Project: ETAP Page: 1

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (2): Normal

Generation Category (1): Design

Load Diversity Factor: Global

Constant kVA=83%, Constant Z=83%, Generic=83%, Constant I=83%

Swing V-Control Load Total


Number of Buses: 2 0 928 930

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 14 0 0 914 0 0 928

Method of Solution: Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.1000000

System Frequency: 60.00 Hz

Unit System: Metric

Project Filename:

Output Filename:
Project: ETAP Page: 2

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

1S/S1-LV-PANEL 0.400 1 100.0 0.0

1S/S2-LV-PANEL2 0.400 1 100.0 0.0

1S/S3-LV-PANEL 0.400 1 100.0 0.0

1S/S4-LV-PANEL 0.400 1 100.0 0.0

1S/S5-LV-PANEL1 0.400 1 100.0 0.0

1S/S6-LV-PANEL 0.400 1 100.0 0.0

1S/S7-LV-PANEL 0.400 1 100.0 0.0

2S/S2-LV-PANEL3 0.400 2 100.0 0.0

2S/S3 0.400 2 100.0 0.0

2S/S4 0.400 2 100.0 0.0

2S/S5 0.400 2 100.0 0.0

2S/S6 0.400 2 100.0 0.0

2S/S7 0.400 2 100.0 0.0

11-SMDP-1 0.400 1 100.0 0.0

11-SMDP-2 0.400 1 100.0 0.0

11-SMDP-3 0.400 1 100.0 0.0

11-SMDP-04 0.400 1 100.0 0.0

11-SMDP-05 0.400 1 100.0 0.0

11-SMDP-06 0.400 1 100.0 0.0

11-SMDP-16 0.400 1 100.0 0.0

12-SMDP-01 0.400 1 100.0 0.0

12-SMDP-02 0.400 1 100.0 0.0

12-SMDP-3 0.400 1 100.0 0.0

12-SMDP-4 0.400 1 100.0 0.0

12-SMDP-5 0.400 1 100.0 0.0

12-SMDP-6 0.400 1 100.0 0.0

12-SMDP-7 0.400 1 100.0 0.0

13-SMDP-1 0.400 1 100.0 0.0

13-SMDP-2 0.400 1 100.0 0.0

13-SMDP-3 0.400 1 100.0 0.0

13-SMDP-04 0.400 1 100.0 0.0

13-SMDP-5 0.400 1 100.0 0.0

13-SMDP-6 0.400 1 100.0 0.0


Project: ETAP Page: 4

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

13-SMDP-7 0.400 1 100.0 0.0

14-SMDP-01 0.400 1 100.0 0.0

16-SMDP-2 0.400 1 100.0 0.0

17-SMDP-01 0.400 1 100.0 0.0

17-SMDP-02 0.400 1 100.0 0.0

17-SMDP-03 0.400 1 100.0 0.0

17-SMDP-04 0.400 1 100.0 0.0

17-SMDP-05 0.400 1 100.0 0.0

17-SMDP-6 0.400 1 100.0 0.0

17-SMDP-07 0.400 1 100.0 0.0

21-MDP 0.400 2 100.0 0.0

21-SMDP-1 0.400 2 100.0 0.0

21-SMDP-2 0.400 2 100.0 0.0

21-SMDP-3 0.400 2 100.0 0.0

21-SMDP-04 0.400 2 100.0 0.0

21-SMDP-5 0.400 2 100.0 0.0

21-SMDP-6 0.400 2 100.0 0.0

21-SMDP-7 0.400 2 100.0 0.0

22-SMDP-01 0.400 2 100.0 0.0

22-SMDP-02 0.400 2 100.0 0.0

22-SMDP-03 0.400 2 100.0 0.0

22-SMDP-04 0.400 2 100.0 0.0

22-SMDP-5 0.400 2 100.0 0.0

22-SMDP-06 0.400 2 100.0 0.0

23-SMDP-01 0.400 2 100.0 0.0

23-SMDP-02 0.400 2 100.0 0.0

23-SMDP-03 0.400 2 100.0 0.0

23-SMDP-04 0.400 2 100.0 0.0

23-SMDP-05 0.400 2 100.0 0.0

23-SMDP-06 0.400 2 100.0 0.0

23-SMDP-07 0.400 2 100.0 0.0

24-SMDP-01 0.400 2 100.0 0.0

27-SMDP-01 0.400 2 100.0 0.0

27-SMDP-02 0.400 2 100.0 0.0

27-SMDP-03 0.400 2 100.0 0.0


Project: ETAP Page: 5

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

27-SMDP-04 0.400 2 100.0 0.0

27-SMDP-05 0.400 2 100.0 0.0

27-SMDP-06 0.400 2 100.0 0.0

27-SMDP-07 0.400 2 100.0 0.0

Bus1 0.400 1 100.0 0.0

BUS-1S/S-01 13.800 1 100.0 0.0

BUS-1S/S-02 13.800 1 100.0 0.0

BUS-1S/S-03 13.800 1 100.0 0.0

BUS-1S/S-04 13.800 1 100.0 0.0

BUS-1S/S-05 13.800 1 100.0 0.0

BUS-1S/S-06 13.800 1 100.0 0.0

BUS-1S/S-07 13.800 1 100.0 0.0

Bus2 0.400 1 100.0 0.0 0.022 0.011

BUS-2S/S-1 13.800 2 100.0 0.0

BUS-2S/S-2 13.800 2 100.0 0.0

BUS-2S/S-3 13.800 2 100.0 0.0

BUS-2S/S-4 13.800 2 100.0 0.0

BUS-2S/S-5 13.800 2 100.0 0.0

BUS-2S/S-6 13.800 2 100.0 0.0

BUS-2S/S-7 13.800 2 100.0 0.0

Bus3 0.400 1 100.0 0.0

Bus4 0.400 1 100.0 0.0 0.013 0.006

Bus5 0.400 1 100.0 0.0 0.015 0.007

Bus6 0.400 1 100.0 0.0 0.013 0.006

Bus7 0.400 1 100.0 0.0 0.013 0.007

Bus8 0.400 1 100.0 0.0 0.030 0.014

Bus9 0.400 1 100.0 0.0 0.004 0.002

Bus10 0.400 1 100.0 0.0 0.024 0.012

Bus11 0.400 1 100.0 0.0 0.021 0.010

Bus12 0.400 1 100.0 0.0 0.020 0.010

Bus13 0.400 1 100.0 0.0 0.015 0.007

Bus14 0.400 1 100.0 0.0 0.045 0.022

Bus15 0.400 2 100.0 0.0 0.013 0.006

Bus17 0.400 1 100.0 0.0 0.024 0.011

Bus18 13.800 1 100.0 0.0


Project: ETAP Page: 6

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus20 0.400 1 100.0 0.0 0.013 0.006

