 89.9
Bus88 0.400 97.493 -1.7 0.000 0.000 0.003 0.002 DB-B01-03 -0.003 -0.002 5.6 88.9
Bus89 0.400 97.403 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 20.7 89.9
Project: ETAP Page: 94
Contract: SN:
Bus90 0.400 97.528 -1.7 0.000 0.000 0.014 0.007 DB-B01-04 -0.014 -0.007 22.7 89.8
Bus91 0.400 97.352 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 20.7 89.9
Bus92 0.400 97.471 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 21.0 89.9
Bus93 0.400 97.688 -1.7 0.000 0.000 0.003 0.002 DB-B01-04 -0.003 -0.002 5.6 88.9
Bus94 0.400 97.533 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 20.7 89.9
Bus95 0.400 97.658 -1.7 0.000 0.000 0.014 0.007 DB-B01-05 -0.014 -0.007 22.7 89.8
Bus96 0.400 97.482 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 20.8 89.9
Bus97 0.400 97.601 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 21.0 89.9
Bus98 0.400 97.818 -1.7 0.000 0.000 0.003 0.002 DB-B01-05 -0.003 -0.002 5.6 89.0
Bus99 0.400 97.699 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 21.0 89.9
Bus100 0.400 97.922 -1.7 0.000 0.000 0.003 0.002 DB-B01-11 -0.003 -0.002 5.7 89.7
Bus101 0.400 97.415 -1.7 0.000 0.000 0.014 0.007 DB-B01-12 -0.014 -0.007 22.7 89.9
Bus102 0.400 97.367 -1.7 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.7 89.9
Bus103 0.400 97.507 -1.8 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.9 89.8
Bus104 0.400 97.652 -1.8 0.000 0.000 0.003 0.002 DB-B01-12 -0.003 -0.002 5.6 88.9
Bus105 0.400 97.175 -1.7 0.000 0.000 0.012 0.006 DB-B01-13 -0.012 -0.006 20.7 89.9
Bus106 0.400 97.272 -1.7 0.000 0.000 0.014 0.007 DB-B01-13 -0.014 -0.007 22.6 89.9
Bus107 0.400 97.224 -1.7 0.000 0.000 0.013 0.006 DB-B01-13 -0.013 -0.006 20.7 89.9
Bus108 0.400 97.364 -1.7 0.000 0.000 0.013 0.006 DB-B01-13 -0.013 -0.006 20.9 89.8
Bus109 0.400 97.509 -1.8 0.000 0.000 0.003 0.002 DB-B01-13 -0.003 -0.002 5.6 88.8
Bus110 0.400 96.982 -1.7 0.000 0.000 0.012 0.006 DB-B01-14 -0.012 -0.006 20.6 89.9
Bus111 0.400 97.078 -1.7 0.000 0.000 0.014 0.007 DB-B01-14 -0.014 -0.007 22.6 89.8
Bus112 0.400 97.030 -1.7 0.000 0.000 0.012 0.006 DB-B01-14 -0.012 -0.006 20.7 89.9
Bus113 0.400 97.170 -1.7 0.000 0.000 0.013 0.006 DB-B01-14 -0.013 -0.006 20.9 89.8
Bus114 0.400 97.315 -1.8 0.000 0.000 0.003 0.002 DB-B01-14 -0.003 -0.002 5.6 88.7
Bus115 0.400 97.214 -1.9 0.000 0.000 0.003 0.002 DB-B01-15 -0.003 -0.002 5.6 89.5
Bus116 0.400 96.931 -1.8 0.000 0.000 0.012 0.006 DB-B01-16 -0.012 -0.006 20.5 89.7
Bus117 0.400 96.760 -1.8 0.000 0.000 0.014 0.007 DB-B01-16 -0.014 -0.007 22.5 89.9
Bus118 0.400 97.001 -1.9 0.000 0.000 0.012 0.006 DB-B01-16 -0.012 -0.006 20.5 89.5
Bus119 0.400 97.837 -1.6 0.000 0.000 0.009 0.004 DB-B02-02 -0.009 -0.004 15.1 89.9
Bus120 0.400 96.857 -1.8 0.000 0.000 0.013 0.006 DB-B01-16 -0.013 -0.006 20.8 89.8
Bus121 0.400 97.007 -1.9 0.000 0.000 0.003 0.002 DB-B01-16 -0.003 -0.002 5.6 89.5
Bus122 0.400 97.399 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 0.000 0.000 0.4 90.7
Project: ETAP Page: 95
Contract: SN:
Bus123 0.400 97.703 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.8
Bus124 0.400 97.778 -1.6 0.000 0.000 0.010 0.005 DB-B02-01 -0.010 -0.005 17.1 89.7
Bus125 0.400 97.651 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.9
Bus126 0.400 97.754 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.7
Bus127 0.400 97.753 -1.7 0.000 0.000 0.010 0.005 DB-B02-4 -0.010 -0.005 17.1 89.9
Bus128 0.400 97.182 -1.6 0.000 0.000 0.012 0.006 DB-B21 -0.012 -0.006 19.7 89.6
Bus129 0.400 97.107 -1.6 0.000 0.000 0.027 0.013 DB-B21 -0.027 -0.013 44.3 89.8
Bus130 0.400 97.161 -1.6 0.000 0.000 0.003 0.002 DB-B21 -0.003 -0.002 5.5 89.7
Bus131 0.400 96.703 -1.8 0.000 0.000 0.012 0.006 DB-B01-01 -0.012 -0.006 20.5 89.9
Bus132 0.400 96.799 -1.9 0.000 0.000 0.014 0.007 DB-B01-01 -0.014 -0.007 22.5 89.8
Bus133 0.400 96.752 -1.8 0.000 0.000 0.012 0.006 DB-B01-01 -0.012 -0.006 20.6 89.8
Bus134 0.400 96.891 -1.9 0.000 0.000 0.013 0.006 DB-B01-01 -0.013 -0.006 20.8 89.7
Bus135 0.400 97.035 -1.9 0.000 0.000 0.003 0.002 DB-B01-01 -0.003 -0.002 5.5 88.4
Bus136 0.400 96.819 -1.8 0.000 0.000 0.012 0.006 DB-B01-02 -0.012 -0.006 20.6 89.9
Bus137 0.400 96.915 -1.9 0.000 0.000 0.014 0.007 DB-B01-02 -0.014 -0.007 22.5 89.8
Bus138 0.400 96.868 -1.9 0.000 0.000 0.012 0.006 DB-B01-02 -0.012 -0.006 20.6 89.8
Bus139 0.400 97.007 -1.9 0.000 0.000 0.013 0.006 DB-B01-02 -0.013 -0.006 20.8 89.7
Bus140 0.400 97.152 -1.9 0.000 0.000 0.003 0.002 DB-B01-02 -0.003 -0.002 5.5 88.4
Bus141 0.400 97.925 -1.7 0.000 0.000 0.009 0.005 DB-B02-4 -0.009 -0.005 15.0 89.6
Bus142 0.400 97.837 -1.7 0.000 0.000 0.009 0.004 DB-B02-4 -0.009 -0.004 15.1 89.8
Bus143 0.400 97.752 -1.7 0.000 0.000 0.009 0.004 DB-B02-5 -0.009 -0.004 15.0 89.7
Bus144 0.400 97.797 -1.7 0.000 0.000 0.009 0.004 11-SMDP-16 -0.009 -0.004 14.1 90.0
Bus145 0.400 97.617 -1.6 0.000 0.000 0.010 0.005 DB-B02-5 -0.010 -0.005 17.1 89.9
Bus146 0.400 97.788 -1.7 0.000 0.000 0.009 0.005 DB-B02-5 -0.009 -0.005 15.0 89.6
Bus147 0.400 96.947 -1.5 0.000 0.000 0.035 0.017 11-SMDP-16 -0.035 -0.017 58.1 90.0
Bus148 0.400 97.700 -1.6 0.000 0.000 0.009 0.004 DB-B02-5 -0.009 -0.004 15.0 89.8
Bus149 0.400 97.566 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.7
Bus150 0.400 97.432 -1.6 0.000 0.000 0.010 0.005 DB-B02-6 -0.010 -0.005 17.0 89.9
Bus151 0.400 97.602 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.6
Bus152 0.400 97.515 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.8
Bus153 0.400 97.106 -1.5 0.000 0.000 0.035 0.017 21-SMDP-7 -0.035 -0.017 58.2 90.0
Bus154 0.400 97.940 -1.6 0.000 0.000 0.009 0.005 DB-B02-02 -0.009 -0.005 15.1 89.8
* Bus155 13.800 100.000 0.0 6.396 3.292 0.000 0.000 MV SWGR#1 6.396 3.292 301.0 88.9
Project: ETAP Page: 96
Contract: SN:
Bus156 0.400 98.046 -1.6 0.000 0.000 0.014 0.007 21-SMDP-7 -0.014 -0.007 22.5 90.0
Bus157 0.400 97.225 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 20.7 90.0
Bus158 0.400 97.321 -1.6 0.000 0.000 0.014 0.007 DB-B01-17 -0.014 -0.007 22.7 90.0
Bus159 0.400 96.668 -1.8 0.000 0.000 0.012 0.006 DB-B01-33 -0.012 -0.006 20.5 89.9
Bus160 0.400 96.764 -1.8 0.000 0.000 0.014 0.007 DB-B01-33 -0.014 -0.007 22.5 89.8
Bus161 0.400 96.717 -1.8 0.000 0.000 0.012 0.006 DB-B01-33 -0.012 -0.006 20.6 89.8
Bus162 0.400 96.856 -1.9 0.000 0.000 0.013 0.006 DB-B01-33 -0.013 -0.006 20.8 89.7
Bus163 0.400 97.000 -1.9 0.000 0.000 0.003 0.002 DB-B01-33 -0.003 -0.002 5.5 88.3
Bus164 0.400 96.810 -1.8 0.000 0.000 0.012 0.006 DB-B01-34 -0.012 -0.006 20.6 89.9
Bus165 0.400 98.075 -1.6 0.000 0.000 0.009 0.005 DB-B02-03 -0.009 -0.005 15.1 89.8
Bus166 0.400 98.150 -1.6 0.000 0.000 0.010 0.005 DB-B02-03 -0.010 -0.005 17.1 89.7
Bus167 0.400 98.023 -1.6 0.000 0.000 0.009 0.004 DB-B02-03 -0.009 -0.004 15.1 89.9
Bus168 0.400 98.127 -1.6 0.000 0.000 0.009 0.005 DB-B02-03 -0.009 -0.005 15.1 89.8
Bus169 0.400 96.906 -1.9 0.000 0.000 0.014 0.007 DB-B01-34 -0.014 -0.007 22.5 89.8
Bus170 0.400 96.859 -1.8 0.000 0.000 0.012 0.006 DB-B01-34 -0.012 -0.006 20.6 89.8
Bus171 0.400 96.998 -1.9 0.000 0.000 0.013 0.006 DB-B01-34 -0.013 -0.006 20.8 89.7
Bus172 0.400 97.143 -1.9 0.000 0.000 0.003 0.002 DB-B01-34 -0.003 -0.002 5.5 88.4
Bus173 0.400 97.273 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 20.7 90.0
Bus174 0.400 97.760 -1.7 0.000 0.000 0.009 0.005 DB-B02-12 -0.009 -0.005 15.0 89.7
Bus175 0.400 97.625 -1.7 0.000 0.000 0.010 0.005 DB-B02-12 -0.010 -0.005 17.1 89.9
Bus176 0.400 97.796 -1.7 0.000 0.000 0.009 0.005 DB-B02-12 -0.009 -0.005 15.0 89.6
Bus177 0.400 97.180 -1.7 0.000 0.000 0.013 0.006 DB-B03-01 -0.013 -0.006 21.5 89.9
Bus178 0.400 96.621 -1.8 0.000 0.000 0.005 0.002 12-SMDP-5 -0.005 -0.002 8.3 90.0
Bus179 0.400 97.305 -1.7 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 23.3 89.8
Bus180 0.400 97.906 -1.6 0.000 0.000 0.013 0.006 DB-B03-04 -0.013 -0.006 21.7 89.9
Bus181 0.400 96.588 -1.8 0.000 0.000 0.021 0.010 12-SMDP-5 -0.021 -0.010 34.3 90.0
Bus182 0.400 98.033 -1.6 0.000 0.000 0.014 0.007 DB-B03-04 -0.014 -0.007 23.5 89.9
Bus183 0.400 98.151 -1.6 0.000 0.000 0.012 0.006 DB-B03-04 -0.012 -0.006 19.1 89.8
Bus184 0.400 97.858 -1.5 0.000 0.000 0.014 0.007 DB-B03-04 -0.014 -0.007 22.9 89.9
Bus185 0.400 98.105 -1.6 0.000 0.000 0.013 0.007 DB-B03-04 -0.013 -0.007 21.9 89.9
Bus186 0.400 98.166 -1.6 0.000 0.000 0.015 0.007 DB-B03-04 -0.015 -0.007 24.1 89.8
Bus187 0.400 97.422 -1.8 0.000 0.000 0.011 0.006 DB-B03-01 -0.011 -0.006 19.0 89.7
Bus188 0.400 97.132 -1.7 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 22.8 89.9
Project: ETAP Page: 97
Contract: SN:
Bus189 0.400 97.377 -1.8 0.000 0.000 0.013 0.006 DB-B03-01 -0.013 -0.006 21.7 89.8
Bus190 0.400 97.437 -1.8 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 23.9 89.7
Bus191 0.400 97.273 -1.7 0.000 0.000 0.013 0.006 DB-B03-03 -0.013 -0.006 21.5 89.9
Bus192 0.400 97.398 -1.7 0.000 0.000 0.014 0.007 DB-B03-03 -0.014 -0.007 23.3 89.8
Bus193 0.400 97.515 -1.8 0.000 0.000 0.012 0.006 DB-B03-03 -0.012 -0.006 19.0 89.7
Bus194 0.400 97.030 -1.8 0.000 0.000 0.012 0.006 DB-B01-35 -0.012 -0.006 20.6 89.7
Bus195 0.400 96.859 -1.8 0.000 0.000 0.014 0.007 DB-B01-35 -0.014 -0.007 22.5 89.9
Bus196 0.400 97.101 -1.8 0.000 0.000 0.012 0.006 DB-B01-35 -0.012 -0.006 20.6 89.5
Bus197 0.400 96.957 -1.8 0.000 0.000 0.013 0.006 DB-B01-35 -0.013 -0.006 20.8 89.8
Bus198 0.400 97.107 -1.8 0.000 0.000 0.003 0.002 DB-B01-35 -0.003 -0.002 5.6 89.5
Bus199 0.400 97.159 -1.8 0.000 0.000 0.012 0.006 DB-B01-36 -0.012 -0.006 20.6 89.7
Bus200 0.400 96.988 -1.8 0.000 0.000 0.014 0.007 DB-B01-36 -0.014 -0.007 22.6 89.9
Bus201 0.400 97.230 -1.9 0.000 0.000 0.012 0.006 DB-B01-36 -0.012 -0.006 20.6 89.5
Bus202 0.400 97.086 -1.8 0.000 0.000 0.013 0.006 DB-B01-36 -0.013 -0.006 20.8 89.8
Bus203 0.400 97.236 -1.9 0.000 0.000 0.003 0.002 DB-B01-36 -0.003 -0.002 5.6 89.5
Bus204 0.400 97.225 -1.7 0.000 0.000 0.014 0.007 DB-B03-03 -0.014 -0.007 22.8 89.9
Bus205 0.400 97.470 -1.7 0.000 0.000 0.013 0.006 DB-B03-03 -0.013 -0.006 21.7 89.8
Bus206 0.400 97.531 -1.8 0.000 0.000 0.015 0.007 DB-B03-03 -0.015 -0.007 23.9 89.7
Bus207 0.400 97.708 -1.7 0.000 0.000 0.009 0.004 DB-B02-12 -0.009 -0.004 15.0 89.8
Bus208 0.400 97.574 -1.7 0.000 0.000 0.009 0.004 DB-B02-13 -0.009 -0.004 15.0 89.7
Bus209 0.400 97.440 -1.6 0.000 0.000 0.010 0.005 DB-B02-13 -0.010 -0.005 17.1 89.9
Bus210 0.400 97.610 -1.7 0.000 0.000 0.009 0.005 DB-B02-13 -0.009 -0.005 15.0 89.6
Bus211 0.400 97.523 -1.6 0.000 0.000 0.009 0.004 DB-B02-13 -0.009 -0.004 15.0 89.8
Bus212 0.400 97.414 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 21.0 90.0
Bus213 0.400 97.559 -1.6 0.000 0.000 0.003 0.002 DB-B01-17 -0.003 -0.002 5.7 89.8
Bus214 0.400 97.958 -1.6 0.000 0.000 0.009 0.004 21-SMDP-7 -0.009 -0.004 14.1 90.0
Bus215 0.400 98.539 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.0 90.0
Bus216 0.400 97.401 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.7
Bus217 0.400 97.267 -1.6 0.000 0.000 0.010 0.005 DB-B02-14 -0.010 -0.005 17.0 89.8
Bus218 0.400 97.437 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.5
Bus219 0.400 97.350 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.8
Bus220 0.400 97.457 -1.8 0.000 0.000 0.009 0.004 DB-B02-15 -0.009 -0.004 15.0 89.6
Bus221 0.400 97.322 -1.8 0.000 0.000 0.010 0.005 DB-B02-15 -0.010 -0.005 17.0 89.8
Project: ETAP Page: 98
Contract: SN:
Bus222 0.400 97.493 -1.8 0.000 0.000 0.009 0.005 DB-B02-15 -0.009 -0.005 14.9 89.5
Bus223 0.400 97.405 -1.8 0.000 0.000 0.009 0.004 DB-B02-15 -0.009 -0.004 15.0 89.7
Bus224 0.400 97.413 -1.8 0.000 0.000 0.009 0.004 DB-B02-16 -0.009 -0.004 15.0 89.6
Bus225 0.400 97.279 -1.8 0.000 0.000 0.010 0.005 DB-B02-16 -0.010 -0.005 17.0 89.8
Bus226 0.400 97.449 -1.8 0.000 0.000 0.009 0.005 DB-B02-16 -0.009 -0.005 14.9 89.5
Bus227 0.400 97.362 -1.8 0.000 0.000 0.009 0.004 DB-B02-16 -0.009 -0.004 15.0 89.7
Bus231 0.400 98.225 -1.7 0.000 0.000 0.022 0.010 27-SMDP-07 -0.022 -0.010 35.3 90.1
Bus232 0.400 96.289 -1.6 0.000 0.000 0.028 0.013 13-SMDP-7 -0.028 -0.013 46.2 90.0
Bus233 0.400 97.538 -1.5 0.000 0.000 0.028 0.014 27-SMDP-07 -0.028 -0.014 46.7 90.0
Bus237 0.400 97.945 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 20.8 89.9
Bus238 0.400 98.070 -1.6 0.000 0.000 0.014 0.007 DB-B01-040 -0.014 -0.007 22.8 89.8
Bus239 0.400 97.894 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 20.9 89.9
Bus240 0.400 98.013 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 21.1 89.9
Bus241 0.400 98.231 -1.7 0.000 0.000 0.003 0.002 DB-B01-040 -0.003 -0.002 5.6 89.1
Bus242 0.400 97.762 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 20.8 89.9
Bus243 0.400 97.887 -1.6 0.000 0.000 0.014 0.007 DB-B01-041 -0.014 -0.007 22.8 89.8
Bus244 0.400 97.711 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 20.8 89.9
Bus245 0.400 97.830 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 21.0 89.9
Bus246 0.400 98.048 -1.6 0.000 0.000 0.003 0.002 DB-B01-041 -0.003 -0.002 5.6 89.1
Bus247 0.400 97.580 -1.6 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 20.7 89.9
Bus248 0.400 97.705 -1.6 0.000 0.000 0.014 0.007 DB-B01-042 -0.014 -0.007 22.7 89.8
Bus249 0.400 97.529 -1.5 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 20.8 89.9
Bus250 0.400 97.648 -1.6 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 21.0 89.9
Bus251 0.400 97.865 -1.6 0.000 0.000 0.003 0.002 DB-B01-042 -0.003 -0.002 5.6 89.1
Bus252 0.400 97.253 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.7 89.9
Bus253 0.400 97.377 -1.7 0.000 0.000 0.014 0.007 DB-B01-37 -0.014 -0.007 22.7 89.8
Bus254 0.400 97.202 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.7 89.9
Bus255 0.400 97.321 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.9 89.9
Bus256 0.400 97.537 -1.7 0.000 0.000 0.003 0.002 DB-B01-37 -0.003 -0.002 5.6 88.9
Bus257 0.400 97.447 -1.7 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 20.7 89.9
Bus258 0.400 97.572 -1.7 0.000 0.000 0.014 0.007 DB-B01-38. -0.014 -0.007 22.7 89.8
Bus259 0.400 97.396 -1.6 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 20.8 89.9
Bus260 0.400 97.515 -1.7 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 21.0 89.9
Project: ETAP Page: 99
Contract: SN:
Bus261 0.400 97.732 -1.7 0.000 0.000 0.003 0.002 DB-B01-38. -0.003 -0.002 5.6 89.0
Bus262 0.400 97.577 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 20.7 89.9
Bus263 0.400 97.702 -1.7 0.000 0.000 0.014 0.007 DB-B01-39 -0.014 -0.007 22.7 89.8
Bus264 0.400 97.526 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 20.8 89.9
Bus265 0.400 97.645 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 21.0 89.9
Bus266 0.400 97.862 -1.7 0.000 0.000 0.003 0.002 DB-B01-39 -0.003 -0.002 5.6 89.0
Bus267 0.400 98.035 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 0.000 0.000 0.3 90.4
Bus271 0.400 97.342 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 20.7 90.0
Bus272 0.400 97.438 -1.6 0.000 0.000 0.014 0.007 DB-B01-18 -0.014 -0.007 22.7 90.0
Bus273 0.400 97.390 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 20.8 90.0
Bus274 0.400 97.531 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 21.0 90.0
Bus275 0.400 97.676 -1.6 0.000 0.000 0.003 0.002 DB-B01-18 -0.003 -0.002 5.7 89.9
Bus278 0.400 98.455 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 0.000 0.000 0.4 90.7
Bus282 0.400 97.198 -1.8 0.000 0.000 0.012 0.006 DB-B01-031 -0.012 -0.006 20.6 89.7
Bus283 0.400 97.026 -1.8 0.000 0.000 0.014 0.007 DB-B01-031 -0.014 -0.007 22.6 89.9
Bus284 0.400 97.268 -1.9 0.000 0.000 0.012 0.006 DB-B01-031 -0.012 -0.006 20.6 89.6
Bus285 0.400 97.124 -1.8 0.000 0.000 0.013 0.006 DB-B01-031 -0.013 -0.006 20.8 89.8
Bus286 0.400 97.340 -1.9 0.000 0.000 0.003 0.002 DB-B01-031 -0.003 -0.002 5.5 88.6
Bus287 0.400 96.991 -1.8 0.000 0.000 0.012 0.006 DB-B01-032 -0.012 -0.006 20.5 89.7
Bus288 0.400 96.819 -1.8 0.000 0.000 0.014 0.007 DB-B01-032 -0.014 -0.007 22.5 89.9
Bus289 0.400 97.061 -1.8 0.000 0.000 0.012 0.006 DB-B01-032 -0.012 -0.006 20.5 89.5
Bus290 0.400 96.917 -1.8 0.000 0.000 0.013 0.006 DB-B01-032 -0.013 -0.006 20.8 89.8
Bus291 0.400 97.133 -1.8 0.000 0.000 0.003 0.002 DB-B01-032 -0.003 -0.002 5.5 88.5
Bus292 0.400 97.479 -1.9 0.000 0.000 0.000 0.000 27-SMDP-06 0.000 0.000 0.4 91.7
Bus293 13.800 100.000 0.0 0.000 0.000 0.000 -0.005 BUS-2S/S-3 -0.919 -0.469 43.2 89.1
Bus297 0.400 98.227 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.3 89.9
Bus298 0.400 98.346 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.6 89.8
Bus299 0.400 98.065 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.4 89.9
Bus300 0.400 98.282 -1.5 0.000 0.000 0.018 0.009 DB-B04-01 -0.018 -0.009 28.6 89.9
Bus301 0.400 98.229 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.8