Bus21 0.400 1 100.0 0.0 0.015 0.007

Bus22 0.400 1 100.0 0.0 0.013 0.006

Bus23 0.400 1 100.0 0.0 0.013 0.007

Bus24 0.400 1 100.0 0.0 0.013 0.006

Bus25 0.400 1 100.0 0.0 0.013 0.006

Bus26 0.400 1 100.0 0.0 0.015 0.007

Bus28 0.400 1 100.0 0.0 0.013 0.006

Bus29 0.400 1 100.0 0.0 0.013 0.007

Bus30 0.400 1 100.0 0.0 0.004 0.002

Bus31 0.400 1 100.0 0.0 0.013 0.006

Bus33 0.400 1 100.0 0.0 0.015 0.007

Bus37 0.400 1 100.0 0.0 0.013 0.006

Bus38 0.400 1 100.0 0.0 0.013 0.007

Bus39 0.400 1 100.0 0.0 0.010 0.005

Bus40 0.400 1 100.0 0.0 0.004 0.002

Bus42 13.800 2 100.0 0.0

Bus44 0.400 1 100.0 0.0 0.013 0.006

Bus46 0.400 1 100.0 0.0 0.010 0.005

Bus47 0.400 1 100.0 0.0 0.013 0.006

Bus48 0.400 1 100.0 0.0 0.015 0.007

Bus50 0.400 1 100.0 0.0 0.011 0.005

Bus74 0.400 1 100.0 0.0 0.013 0.006

Bus75 0.400 1 100.0 0.0 0.013 0.007

Bus76 0.400 1 100.0 0.0 0.004 0.002

Bus77 0.400 1 100.0 0.0 0.013 0.006

Bus78 0.400 1 100.0 0.0 0.015 0.007

Bus79 0.400 1 100.0 0.0 0.013 0.006

Bus80 0.400 1 100.0 0.0 0.013 0.007

Bus81 0.400 1 100.0 0.0 0.004 0.002

Bus82 0.400 1 100.0 0.0 0.015 0.007

Bus83 0.400 1 100.0 0.0 0.013 0.006

Bus84 0.400 1 100.0 0.0 0.013 0.006

Bus85 0.400 1 100.0 0.0 0.015 0.007

Bus86 0.400 1 100.0 0.0 0.013 0.006


Project: ETAP Page: 7

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus87 0.400 1 100.0 0.0 0.013 0.007

Bus88 0.400 1 100.0 0.0 0.004 0.002

Bus89 0.400 1 100.0 0.0 0.013 0.006

Bus90 0.400 1 100.0 0.0 0.015 0.007

Bus91 0.400 1 100.0 0.0 0.013 0.006

Bus92 0.400 1 100.0 0.0 0.013 0.007

Bus93 0.400 1 100.0 0.0 0.004 0.002

Bus94 0.400 1 100.0 0.0 0.013 0.006

Bus95 0.400 1 100.0 0.0 0.015 0.007

Bus96 0.400 1 100.0 0.0 0.013 0.006

Bus97 0.400 1 100.0 0.0 0.013 0.007

Bus98 0.400 1 100.0 0.0 0.004 0.002

Bus99 0.400 1 100.0 0.0 0.013 0.007

Bus100 0.400 1 100.0 0.0 0.004 0.002

Bus101 0.400 1 100.0 0.0 0.015 0.007

Bus102 0.400 1 100.0 0.0 0.013 0.006

Bus103 0.400 1 100.0 0.0 0.013 0.007

Bus104 0.400 1 100.0 0.0 0.004 0.002

Bus105 0.400 1 100.0 0.0 0.013 0.006

Bus106 0.400 1 100.0 0.0 0.015 0.007

Bus107 0.400 1 100.0 0.0 0.013 0.006

Bus108 0.400 1 100.0 0.0 0.013 0.007

Bus109 0.400 1 100.0 0.0 0.004 0.002

Bus110 0.400 1 100.0 0.0 0.013 0.006

Bus111 0.400 1 100.0 0.0 0.015 0.007

Bus112 0.400 1 100.0 0.0 0.013 0.006

Bus113 0.400 1 100.0 0.0 0.013 0.007

Bus114 0.400 1 100.0 0.0 0.004 0.002

Bus115 0.400 1 100.0 0.0 0.004 0.002

Bus116 0.400 1 100.0 0.0 0.013 0.006

Bus117 0.400 1 100.0 0.0 0.015 0.007

Bus118 0.400 1 100.0 0.0 0.013 0.006

Bus119 0.400 1 100.0 0.0 0.010 0.005

Bus120 0.400 1 100.0 0.0 0.013 0.007

Bus121 0.400 1 100.0 0.0 0.004 0.002


Project: ETAP Page: 8

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus122 0.400 1 100.0 0.0

Bus123 0.400 1 100.0 0.0 0.010 0.005

Bus124 0.400 1 100.0 0.0 0.011 0.005

Bus125 0.400 1 100.0 0.0 0.010 0.005

Bus126 0.400 1 100.0 0.0 0.010 0.005

Bus127 0.400 1 100.0 0.0 0.011 0.005

Bus128 0.400 1 100.0 0.0 0.013 0.006

Bus129 0.400 1 100.0 0.0 0.029 0.014

Bus130 0.400 1 100.0 0.0 0.004 0.002

Bus131 0.400 1 100.0 0.0 0.013 0.006

Bus132 0.400 1 100.0 0.0 0.015 0.007

Bus133 0.400 1 100.0 0.0 0.013 0.006

Bus134 0.400 1 100.0 0.0 0.013 0.007

Bus135 0.400 1 100.0 0.0 0.004 0.002

Bus136 0.400 1 100.0 0.0 0.013 0.006

Bus137 0.400 1 100.0 0.0 0.015 0.007

Bus138 0.400 1 100.0 0.0 0.013 0.006

Bus139 0.400 1 100.0 0.0 0.013 0.007

Bus140 0.400 1 100.0 0.0 0.004 0.002

Bus141 0.400 1 100.0 0.0 0.010 0.005

Bus142 0.400 1 100.0 0.0 0.010 0.005

Bus143 0.400 1 100.0 0.0 0.010 0.005

Bus144 0.400 1 100.0 0.0 0.009 0.004

Bus145 0.400 1 100.0 0.0 0.011 0.005

Bus146 0.400 1 100.0 0.0 0.010 0.005

Bus147 0.400 1 100.0 0.0 0.037 0.018

Bus148 0.400 1 100.0 0.0 0.010 0.005

Bus149 0.400 1 100.0 0.0 0.010 0.005

Bus150 0.400 1 100.0 0.0 0.011 0.005

Bus151 0.400 1 100.0 0.0 0.010 0.005

Bus152 0.400 1 100.0 0.0 0.010 0.005

Bus153 0.400 2 100.0 0.0 0.037 0.018

Bus154 0.400 1 100.0 0.0 0.010 0.005

Bus155 13.800 1 100.0 0.0

Bus156 0.400 2 100.0 0.0 0.014 0.007


Project: ETAP Page: 9

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus157 0.400 1 100.0 0.0 0.013 0.006

Bus158 0.400 1 100.0 0.0 0.015 0.007

Bus159 0.400 1 100.0 0.0 0.013 0.006

Bus160 0.400 1 100.0 0.0 0.015 0.007

Bus161 0.400 1 100.0 0.0 0.013 0.006

Bus162 0.400 1 100.0 0.0 0.013 0.007

Bus163 0.400 1 100.0 0.0 0.004 0.002

Bus164 0.400 1 100.0 0.0 0.013 0.006

Bus165 0.400 1 100.0 0.0 0.010 0.005

Bus166 0.400 1 100.0 0.0 0.011 0.005

Bus167 0.400 1 100.0 0.0 0.010 0.005

Bus168 0.400 1 100.0 0.0 0.010 0.005

Bus169 0.400 1 100.0 0.0 0.015 0.007

Bus170 0.400 1 100.0 0.0 0.013 0.006

Bus171 0.400 1 100.0 0.0 0.013 0.007

Bus172 0.400 1 100.0 0.0 0.004 0.002

Bus173 0.400 1 100.0 0.0 0.013 0.006

Bus174 0.400 1 100.0 0.0 0.010 0.005

Bus175 0.400 1 100.0 0.0 0.011 0.005

Bus176 0.400 1 100.0 0.0 0.010 0.005

Bus177 0.400 1 100.0 0.0 0.014 0.007

Bus178 0.400 1 100.0 0.0 0.005 0.003

Bus179 0.400 1 100.0 0.0 0.015 0.007

Bus180 0.400 1 100.0 0.0 0.014 0.007

Bus181 0.400 1 100.0 0.0 0.022 0.011

Bus182 0.400 1 100.0 0.0 0.015 0.007

Bus183 0.400 1 100.0 0.0 0.012 0.006

Bus184 0.400 1 100.0 0.0 0.015 0.007

Bus185 0.400 1 100.0 0.0 0.014 0.007

Bus186 0.400 1 100.0 0.0 0.015 0.007

Bus187 0.400 1 100.0 0.0 0.012 0.006

Bus188 0.400 1 100.0 0.0 0.015 0.007

Bus189 0.400 1 100.0 0.0 0.014 0.007

Bus190 0.400 1 100.0 0.0 0.015 0.007

Bus191 0.400 1 100.0 0.0 0.014 0.007


Project: ETAP Page: 10

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus192 0.400 1 100.0 0.0 0.015 0.007

Bus193 0.400 1 100.0 0.0 0.012 0.006

Bus194 0.400 1 100.0 0.0 0.013 0.006

Bus195 0.400 1 100.0 0.0 0.015 0.007

Bus196 0.400 1 100.0 0.0 0.013 0.006

Bus197 0.400 1 100.0 0.0 0.013 0.007

Bus198 0.400 1 100.0 0.0 0.004 0.002

Bus199 0.400 1 100.0 0.0 0.013 0.006

Bus200 0.400 1 100.0 0.0 0.015 0.007

Bus201 0.400 1 100.0 0.0 0.013 0.006

Bus202 0.400 1 100.0 0.0 0.013 0.007

Bus203 0.400 1 100.0 0.0 0.004 0.002

Bus204 0.400 1 100.0 0.0 0.015 0.007

Bus205 0.400 1 100.0 0.0 0.014 0.007

Bus206 0.400 1 100.0 0.0 0.015 0.007

Bus207 0.400 1 100.0 0.0 0.010 0.005

Bus208 0.400 1 100.0 0.0 0.010 0.005

Bus209 0.400 1 100.0 0.0 0.011 0.005

Bus210 0.400 1 100.0 0.0 0.010 0.005

Bus211 0.400 1 100.0 0.0 0.010 0.005

Bus212 0.400 1 100.0 0.0 0.013 0.007

Bus213 0.400 1 100.0 0.0 0.004 0.002

Bus214 0.400 2 100.0 0.0 0.009 0.004

Bus215 0.400 2 100.0 0.0 0.013 0.006

Bus216 0.400 1 100.0 0.0 0.010 0.005

Bus217 0.400 1 100.0 0.0 0.011 0.005

Bus218 0.400 1 100.0 0.0 0.010 0.005

Bus219 0.400 1 100.0 0.0 0.010 0.005

Bus220 0.400 1 100.0 0.0 0.010 0.005

Bus221 0.400 1 100.0 0.0 0.011 0.005

Bus222 0.400 1 100.0 0.0 0.010 0.005

Bus223 0.400 1 100.0 0.0 0.010 0.005

Bus224 0.400 1 100.0 0.0 0.010 0.005

Bus225 0.400 1 100.0 0.0 0.011 0.005

Bus226 0.400 1 100.0 0.0 0.010 0.005


Project: ETAP Page: 11

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus227 0.400 1 100.0 0.0 0.010 0.005