Bus302 0.400 98.094 -1.5 0.000 0.000 0.010 0.005 DB-B02-7 -0.010 -0.005 17.2 89.9
Bus303 0.400 98.265 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.7
Project: ETAP Page: 100
Contract: SN:
Bus304 0.400 98.177 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.9
Bus305 0.400 97.277 -1.5 0.000 0.000 0.021 0.010 22-SMDP-5 -0.021 -0.010 34.6 90.0
Bus309 0.400 98.030 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.8
Bus310 0.400 97.895 -1.5 0.000 0.000 0.010 0.005 DB-B02-08 -0.010 -0.005 17.1 89.9
Bus311 0.400 98.066 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.7
Bus312 0.400 97.762 -1.6 0.000 0.000 0.013 0.006 DB-B03-02 -0.013 -0.006 21.6 89.9
Bus313 0.400 97.888 -1.6 0.000 0.000 0.014 0.007 DB-B03-02 -0.014 -0.007 23.5 89.9
Bus314 0.400 98.006 -1.6 0.000 0.000 0.012 0.006 DB-B03-02 -0.012 -0.006 19.1 89.8
Bus315 0.400 97.714 -1.6 0.000 0.000 0.014 0.007 DB-B03-02 -0.014 -0.007 22.9 89.9
Bus316 0.400 97.960 -1.6 0.000 0.000 0.013 0.006 DB-B03-02 -0.013 -0.006 21.8 89.9
Bus317 0.400 97.978 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.8
Bus318 0.400 97.844 -1.5 0.000 0.000 0.009 0.005 DB-B08-09 -0.009 -0.005 15.1 89.8
Bus319 0.400 97.709 -1.5 0.000 0.000 0.010 0.005 DB-B08-09 -0.010 -0.005 17.1 89.9
Bus320 0.400 97.880 -1.5 0.000 0.000 0.009 0.005 DB-B08-09 -0.009 -0.005 15.1 89.7
Bus321 0.400 97.792 -1.5 0.000 0.000 0.009 0.004 DB-B08-09 -0.009 -0.004 15.1 89.8
Bus322 0.400 97.052 -1.8 0.000 0.000 0.026 0.013 DB-B14 -0.026 -0.013 42.9 89.8
Bus323 0.400 96.638 -1.7 0.000 0.000 0.010 0.005 DB-B14 -0.010 -0.005 17.4 89.9
Bus324 0.400 96.638 -1.7 0.000 0.000 0.010 0.005 DB-B14 -0.010 -0.005 17.4 89.9
Bus326 13.800 100.000 0.0 0.000 0.000 0.000 -0.007 BUS-1S/S-01 -1.018 -0.522 47.9 89.0
Bus327 13.800 100.000 0.0 0.000 0.000 0.001 -0.007 BUS-1S/S-02 -1.006 -0.515 47.3 89.0
Bus335 0.400 98.003 -1.5 0.000 0.000 0.011 0.005 13-SMDP-04 -0.011 -0.005 17.6 90.0
Bus377 0.400 96.925 -1.8 0.000 0.000 0.011 0.006 14-SMDP-01 -0.011 -0.006 19.0 90.0
Bus393 0.400 98.056 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.8
Bus394 0.400 98.314 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.4 89.9
Bus395 0.400 98.432 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.6 89.8
Bus396 0.400 98.151 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.4 89.9
Bus397 0.400 98.369 -1.5 0.000 0.000 0.018 0.009 DB-B04-2 -0.018 -0.009 28.7 89.9
Bus398 0.400 98.449 -1.5 0.000 0.000 0.018 0.009 13-SMDP-1 -0.018 -0.009 29.0 90.1
Bus399 0.400 97.921 -1.6 0.000 0.000 0.010 0.005 DB-B02-10 -0.010 -0.005 17.1 89.9
Bus400 0.400 98.092 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.7
Bus401 0.400 98.004 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.8
Project: ETAP Page: 101
Contract: SN:
Bus402 0.400 97.907 -1.6 0.000 0.000 0.009 0.005 DB-B02-011 -0.009 -0.005 15.1 89.8
Bus403 0.400 97.772 -1.5 0.000 0.000 0.010 0.005 DB-B02-011 -0.010 -0.005 17.1 89.9
Bus404 0.400 97.943 -1.6 0.000 0.000 0.009 0.005 DB-B02-011 -0.009 -0.005 15.1 89.7
Bus405 0.400 97.855 -1.6 0.000 0.000 0.009 0.004 DB-B02-011 -0.009 -0.004 15.1 89.8
Bus406 0.400 98.431 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 20.9 90.0
Bus407 0.400 98.557 -1.4 0.000 0.000 0.014 0.007 DB-B01-022 -0.014 -0.007 23.0 89.9
Bus408 0.400 98.380 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 21.0 90.0
Bus409 0.400 98.500 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 21.2 89.9
Bus410 0.400 98.719 -1.4 0.000 0.000 0.004 0.002 DB-B01-022 -0.004 -0.002 5.7 89.6
Bus411 0.400 98.234 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 20.9 90.0
Bus412 0.400 98.360 -1.4 0.000 0.000 0.014 0.007 DB-B01-023 -0.014 -0.007 22.9 89.9
Bus413 0.400 98.183 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 20.9 90.0
Bus414 0.400 98.303 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 21.2 89.9
Bus415 0.400 98.521 -1.4 0.000 0.000 0.003 0.002 DB-B01-023 -0.003 -0.002 5.7 89.6
Bus416 0.400 98.064 -1.4 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 20.9 89.9
Bus417 0.400 98.190 -1.4 0.000 0.000 0.014 0.007 DB-B01-024 -0.014 -0.007 22.9 89.9
Bus418 0.400 98.013 -1.3 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 20.9 90.0
Bus419 0.400 98.133 -1.4 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 21.1 89.9
Bus420 0.400 98.351 -1.4 0.000 0.000 0.003 0.002 DB-B01-024 -0.003 -0.002 5.7 89.5
Bus421 0.400 97.840 -1.4 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 20.8 89.9
Bus422 0.400 97.966 -1.5 0.000 0.000 0.014 0.007 DB-B01-019 -0.014 -0.007 22.8 89.9
Bus423 0.400 97.789 -1.4 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 20.9 90.0
Bus424 0.400 97.908 -1.5 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 21.1 89.9
Bus425 0.400 98.126 -1.5 0.000 0.000 0.003 0.002 DB-B01-019 -0.003 -0.002 5.7 89.5
Bus426 0.400 97.840 -1.4 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 20.8 89.9
Bus427 0.400 97.966 -1.5 0.000 0.000 0.014 0.007 DB-B01-020 -0.014 -0.007 22.8 89.9
Bus428 0.400 97.789 -1.4 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 20.9 90.0
Bus429 0.400 97.908 -1.5 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 21.1 89.9
Bus430 0.400 98.126 -1.5 0.000 0.000 0.003 0.002 DB-B01-020 -0.003 -0.002 5.7 89.5
Bus431 0.400 97.645 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 20.8 89.9
Bus432 0.400 97.770 -1.4 0.000 0.000 0.014 0.007 DB-B01-021 -0.014 -0.007 22.8 89.9
Bus433 0.400 97.594 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 20.8 89.9
Bus434 0.400 97.713 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 21.0 89.9
Project: ETAP Page: 102
Contract: SN:
Bus435 0.400 97.931 -1.5 0.000 0.000 0.003 0.002 DB-B01-021 -0.003 -0.002 5.7 89.4
Bus436 0.400 98.517 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 0.000 0.000 0.3 90.2
Bus437 0.400 98.026 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 20.8 89.9
Bus438 0.400 97.966 -1.4 0.000 0.000 0.014 0.007 DB-B01-025 -0.014 -0.007 22.8 89.9
Bus439 0.400 97.890 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 20.9 89.9
Bus440 0.400 97.837 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 21.1 89.9
Bus441 0.400 98.060 -1.4 0.000 0.000 0.003 0.002 DB-B01-025 -0.003 -0.002 5.7 89.8
Bus442 0.400 98.222 -1.5 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 20.9 89.9
Bus443 0.400 98.162 -1.4 0.000 0.000 0.014 0.007 DB-B01-026 -0.014 -0.007 22.9 89.9
Bus444 0.400 98.085 -1.4 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 20.9 89.9
Bus445 0.400 98.032 -1.4 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 21.1 89.9
Bus446 0.400 98.256 -1.5 0.000 0.000 0.003 0.002 DB-B01-026 -0.003 -0.002 5.7 89.8
Bus447 0.400 98.419 -1.5 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 20.9 89.9
Bus448 0.400 98.359 -1.5 0.000 0.000 0.014 0.007 DB-B01-027 -0.014 -0.007 22.9 89.9
Bus449 0.400 98.282 -1.4 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 21.0 89.9
Bus450 0.400 98.229 -1.4 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 21.1 90.0
Bus451 0.400 98.453 -1.5 0.000 0.000 0.003 0.002 DB-B01-027 -0.003 -0.002 5.7 89.8
Bus452 0.400 97.845 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 20.8 89.9
Bus453 0.400 97.943 -1.5 0.000 0.000 0.014 0.007 DB-B01-028 -0.014 -0.007 22.8 89.9
Bus454 0.400 97.894 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 20.9 89.9
Bus455 0.400 98.036 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 21.1 89.9
Bus456 0.400 98.181 -1.6 0.000 0.000 0.003 0.002 DB-B01-028 -0.003 -0.002 5.7 89.4
Bus457 0.400 97.702 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 20.8 89.9
Bus458 0.400 97.799 -1.5 0.000 0.000 0.014 0.007 DB-B01-029 -0.014 -0.007 22.8 89.9
Bus459 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-04 -1.016 -0.534 48.0 88.5
Bus460 0.400 96.546 -1.7 0.000 0.000 0.023 0.011 14-SMDP-01 -0.023 -0.011 38.7 90.0
Bus461 0.400 97.751 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 20.8 89.9
Bus462 0.400 97.315 -1.8 0.000 0.000 0.032 0.015 14-SMDP-01 -0.032 -0.015 52.3 90.0
Bus463 0.400 96.477 -1.7 0.000 0.000 0.032 0.015 14-SMDP-01 -0.032 -0.015 52.4 90.0
Bus464 0.400 97.327 -1.8 0.000 0.000 0.009 0.005 14-SMDP-01 -0.009 -0.005 15.5 90.0
Bus465 0.400 97.171 -1.8 0.000 0.000 0.011 0.006 14-SMDP-01 -0.011 -0.006 19.0 90.0
Bus466 0.400 97.892 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 21.1 89.9
Project: ETAP Page: 103
Contract: SN:
Bus467 0.400 97.415 -1.9 0.000 0.000 0.001 0.001 14-SMDP-01 -0.001 -0.001 2.0 90.0
Bus468 0.400 98.037 -1.6 0.000 0.000 0.003 0.002 DB-B01-029 -0.003 -0.002 5.7 89.4
Bus469 0.400 96.235 -1.6 0.000 0.000 0.028 0.013 14-SMDP-01 -0.028 -0.013 46.1 90.0
Bus470 0.400 95.845 -1.5 0.000 0.000 0.010 0.005 14-SMDP-01 -0.010 -0.005 17.2 90.0
Bus471 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0
Bus472 0.400 97.009 -2.0 0.000 0.000 0.108 0.052 1S/S4-LV-PANEL -0.108 -0.052 177.8 90.0
Bus473 0.400 97.507 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 20.7 89.9
Bus474 0.400 97.009 -2.0 0.000 0.000 0.108 0.052 1S/S4-LV-PANEL -0.108 -0.052 177.8 90.0
Bus475 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0
Bus476 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0
Bus477 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0
Bus478 0.400 97.604 -1.5 0.000 0.000 0.014 0.007 DB-B01-30 -0.014 -0.007 22.7 89.9
Bus479 0.400 97.556 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 20.8 89.9
Bus480 0.400 97.696 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 21.0 89.9
Bus481 0.400 97.842 -1.5 0.000 0.000 0.003 0.002 DB-B01-30 -0.003 -0.002 5.7 89.3
Bus482 0.400 97.638 -1.6 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 20.7 89.8
Bus483 0.400 97.465 -1.6 0.000 0.000 0.014 0.007 DB-B01-31 -0.014 -0.007 22.7 89.9
Bus484 0.400 97.709 -1.7 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 20.8 89.7
Bus485 0.400 97.564 -1.6 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 21.0 89.9
Bus486 0.400 97.715 -1.7 0.000 0.000 0.003 0.002 DB-B01-31 -0.003 -0.002 5.7 89.7
Bus487 0.400 97.508 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.7 89.8
Bus488 0.400 97.336 -1.6 0.000 0.000 0.014 0.007 DB-B01-32 -0.014 -0.007 22.7 89.9
Bus489 0.400 97.579 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.7 89.7
Bus490 0.400 97.434 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.9 89.9
Bus491 0.400 97.585 -1.6 0.000 0.000 0.003 0.002 DB-B01-32 -0.003 -0.002 5.6 89.7
Bus492 0.400 97.936 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 0.000 0.000 0.4 91.2
Bus503 0.400 98.002 -1.3 0.000 0.000 0.029 0.014 17-SMDP-6 -0.029 -0.014 47.0 90.0
Bus508 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-05 -0.728 -0.375 34.3 88.9
Bus509 0.400 99.260 -1.4 0.000 0.000 0.714 0.346 1S/S5-LV-PANEL1 -0.714 -0.346 1153.6 90.0
Bus510 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 -0.807 -0.416 38.0 88.9
Bus512 13.800 100.000 0.0 0.000 0.000 -0.001 -0.004 BUS-1S/S-07 -0.876 -0.447 41.1 89.1
Project: ETAP Page: 104
Contract: SN:
Bus513 0.400 98.390 -1.4 0.000 0.000 0.020 0.010 17-SMDP-6 -0.020 -0.010 33.2 90.0
Bus514 0.400 98.691 -1.5 0.000 0.000 0.022 0.011 17-SMDP-6 -0.022 -0.011 35.5 90.0
Bus535 0.400 97.211 -1.5 0.000 0.000 0.021 0.010 16-SMDP-2 -0.021 -0.010 34.6 90.0
Bus536 0.400 99.074 -1.5 0.000 0.000 0.658 0.319 1S/S6-LV-PANEL -0.658 -0.319 1064.5 90.0
Bus954 0.400 97.278 -1.9 0.000 0.000 0.032 0.015 24-SMDP-01 -0.032 -0.015 52.3 90.0
Bus955 0.400 96.198 -1.7 0.000 0.000 0.028 0.013 24-SMDP-01 -0.028 -0.013 46.1 90.0
Bus956 0.400 96.441 -1.7 0.000 0.000 0.032 0.015 24-SMDP-01 -0.032 -0.015 52.4 90.0
Bus957 0.400 97.290 -1.9 0.000 0.000 0.009 0.005 24-SMDP-01 -0.009 -0.005 15.5 90.0
Bus958 0.400 97.113 -1.8 0.000 0.000 0.011 0.006 24-SMDP-01 -0.011 -0.006 18.9 90.0
Bus959 0.400 97.378 -1.9 0.000 0.000 0.001 0.001 24-SMDP-01 -0.001 -0.001 2.0 90.0
Bus960 0.400 96.888 -1.8 0.000 0.000 0.011 0.006 24-SMDP-01 -0.011 -0.006 19.0 90.0
Bus961 0.400 93.125 -0.8 0.000 0.000 0.026 0.013 24-SMDP-01 -0.026 -0.013 44.6 90.0
Bus962 0.400 95.501 -1.4 0.000 0.000 0.010 0.005 24-SMDP-01 -0.010 -0.005 17.2 90.0
Bus963 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0
Bus964 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0
Bus965 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0
Bus966 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0
Bus967 0.400 96.997 -2.0 0.000 0.000 0.108 0.052 2S/S4 -0.108 -0.052 177.8 90.0
Bus968 0.400 96.997 -2.0 0.000 0.000 0.108 0.052 2S/S4 -0.108 -0.052 177.8 90.0
Bus969 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-4 -1.019 -0.535 48.2 88.5
Bus970 0.400 98.327 -1.5 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.4 89.9
Bus971 0.400 98.446 -1.5 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.6 89.8
Bus972 0.400 98.165 -1.4 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.4 89.9
Bus973 0.400 98.382 -1.5 0.000 0.000 0.018 0.009 DB-B04-1 -0.018 -0.009 28.7 89.9
Bus974 0.400 98.414 -1.5 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.4 89.9
Bus975 0.400 98.532 -1.5 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.6 89.8
Bus976 0.400 98.251 -1.4 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.5 89.9
Bus977 0.400 98.469 -1.5 0.000 0.000 0.018 0.009 DB-B04-02 -0.018 -0.009 28.7 89.9
Bus978 0.400 98.549 -1.5 0.000 0.000 0.018 0.009 23-SMDP-01 -0.018 -0.009 29.0 90.0
Bus979 0.400 97.861 -1.5 0.000 0.000 0.013 0.006 DB-B03-2 -0.013 -0.006 21.7 89.9
Bus980 0.400 97.987 -1.5 0.000 0.000 0.014 0.007 DB-B03-2 -0.014 -0.007 23.5 89.9
Project: ETAP Page: 105
Contract: SN:
Bus981 0.400 98.105 -1.6 0.000 0.000 0.012 0.006 DB-B03-2 -0.012 -0.006 19.1 89.8
Bus982 0.400 97.813 -1.5 0.000 0.000 0.014 0.007 DB-B03-2 -0.014 -0.007 22.9 89.9
Bus983 0.400 98.060 -1.6 0.000 0.000 0.013 0.007 DB-B03-2 -0.013 -0.007 21.9 89.9
Bus984 0.400 98.121 -1.6 0.000 0.000 0.015 0.007 DB-B03-2 -0.015 -0.007 24.1 89.8
Bus985 0.400 98.005 -1.5 0.000 0.000 0.013 0.006 DB-B03-4 -0.013 -0.006 21.7 89.9
Bus986 0.400 98.132 -1.5 0.000 0.000 0.014 0.007 DB-B03-4 -0.014 -0.007 23.5 89.9
Bus987 0.400 98.250 -1.6 0.000 0.000 0.012 0.006 DB-B03-4 -0.012 -0.006 19.2 89.9
Bus988 0.400 97.958 -1.5 0.000 0.000 0.014 0.007 DB-B03-4 -0.014 -0.007 23.0 89.9
Bus989 0.400 98.204 -1.6 0.000 0.000 0.013 0.007 DB-B03-4 -0.013 -0.007 21.9 89.9
Bus990 0.400 98.265 -1.6 0.000 0.000 0.015 0.007 DB-B03-4 -0.015 -0.007 24.2 89.8
Bus991 0.400 97.278 -1.7 0.000 0.000 0.013 0.006 DB-B03-1 -0.013 -0.006 21.5 89.9
Bus992 0.400 97.404 -1.7 0.000 0.000 0.014 0.007 DB-B03-1 -0.014 -0.007 23.3 89.9
Bus993 0.400 97.521 -1.7 0.000 0.000 0.012 0.006 DB-B03-1 -0.012 -0.006 19.0 89.7
Bus994 0.400 97.231 -1.7 0.000 0.000 0.014 0.007 DB-B03-1 -0.014 -0.007 22.8 89.9
Bus995 0.400 97.476 -1.7 0.000 0.000 0.013 0.006 DB-B03-1 -0.013 -0.006 21.7 89.8
Bus996 0.400 97.536 -1.7 0.000 0.000 0.015 0.007 DB-B03-1 -0.015 -0.007 23.9 89.7
Bus997 0.400 97.371 -1.7 0.000 0.000 0.013 0.006 DB-B03-3 -0.013 -0.006 21.5 89.9
Bus998 0.400 97.497 -1.7 0.000 0.000 0.014 0.007 DB-B03-3 -0.014 -0.007 23.4 89.9
Bus999 0.400 97.614 -1.7 0.000 0.000 0.012 0.006 DB-B03-3 -0.012 -0.006 19.0 89.8
Bus1000 0.400 97.323 -1.7 0.000 0.000 0.014 0.007 DB-B03-3 -0.014 -0.007 22.8 89.9
Bus1001 0.400 97.569 -1.7 0.000 0.000 0.013 0.006 DB-B03-3 -0.013 -0.006 21.7 89.8
Bus1002 0.400 97.629 -1.7 0.000 0.000 0.015 0.007 DB-B03-3 -0.015 -0.007 24.0 89.7
Bus1003 0.400 97.477 -1.7 0.000 0.000 0.028 0.014 23-SMDP-03 -0.028 -0.014 46.7 90.0
Bus1004 0.400 98.329 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.2 89.8
Bus1005 0.400 98.193 -1.5 0.000 0.000 0.011 0.005 DB-B02-07 -0.011 -0.005 17.2 89.9
Bus1006 0.400 98.365 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.1 89.7
Bus1007 0.400 98.277 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.1 89.9
Bus1008 0.400 98.129 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.8
Bus1009 0.400 97.994 -1.5 0.000 0.000 0.010 0.005 DB-B02-8 -0.010 -0.005 17.2 89.9
Bus1010 0.400 98.166 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.7
Bus1011 0.400 98.077 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.9
Bus1012 0.400 98.556 -1.6 0.000 0.000 0.000 0.000 23-SMDP-04 0.000 0.000 0.4 90.6
Bus1013 0.400 97.943 -1.5 0.000 0.000 0.009 0.005 DB-B02-9 -0.009 -0.005 15.1 89.8
Project: ETAP Page: 106
Contract: SN:
Bus1014 0.400 97.808 -1.4 0.000 0.000 0.010 0.005 DB-B02-9 -0.010 -0.005 17.1 89.9
Bus1015 0.400 97.979 -1.5 0.000 0.000 0.009 0.005 DB-B02-9 -0.009 -0.005 15.1 89.7
Bus1016 0.400 97.891 -1.5 0.000 0.000 0.009 0.004 DB-B02-9 -0.009 -0.004 15.1 89.8
Bus1017 0.400 98.103 -1.5 0.000 0.000 0.011 0.005 23-SMDP-04 -0.011 -0.005 17.6 90.0