Bus231 0.400 2 100.0 0.0 0.022 0.011

Bus232 0.400 1 100.0 0.0 0.030 0.014

Bus233 0.400 2 100.0 0.0 0.030 0.014

Bus237 0.400 1 100.0 0.0 0.013 0.006

Bus238 0.400 1 100.0 0.0 0.015 0.007

Bus239 0.400 1 100.0 0.0 0.013 0.006

Bus240 0.400 1 100.0 0.0 0.013 0.007

Bus241 0.400 1 100.0 0.0 0.004 0.002

Bus242 0.400 1 100.0 0.0 0.013 0.006

Bus243 0.400 1 100.0 0.0 0.015 0.007

Bus244 0.400 1 100.0 0.0 0.013 0.006

Bus245 0.400 1 100.0 0.0 0.013 0.007

Bus246 0.400 1 100.0 0.0 0.004 0.002

Bus247 0.400 1 100.0 0.0 0.013 0.006

Bus248 0.400 1 100.0 0.0 0.015 0.007

Bus249 0.400 1 100.0 0.0 0.013 0.006

Bus250 0.400 1 100.0 0.0 0.013 0.007

Bus251 0.400 1 100.0 0.0 0.004 0.002

Bus252 0.400 1 100.0 0.0 0.013 0.006

Bus253 0.400 1 100.0 0.0 0.015 0.007

Bus254 0.400 1 100.0 0.0 0.013 0.006

Bus255 0.400 1 100.0 0.0 0.013 0.007

Bus256 0.400 1 100.0 0.0 0.004 0.002

Bus257 0.400 1 100.0 0.0 0.013 0.006

Bus258 0.400 1 100.0 0.0 0.015 0.007

Bus259 0.400 1 100.0 0.0 0.013 0.006

Bus260 0.400 1 100.0 0.0 0.013 0.007

Bus261 0.400 1 100.0 0.0 0.004 0.002

Bus262 0.400 1 100.0 0.0 0.013 0.006

Bus263 0.400 1 100.0 0.0 0.015 0.007

Bus264 0.400 1 100.0 0.0 0.013 0.006

Bus265 0.400 1 100.0 0.0 0.013 0.007

Bus266 0.400 1 100.0 0.0 0.004 0.002

Bus267 0.400 1 100.0 0.0


Project: ETAP Page: 12

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus271 0.400 1 100.0 0.0 0.013 0.006

Bus272 0.400 1 100.0 0.0 0.015 0.007

Bus273 0.400 1 100.0 0.0 0.013 0.006

Bus274 0.400 1 100.0 0.0 0.013 0.007

Bus275 0.400 1 100.0 0.0 0.004 0.002

Bus278 0.400 1 100.0 0.0

Bus282 0.400 2 100.0 0.0 0.013 0.006

Bus283 0.400 2 100.0 0.0 0.015 0.007

Bus284 0.400 2 100.0 0.0 0.013 0.006

Bus285 0.400 2 100.0 0.0 0.013 0.007

Bus286 0.400 2 100.0 0.0 0.004 0.002

Bus287 0.400 2 100.0 0.0 0.013 0.006

Bus288 0.400 2 100.0 0.0 0.015 0.007

Bus289 0.400 2 100.0 0.0 0.013 0.006

Bus290 0.400 2 100.0 0.0 0.013 0.007

Bus291 0.400 2 100.0 0.0 0.004 0.002

Bus292 0.400 2 100.0 0.0

Bus293 13.800 2 100.0 0.0

Bus297 0.400 1 100.0 0.0 0.017 0.008

Bus298 0.400 1 100.0 0.0 0.017 0.008

Bus299 0.400 1 100.0 0.0 0.017 0.008

Bus300 0.400 1 100.0 0.0 0.018 0.009

Bus301 0.400 1 100.0 0.0 0.010 0.005

Bus302 0.400 1 100.0 0.0 0.011 0.005

Bus303 0.400 1 100.0 0.0 0.010 0.005

Bus304 0.400 1 100.0 0.0 0.010 0.005

Bus305 0.400 2 100.0 0.0 0.022 0.011

Bus309 0.400 1 100.0 0.0 0.010 0.005

Bus310 0.400 1 100.0 0.0 0.011 0.005

Bus311 0.400 1 100.0 0.0 0.010 0.005

Bus312 0.400 1 100.0 0.0 0.014 0.007

Bus313 0.400 1 100.0 0.0 0.015 0.007

Bus314 0.400 1 100.0 0.0 0.012 0.006

Bus315 0.400 1 100.0 0.0 0.015 0.007

Bus316 0.400 1 100.0 0.0 0.014 0.007


Project: ETAP Page: 13

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus317 0.400 1 100.0 0.0 0.010 0.005