Bus1018 0.400 98.156 -1.5 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.8
Bus1019 0.400 98.020 -1.5 0.000 0.000 0.010 0.005 DB-B02-010 -0.010 -0.005 17.2 89.9
Bus1020 0.400 98.192 -1.6 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.7
Bus1021 0.400 98.104 -1.5 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.9
Bus1022 0.400 98.006 -1.5 0.000 0.000 0.009 0.005 DB-B02-11 -0.009 -0.005 15.1 89.8
Bus1023 0.400 97.871 -1.5 0.000 0.000 0.010 0.005 DB-B02-11 -0.010 -0.005 17.1 89.9
Bus1024 0.400 98.043 -1.5 0.000 0.000 0.009 0.005 DB-B02-11 -0.009 -0.005 15.1 89.7
Bus1025 0.400 97.955 -1.5 0.000 0.000 0.009 0.004 DB-B02-11 -0.009 -0.004 15.1 89.8
Bus1026 0.400 97.859 -1.6 0.000 0.000 0.009 0.005 DB-B02-012 -0.009 -0.005 15.1 89.7
Bus1027 0.400 97.724 -1.6 0.000 0.000 0.010 0.005 DB-B02-012 -0.010 -0.005 17.1 89.9
Bus1028 0.400 97.895 -1.6 0.000 0.000 0.009 0.005 DB-B02-012 -0.009 -0.005 15.1 89.6
Bus1029 0.400 97.807 -1.6 0.000 0.000 0.009 0.004 DB-B02-012 -0.009 -0.004 15.1 89.8
Bus1030 0.400 97.673 -1.6 0.000 0.000 0.009 0.004 DB-B02-013 -0.009 -0.004 15.0 89.7
Bus1031 0.400 97.538 -1.6 0.000 0.000 0.010 0.005 DB-B02-013 -0.010 -0.005 17.1 89.9
Bus1032 0.400 97.709 -1.6 0.000 0.000 0.009 0.005 DB-B02-013 -0.009 -0.005 15.0 89.6
Bus1033 0.400 97.621 -1.6 0.000 0.000 0.009 0.004 DB-B02-013 -0.009 -0.004 15.0 89.8
Bus1034 0.400 97.500 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.7
Bus1035 0.400 97.366 -1.6 0.000 0.000 0.010 0.005 DB-B02-014 -0.010 -0.005 17.0 89.9
Bus1036 0.400 97.536 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.6
Bus1037 0.400 97.449 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.8
Bus1038 0.400 97.921 -1.7 0.000 0.000 0.009 0.005 DB-B02-015 -0.009 -0.005 15.1 89.7
Bus1039 0.400 97.786 -1.6 0.000 0.000 0.010 0.005 DB-B02-015 -0.010 -0.005 17.1 89.9
Bus1040 0.400 97.957 -1.7 0.000 0.000 0.009 0.005 DB-B02-015 -0.009 -0.005 15.0 89.6
Bus1041 0.400 97.869 -1.6 0.000 0.000 0.009 0.004 DB-B02-015 -0.009 -0.004 15.1 89.8
Bus1042 0.400 97.877 -1.7 0.000 0.000 0.009 0.005 DB-B02-016 -0.009 -0.005 15.1 89.7
Bus1043 0.400 97.742 -1.6 0.000 0.000 0.010 0.005 DB-B02-016 -0.010 -0.005 17.1 89.9
Bus1044 0.400 97.913 -1.7 0.000 0.000 0.009 0.005 DB-B02-016 -0.009 -0.005 15.0 89.6
Bus1045 0.400 97.826 -1.7 0.000 0.000 0.009 0.004 DB-B02-016 -0.009 -0.004 15.1 89.8
Bus1048 0.400 98.590 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.0 90.0
Project: ETAP Page: 107
Contract: SN:
Bus1049 0.400 98.717 -1.3 0.000 0.000 0.014 0.007 DB-B01-40 -0.014 -0.007 23.0 89.9
Bus1051 0.400 98.659 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.2 90.0
Bus1052 0.400 98.879 -1.4 0.000 0.000 0.004 0.002 DB-B01-40 -0.004 -0.002 5.7 89.7
Bus1053 0.400 98.406 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 20.9 90.0
Bus1054 0.400 98.532 -1.3 0.000 0.000 0.014 0.007 DB-B01-41 -0.014 -0.007 23.0 89.9
Bus1055 0.400 98.355 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 21.0 90.0
Bus1056 0.400 98.475 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 21.2 90.0
Bus1057 0.400 98.694 -1.4 0.000 0.000 0.004 0.002 DB-B01-41 -0.004 -0.002 5.7 89.7
Bus1058 0.400 98.223 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 20.9 90.0
Bus1059 0.400 98.349 -1.3 0.000 0.000 0.014 0.007 DB-B01-42 -0.014 -0.007 22.9 89.9
Bus1060 0.400 98.172 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 20.9 90.0
Bus1061 0.400 98.291 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 21.2 89.9
Bus1062 0.400 98.510 -1.3 0.000 0.000 0.003 0.002 DB-B01-42 -0.003 -0.002 5.7 89.6
Bus1063 0.400 97.893 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 20.8 90.0
Bus1064 0.400 98.019 -1.4 0.000 0.000 0.014 0.007 DB-B01-037 -0.014 -0.007 22.8 89.9
Bus1065 0.400 97.842 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 20.9 90.0
Bus1066 0.400 97.961 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 21.1 89.9
Bus1067 0.400 98.179 -1.4 0.000 0.000 0.003 0.002 DB-B01-037 -0.003 -0.002 5.7 89.5
Bus1068 0.400 98.089 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 20.9 90.0
Bus1069 0.400 98.215 -1.4 0.000 0.000 0.014 0.007 DB-B01-38 -0.014 -0.007 22.9 89.9
Bus1070 0.400 98.038 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 20.9 90.0
Bus1071 0.400 98.157 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 21.1 89.9
Bus1072 0.400 98.376 -1.4 0.000 0.000 0.003 0.002 DB-B01-38 -0.003 -0.002 5.7 89.6
Bus1073 0.400 98.220 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 20.9 90.0
Bus1074 0.400 98.346 -1.4 0.000 0.000 0.014 0.007 DB-B01-039 -0.014 -0.007 22.9 89.9
Bus1075 0.400 98.169 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 20.9 90.0
Bus1076 0.400 98.288 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 21.2 89.9
Bus1077 0.400 98.507 -1.5 0.000 0.000 0.003 0.002 DB-B01-039 -0.003 -0.002 5.7 89.6
Bus1078 0.400 98.681 -1.5 0.000 0.000 0.000 0.000 22-SMDP-02 0.000 0.000 0.3 90.2
Bus1079 0.400 98.346 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9
Bus1080 0.400 98.422 -1.3 0.000 0.000 0.011 0.005 DB-B02-1 -0.011 -0.005 17.2 89.9
Bus1081 0.400 98.294 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9
Bus1082 0.400 98.398 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9
Project: ETAP Page: 108
Contract: SN:
Bus1083 0.400 98.534 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9
Bus1084 0.400 98.609 -1.3 0.000 0.000 0.011 0.005 DB-B02-2 -0.011 -0.005 17.3 89.9
Bus1085 0.400 98.482 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9
Bus1086 0.400 98.586 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9
Bus1087 0.400 98.722 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 89.9
Bus1088 0.400 98.786 -1.4 0.000 0.000 0.011 0.005 DB-B02-3 -0.011 -0.005 17.3 89.9
Bus1089 0.400 98.643 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 90.0
Bus1090 0.400 98.722 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 89.9
Bus1091 0.400 98.533 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9
Bus1092 0.400 98.397 -1.4 0.000 0.000 0.011 0.005 DB-B02-04 -0.011 -0.005 17.2 89.9
Bus1093 0.400 98.570 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9
Bus1094 0.400 98.481 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9
Bus1095 0.400 98.396 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.9
Bus1096 0.400 98.260 -1.4 0.000 0.000 0.011 0.005 DB-B02-05 -0.011 -0.005 17.2 89.9
Bus1097 0.400 98.432 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.8
Bus1098 0.400 98.344 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.9
Bus1099 0.400 98.209 -1.4 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.9
Bus1100 0.400 98.073 -1.3 0.000 0.000 0.010 0.005 DB-B02-06 -0.010 -0.005 17.2 89.9
Bus1101 0.400 98.245 -1.4 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.8
Bus1102 0.400 98.157 -1.3 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.9
Bus1103 0.400 97.357 -1.5 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 20.7 89.9
Bus1104 0.400 97.453 -1.6 0.000 0.000 0.014 0.007 DB-B01-033 -0.014 -0.007 22.7 89.9
Bus1105 0.400 97.406 -1.6 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 20.8 89.9
Bus1106 0.400 97.546 -1.6 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 21.0 89.8
Bus1107 0.400 97.691 -1.6 0.000 0.000 0.003 0.002 DB-B01-033 -0.003 -0.002 5.6 89.2
Bus1108 0.400 97.500 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 20.7 89.9
Bus1109 0.400 97.597 -1.6 0.000 0.000 0.014 0.007 DB-B01-034 -0.014 -0.007 22.7 89.9
Bus1110 0.400 97.549 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 20.8 89.9
Bus1111 0.400 97.689 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 21.0 89.9
Bus1112 0.400 97.835 -1.6 0.000 0.000 0.003 0.002 DB-B01-034 -0.003 -0.002 5.6 89.3
Bus1115 0.400 97.667 -1.6 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 20.7 89.8
Bus1116 0.400 97.494 -1.5 0.000 0.000 0.014 0.007 DB-B01-035 -0.014 -0.007 22.7 89.9
Bus1117 0.400 97.738 -1.6 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 20.8 89.7
Project: ETAP Page: 109
Contract: SN:
Bus1118 0.400 97.593 -1.5 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 21.0 89.9
Bus1119 0.400 97.744 -1.6 0.000 0.000 0.003 0.002 DB-B01-035 -0.003 -0.002 5.7 89.7
Bus1120 0.400 97.797 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 20.8 89.8
Bus1121 0.400 97.624 -1.5 0.000 0.000 0.014 0.007 DB-B01-036 -0.014 -0.007 22.7 89.9
Bus1122 0.400 97.868 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 20.8 89.7
Bus1123 0.400 97.723 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 21.0 89.9
Bus1124 0.400 97.874 -1.6 0.000 0.000 0.003 0.002 DB-B01-036 -0.003 -0.002 5.7 89.7
Bus1134 13.800 100.000 0.0 0.000 0.000 -0.001 -0.004 BUS-2S/S-2 -0.833 -0.424 39.1 89.1
Bus1135 0.400 97.958 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 20.8 89.9
Bus1136 0.400 98.084 -1.6 0.000 0.000 0.014 0.007 DB-B01-006 -0.014 -0.007 22.8 89.9
Bus1137 0.400 97.907 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 20.9 89.9
Bus1138 0.400 98.026 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 21.1 89.9
Bus1139 0.400 98.245 -1.6 0.000 0.000 0.003 0.002 DB-B01-006 -0.003 -0.002 5.7 89.2
Bus1140 0.400 97.775 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 20.8 89.9
Bus1141 0.400 97.901 -1.6 0.000 0.000 0.014 0.007 DB-B01-07 -0.014 -0.007 22.8 89.8
Bus1142 0.400 97.725 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 20.8 89.9
Bus1143 0.400 97.844 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 21.0 89.9
Bus1144 0.400 98.061 -1.6 0.000 0.000 0.003 0.002 DB-B01-07 -0.003 -0.002 5.6 89.1
Bus1145 0.400 97.593 -1.5 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 20.7 89.9
Bus1146 0.400 97.718 -1.6 0.000 0.000 0.014 0.007 DB-B01-08 -0.014 -0.007 22.7 89.8
Bus1147 0.400 97.543 -1.5 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 20.8 89.9
Bus1148 0.400 97.661 -1.6 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 21.0 89.9
Bus1149 0.400 97.879 -1.6 0.000 0.000 0.003 0.002 DB-B01-08 -0.003 -0.002 5.6 89.1
Bus1150 0.400 97.266 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.7 89.9
Bus1151 0.400 97.391 -1.7 0.000 0.000 0.014 0.007 DB-B01-003 -0.014 -0.007 22.7 89.8
Bus1152 0.400 97.216 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.7 89.9
Bus1153 0.400 97.334 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.9 89.9
Bus1154 0.400 97.551 -1.7 0.000 0.000 0.003 0.002 DB-B01-003 -0.003 -0.002 5.6 88.9
Bus1155 0.400 97.461 -1.7 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 20.7 89.9
Bus1156 0.400 97.586 -1.7 0.000 0.000 0.014 0.007 DB-B01-004 -0.014 -0.007 22.7 89.8
Bus1157 0.400 97.410 -1.6 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 20.8 89.9
Bus1158 0.400 97.529 -1.7 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 21.0 89.9
Project: ETAP Page: 110
Contract: SN:
Bus1159 0.400 97.746 -1.7 0.000 0.000 0.003 0.002 DB-B01-004 -0.003 -0.002 5.6 89.0
Bus1160 0.400 97.591 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 20.7 89.9
Bus1161 0.400 97.716 -1.7 0.000 0.000 0.014 0.007 DB-B01-005 -0.014 -0.007 22.7 89.8
Bus1162 0.400 97.540 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 20.8 89.9
Bus1163 0.400 97.659 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 21.0 89.9
Bus1164 0.400 97.876 -1.7 0.000 0.000 0.003 0.002 DB-B01-005 -0.003 -0.002 5.6 89.0
Bus1165 0.400 98.048 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 0.000 0.000 0.3 90.4
Bus1166 0.400 97.555 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.7 89.8
Bus1167 0.400 97.496 -1.6 0.000 0.000 0.014 0.007 DB-B01-009 -0.014 -0.007 22.7 89.8
Bus1168 0.400 97.420 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.8 89.9
Bus1169 0.400 97.367 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.9 89.9
Bus1170 0.400 97.590 -1.6 0.000 0.000 0.003 0.002 DB-B01-009 -0.003 -0.002 5.6 89.7
Bus1171 0.400 97.750 -1.7 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 20.7 89.8
Bus1172 0.400 97.691 -1.6 0.000 0.000 0.014 0.007 DB-B01-010 -0.014 -0.007 22.7 89.8
Bus1173 0.400 97.614 -1.6 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 20.8 89.9
Bus1174 0.400 97.562 -1.6 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 21.0 89.9
Bus1175 0.400 97.785 -1.7 0.000 0.000 0.003 0.002 DB-B01-010 -0.003 -0.002 5.7 89.7
Bus1176 0.400 97.946 -1.7 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 20.8 89.8
Bus1177 0.400 97.886 -1.7 0.000 0.000 0.014 0.007 DB-B01-011 -0.014 -0.007 22.8 89.8
Bus1178 0.400 97.810 -1.6 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 20.8 89.9
Bus1179 0.400 97.757 -1.6 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 21.0 89.9
Bus1180 0.400 97.980 -1.7 0.000 0.000 0.003 0.002 DB-B01-011 -0.003 -0.002 5.7 89.7
Bus1181 0.400 97.376 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 20.7 89.9
Bus1182 0.400 97.473 -1.7 0.000 0.000 0.014 0.007 DB-B01-012 -0.014 -0.007 22.7 89.9
Bus1183 0.400 97.425 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 20.8 89.9
Bus1184 0.400 97.565 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 21.0 89.8
Bus1185 0.400 97.710 -1.8 0.000 0.000 0.003 0.002 DB-B01-012 -0.003 -0.002 5.6 88.9
Bus1186 0.400 97.233 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.7 89.9
Bus1187 0.400 97.330 -1.7 0.000 0.000 0.014 0.007 DB-B01-013 -0.014 -0.007 22.7 89.9
Bus1188 0.400 97.282 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.7 89.9
Bus1189 0.400 97.422 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.9 89.8
Bus1190 0.400 97.567 -1.8 0.000 0.000 0.003 0.002 DB-B01-013 -0.003 -0.002 5.6 88.9
Bus1191 0.400 97.039 -1.7 0.000 0.000 0.012 0.006 DB-B01-014 -0.012 -0.006 20.6 89.9
Project: ETAP Page: 111
Contract: SN:
Bus1192 0.400 97.136 -1.7 0.000 0.000 0.014 0.007 DB-B01-014 -0.014 -0.007 22.6 89.9
Bus1193 0.400 97.088 -1.7 0.000 0.000 0.013 0.006 DB-B01-014 -0.013 -0.006 20.7 89.9
Bus1194 0.400 97.228 -1.7 0.000 0.000 0.013 0.006 DB-B01-014 -0.013 -0.006 20.9 89.8
Bus1195 0.400 97.373 -1.7 0.000 0.000 0.003 0.002 DB-B01-014 -0.003 -0.002 5.6 88.8
Bus1196 0.400 96.760 -1.8 0.000 0.000 0.012 0.006 DB-B01-001 -0.012 -0.006 20.6 89.9
Bus1197 0.400 96.857 -1.8 0.000 0.000 0.014 0.007 DB-B01-001 -0.014 -0.007 22.5 89.8
Bus1198 0.400 96.809 -1.8 0.000 0.000 0.012 0.006 DB-B01-001 -0.012 -0.006 20.6 89.8
Bus1199 0.400 96.949 -1.8 0.000 0.000 0.013 0.006 DB-B01-001 -0.013 -0.006 20.8 89.7
Bus1200 0.400 97.093 -1.9 0.000 0.000 0.003 0.002 DB-B01-001 -0.003 -0.002 5.5 88.4
Bus1201 0.400 96.877 -1.8 0.000 0.000 0.012 0.006 DB-B01-002 -0.012 -0.006 20.6 89.9
Bus1202 0.400 96.973 -1.8 0.000 0.000 0.014 0.007 DB-B01-002 -0.014 -0.007 22.6 89.8
Bus1203 0.400 96.925 -1.8 0.000 0.000 0.012 0.006 DB-B01-002 -0.012 -0.006 20.6 89.8
Bus1204 0.400 97.065 -1.9 0.000 0.000 0.013 0.006 DB-B01-002 -0.013 -0.006 20.8 89.7
Bus1205 0.400 97.209 -1.9 0.000 0.000 0.003 0.002 DB-B01-002 -0.003 -0.002 5.5 88.5
Bus1206 0.400 96.836 -1.8 0.000 0.000 0.021 0.010 21-SMDP-5 -0.021 -0.010 34.4 90.0
Bus1207 0.400 97.056 -1.8 0.000 0.000 0.012 0.006 DB-B01-116 -0.012 -0.006 20.6 89.8
Bus1208 0.400 97.181 -1.8 0.000 0.000 0.014 0.007 DB-B01-116 -0.014 -0.007 22.6 89.8
Bus1209 0.400 96.964 -1.8 0.000 0.000 0.012 0.006 DB-B01-116 -0.012 -0.006 20.7 89.9
Bus1210 0.400 97.103 -1.8 0.000 0.000 0.013 0.006 DB-B01-116 -0.013 -0.006 20.9 89.8
Bus1211 0.400 97.340 -1.9 0.000 0.000 0.003 0.002 DB-B01-116 -0.003 -0.002 5.5 88.6
Bus1212 0.400 96.850 -1.8 0.000 0.000 0.012 0.006 DB-B01-117 -0.012 -0.006 20.6 89.8
Bus1213 0.400 96.974 -1.8 0.000 0.000 0.014 0.007 DB-B01-117 -0.014 -0.007 22.5 89.7
Bus1214 0.400 96.757 -1.8 0.000 0.000 0.012 0.006 DB-B01-117 -0.012 -0.006 20.6 89.9
Bus1215 0.400 96.896 -1.8 0.000 0.000 0.013 0.006 DB-B01-117 -0.013 -0.006 20.8 89.8
Bus1216 0.400 97.133 -1.8 0.000 0.000 0.003 0.002 DB-B01-117 -0.003 -0.002 5.5 88.5
Bus1223 13.800 100.000 0.0 0.000 0.000 0.000 -0.006 BUS-2S/S-1 -1.003 -0.514 47.1 89.0
Bus1224 0.400 99.259 -1.4 0.000 0.000 0.714 0.346 2S/S5 -0.714 -0.346 1153.9 90.0
Bus1225 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-5 -0.728 -0.375 34.3 88.9
Bus1237 0.400 99.566 -1.3 0.000 0.000 0.663 0.321 2S/S6 -0.663 -0.321 1068.5 90.0
Bus1238 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 -0.675 -0.346 31.7 89.0
Contract: SN:
Bus1239 0.400 97.959 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 20.8 89.9
Bus1240 0.400 98.085 -1.6 0.000 0.000 0.014 0.007 DB-B01-22 -0.014 -0.007 22.8 89.9
Bus1241 0.400 97.908 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 20.9 89.9
Bus1242 0.400 98.027 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 21.1 89.9