Bus318 0.400 1 100.0 0.0 0.010 0.005

Bus319 0.400 1 100.0 0.0 0.011 0.005

Bus320 0.400 1 100.0 0.0 0.010 0.005

Bus321 0.400 1 100.0 0.0 0.010 0.005

Bus322 0.400 1 100.0 0.0 0.028 0.013

Bus323 0.400 1 100.0 0.0 0.011 0.005

Bus324 0.400 1 100.0 0.0 0.011 0.005

Bus326 13.800 1 100.0 0.0

Bus327 13.800 1 100.0 0.0

Bus335 0.400 1 100.0 0.0 0.011 0.005

Bus377 0.400 1 100.0 0.0 0.012 0.006

Bus393 0.400 1 100.0 0.0 0.010 0.005

Bus394 0.400 1 100.0 0.0 0.017 0.008

Bus395 0.400 1 100.0 0.0 0.017 0.008

Bus396 0.400 1 100.0 0.0 0.017 0.008

Bus397 0.400 1 100.0 0.0 0.018 0.009

Bus398 0.400 1 100.0 0.0 0.018 0.009

Bus399 0.400 1 100.0 0.0 0.011 0.005

Bus400 0.400 1 100.0 0.0 0.010 0.005

Bus401 0.400 1 100.0 0.0 0.010 0.005

Bus402 0.400 1 100.0 0.0 0.010 0.005

Bus403 0.400 1 100.0 0.0 0.011 0.005

Bus404 0.400 1 100.0 0.0 0.010 0.005

Bus405 0.400 1 100.0 0.0 0.010 0.005

Bus406 0.400 1 100.0 0.0 0.013 0.006

Bus407 0.400 1 100.0 0.0 0.015 0.007

Bus408 0.400 1 100.0 0.0 0.013 0.006

Bus409 0.400 1 100.0 0.0 0.013 0.007

Bus410 0.400 1 100.0 0.0 0.004 0.002

Bus411 0.400 1 100.0 0.0 0.013 0.006

Bus412 0.400 1 100.0 0.0 0.015 0.007

Bus413 0.400 1 100.0 0.0 0.013 0.006

Bus414 0.400 1 100.0 0.0 0.013 0.007

Bus415 0.400 1 100.0 0.0 0.004 0.002


Project: ETAP Page: 14

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus416 0.400 1 100.0 0.0 0.013 0.006

Bus417 0.400 1 100.0 0.0 0.015 0.007

Bus418 0.400 1 100.0 0.0 0.013 0.006

Bus419 0.400 1 100.0 0.0 0.013 0.007

Bus420 0.400 1 100.0 0.0 0.004 0.002

Bus421 0.400 1 100.0 0.0 0.013 0.006

Bus422 0.400 1 100.0 0.0 0.015 0.007

Bus423 0.400 1 100.0 0.0 0.013 0.006

Bus424 0.400 1 100.0 0.0 0.013 0.007

Bus425 0.400 1 100.0 0.0 0.004 0.002

Bus426 0.400 1 100.0 0.0 0.013 0.006

Bus427 0.400 1 100.0 0.0 0.015 0.007

Bus428 0.400 1 100.0 0.0 0.013 0.006

Bus429 0.400 1 100.0 0.0 0.013 0.007

Bus430 0.400 1 100.0 0.0 0.004 0.002

Bus431 0.400 1 100.0 0.0 0.013 0.006

Bus432 0.400 1 100.0 0.0 0.015 0.007

Bus433 0.400 1 100.0 0.0 0.013 0.006

Bus434 0.400 1 100.0 0.0 0.013 0.007

Bus435 0.400 1 100.0 0.0 0.004 0.002

Bus436 0.400 1 100.0 0.0

Bus437 0.400 1 100.0 0.0 0.013 0.006

Bus438 0.400 1 100.0 0.0 0.015 0.007

Bus439 0.400 1 100.0 0.0 0.013 0.006

Bus440 0.400 1 100.0 0.0 0.013 0.007

Bus441 0.400 1 100.0 0.0 0.004 0.002

Bus442 0.400 1 100.0 0.0 0.013 0.006

Bus443 0.400 1 100.0 0.0 0.015 0.007

Bus444 0.400 1 100.0 0.0 0.013 0.006

Bus445 0.400 1 100.0 0.0 0.013 0.007

Bus446 0.400 1 100.0 0.0 0.004 0.002

Bus447 0.400 1 100.0 0.0 0.013 0.006

Bus448 0.400 1 100.0 0.0 0.015 0.007

Bus449 0.400 1 100.0 0.0 0.013 0.006

Bus450 0.400 1 100.0 0.0 0.013 0.007


Project: ETAP Page: 15

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus451 0.400 1 100.0 0.0 0.004 0.002

Bus452 0.400 1 100.0 0.0 0.013 0.006

Bus453 0.400 1 100.0 0.0 0.015 0.007

Bus454 0.400 1 100.0 0.0 0.013 0.006

Bus455 0.400 1 100.0 0.0 0.013 0.007

Bus456 0.400 1 100.0 0.0 0.004 0.002

Bus457 0.400 1 100.0 0.0 0.013 0.006

Bus458 0.400 1 100.0 0.0 0.015 0.007

Bus459 13.800 1 100.0 0.0

Bus460 0.400 1 100.0 0.0 0.025 0.012

Bus461 0.400 1 100.0 0.0 0.013 0.006

Bus462 0.400 1 100.0 0.0 0.034 0.016

Bus463 0.400 1 100.0 0.0 0.034 0.016

Bus464 0.400 1 100.0 0.0 0.010 0.005

Bus465 0.400 1 100.0 0.0 0.012 0.006

Bus466 0.400 1 100.0 0.0 0.013 0.007

Bus467 0.400 1 100.0 0.0 0.001 0.001

Bus468 0.400 1 100.0 0.0 0.004 0.002

Bus469 0.400 1 100.0 0.0 0.030 0.014

Bus470 0.400 1 100.0 0.0 0.011 0.005

Bus471 0.400 1 100.0 0.0 0.016 0.008 0.143 0.069

Bus472 0.400 1 100.0 0.0 0.011 0.006 0.102 0.050

Bus473 0.400 1 100.0 0.0 0.013 0.006

Bus474 0.400 1 100.0 0.0 0.011 0.006 0.102 0.050

Bus475 0.400 1 100.0 0.0 0.016 0.008 0.143 0.069

Bus476 0.400 1 100.0 0.0 0.016 0.008 0.143 0.069

Bus477 0.400 1 100.0 0.0 0.016 0.008 0.143 0.069

Bus478 0.400 1 100.0 0.0 0.015 0.007

Bus479 0.400 1 100.0 0.0 0.013 0.006

Bus480 0.400 1 100.0 0.0 0.013 0.007

Bus481 0.400 1 100.0 0.0 0.004 0.002

Bus482 0.400 1 100.0 0.0 0.013 0.006

Bus483 0.400 1 100.0 0.0 0.015 0.007

Bus484 0.400 1 100.0 0.0 0.013 0.006

Bus485 0.400 1 100.0 0.0 0.013 0.007


Project: ETAP Page: 16

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus486 0.400 1 100.0 0.0 0.004 0.002