Bus1243 0.400 98.245 -1.6 0.000 0.000 0.003 0.002 DB-B01-22 -0.003 -0.002 5.7 89.2
Bus1244 0.400 97.776 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 20.8 89.9
Bus1245 0.400 97.902 -1.6 0.000 0.000 0.014 0.007 DB-B01-23 -0.014 -0.007 22.8 89.9
Bus1246 0.400 97.726 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 20.8 89.9
Bus1247 0.400 97.844 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 21.0 89.9
Bus1248 0.400 98.062 -1.6 0.000 0.000 0.003 0.002 DB-B01-23 -0.003 -0.002 5.6 89.2
Bus1249 0.400 97.594 -1.5 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 20.7 89.9
Bus1250 0.400 97.719 -1.6 0.000 0.000 0.014 0.007 DB-B01-24 -0.014 -0.007 22.7 89.8
Bus1251 0.400 97.544 -1.5 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 20.8 89.9
Bus1252 0.400 97.662 -1.6 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 21.0 89.9
Bus1253 0.400 97.880 -1.6 0.000 0.000 0.003 0.002 DB-B01-24 -0.003 -0.002 5.6 89.1
Bus1254 0.400 97.267 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.7 89.9
Bus1255 0.400 97.392 -1.7 0.000 0.000 0.014 0.007 DB-B01-19 -0.014 -0.007 22.7 89.8
Bus1256 0.400 97.217 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.7 89.9
Bus1257 0.400 97.335 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.9 89.9
Bus1258 0.400 97.551 -1.7 0.000 0.000 0.003 0.002 DB-B01-19 -0.003 -0.002 5.6 89.0
Bus1259 0.400 97.461 -1.7 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 20.7 89.9
Bus1260 0.400 97.586 -1.7 0.000 0.000 0.014 0.007 DB-B01-20 -0.014 -0.007 22.7 89.8
Bus1261 0.400 97.411 -1.6 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 20.8 89.9
Bus1262 0.400 97.529 -1.7 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 21.0 89.9
Bus1263 0.400 97.746 -1.7 0.000 0.000 0.003 0.002 DB-B01-20 -0.003 -0.002 5.6 89.0
Bus1264 0.400 97.591 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 20.7 89.9
Bus1265 0.400 97.717 -1.7 0.000 0.000 0.014 0.007 DB-B01-21 -0.014 -0.007 22.7 89.8
Bus1266 0.400 97.541 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 20.8 89.9
Bus1267 0.400 97.659 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 21.0 89.9
Bus1268 0.400 97.877 -1.7 0.000 0.000 0.003 0.002 DB-B01-21 -0.003 -0.002 5.6 89.1
Bus1269 0.400 98.047 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 0.000 0.000 0.3 90.4
Bus1270 0.400 97.557 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.7 89.7
Bus1271 0.400 97.497 -1.6 0.000 0.000 0.014 0.007 DB-B01-25 -0.014 -0.007 22.7 89.8
Project: ETAP Page: 113
Contract: SN:
Bus1272 0.400 97.421 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.7 89.9
Bus1273 0.400 97.368 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.9 89.9
Bus1274 0.400 97.657 -1.6 0.000 0.000 0.003 0.002 DB-B01-25 -0.003 -0.002 5.6 89.0
Bus1275 0.400 97.752 -1.7 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 20.7 89.8
Bus1276 0.400 97.692 -1.6 0.000 0.000 0.014 0.007 DB-B01-26 -0.014 -0.007 22.7 89.8
Bus1277 0.400 97.616 -1.6 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 20.8 89.9
Bus1278 0.400 97.563 -1.6 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 21.0 89.9
Bus1279 0.400 97.852 -1.7 0.000 0.000 0.003 0.002 DB-B01-26 -0.003 -0.002 5.6 89.0
Bus1280 0.400 97.947 -1.7 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 20.8 89.8
Bus1281 0.400 97.887 -1.7 0.000 0.000 0.014 0.007 DB-B01-27 -0.014 -0.007 22.8 89.8
Bus1282 0.400 97.811 -1.6 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 20.8 89.9
Bus1283 0.400 97.758 -1.6 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 21.0 89.9
Bus1284 0.400 98.048 -1.7 0.000 0.000 0.003 0.002 DB-B01-27 -0.003 -0.002 5.6 89.1
Bus1285 0.400 97.377 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 20.7 89.9
Bus1286 0.400 97.473 -1.7 0.000 0.000 0.014 0.007 DB-B01-28 -0.014 -0.007 22.7 89.9
Bus1287 0.400 97.425 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 20.8 89.9
Bus1288 0.400 97.566 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 21.0 89.8
Bus1289 0.400 97.711 -1.8 0.000 0.000 0.003 0.002 DB-B01-28 -0.003 -0.002 5.6 88.9
Bus1290 0.400 97.234 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.7 89.9
Bus1291 0.400 97.330 -1.7 0.000 0.000 0.014 0.007 DB-B01-29 -0.014 -0.007 22.7 89.9
Bus1292 0.400 97.283 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.7 89.9
Bus1293 0.400 97.423 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.9 89.8
Bus1294 0.400 97.568 -1.7 0.000 0.000 0.003 0.002 DB-B01-29 -0.003 -0.002 5.6 88.9
Bus1295 0.400 97.040 -1.7 0.000 0.000 0.012 0.006 DB-B01-030 -0.012 -0.006 20.6 89.9
Bus1296 0.400 97.136 -1.7 0.000 0.000 0.014 0.007 DB-B01-030 -0.014 -0.007 22.6 89.9
Bus1297 0.400 97.089 -1.7 0.000 0.000 0.013 0.006 DB-B01-030 -0.013 -0.006 20.7 89.9
Bus1298 0.400 97.229 -1.7 0.000 0.000 0.013 0.006 DB-B01-030 -0.013 -0.006 20.9 89.8
Bus1299 0.400 97.373 -1.7 0.000 0.000 0.003 0.002 DB-B01-030 -0.003 -0.002 5.6 88.8
Bus1300 0.400 96.761 -1.8 0.000 0.000 0.012 0.006 DB-B01-017 -0.012 -0.006 20.6 89.9
Bus1301 0.400 96.857 -1.8 0.000 0.000 0.014 0.007 DB-B01-017 -0.014 -0.007 22.5 89.8
Bus1302 0.400 96.810 -1.8 0.000 0.000 0.012 0.006 DB-B01-017 -0.012 -0.006 20.6 89.8
Bus1303 0.400 96.949 -1.8 0.000 0.000 0.013 0.006 DB-B01-017 -0.013 -0.006 20.8 89.7
Bus1304 0.400 97.094 -1.9 0.000 0.000 0.003 0.002 DB-B01-017 -0.003 -0.002 5.5 88.4
Project: ETAP Page: 114
Contract: SN:
Bus1305 0.400 96.877 -1.8 0.000 0.000 0.012 0.006 DB-B01-018 -0.012 -0.006 20.6 89.9
Bus1306 0.400 96.973 -1.8 0.000 0.000 0.014 0.007 DB-B01-018 -0.014 -0.007 22.6 89.8
Bus1307 0.400 96.926 -1.8 0.000 0.000 0.012 0.006 DB-B01-018 -0.012 -0.006 20.6 89.8
Bus1308 0.400 97.066 -1.9 0.000 0.000 0.013 0.006 DB-B01-018 -0.013 -0.006 20.8 89.7
Bus1309 0.400 97.210 -1.9 0.000 0.000 0.003 0.002 DB-B01-018 -0.003 -0.002 5.5 88.5
Bus1310 0.400 96.837 -1.8 0.000 0.000 0.021 0.010 27-SMDP-05 -0.021 -0.010 34.4 90.0
Bus1315 0.400 97.663 -1.6 0.000 0.000 0.020 0.010 27-SMDP-07 -0.020 -0.010 32.9 90.0
Bus1316 13.800 100.000 0.0 0.000 0.000 0.000 -0.007 BUS-2S/S-7 -1.002 -0.513 47.1 89.0
DB-B01-01 0.400 97.069 -1.9 0.000 0.000 0.000 0.000 11-SMDP-05 -0.055 -0.026 90.2 90.0
DB-B01-001 0.400 97.127 -1.9 0.000 0.000 0.000 0.000 21-SMDP-5 -0.055 -0.027 90.3 90.0
DB-B01-02 0.400 97.185 -1.9 0.000 0.000 0.000 0.000 11-SMDP-05 -0.055 -0.027 90.4 90.0
DB-B01-002 0.400 97.243 -1.9 0.000 0.000 0.000 0.000 21-SMDP-5 -0.055 -0.027 90.5 90.0
Contract: SN:
DB-B01-03 0.400 97.527 -1.7 0.000 0.000 0.000 0.000 11-SMDP-2 -0.055 -0.027 90.6 90.0
DB-B01-003 0.400 97.585 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.055 -0.027 90.7 90.0
DB-B01-04 0.400 97.722 -1.7 0.000 0.000 0.000 0.000 11-SMDP-2 -0.055 -0.027 90.8 90.0
DB-B01-004 0.400 97.780 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.055 -0.027 90.9 90.0
DB-B01-05 0.400 97.852 -1.8 0.000 0.000 0.000 0.000 11-SMDP-2 -0.056 -0.027 91.0 90.0
DB-B01-005 0.400 97.910 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.056 -0.027 91.1 90.0
Contract: SN:
DB-B01-06 0.400 98.221 -1.7 0.000 0.000 0.000 0.000 11-SMDP-1 -0.056 -0.027 91.4 90.0
DB-B01-006 0.400 98.279 -1.7 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.4 90.0
DB-B01-7 0.400 98.037 -1.7 0.000 0.000 0.000 0.000 11-SMDP-1 -0.056 -0.027 91.1 90.0
DB-B01-07 0.400 98.096 -1.6 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.2 90.0
DB-B01-8 0.400 97.855 -1.6 0.000 0.000 0.000 0.000 11-SMDP-1 -0.055 -0.027 90.9 90.0
Contract: SN:
DB-B01-08 0.400 97.913 -1.6 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.0 90.0
DB-B01-09 0.400 97.632 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.055 -0.027 90.8 90.0
DB-B01-009 0.400 97.690 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.055 -0.027 90.8 90.0
DB-B01-10 0.400 97.827 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.055 -0.027 91.0 90.0
DB-B01-010 0.400 97.885 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.056 -0.027 91.0 90.0
DB-B01-11 0.400 98.023 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.056 -0.027 91.2 90.0
Contract: SN:
DB-B01-011 0.400 98.081 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.056 -0.027 91.3 90.0
DB-B01-12 0.400 97.686 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.9 90.0
DB-B01-012 0.400 97.745 -1.8 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.9 90.0
DB-B01-13 0.400 97.543 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.7 90.0
DB-B01-013 0.400 97.601 -1.8 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.7 90.0
Contract: SN:
DB-B01-14 0.400 97.349 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.4 89.9
DB-B01-014 0.400 97.407 -1.7 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.5 90.0
DB-B01-15 0.400 97.314 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 -0.055 -0.027 90.6 90.0
DB-B01-16 0.400 97.106 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 -0.055 -0.027 90.2 89.9
DB-B01-17 0.400 97.594 -1.6 0.000 0.000 0.000 0.000 16-SMDP-2 -0.055 -0.027 90.7 90.0
DB-B01-017 0.400 97.127 -1.9 0.000 0.000 0.000 0.000 27-SMDP-05 -0.055 -0.027 90.3 90.0
Contract: SN:
DB-B01-18 0.400 97.711 -1.6 0.000 0.000 0.000 0.000 16-SMDP-2 -0.055 -0.027 90.8 90.0
DB-B01-018 0.400 97.244 -1.9 0.000 0.000 0.000 0.000 27-SMDP-05 -0.055 -0.027 90.5 90.0
DB-B01-19 0.400 97.586 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.055 -0.027 90.7 90.0
DB-B01-019 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.3 90.0
DB-B01-20 0.400 97.781 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.055 -0.027 90.9 90.0
Contract: SN:
DB-B01-020 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.3 90.0
DB-B01-21 0.400 97.911 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.056 -0.027 91.1 90.0
DB-B01-021 0.400 97.965 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.1 90.0
DB-B01-22 0.400 98.280 -1.7 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.4 90.0
DB-B01-022 0.400 98.754 -1.5 0.000 0.000 0.000 0.000 17-SMDP-01 -0.057 -0.027 91.9 90.0
DB-B01-23 0.400 98.097 -1.6 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.2 90.0
Contract: SN:
DB-B01-023 0.400 98.557 -1.4 0.000 0.000 0.000 0.000 17-SMDP-01 -0.056 -0.027 91.6 90.0
DB-B01-24 0.400 97.914 -1.6 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.0 90.0
DB-B01-024 0.400 98.386 -1.4 0.000 0.000 0.000 0.000 17-SMDP-01 -0.056 -0.027 91.5 90.0
DB-B01-25 0.400 97.691 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.055 -0.027 90.8 89.9
DB-B01-025 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.3 90.0
Contract: SN:
DB-B01-26 0.400 97.886 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.056 -0.027 91.0 90.0
DB-B01-026 0.400 98.358 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.5 90.0
DB-B01-27 0.400 98.083 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.056 -0.027 91.3 90.0
DB-B01-027 0.400 98.555 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.7 90.0
DB-B01-28 0.400 97.745 -1.8 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.9 90.0
DB-B01-028 0.400 98.216 -1.6 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.3 90.0
Contract: SN:
DB-B01-29 0.400 97.602 -1.8 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.7 90.0
DB-B01-029 0.400 98.072 -1.6 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.2 90.0
DB-B01-30 0.400 97.876 -1.5 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.0 90.0
DB-B01-030 0.400 97.408 -1.7 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.5 90.0
DB-B01-31 0.400 97.816 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 -0.056 -0.027 91.0 90.0
Contract: SN:
DB-B01-031 0.400 97.374 -1.9 0.000 0.000 0.000 0.000 27-SMDP-06 -0.055 -0.027 90.7 90.0
DB-B01-32 0.400 97.685 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 -0.055 -0.027 90.8 90.0
DB-B01-032 0.400 97.167 -1.8 0.000 0.000 0.000 0.000 27-SMDP-06 -0.055 -0.027 90.2 89.9
DB-B01-33 0.400 97.034 -1.9 0.000 0.000 0.000 0.000 Bus159 0.012 0.006 20.5 89.9
DB-B01-033 0.400 97.726 -1.6 0.000 0.000 0.000 0.000 22-SMDP-5 -0.055 -0.027 90.8 90.0
DB-B01-34 0.400 97.176 -1.9 0.000 0.000 0.000 0.000 Bus164 0.012 0.006 20.6 89.9
Contract: SN:
DB-B01-034 0.400 97.869 -1.6 0.000 0.000 0.000 0.000 22-SMDP-5 -0.056 -0.027 91.0 90.0
DB-B01-35 0.400 97.206 -1.9 0.000 0.000 0.000 0.000 12-SMDP-6 -0.055 -0.027 90.4 89.9
DB-B01-035 0.400 97.845 -1.6 0.000 0.000 0.000 0.000 22-SMDP-06 -0.056 -0.027 91.0 90.0
DB-B01-36 0.400 97.336 -1.9 0.000 0.000 0.000 0.000 12-SMDP-6 -0.055 -0.027 90.6 90.0
DB-B01-036 0.400 97.975 -1.6 0.000 0.000 0.000 0.000 22-SMDP-06 -0.056 -0.027 91.2 90.0
Contract: SN:
DB-B01-37 0.400 97.571 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.055 -0.027 90.7 90.0
DB-B01-037 0.400 98.214 -1.4 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.3 90.0
DB-B01-38 0.400 98.411 -1.4 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.5 90.0
DB-B01-38. 0.400 97.766 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.055 -0.027 90.9 90.0
DB-B01-39 0.400 97.897 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.056 -0.027 91.1 90.0
DB-B01-039 0.400 98.542 -1.5 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.6 90.0
Contract: SN:
DB-B01-40 0.400 98.914 -1.4 0.000 0.000 0.000 0.000 22-SMDP-01 -0.057 -0.027 92.0 90.0
DB-B01-040 0.400 98.266 -1.7 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.4 90.0
DB-B01-41 0.400 98.729 -1.4 0.000 0.000 0.000 0.000 22-SMDP-01 -0.057 -0.027 91.8 90.0
DB-B01-041 0.400 98.082 -1.6 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.2 90.0
DB-B01-42 0.400 98.545 -1.3 0.000 0.000 0.000 0.000 22-SMDP-01 -0.056 -0.027 91.6 90.0
Contract: SN:
DB-B01-042 0.400 97.900 -1.6 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.0 90.0
DB-B01-116 0.400 97.374 -1.9 0.000 0.000 0.000 0.000 21-SMDP-6 -0.055 -0.027 90.6 90.1
DB-B01-117 0.400 97.167 -1.9 0.000 0.000 0.000 0.000 21-SMDP-6 -0.055 -0.027 90.3 90.0
DB-B02-1 0.400 98.528 -1.3 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 62.7 90.0
DB-B02-01 0.400 97.883 -1.6 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.018 62.3 89.9
DB-B02-2 0.400 98.716 -1.4 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 62.9 90.0
Contract: SN:
DB-B02-02 0.400 98.069 -1.6 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.019 62.4 89.9
DB-B02-3 0.400 98.904 -1.4 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 63.0 90.0
DB-B02-03 0.400 98.256 -1.7 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.019 62.6 90.0
DB-B02-4 0.400 98.017 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.4 90.0
DB-B02-04 0.400 98.663 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.039 -0.019 62.8 90.0
DB-B02-5 0.400 97.880 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.3 89.9
DB-B02-05 0.400 98.525 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.039 -0.019 62.7 90.0
Contract: SN:
DB-B02-6 0.400 97.695 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.1 89.9
DB-B02-06 0.400 98.338 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.038 -0.019 62.6 90.0
DB-B02-7 0.400 98.359 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.019 62.7 90.0
DB-B02-07 0.400 98.459 -1.6 0.000 0.000 0.000 0.000 23-SMDP-04 -0.039 -0.019 62.7 90.0
DB-B02-8 0.400 98.259 -1.5 0.000 0.000 0.000 0.000 23-SMDP-04 -0.038 -0.019 62.6 90.0
DB-B02-08 0.400 98.159 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.019 62.5 90.0
DB-B02-9 0.400 98.072 -1.5 0.000 0.000 0.000 0.000 23-SMDP-04 -0.038 -0.019 62.4 90.0
Project: ETAP Page: 132
Contract: SN:
DB-B02-10 0.400 98.185 -1.6 0.000 0.000 0.000 0.000 13-SMDP-5 -0.038 -0.019 62.5 90.0
DB-B02-010 0.400 98.285 -1.6 0.000 0.000 0.000 0.000 23-SMDP-05 -0.038 -0.019 62.6 90.0
DB-B02-11 0.400 98.136 -1.6 0.000 0.000 0.000 0.000 23-SMDP-05 -0.038 -0.019 62.5 90.0
DB-B02-011 0.400 98.036 -1.6 0.000 0.000 0.000 0.000 13-SMDP-5 -0.038 -0.019 62.4 90.0
DB-B02-12 0.400 97.889 -1.7 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.4 90.0
DB-B02-012 0.400 97.988 -1.7 0.000 0.000 0.000 0.000 Bus1026 0.009 0.005 15.1 89.8
Contract: SN:
DB-B02-13 0.400 97.703 -1.7 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.2 89.9
DB-B02-013 0.400 97.802 -1.6 0.000 0.000 0.000 0.000 Bus1030 0.009 0.004 15.0 89.7
DB-B02-14 0.400 97.530 -1.6 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.0 89.9
DB-B02-014 0.400 97.628 -1.6 0.000 0.000 0.000 0.000 23-SMDP-06 -0.038 -0.018 62.1 89.9
DB-B02-15 0.400 97.585 -1.8 0.000 0.000 0.001 0.000 13-SMDP-7 -0.038 -0.018 62.5 90.1
DB-B02-015 0.400 98.050 -1.7 0.000 0.000 0.000 0.000 23-SMDP-07 -0.038 -0.019 62.7 90.1
DB-B02-16 0.400 97.541 -1.8 0.000 0.000 0.000 0.000 13-SMDP-7 -0.038 -0.018 62.2 89.9
Contract: SN:
DB-B02-016 0.400 98.006 -1.7 0.000 0.000 0.000 0.000 23-SMDP-07 -0.038 -0.019 62.5 90.0
DB-B03-1 0.400 97.684 -1.8 0.000 0.000 0.000 0.000 23-SMDP-03 -0.081 -0.039 132.6 90.0
DB-B03-01 0.400 97.585 -1.8 0.000 0.000 0.000 0.000 13-SMDP-3 -0.081 -0.039 132.4 90.0
DB-B03-2 0.400 98.269 -1.6 0.000 0.000 0.000 0.000 23-SMDP-02 -0.082 -0.040 133.3 90.0
DB-B03-02 0.400 98.169 -1.6 0.000 0.000 0.000 0.000 13-SMDP-2 -0.082 -0.039 133.2 90.0
Contract: SN:
DB-B03-3 0.400 97.777 -1.7 0.000 0.000 0.001 0.000 23-SMDP-03 -0.081 -0.039 133.0 90.1
DB-B03-03 0.400 97.678 -1.8 0.000 0.000 0.001 0.000 13-SMDP-3 -0.081 -0.039 132.9 90.1
DB-B03-4 0.400 98.414 -1.6 0.000 0.000 0.000 0.000 23-SMDP-02 -0.082 -0.040 133.6 90.1
DB-B03-04 0.400 98.314 -1.6 0.000 0.000 0.000 0.000 13-SMDP-2 -0.082 -0.040 133.5 90.0
DB-B04-1 0.400 98.573 -1.5 0.000 0.000 0.000 0.000 23-SMDP-01 -0.067 -0.032 108.2 90.0
Contract: SN:
DB-B04-01 0.400 98.473 -1.6 0.000 0.000 0.000 0.000 13-SMDP-1 -0.066 -0.032 108.1 90.0
DB-B04-2 0.400 98.559 -1.6 0.000 0.000 0.000 0.000 13-SMDP-1 -0.067 -0.032 108.3 90.1
DB-B04-02 0.400 98.659 -1.5 0.000 0.000 0.000 0.000 23-SMDP-01 -0.067 -0.032 108.4 90.1
DB-B06 0.400 96.885 -2.0 0.000 0.000 0.001 0.000 12-SMDP-7 -0.102 -0.050 169.2 89.7
DB-B08-09 0.400 97.972 -1.5 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.018 62.4 89.9
DB-B14 0.400 97.280 -1.8 0.000 0.000 0.000 0.000 12-SMDP-7 -0.047 -0.023 77.7 90.1
Contract: SN:
DB-B21 0.400 97.283 -1.6 0.000 0.000 0.000 0.000 11-SMDP-16 -0.042 -0.021 69.5 89.9
MV SWGR#1 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-01 3.985 2.054 187.6 88.9
MV SWGR#2 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-1 3.773 1.942 177.5 88.9
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Bus156 0.400 400.0 0.000 0.014 0.007 0.015 90.0 22.5 5.6
Bus157 0.400 0.000 0.013 0.006 0.014 90.0 20.7
Bus158 0.400 0.000 0.014 0.007 0.015 90.0 22.7
Bus159 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.5
Bus160 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus161 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus162 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus163 0.400 0.000 0.000 0.003 0.002 0.004 88.3 5.5
Bus164 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus165 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus166 0.400 0.000 0.000 0.011 0.005 0.012 89.7 17.1
Bus167 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus168 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus169 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus170 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus171 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus172 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus173 0.400 0.000 0.013 0.006 0.014 90.0 20.7
Bus174 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus175 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus176 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus177 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.5
Bus178 0.400 0.000 0.005 0.002 0.006 90.0 8.3
Bus179 0.400 0.000 0.000 0.014 0.007 0.016 89.8 23.3
Bus180 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.7
Bus181 0.400 0.000 0.000 0.021 0.010 0.023 90.0 34.3
Bus182 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.5
Bus183 0.400 0.000 0.000 0.012 0.006 0.013 89.8 19.1
Bus184 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus185 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.9
Bus186 0.400 0.000 0.000 0.015 0.007 0.016 89.8 24.1
Bus187 0.400 0.000 0.000 0.012 0.006 0.013 89.7 19.0
Bus188 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus189 0.400 0.000 0.000 0.013 0.006 0.015 89.8 21.7
Bus190 0.400 0.000 0.000 0.015 0.007 0.016 89.7 23.9
Bus191 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.5
Bus192 0.400 0.000 0.000 0.014 0.007 0.016 89.8 23.3
Bus193 0.400 0.000 0.000 0.012 0.006 0.013 89.7 19.0
Bus194 0.400 0.000 0.000 0.012 0.006 0.014 89.7 20.6
Bus195 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.5
Bus196 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.6
Bus197 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Project: ETAP Page: 144
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Contract: SN:
Bus1315 0.400 400.0 0.000 0.020 0.010 0.022 90.0 32.9 8.2
Bus1316 13.800 400.0 0.000 -0.007 1.126 89.0 47.1 11.8
DB-B01-01 0.400 400.0 0.000 0.000 0.061 90.0 90.2 22.6
DB-B01-001 0.400 400.0 0.000 0.000 0.061 90.0 90.3 22.6
DB-B01-02 0.400 400.0 0.000 0.000 0.061 90.0 90.4 22.6
DB-B01-002 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-03 0.400 400.0 0.000 0.000 0.061 90.0 90.6 22.7
DB-B01-003 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-04 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-004 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-05 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-005 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-06 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.8
DB-B01-006 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.9
DB-B01-7 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-07 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-8 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-08 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-09 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-009 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-10 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-010 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-11 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-011 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-12 0.400 400.0 0.000 0.000 0.061 90.0 90.9 22.7
DB-B01-012 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-13 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-013 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-14 0.400 400.0 0.000 0.000 0.061 89.9 90.4 22.6
DB-B01-014 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-15 0.400 400.0 0.000 0.000 0.061 90.0 90.6 22.7
DB-B01-16 0.400 400.0 0.000 0.000 0.061 89.9 90.2 22.6
DB-B01-17 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-017 0.400 400.0 0.000 0.000 0.061 90.0 90.3 22.6
DB-B01-18 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-018 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-19 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-019 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-20 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-020 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-21 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-021 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
Project: ETAP Page: 158
Contract: SN:
Contract: SN:
Contract: SN:
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
Project: ETAP Page: 161
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.7 98.4 0.38
11-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.2 0.13
11-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32
11-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20
11-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37
11-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.25
11-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03
11-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.0 0.31
11-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.32
11-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.19
11-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.0 0.37
11-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.25
11-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.0 0.03
11-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32
11-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
11-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
11-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25
11-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03
11-PC-20 0.056 0.027 -0.055 -0.027 0.3 0.1 98.4 97.9 0.50
11-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.7 98.0 0.71
11-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.0 97.5 0.50
11-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.5 0.32
11-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.5 0.19
11-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.5 0.37
11-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.5 0.25
11-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.5 0.03
11-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.0 97.7 0.30
11-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
11-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19
11-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37
11-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.25
11-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
11-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.0 97.9 0.17
11-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32
Project: ETAP Page: 189
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
11-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
11-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25
11-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03
11-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.0 98.0 0.03
11-PC-300 0.167 0.082 -0.166 -0.081 0.8 0.9 98.7 98.2 0.58
11-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.6 0.52
11-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.6 0.13
11-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19
11-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.27
11-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
11-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.6 0.10
11-PC-320 0.056 0.027 -0.055 -0.027 0.2 0.1 98.2 97.8 0.33
11-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.13
11-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19
11-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.27
11-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32
11-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10
11-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.0 0.13
11-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.0 0.14
11-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.19
11-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.27
11-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.32
11-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.10
11-PC-400 0.166 0.082 -0.165 -0.081 1.2 1.3 98.7 97.8 0.89
11-PC-410 0.055 0.027 -0.055 -0.027 0.1 0.0 97.8 97.7 0.16
11-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.37
11-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.27
11-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
11-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18
11-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
11-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.8 97.5 0.30
11-PC-421 -0.012 -0.006 0.013 0.006 0.1 0.0 97.2 97.5 0.37
11-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.5 0.27
11-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.5 0.32
11-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.5 0.18
11-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.5 0.03
Project: ETAP Page: 190
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.8 97.3 0.49
11-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.3 0.37
11-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.3 0.27
11-PC-433 -0.012 -0.006 0.013 0.006 0.0 0.0 97.0 97.3 0.32
11-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.3 0.18
11-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.3 0.03
11-PC-500 0.131 0.065 -0.129 -0.063 1.5 1.7 98.7 97.3 1.41
11-PC-510 0.055 0.027 -0.055 -0.026 0.2 0.0 97.3 97.1 0.26
11-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.7 97.1 0.37
11-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.8 97.1 0.27
11-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32
11-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18
11-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.1 0.03
11-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.3 97.2 0.14
11-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.37
11-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.2 0.27
11-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32
11-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.18
11-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03
11-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.3 96.8 0.55
11-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.7 97.4 1.30
11-PC-610 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.3 0.12
11-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.3 0.18
11-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.3 0.35
11-PC-613 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.11
11-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.3 0.25
11-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.10
11-PC-620 0.055 0.027 -0.055 -0.027 0.2 0.1 97.4 97.1 0.32
11-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.1 0.18
11-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 96.8 97.1 0.35
11-PC-623 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.1 0.11
11-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.25
11-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.1 0.10
11-PC-630 0.000 0.000 0.000 0.000 0.0 0.0 97.4 97.4 0.03
11-PC-700 0.087 0.042 -0.087 -0.042 0.4 0.4 98.7 98.2 0.55
11-PC-710 0.009 0.004 -0.009 -0.004 0.0 0.0 98.2 97.8 0.39
11-PC-720 0.043 0.021 -0.042 -0.021 0.4 0.1 98.2 97.3 0.90
Project: ETAP Page: 191
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
11-PC-721 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.10
11-PC-722 -0.027 -0.013 0.027 0.013 0.1 0.0 97.1 97.3 0.18
11-PC-723 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.12
11-PC-730 0.036 0.017 -0.035 -0.017 0.5 0.1 98.2 96.9 1.24
12-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38
12-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13
12-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.3 0.32
12-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20
12-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37
12-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25
12-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03
12-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.31
12-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
12-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
12-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37
12-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25
12-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03
12-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50
12-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
12-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
12-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
12-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25
12-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
12-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71
12-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50
12-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
12-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19
12-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
12-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25
12-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.6 0.03
12-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30
12-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.8 0.32
12-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19
12-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37
12-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25
12-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03
12-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17
Project: ETAP Page: 192
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
12-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
12-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
12-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
12-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25
12-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
12-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03
12-PC-300 0.115 0.056 -0.114 -0.056 0.4 0.4 98.8 98.4 0.40
12-PC-310 0.038 0.019 -0.038 -0.018 0.2 0.0 98.4 97.9 0.50
12-PC-311 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18
12-PC-312 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 97.9 0.11
12-PC-313 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.23