Bus487 0.400 1 100.0 0.0 0.013 0.006

Bus488 0.400 1 100.0 0.0 0.015 0.007

Bus489 0.400 1 100.0 0.0 0.013 0.006

Bus490 0.400 1 100.0 0.0 0.013 0.007

Bus491 0.400 1 100.0 0.0 0.004 0.002

Bus492 0.400 1 100.0 0.0

Bus503 0.400 1 100.0 0.0 0.030 0.014

Bus508 13.800 1 100.0 0.0

Bus509 0.400 1 100.0 0.0 0.058 0.028 0.666 0.323

Bus510 13.800 1 100.0 0.0

Bus512 13.800 1 100.0 0.0

Bus513 0.400 1 100.0 0.0 0.021 0.010

Bus514 0.400 1 100.0 0.0 0.022 0.011

Bus535 0.400 1 100.0 0.0 0.022 0.011

Bus536 0.400 1 100.0 0.0 0.074 0.036 0.595 0.288

Bus954 0.400 2 100.0 0.0 0.034 0.016

Bus955 0.400 2 100.0 0.0 0.030 0.014

Bus956 0.400 2 100.0 0.0 0.034 0.016

Bus957 0.400 2 100.0 0.0 0.010 0.005

Bus958 0.400 2 100.0 0.0 0.012 0.006

Bus959 0.400 2 100.0 0.0 0.001 0.001

Bus960 0.400 2 100.0 0.0 0.012 0.006

Bus961 0.400 2 100.0 0.0 0.030 0.014

Bus962 0.400 2 100.0 0.0 0.011 0.005

Bus963 0.400 2 100.0 0.0 0.016 0.008 0.143 0.069

Bus964 0.400 2 100.0 0.0 0.016 0.008 0.143 0.069

Bus965 0.400 2 100.0 0.0 0.016 0.008 0.143 0.069

Bus966 0.400 2 100.0 0.0 0.016 0.008 0.143 0.069

Bus967 0.400 2 100.0 0.0 0.011 0.006 0.102 0.050

Bus968 0.400 2 100.0 0.0 0.011 0.006 0.102 0.050

Bus969 13.800 2 100.0 0.0

Bus970 0.400 2 100.0 0.0 0.017 0.008

Bus971 0.400 2 100.0 0.0 0.017 0.008

Bus972 0.400 2 100.0 0.0 0.017 0.008


Project: ETAP Page: 17

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus973 0.400 2 100.0 0.0 0.018 0.009

Bus974 0.400 2 100.0 0.0 0.017 0.008

Bus975 0.400 2 100.0 0.0 0.017 0.008

Bus976 0.400 2 100.0 0.0 0.017 0.008

Bus977 0.400 2 100.0 0.0 0.018 0.009

Bus978 0.400 2 100.0 0.0 0.018 0.009

Bus979 0.400 2 100.0 0.0 0.014 0.007

Bus980 0.400 2 100.0 0.0 0.015 0.007

Bus981 0.400 2 100.0 0.0 0.012 0.006

Bus982 0.400 2 100.0 0.0 0.015 0.007

Bus983 0.400 2 100.0 0.0 0.014 0.007

Bus984 0.400 2 100.0 0.0 0.015 0.007

Bus985 0.400 2 100.0 0.0 0.014 0.007

Bus986 0.400 2 100.0 0.0 0.015 0.007

Bus987 0.400 2 100.0 0.0 0.012 0.006

Bus988 0.400 2 100.0 0.0 0.015 0.007

Bus989 0.400 2 100.0 0.0 0.014 0.007

Bus990 0.400 2 100.0 0.0 0.015 0.007

Bus991 0.400 2 100.0 0.0 0.014 0.007

Bus992 0.400 2 100.0 0.0 0.015 0.007

Bus993 0.400 2 100.0 0.0 0.012 0.006

Bus994 0.400 2 100.0 0.0 0.015 0.007

Bus995 0.400 2 100.0 0.0 0.014 0.007

Bus996 0.400 2 100.0 0.0 0.015 0.007

Bus997 0.400 2 100.0 0.0 0.014 0.007

Bus998 0.400 2 100.0 0.0 0.015 0.007

Bus999 0.400 2 100.0 0.0 0.012 0.006

Bus1000 0.400 2 100.0 0.0 0.015 0.007

Bus1001 0.400 2 100.0 0.0 0.014 0.007

Bus1002 0.400 2 100.0 0.0 0.015 0.007

Bus1003 0.400 2 100.0 0.0 0.030 0.014

Bus1004 0.400 2 100.0 0.0 0.010 0.005

Bus1005 0.400 2 100.0 0.0 0.011 0.005

Bus1006 0.400 2 100.0 0.0 0.010 0.005

Bus1007 0.400 2 100.0 0.0 0.010 0.005


Project: ETAP Page: 18

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1008 0.400 2 100.0 0.0 0.010 0.005