12-PC-314 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 97.9 0.13
12-PC-320 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.1 0.31
12-PC-321 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.1 0.18
12-PC-322 -0.010 -0.005 0.010 0.005 0.0 0.0 98.0 98.1 0.11
12-PC-323 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.1 0.23
12-PC-324 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.1 0.13
12-PC-330 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.3 0.13
12-PC-331 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18
12-PC-332 -0.010 -0.005 0.010 0.005 0.0 0.0 98.2 98.3 0.11
12-PC-333 -0.009 -0.004 0.009 0.005 0.0 0.0 98.0 98.3 0.23
12-PC-334 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.13
12-PC-400 0.114 0.056 -0.114 -0.056 0.6 0.6 98.8 98.2 0.61
12-PC-410 0.038 0.018 -0.038 -0.018 0.1 0.0 98.2 98.0 0.15
12-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13
12-PC-412 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26
12-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09
12-PC-414 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18
12-PC-420 0.038 0.018 -0.038 -0.018 0.1 0.0 98.2 97.9 0.29
12-PC-421 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 97.9 0.13
12-PC-422 -0.010 -0.005 0.010 0.005 0.0 0.0 97.6 97.9 0.26
12-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.09
12-PC-424 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18
12-PC-430 0.038 0.018 -0.038 -0.018 0.2 0.0 98.2 97.7 0.47
12-PC-431 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.13
12-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.7 0.26
12-PC-433 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.09
Project: ETAP Page: 193
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
12-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.7 0.18
12-PC-50 -0.012 -0.006 0.012 0.006 0.1 0.0 96.7 97.0 0.37
12-PC-500 0.136 0.068 -0.134 -0.066 1.6 1.8 98.8 97.3 1.46
12-PC-51 -0.014 -0.007 0.014 0.007 0.0 0.0 96.8 97.0 0.27
12-PC-510 0.055 0.027 -0.055 -0.026 0.2 0.0 97.3 97.0 0.29
12-PC-52 -0.012 -0.006 0.012 0.006 0.0 0.0 96.7 97.0 0.32
12-PC-520 0.055 0.027 -0.055 -0.026 0.1 0.0 97.3 97.2 0.14
12-PC-53 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.0 0.18
12-PC-530 0.021 0.010 -0.021 -0.010 0.2 0.0 97.3 96.6 0.73
12-PC-54 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.0 0.03
12-PC-540 0.005 0.002 -0.005 -0.002 0.0 0.0 97.3 96.6 0.70
12-PC-56 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.37
12-PC-57 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.2 0.27
12-PC-58 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32
12-PC-59 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.18
12-PC-60 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03
12-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.8 97.5 1.31
12-PC-610 0.055 0.027 -0.055 -0.027 0.2 0.0 97.5 97.2 0.26
12-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.2 0.18
12-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 96.9 97.2 0.35
12-PC-613 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.2 0.11
12-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.25
12-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.10
12-PC-620 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.3 0.13
12-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.18
12-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.3 0.35
12-PC-623 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.11
12-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.3 0.25
12-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.10
12-PC-700 0.173 0.086 -0.172 -0.084 1.7 2.0 98.8 97.5 1.24
12-PC-710 0.102 0.051 -0.102 -0.050 0.6 0.6 97.5 96.9 0.65
12-PC-710-A 0.001 0.000 -0.001 0.000 0.0 0.0 96.9 96.9 0.00
12-PC-711 -0.022 -0.011 0.022 0.011 0.0 0.0 96.7 96.9 0.15
12-PC-712 -0.020 -0.010 0.020 0.010 0.0 0.0 96.8 96.9 0.13
12-PC-713 -0.018 -0.009 0.018 0.009 0.0 0.0 96.8 96.9 0.12
12-PC-714 -0.041 -0.020 0.041 0.020 0.1 0.0 96.7 96.9 0.15
12-PC-720 0.023 0.011 -0.023 -0.011 0.0 0.0 97.5 97.4 0.14
Project: ETAP Page: 194
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
12-PC-730 0.047 0.023 -0.047 -0.023 0.1 0.0 97.5 97.3 0.26
12-PC-731 -0.026 -0.013 0.026 0.013 0.1 0.0 97.1 97.3 0.23
12-PC-732 -0.010 -0.005 0.011 0.005 0.1 0.0 96.6 97.3 0.64
12-PC-733 -0.010 -0.005 0.011 0.005 0.1 0.0 96.6 97.3 0.64
13-PC-100 0.151 0.074 -0.150 -0.073 0.4 0.5 99.0 98.7 0.34
13-PC-101 0.164 0.080 -0.163 -0.079 0.8 0.9 99.0 98.4 0.58
13-PC-102 0.190 0.094 -0.188 -0.092 1.9 2.2 99.0 97.8 1.24
13-PC-103 0.126 0.062 -0.126 -0.061 0.5 0.6 99.0 98.5 0.54
13-PC-104 0.077 0.038 -0.076 -0.037 0.4 0.5 99.0 98.3 0.66
13-PC-105 0.114 0.056 -0.113 -0.055 0.9 1.0 99.0 98.0 1.01
13-PC-106 0.104 0.051 -0.103 -0.050 1.1 1.3 99.0 97.6 1.37
13-PC-110 0.067 0.032 -0.066 -0.032 0.1 0.1 98.7 98.5 0.19
13-PC-111 -0.016 -0.008 0.016 0.008 0.0 0.0 98.2 98.5 0.25
13-PC-112 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.5 0.13
13-PC-113 -0.016 -0.008 0.016 0.008 0.1 0.0 98.1 98.5 0.41
13-PC-114 -0.018 -0.009 0.018 0.009 0.0 0.0 98.3 98.5 0.19
13-PC-120 0.067 0.032 -0.067 -0.032 0.1 0.0 98.7 98.6 0.11
13-PC-121 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.6 0.25
13-PC-122 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.6 0.13
13-PC-123 -0.016 -0.008 0.016 0.008 0.1 0.0 98.2 98.6 0.41
13-PC-124 -0.018 -0.009 0.018 0.009 0.0 0.0 98.4 98.6 0.19
13-PC-130 0.018 0.009 -0.018 -0.009 0.0 0.0 98.7 98.4 0.22
13-PC-210 0.082 0.040 -0.082 -0.039 0.2 0.1 98.4 98.2 0.26
13-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.41
13-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.2 0.28
13-PC-213 -0.012 -0.006 0.012 0.006 0.0 0.0 98.0 98.2 0.16
13-PC-214 -0.014 -0.007 0.014 0.007 0.1 0.0 97.7 98.2 0.46
13-PC-215 -0.013 -0.006 0.013 0.007 0.0 0.0 98.0 98.2 0.21
13-PC-216 -0.015 -0.007 0.015 0.007 0.0 0.0 98.0 98.2 0.15
13-PC-220 0.082 0.040 -0.082 -0.040 0.1 0.1 98.4 98.3 0.11
13-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.41
13-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.3 0.28
13-PC-223 -0.012 -0.006 0.012 0.006 0.0 0.0 98.2 98.3 0.16
13-PC-224 -0.014 -0.007 0.014 0.007 0.1 0.0 97.9 98.3 0.46
13-PC-225 -0.013 -0.007 0.013 0.007 0.0 0.0 98.1 98.3 0.21
13-PC-226 -0.015 -0.007 0.015 0.007 0.0 0.0 98.2 98.3 0.15
13-PC-310 0.081 0.039 -0.081 -0.039 0.1 0.1 97.8 97.6 0.18
Project: ETAP Page: 195
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
13-PC-311 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.41
13-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.28
13-PC-313 -0.011 -0.006 0.012 0.006 0.0 0.0 97.4 97.6 0.16
13-PC-314 -0.014 -0.007 0.014 0.007 0.1 0.0 97.1 97.6 0.45
13-PC-315 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.21
13-PC-316 -0.014 -0.007 0.015 0.007 0.0 0.0 97.4 97.6 0.15
13-PC-320 0.081 0.039 -0.081 -0.039 0.1 0.0 97.8 97.7 0.09
13-PC-321 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.41
13-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.28
13-PC-323 -0.012 -0.006 0.012 0.006 0.0 0.0 97.5 97.7 0.16
13-PC-324 -0.014 -0.007 0.014 0.007 0.1 0.0 97.2 97.7 0.45
13-PC-325 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.21
13-PC-326 -0.015 -0.007 0.015 0.007 0.0 0.0 97.5 97.7 0.15
13-PC-330 0.028 0.014 -0.028 -0.014 0.1 0.0 97.8 97.4 0.39
13-PC-410 0.038 0.019 -0.038 -0.019 0.0 0.0 98.5 98.4 0.11
13-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.4 0.13
13-PC-412 -0.010 -0.005 0.011 0.005 0.0 0.0 98.1 98.4 0.26
13-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.4 0.09
13-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.4 0.18
13-PC-420 0.038 0.019 -0.038 -0.019 0.1 0.0 98.5 98.2 0.31
13-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.13
13-PC-422 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.2 0.26
13-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.09
13-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.18
13-PC-430 0.038 0.019 -0.038 -0.018 0.2 0.0 98.5 98.0 0.50
13-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 98.0 0.13
13-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26
13-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09
13-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18
13-PC-440 0.011 0.005 -0.011 -0.005 0.1 0.0 98.5 98.0 0.47
13-PC-450 0.000 0.000 0.000 0.000 0.0 0.0 98.5 98.5 0.02
13-PC-510 0.038 0.019 -0.038 -0.019 0.1 0.0 98.3 98.2 0.16
13-PC-511 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.13
13-PC-512 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.2 0.26
13-PC-513 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.09
13-PC-514 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.18
13-PC-520 0.038 0.019 -0.038 -0.019 0.1 0.0 98.3 98.0 0.31
Project: ETAP Page: 196
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
13-PC-521 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13
13-PC-522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26
13-PC-523 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09
13-PC-524 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.0 0.18
13-PC-610 0.038 0.018 -0.038 -0.018 0.0 0.0 98.0 97.9 0.11
13-PC-611 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.13
13-PC-612 -0.010 -0.005 0.010 0.005 0.0 0.0 97.6 97.9 0.26
13-PC-613 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.09
13-PC-614 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18
13-PC-620 0.038 0.018 -0.038 -0.018 0.1 0.0 98.0 97.7 0.30
13-PC-621 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.13
13-PC-622 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.7 0.26
13-PC-623 -0.009 -0.005 0.009 0.005 0.0 0.0 97.6 97.7 0.09
13-PC-624 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.7 0.18
13-PC-630 0.038 0.018 -0.038 -0.018 0.2 0.0 98.0 97.5 0.47
13-PC-631 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.13
13-PC-632 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.5 0.26
13-PC-633 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.09
13-PC-634 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.18
13-PC-710 0.038 0.018 -0.038 -0.018 0.0 0.0 97.6 97.6 0.06
13-PC-711 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.6 0.13
13-PC-712 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.6 0.26
13-PC-713 -0.009 -0.005 0.009 0.005 0.0 0.0 97.5 97.6 0.09
13-PC-714 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.6 0.18
13-PC-720 0.038 0.018 -0.038 -0.018 0.0 0.0 97.6 97.5 0.10
13-PC-721 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.13
13-PC-722 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.5 0.26
13-PC-723 -0.009 -0.005 0.009 0.005 0.0 0.0 97.4 97.5 0.09
13-PC-724 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.18
13-PC-730 0.028 0.013 -0.028 -0.013 0.4 0.1 97.6 96.3 1.35
14-PC-100 0.161 0.079 -0.160 -0.077 1.6 1.8 98.7 97.5 1.19
14-PC-110 0.024 0.011 -0.023 -0.011 0.3 0.0 97.5 96.5 0.98
14-PC-120 0.032 0.015 -0.032 -0.015 0.1 0.0 97.5 97.3 0.21
14-PC-130 0.032 0.015 -0.032 -0.015 0.4 0.1 97.5 96.5 1.05
14-PC-140 0.009 0.005 -0.009 -0.005 0.0 0.0 97.5 97.3 0.20
14-PC-150 0.012 0.006 -0.011 -0.006 0.0 0.0 97.5 97.2 0.35
14-PC-160 0.001 0.001 -0.001 -0.001 0.0 0.0 97.5 97.4 0.11
Project: ETAP Page: 197
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
14-PC-170 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 96.9 0.60
14-PC-180 0.028 0.013 -0.028 -0.013 0.4 0.1 97.5 96.2 1.29
14-PC-190 0.011 0.005 -0.010 -0.005 0.2 0.0 97.5 95.8 1.68
14-PC-200 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
14-PC-300 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
14-PC-400 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
14-PC-500 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
14-PC-600 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71
14-PC-700 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71
15-PC-100 0.716 0.351 -0.714 -0.346 2.2 5.4 99.8 99.3 0.55
16-PC-100 0.659 0.323 -0.658 -0.319 1.7 4.0 99.5 99.1 0.44
16-PC-200 0.133 0.065 -0.132 -0.063 1.8 2.0 99.5 97.9 1.66
16-PC-210 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.26
16-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
16-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27
16-PC-213 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
16-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18
16-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03
16-PC-220 0.055 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.14
16-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.37
16-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.27
16-PC-223 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
16-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18
16-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
16-PC-230 0.021 0.010 -0.021 -0.010 0.2 0.0 97.9 97.2 0.64
17-PC-100 0.170 0.083 -0.169 -0.082 0.5 0.6 99.3 98.9 0.38
17-PC-110 0.057 0.027 -0.057 -0.027 0.1 0.0 98.9 98.8 0.13
17-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.8 0.32
17-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.6 98.8 0.20
17-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 98.4 98.8 0.37
17-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.5 98.8 0.25
17-PC-115 -0.004 -0.002 0.004 0.002 0.0 0.0 98.7 98.8 0.04
17-PC-120 0.057 0.027 -0.056 -0.027 0.2 0.1 98.9 98.6 0.33
17-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.6 0.32
17-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 98.4 98.6 0.20
17-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.6 0.37
17-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.6 0.25
Project: ETAP Page: 198
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
17-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.6 0.04
17-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.9 98.4 0.50
17-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.32
17-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20
17-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.37
17-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.25
17-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 98.4 98.4 0.03
17-PC-200 0.169 0.082 -0.168 -0.081 1.0 1.1 99.3 98.6 0.71
17-PC-210 0.056 0.027 -0.056 -0.027 0.2 0.1 98.6 98.2 0.39
17-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32
17-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20
17-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37
17-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.25
17-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.03
17-PC-220 0.056 0.027 -0.056 -0.027 0.2 0.1 98.6 98.2 0.39
17-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32
17-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20
17-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37
17-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.25
17-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.03
17-PC-230 0.056 0.027 -0.056 -0.027 0.4 0.1 98.6 98.0 0.59
17-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 98.0 0.32
17-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.20
17-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.6 98.0 0.37
17-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.25
17-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.03
17-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.6 98.5 0.04
17-PC-300 0.169 0.083 -0.169 -0.082 0.8 0.9 99.3 98.7 0.58
17-PC-310 0.056 0.027 -0.056 -0.027 0.3 0.1 98.7 98.2 0.53
17-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.14
17-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20
17-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.27
17-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32
17-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.10
17-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.7 98.4 0.33
17-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.4 0.14
17-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20
Project: ETAP Page: 199
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
17-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.27
17-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.4 0.33
17-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 98.3 98.4 0.10
17-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.7 98.6 0.13
17-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.6 0.14
17-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 98.4 98.6 0.20
17-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.6 0.27
17-PC-334 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.6 0.33