Bus1009 0.400 2 100.0 0.0 0.011 0.005

Bus1010 0.400 2 100.0 0.0 0.010 0.005

Bus1011 0.400 2 100.0 0.0 0.010 0.005

Bus1012 0.400 2 100.0 0.0

Bus1013 0.400 2 100.0 0.0 0.010 0.005

Bus1014 0.400 2 100.0 0.0 0.011 0.005

Bus1015 0.400 2 100.0 0.0 0.010 0.005

Bus1016 0.400 2 100.0 0.0 0.010 0.005

Bus1017 0.400 2 100.0 0.0 0.011 0.005

Bus1018 0.400 2 100.0 0.0 0.010 0.005

Bus1019 0.400 2 100.0 0.0 0.011 0.005

Bus1020 0.400 2 100.0 0.0 0.010 0.005

Bus1021 0.400 2 100.0 0.0 0.010 0.005

Bus1022 0.400 2 100.0 0.0 0.010 0.005

Bus1023 0.400 2 100.0 0.0 0.011 0.005

Bus1024 0.400 2 100.0 0.0 0.010 0.005

Bus1025 0.400 2 100.0 0.0 0.010 0.005

Bus1026 0.400 2 100.0 0.0 0.010 0.005

Bus1027 0.400 2 100.0 0.0 0.011 0.005

Bus1028 0.400 2 100.0 0.0 0.010 0.005

Bus1029 0.400 2 100.0 0.0 0.010 0.005

Bus1030 0.400 2 100.0 0.0 0.010 0.005

Bus1031 0.400 2 100.0 0.0 0.011 0.005

Bus1032 0.400 2 100.0 0.0 0.010 0.005

Bus1033 0.400 2 100.0 0.0 0.010 0.005

Bus1034 0.400 2 100.0 0.0 0.010 0.005

Bus1035 0.400 2 100.0 0.0 0.011 0.005

Bus1036 0.400 2 100.0 0.0 0.010 0.005

Bus1037 0.400 2 100.0 0.0 0.010 0.005

Bus1038 0.400 2 100.0 0.0 0.010 0.005

Bus1039 0.400 2 100.0 0.0 0.011 0.005

Bus1040 0.400 2 100.0 0.0 0.010 0.005

Bus1041 0.400 2 100.0 0.0 0.010 0.005

Bus1042 0.400 2 100.0 0.0 0.010 0.005


Project: ETAP Page: 19

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1043 0.400 2 100.0 0.0 0.011 0.005

Bus1044 0.400 2 100.0 0.0 0.010 0.005

Bus1045 0.400 2 100.0 0.0 0.010 0.005

Bus1048 0.400 2 100.0 0.0 0.013 0.006

Bus1049 0.400 2 100.0 0.0 0.015 0.007

Bus1051 0.400 2 100.0 0.0 0.013 0.007

Bus1052 0.400 2 100.0 0.0 0.004 0.002

Bus1053 0.400 2 100.0 0.0 0.013 0.006

Bus1054 0.400 2 100.0 0.0 0.015 0.007

Bus1055 0.400 2 100.0 0.0 0.013 0.006

Bus1056 0.400 2 100.0 0.0 0.013 0.007

Bus1057 0.400 2 100.0 0.0 0.004 0.002

Bus1058 0.400 2 100.0 0.0 0.013 0.006

Bus1059 0.400 2 100.0 0.0 0.015 0.007

Bus1060 0.400 2 100.0 0.0 0.013 0.006

Bus1061 0.400 2 100.0 0.0 0.013 0.007

Bus1062 0.400 2 100.0 0.0 0.004 0.002

Bus1063 0.400 2 100.0 0.0 0.013 0.006

Bus1064 0.400 2 100.0 0.0 0.015 0.007

Bus1065 0.400 2 100.0 0.0 0.013 0.006

Bus1066 0.400 2 100.0 0.0 0.013 0.007

Bus1067 0.400 2 100.0 0.0 0.004 0.002

Bus1068 0.400 2 100.0 0.0 0.013 0.006

Bus1069 0.400 2 100.0 0.0 0.015 0.007

Bus1070 0.400 2 100.0 0.0 0.013 0.006

Bus1071 0.400 2 100.0 0.0 0.013 0.007

Bus1072 0.400 2 100.0 0.0 0.004 0.002

Bus1073 0.400 2 100.0 0.0 0.013 0.006

Bus1074 0.400 2 100.0 0.0 0.015 0.007

Bus1075 0.400 2 100.0 0.0 0.013 0.006

Bus1076 0.400 2 100.0 0.0 0.013 0.007

Bus1077 0.400 2 100.0 0.0 0.004 0.002

Bus1078 0.400 2 100.0 0.0

Bus1079 0.400 2 100.0 0.0 0.010 0.005

Bus1080 0.400 2 100.0 0.0 0.011 0.005


Project: ETAP Page: 20

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1081 0.400 2 100.0 0.0 0.010 0.005