17-PC-335 -0.003 -0.002 0.004 0.002 0.0 0.0 98.5 98.6 0.10
17-PC-400 0.169 0.083 -0.167 -0.081 1.2 1.4 99.3 98.4 0.90
17-PC-410 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.2 0.16
17-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37
17-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.2 0.27
17-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32
17-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.18
17-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03
17-PC-420 0.056 0.027 -0.056 -0.027 0.2 0.0 98.4 98.1 0.30
17-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37
17-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.1 0.27
17-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
17-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.18
17-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03
17-PC-430 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50
17-PC-431 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
17-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.9 0.27
17-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
17-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.18
17-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03
17-PC-500 0.112 0.055 -0.111 -0.054 1.2 1.3 99.3 97.9 1.32
17-PC-510 0.056 0.027 -0.056 -0.027 0.1 0.0 97.9 97.8 0.13
17-PC-511 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.18
17-PC-512 -0.014 -0.007 0.014 0.007 0.1 0.0 97.5 97.8 0.35
17-PC-513 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.11
17-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.25
17-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10
17-PC-520 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.7 0.26
17-PC-521 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18
Project: ETAP Page: 200
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
17-PC-522 -0.014 -0.007 0.014 0.007 0.1 0.0 97.3 97.7 0.35
17-PC-523 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.11
17-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.25
17-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.7 0.10
17-PC-530 0.000 0.000 0.000 0.000 0.0 0.0 97.9 97.9 0.01
17-PC-600 0.072 0.035 -0.071 -0.034 0.3 0.3 99.3 98.8 0.46
17-PC-610 0.022 0.011 -0.022 -0.011 0.0 0.0 98.8 98.7 0.12
17-PC-620 0.020 0.010 -0.020 -0.010 0.1 0.0 98.8 98.4 0.42
17-PC-630 0.029 0.014 -0.029 -0.014 0.3 0.0 98.8 98.0 0.81
17-PC-700 0.000 0.000 0.000 0.000 0.0 0.0 99.3 99.3 0.00
1-PC-001 -3.985 -2.054 3.985 2.054 0.0 0.0 100.0 100.0 0.00
1-PC-002 2.967 1.533 -2.967 -1.533 0.0 0.0 100.0 100.0 0.00
1-PC-003 1.961 1.017 -1.961 -1.017 0.0 0.0 100.0 100.0 0.00
1-PC-004 1.016 0.534 -1.016 -0.534 0.0 0.0 100.0 100.0 0.00
1-PC-006 -0.728 -0.375 0.728 0.375 0.0 0.0 100.0 100.0 0.00
1-PC-007 -1.535 -0.792 1.535 0.792 0.0 0.0 100.0 100.0 0.00
1S/S05--TR -0.716 -0.351 0.728 0.375 12.0 24.0 99.8 100.0 0.19
1S/S06--TR -0.792 -0.387 0.807 0.417 14.8 29.5 99.5 100.0 0.48
1S/S07--TR -0.859 -0.416 0.876 0.450 17.4 34.7 99.3 100.0 0.73
1S/S1-TR -0.994 -0.482 1.018 0.529 23.5 47.1 98.7 100.0 1.27
1S/S2-TR -0.982 -0.477 1.005 0.522 23.0 45.9 98.8 100.0 1.22
1S/S3-TR -0.925 -0.449 0.945 0.489 20.2 40.5 99.0 100.0 0.99
1S/S4-TR -0.992 -0.487 1.015 0.534 23.5 47.1 98.7 100.0 1.28
21-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38
21-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13
21-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.32
21-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20
21-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37
21-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25
21-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03
21-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.32
21-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
21-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
21-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37
21-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25
21-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.1 0.03
21-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50
Project: ETAP Page: 201
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
21-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
21-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
21-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
21-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25
21-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
21-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71
21-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50
21-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
21-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19
21-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
21-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25
21-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03
21-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30
21-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32
21-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19
21-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37
21-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25
21-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03
21-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17
21-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
21-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
21-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
21-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25
21-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
21-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03
21-PC-300 0.167 0.082 -0.167 -0.081 0.8 0.9 98.8 98.2 0.58
21-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.7 0.52
21-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.13
21-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19
21-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.27
21-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
21-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.7 0.10
21-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.2 97.9 0.33
21-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 97.9 0.13
21-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
21-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.27
21-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
Project: ETAP Page: 202
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
21-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.10
21-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.1 0.13
21-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.14
21-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
21-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.27
21-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
21-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.10
21-PC-400 0.167 0.082 -0.165 -0.081 1.2 1.3 98.8 97.9 0.89
21-PC-410 0.056 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.16
21-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37
21-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27
21-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
21-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.18
21-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
21-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.30
21-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
21-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27
21-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
21-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18
21-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03
21-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.9 97.4 0.49
21-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.37
21-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.4 0.27
21-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.32
21-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.4 0.18
21-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.4 97.4 0.03
21-PC-500 0.131 0.065 -0.130 -0.063 1.5 1.7 98.8 97.4 1.41
21-PC-510 0.055 0.027 -0.055 -0.027 0.2 0.0 97.4 97.1 0.26
21-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.1 0.37
21-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.1 0.27
21-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32
21-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18
21-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.1 0.03
21-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.2 0.14
21-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.9 97.2 0.37
21-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.27
21-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32
Project: ETAP Page: 203
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
21-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.2 0.18
21-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03
21-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.4 96.8 0.55
21-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.8 97.5 1.30
21-PC-610 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.4 0.12
21-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.4 0.32
21-PC-612 -0.014 -0.007 0.014 0.007 0.0 0.0 97.2 97.4 0.19
21-PC-613 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.41
21-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.27
21-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.4 0.03
21-PC-620 0.055 0.027 -0.055 -0.027 0.2 0.1 97.5 97.2 0.32
21-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.2 0.32
21-PC-622 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.19
21-PC-623 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.41
21-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.2 0.27
21-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03
21-PC-700 0.071 0.034 -0.071 -0.034 0.3 0.3 98.8 98.3 0.45
21-PC-710 0.009 0.004 -0.009 -0.004 0.0 0.0 98.3 98.0 0.39
21-PC-720 0.013 0.006 -0.013 -0.006 0.0 0.0 98.3 98.0 0.31
21-PC-730 0.014 0.007 -0.014 -0.007 0.0 0.0 98.3 98.0 0.30
21-PC-740 0.036 0.017 -0.035 -0.017 0.5 0.1 98.3 97.1 1.24
22-PC-100 0.171 0.083 -0.170 -0.082 0.5 0.6 99.4 99.0 0.38
22-PC-110 0.057 0.027 -0.057 -0.027 0.1 0.0 99.0 98.9 0.13
22-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.6 98.9 0.32
22-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.7 98.9 0.20
22-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 98.5 98.9 0.37
22-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.7 98.9 0.25
22-PC-115 -0.004 -0.002 0.004 0.002 0.0 0.0 98.9 98.9 0.04
22-PC-120 0.057 0.027 -0.057 -0.027 0.2 0.1 99.0 98.7 0.32
22-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.7 0.32
22-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 98.5 98.7 0.20
22-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 98.4 98.7 0.37
22-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 98.5 98.7 0.25
22-PC-125 -0.004 -0.002 0.004 0.002 0.0 0.0 98.7 98.7 0.04
22-PC-130 0.057 0.027 -0.056 -0.027 0.3 0.1 99.0 98.5 0.50
22-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.5 0.32
22-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 98.3 98.5 0.20
Project: ETAP Page: 204
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
22-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.5 0.37
22-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.5 0.25
22-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.5 0.04
22-PC-200 0.170 0.083 -0.169 -0.082 1.0 1.1 99.4 98.7 0.72
22-PC-210 0.056 0.027 -0.056 -0.027 0.3 0.1 98.7 98.2 0.50
22-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32
22-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20
22-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37
22-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.25
22-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03
22-PC-220 0.056 0.027 -0.056 -0.027 0.2 0.0 98.7 98.4 0.30
22-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.32
22-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20
22-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.37
22-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.4 0.25
22-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 98.4 98.4 0.04
22-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.7 98.5 0.17
22-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.5 0.32
22-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 98.3 98.5 0.20
22-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.5 0.37
22-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.5 0.25
22-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.5 0.04
22-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.03
22-PC-300 0.117 0.057 -0.116 -0.056 0.4 0.4 99.4 99.0 0.40
22-PC-310 0.039 0.019 -0.039 -0.019 0.2 0.0 99.0 98.5 0.50
22-PC-311 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18
22-PC-312 -0.011 -0.005 0.011 0.005 0.0 0.0 98.4 98.5 0.11
22-PC-313 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.23
22-PC-314 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.13
22-PC-320 0.039 0.019 -0.039 -0.019 0.1 0.0 99.0 98.7 0.31
22-PC-321 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.18
22-PC-322 -0.011 -0.005 0.011 0.005 0.0 0.0 98.6 98.7 0.11
22-PC-323 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.23
22-PC-324 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.7 0.13
22-PC-330 0.039 0.019 -0.039 -0.019 0.1 0.0 99.0 98.9 0.13
22-PC-331 -0.009 -0.005 0.009 0.005 0.0 0.0 98.7 98.9 0.18
22-PC-332 -0.011 -0.005 0.011 0.005 0.0 0.0 98.8 98.9 0.12
Project: ETAP Page: 205
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
22-PC-333 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.9 0.26
22-PC-334 -0.009 -0.005 0.009 0.005 0.0 0.0 98.7 98.9 0.18
22-PC-4 0.021 0.010 -0.021 -0.010 0.2 0.0 98.0 97.3 0.74
22-PC-400 0.116 0.057 -0.116 -0.056 0.6 0.6 99.4 98.8 0.62
22-PC-410 0.039 0.019 -0.039 -0.019 0.1 0.0 98.8 98.7 0.15
22-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.13
22-PC-412 -0.011 -0.005 0.011 0.005 0.0 0.0 98.4 98.7 0.27
22-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.7 0.09
22-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.18
22-PC-420 0.039 0.019 -0.039 -0.019 0.1 0.0 98.8 98.5 0.29
22-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.13
22-PC-422 -0.011 -0.005 0.011 0.005 0.0 0.0 98.3 98.5 0.27
22-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.09
22-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18
22-PC-430 0.039 0.019 -0.038 -0.019 0.2 0.0 98.8 98.3 0.48
22-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.13
22-PC-432 -0.010 -0.005 0.011 0.005 0.0 0.0 98.1 98.3 0.26
22-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09
22-PC-434 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.18
22-PC-500 0.133 0.066 -0.132 -0.064 1.5 1.7 99.4 98.0 1.42
22-PC-510 0.056 0.027 -0.055 -0.027 0.2 0.0 98.0 97.7 0.29
22-PC-511 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37
22-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27
22-PC-513 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
22-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18
22-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
22-PC-520 0.056 0.027 -0.056 -0.027 0.1 0.0 98.0 97.9 0.14
22-PC-521 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
22-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.9 0.27
22-PC-523 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32
22-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.18
22-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03
22-PC-600 0.112 0.055 -0.111 -0.054 1.2 1.3 99.4 98.1 1.32
22-PC-610 0.056 0.027 -0.056 -0.027 0.2 0.0 98.1 97.8 0.26
22-PC-611 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.18
22-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 97.5 97.8 0.35
22-PC-613 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.11
Project: ETAP Page: 206
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
22-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.25
22-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10
22-PC-620 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 98.0 0.13
22-PC-621 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.18
22-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 97.6 98.0 0.35
22-PC-623 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.0 0.11
22-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.25
22-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.10
23-PC-0511 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13
23-PC-0512 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26
23-PC-0513 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09
23-PC-0514 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18
23-PC-0521 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.8 0.13
23-PC-0522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.5 97.8 0.26
23-PC-0523 -0.009 -0.005 0.009 0.005 0.0 0.0 97.7 97.8 0.09
23-PC-0524 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.8 0.18
23-PC-100 0.151 0.074 -0.151 -0.073 0.4 0.5 99.1 98.8 0.34
23-PC-110 0.067 0.032 -0.067 -0.032 0.1 0.1 98.8 98.6 0.19
23-PC-111 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.6 0.25
23-PC-112 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.6 0.13
23-PC-113 -0.016 -0.008 0.016 0.008 0.1 0.0 98.2 98.6 0.41
23-PC-114 -0.018 -0.009 0.018 0.009 0.0 0.0 98.4 98.6 0.19
23-PC-120 0.067 0.032 -0.067 -0.032 0.1 0.0 98.8 98.7 0.11
23-PC-121 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.7 0.25
23-PC-122 -0.016 -0.008 0.016 0.008 0.0 0.0 98.5 98.7 0.13
23-PC-123 -0.016 -0.008 0.016 0.008 0.1 0.0 98.3 98.7 0.41
23-PC-124 -0.018 -0.009 0.018 0.009 0.0 0.0 98.5 98.7 0.19
23-PC-130 0.018 0.009 -0.018 -0.009 0.0 0.0 98.8 98.5 0.22
23-PC-200 0.164 0.080 -0.163 -0.079 0.8 0.9 99.1 98.5 0.58
23-PC-210 0.082 0.040 -0.082 -0.040 0.2 0.1 98.5 98.3 0.26
23-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.41
23-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.3 0.28
23-PC-213 -0.012 -0.006 0.012 0.006 0.0 0.0 98.1 98.3 0.16
23-PC-214 -0.014 -0.007 0.014 0.007 0.1 0.0 97.8 98.3 0.46
23-PC-215 -0.013 -0.007 0.013 0.007 0.0 0.0 98.1 98.3 0.21
23-PC-216 -0.015 -0.007 0.015 0.007 0.0 0.0 98.1 98.3 0.15
23-PC-220 0.082 0.040 -0.082 -0.040 0.1 0.1 98.5 98.4 0.11
Project: ETAP Page: 207
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
23-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.41
23-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.4 0.28
23-PC-223 -0.012 -0.006 0.012 0.006 0.0 0.0 98.3 98.4 0.16
23-PC-224 -0.014 -0.007 0.014 0.007 0.1 0.0 98.0 98.4 0.46
23-PC-225 -0.013 -0.007 0.013 0.007 0.0 0.0 98.2 98.4 0.21
23-PC-226 -0.015 -0.007 0.015 0.007 0.0 0.0 98.3 98.4 0.15
23-PC-300 0.191 0.094 -0.189 -0.092 1.9 2.2 99.1 97.9 1.25
23-PC-310 0.081 0.039 -0.081 -0.039 0.1 0.1 97.9 97.7 0.18
23-PC-311 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.41
23-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.28
23-PC-313 -0.012 -0.006 0.012 0.006 0.0 0.0 97.5 97.7 0.16
23-PC-314 -0.014 -0.007 0.014 0.007 0.1 0.0 97.2 97.7 0.45
23-PC-315 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.21
23-PC-316 -0.015 -0.007 0.015 0.007 0.0 0.0 97.5 97.7 0.15
23-PC-320 0.081 0.039 -0.081 -0.039 0.1 0.0 97.9 97.8 0.09
23-PC-321 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.41
23-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.8 0.28
23-PC-323 -0.012 -0.006 0.012 0.006 0.0 0.0 97.6 97.8 0.16
23-PC-324 -0.014 -0.007 0.014 0.007 0.1 0.0 97.3 97.8 0.45
23-PC-325 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.21
23-PC-326 -0.015 -0.007 0.015 0.007 0.0 0.0 97.6 97.8 0.15
23-PC-330 0.029 0.014 -0.028 -0.014 0.1 0.0 97.9 97.5 0.39
23-PC-400 0.127 0.062 -0.126 -0.061 0.5 0.6 99.1 98.6 0.54
23-PC-410 0.039 0.019 -0.039 -0.019 0.1 0.0 98.6 98.5 0.11
23-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.13
23-PC-412 -0.011 -0.005 0.011 0.005 0.0 0.0 98.2 98.5 0.27
23-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.09
23-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18
23-PC-420 0.038 0.019 -0.038 -0.019 0.1 0.0 98.6 98.3 0.31
23-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.13
23-PC-422 -0.010 -0.005 0.011 0.005 0.0 0.0 98.0 98.3 0.26
23-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09
23-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18
23-PC-430 0.038 0.019 -0.038 -0.019 0.2 0.0 98.6 98.1 0.50
23-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.1 0.13
23-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.1 0.26
23-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.09
Project: ETAP Page: 208
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
23-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.1 0.18
23-PC-440 0.011 0.005 -0.011 -0.005 0.1 0.0 98.6 98.1 0.47
23-PC-450 0.000 0.000 0.000 0.000 0.0 0.0 98.6 98.6 0.02
23-PC-500 0.077 0.038 -0.076 -0.037 0.4 0.5 99.1 98.4 0.66
23-PC-510 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.3 0.16
23-PC-511 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.13
23-PC-512 -0.010 -0.005 0.011 0.005 0.0 0.0 98.0 98.3 0.26
23-PC-513 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09
23-PC-514 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18
23-PC-520 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.1 0.31
23-PC-521 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.13
23-PC-522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.1 0.26
23-PC-523 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.09
23-PC-524 -0.009 -0.004 0.009 0.005 0.0 0.0 98.0 98.1 0.18
23-PC-600 0.115 0.057 -0.114 -0.055 0.9 1.0 99.1 98.1 1.01
23-PC-610 0.038 0.018 -0.038 -0.018 0.0 0.0 98.1 98.0 0.11
23-PC-620 0.038 0.018 -0.038 -0.018 0.1 0.0 98.1 97.8 0.30
23-PC-630 0.038 0.018 -0.038 -0.018 0.2 0.0 98.1 97.6 0.47
23-PC-631 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.6 0.13
23-PC-632 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.6 0.26
23-PC-633 -0.009 -0.004 0.009 0.005 0.0 0.0 97.5 97.6 0.09
23-PC-634 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.6 0.18
23-PC-700 0.076 0.038 -0.075 -0.037 0.6 0.7 99.1 98.1 1.00
23-PC-710 0.038 0.019 -0.038 -0.019 0.0 0.0 98.1 98.0 0.06
23-PC-711 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13
23-PC-712 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26
23-PC-713 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.0 0.09
23-PC-714 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.0 0.18
23-PC-720 0.038 0.019 -0.038 -0.019 0.0 0.0 98.1 98.0 0.10
23-PC-721 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13
23-PC-722 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26
23-PC-723 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09
23-PC-724 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18
24-PC-100 0.165 0.080 -0.163 -0.078 1.6 1.8 98.7 97.5 1.22
24-PC-110 0.032 0.015 -0.032 -0.015 0.1 0.0 97.5 97.3 0.21
24-PC-120 0.032 0.015 -0.032 -0.015 0.4 0.1 97.5 96.4 1.05
24-PC-130 0.009 0.005 -0.009 -0.005 0.0 0.0 97.5 97.3 0.20
Project: ETAP Page: 209
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
24-PC-140 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 97.1 0.37
24-PC-150 0.001 0.001 -0.001 -0.001 0.0 0.0 97.5 97.4 0.11
24-PC-160 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 96.9 0.60
24-PC-170 0.028 0.013 -0.028 -0.013 0.4 0.1 97.5 96.2 1.29
24-PC-180 0.027 0.013 -0.026 -0.013 1.5 0.1 97.5 93.1 4.36
24-PC-190 0.010 0.005 -0.010 -0.005 0.3 0.0 97.5 95.5 1.99
24-PC-200 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
24-PC-300 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
24-PC-400 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
24-PC-500 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29
24-PC-600 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71
24-PC-700 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71
25-PC-100 0.716 0.351 -0.714 -0.346 2.2 5.4 99.8 99.3 0.55
26-PC-100 0.665 0.325 -0.663 -0.321 1.7 4.1 100.0 99.6 0.44
27-PC -510 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.4 0.12
27-PC- 520 0.055 0.027 -0.055 -0.027 0.2 0.1 97.5 97.2 0.32
27-PC- 530 0.000 0.000 0.000 0.000 0.0 0.0 97.5 97.5 0.01
27-PC-0511 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.4 0.18
27-PC-0512 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.4 0.35
27-PC-0513 -0.012 -0.006 0.012 0.006 0.0 0.0 97.3 97.4 0.11
27-PC-0514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.25
27-PC-0515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.4 0.03
27-PC-0521 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.2 0.18
27-PC-0522 -0.014 -0.007 0.014 0.007 0.1 0.0 96.8 97.2 0.35
27-PC-0523 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.2 0.11
27-PC-0524 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.2 0.25
27-PC-0525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03
27-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38
27-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13
27-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.32
27-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20
27-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37
27-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25
27-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03
27-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.32
27-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
27-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
Project: ETAP Page: 210
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
27-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37
27-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25
27-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.1 0.03
27-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50
27-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
27-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
27-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
27-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25
27-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
27-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71
27-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50
27-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
27-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19
27-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
27-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25
27-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03
27-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30
27-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32
27-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19
27-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37
27-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25
27-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03
27-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17
27-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
27-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
27-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37
27-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25
27-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
27-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03
27-PC-300 0.167 0.082 -0.166 -0.081 0.8 0.9 98.8 98.2 0.58
27-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.7 0.52
27-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.13
27-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19
27-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.27
27-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
27-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
27-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.2 97.9 0.33
Project: ETAP Page: 211
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
27-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 97.9 0.13
27-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19
27-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.27
27-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
27-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03
27-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.1 0.13
27-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.14
27-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
27-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.27
27-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32
27-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03
27-PC-400 0.167 0.082 -0.165 -0.081 1.2 1.3 98.8 97.9 0.89
27-PC-410 0.056 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.16
27-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37
27-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27
27-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32
27-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.18
27-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03
27-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.30
27-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37
27-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27
27-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32
27-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18
27-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03
27-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.9 97.4 0.49
27-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.37
27-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.4 0.27
27-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.32
27-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.4 0.18
27-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.4 97.4 0.03
27-PC-500 0.131 0.065 -0.130 -0.063 1.5 1.7 98.8 97.4 1.41
27-PC-510 0.055 0.027 -0.055 -0.027 0.2 0.0 97.4 97.1 0.26
27-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.1 0.37
27-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.1 0.27
27-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32
27-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18
27-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.1 0.03
Project: ETAP Page: 212
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
27-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.2 0.14
27-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.9 97.2 0.37
27-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.27
27-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32
27-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.2 0.18
27-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03
27-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.4 96.8 0.55
27-PC-600 0.110 0.055 -0.109 -0.054 1.2 1.3 98.8 97.5 1.30
27-PC-700 0.071 0.034 -0.070 -0.034 0.3 0.3 98.8 98.3 0.45
27-PC-710 0.022 0.010 -0.022 -0.010 0.0 0.0 98.3 98.2 0.12
27-PC-720 0.020 0.010 -0.020 -0.010 0.2 0.0 98.3 97.7 0.68
27-PC-730 0.029 0.014 -0.028 -0.014 0.3 0.0 98.3 97.5 0.81
2-PC-001 -3.773 -1.942 3.773 1.942 0.0 0.0 100.0 100.0 0.00
2-PC-002 2.771 1.428 -2.771 -1.428 0.0 0.0 100.0 100.0 0.00
2-PC-003 1.938 1.004 -1.938 -1.004 0.0 0.0 100.0 100.0 0.00
2-PC-004 1.019 0.535 -1.019 -0.535 0.0 0.0 100.0 100.0 0.00
2-PC-006 -0.728 -0.375 0.728 0.375 0.0 0.0 100.0 100.0 0.00
2-PC-007 -1.404 -0.721 1.404 0.721 0.0 0.0 100.0 100.0 0.00
2-PC-008 -2.406 -1.235 2.406 1.235 0.0 0.0 100.0 100.0 0.00
2S/S05--TR -0.716 -0.351 0.728 0.375 12.0 24.0 99.8 100.0 0.19
2S/S06--TR -0.665 -0.325 0.675 0.346 10.3 20.6 100.0 100.0 0.01
2S/S07--TR -0.979 -0.474 1.002 0.520 22.8 45.6 98.8 100.0 1.21
2S/S1-TR -0.980 -0.474 1.002 0.520 22.8 45.6 98.8 100.0 1.21
2S/S2-TR -0.818 -0.396 0.833 0.427 15.7 31.4 99.4 100.0 0.57
2S/S3-TR -0.899 -0.436 0.918 0.474 19.1 38.2 99.1 100.0 0.89
2S/S4-TR -0.996 -0.488 1.019 0.536 23.7 47.4 98.7 100.0 1.29
Cable12 1.018 0.522 -1.018 -0.522 0.0 0.0 100.0 100.0 0.00
Cable13 1.006 0.515 -1.006 -0.515 0.0 0.0 100.0 100.0 0.00
Cable16 1.019 0.535 -1.019 -0.535 0.0 0.0 100.0 100.0 0.00
Cable17 0.919 0.469 -0.919 -0.469 0.0 0.0 100.0 100.0 0.00
Cable18 0.833 0.424 -0.833 -0.424 0.0 0.0 100.0 100.0 0.00
Cable19 1.003 0.514 -1.003 -0.514 0.0 0.0 100.0 100.0 0.00
Cable2 0.945 0.483 -0.945 -0.483 0.0 0.0 100.0 100.0 0.00
Cable20 0.728 0.375 -0.728 -0.375 0.0 0.0 100.0 100.0 0.00
Cable21 0.675 0.346 -0.675 -0.346 0.0 0.0 100.0 100.0 0.00
Cable22 1.002 0.513 -1.002 -0.513 0.0 0.0 100.0 100.0 0.00
Cable3 1.016 0.534 -1.016 -0.534 0.0 0.0 100.0 100.0 0.00
Project: ETAP Page: 213
Contract: SN:
Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Cable4 0.876 0.447 -0.876 -0.447 0.0 0.0 100.0 100.0 0.00
Cable5 0.728 0.375 -0.728 -0.375 0.0 0.0 100.0 100.0 0.00
Cable7 0.807 0.416 -0.807 -0.416 0.0 0.0 100.0 100.0 0.00
PC-1 6.396 3.292 -6.396 -3.292 0.0 0.0 100.0 100.0 0.00
PC-13 6.180 3.176 -6.180 -3.176 0.0 0.0 100.0 100.0 0.00
PC-161 -2.411 -1.238 2.411 1.238 0.0 0.0 100.0 100.0 0.00
390.5 631.0
Contract: SN:
% Alert Settings
Critical
Loading
Bus 100.0
Reactor 100.0
Line 100.0
Transformer 100.0
Panel 100.0
Generator 100.0
Inverter/Charger 100.0
Bus Voltage
OverVoltage 105.0
UnderVoltage 90.0
Generator Excitation
OverExcited (Q Max.) 100.0
Contract: SN:
MW Mvar MVA % PF
Number of Iterations: 1