Bus1082 0.400 2 100.0 0.0 0.010 0.005

Bus1083 0.400 2 100.0 0.0 0.010 0.005

Bus1084 0.400 2 100.0 0.0 0.011 0.005

Bus1085 0.400 2 100.0 0.0 0.010 0.005

Bus1086 0.400 2 100.0 0.0 0.010 0.005

Bus1087 0.400 2 100.0 0.0 0.010 0.005

Bus1088 0.400 2 100.0 0.0 0.011 0.005

Bus1089 0.400 2 100.0 0.0 0.010 0.005

Bus1090 0.400 2 100.0 0.0 0.010 0.005

Bus1091 0.400 2 100.0 0.0 0.010 0.005

Bus1092 0.400 2 100.0 0.0 0.011 0.005

Bus1093 0.400 2 100.0 0.0 0.010 0.005

Bus1094 0.400 2 100.0 0.0 0.010 0.005

Bus1095 0.400 2 100.0 0.0 0.010 0.005

Bus1096 0.400 2 100.0 0.0 0.011 0.005

Bus1097 0.400 2 100.0 0.0 0.010 0.005

Bus1098 0.400 2 100.0 0.0 0.010 0.005

Bus1099 0.400 2 100.0 0.0 0.010 0.005

Bus1100 0.400 2 100.0 0.0 0.011 0.005

Bus1101 0.400 2 100.0 0.0 0.010 0.005

Bus1102 0.400 2 100.0 0.0 0.010 0.005

Bus1103 0.400 2 100.0 0.0 0.013 0.006

Bus1104 0.400 2 100.0 0.0 0.015 0.007

Bus1105 0.400 2 100.0 0.0 0.013 0.006

Bus1106 0.400 2 100.0 0.0 0.013 0.007

Bus1107 0.400 2 100.0 0.0 0.004 0.002

Bus1108 0.400 2 100.0 0.0 0.013 0.006

Bus1109 0.400 2 100.0 0.0 0.015 0.007

Bus1110 0.400 2 100.0 0.0 0.013 0.006

Bus1111 0.400 2 100.0 0.0 0.013 0.007

Bus1112 0.400 2 100.0 0.0 0.004 0.002

Bus1115 0.400 2 100.0 0.0 0.013 0.006

Bus1116 0.400 2 100.0 0.0 0.015 0.007

Bus1117 0.400 2 100.0 0.0 0.013 0.006


Project: ETAP Page: 21

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1118 0.400 2 100.0 0.0 0.013 0.007

Bus1119 0.400 2 100.0 0.0 0.004 0.002

Bus1120 0.400 2 100.0 0.0 0.013 0.006

Bus1121 0.400 2 100.0 0.0 0.015 0.007

Bus1122 0.400 2 100.0 0.0 0.013 0.006

Bus1123 0.400 2 100.0 0.0 0.013 0.007

Bus1124 0.400 2 100.0 0.0 0.004 0.002

Bus1134 13.800 2 100.0 0.0

Bus1135 0.400 2 100.0 0.0 0.013 0.006

Bus1136 0.400 2 100.0 0.0 0.015 0.007

Bus1137 0.400 2 100.0 0.0 0.013 0.006

Bus1138 0.400 2 100.0 0.0 0.013 0.007

Bus1139 0.400 2 100.0 0.0 0.004 0.002

Bus1140 0.400 2 100.0 0.0 0.013 0.006

Bus1141 0.400 2 100.0 0.0 0.015 0.007

Bus1142 0.400 2 100.0 0.0 0.013 0.006

Bus1143 0.400 2 100.0 0.0 0.013 0.007

Bus1144 0.400 2 100.0 0.0 0.004 0.002

Bus1145 0.400 2 100.0 0.0 0.013 0.006

Bus1146 0.400 2 100.0 0.0 0.015 0.007

Bus1147 0.400 2 100.0 0.0 0.013 0.006

Bus1148 0.400 2 100.0 0.0 0.013 0.007

Bus1149 0.400 2 100.0 0.0 0.004 0.002

Bus1150 0.400 2 100.0 0.0 0.013 0.006

Bus1151 0.400 2 100.0 0.0 0.015 0.007

Bus1152 0.400 2 100.0 0.0 0.013 0.006

Bus1153 0.400 2 100.0 0.0 0.013 0.007

Bus1154 0.400 2 100.0 0.0 0.004 0.002

Bus1155 0.400 2 100.0 0.0 0.013 0.006

Bus1156 0.400 2 100.0 0.0 0.015 0.007

Bus1157 0.400 2 100.0 0.0 0.013 0.006

Bus1158 0.400 2 100.0 0.0 0.013 0.007

Bus1159 0.400 2 100.0 0.0 0.004 0.002

Bus1160 0.400 2 100.0 0.0 0.013 0.006

Bus1161 0.400 2 100.0 0.0 0.015 0.007


Project: ETAP Page: 22

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1162 0.400 2 100.0 0.0 0.013 0.006

Bus1163 0.400 2 100.0 0.0 0.013 0.007

Bus1164 0.400 2 100.0 0.0 0.004 0.002

Bus1165 0.400 2 100.0 0.0

Bus1166 0.400 2 100.0 0.0 0.013 0.006

Bus1167 0.400 2 100.0 0.0 0.015 0.007

Bus1168 0.400 2 100.0 0.0 0.013 0.006

Bus1169 0.400 2 100.0 0.0 0.013 0.007

Bus1170 0.400 2 100.0 0.0 0.004 0.002

Bus1171 0.400 2 100.0 0.0 0.013 0.006

Bus1172 0.400 2 100.0 0.0 0.015 0.007

Bus1173 0.400 2 100.0 0.0 0.013 0.006

Bus1174 0.400 2 100.0 0.0 0.013 0.007

Bus1175 0.400 2 100.0 0.0 0.004 0.002

Bus1176 0.400 2 100.0 0.0 0.013 0.006

Bus1177 0.400 2 100.0 0.0 0.015 0.007

Bus1178 0.400 2 100.0 0.0 0.013 0.006

Bus1179 0.400 2 100.0 0.0 0.013 0.007

Bus1180 0.400 2 100.0 0.0 0.004 0.002

Bus1181 0.400 2 100.0 0.0 0.013 0.006

Bus1182 0.400 2 100.0 0.0 0.015 0.007

Bus1183 0.400 2 100.0 0.0 0.013 0.006

Bus1184 0.400 2 100.0 0.0 0.013 0.007

Bus1185 0.400 2 100.0 0.0 0.004 0.002

Bus1186 0.400 2 100.0 0.0 0.013 0.006

Bus1187 0.400 2 100.0 0.0 0.015 0.007

Bus1188 0.400 2 100.0 0.0 0.013 0.006

Bus1189 0.400 2 100.0 0.0 0.013 0.007

Bus1190 0.400 2 100.0 0.0 0.004 0.002

Bus1191 0.400 2 100.0 0.0 0.013 0.006

Bus1192 0.400 2 100.0 0.0 0.015 0.007

Bus1193 0.400 2 100.0 0.0 0.013 0.006

Bus1194 0.400 2 100.0 0.0 0.013 0.007

Bus1195 0.400 2 100.0 0.0 0.004 0.002

Bus1196 0.400 2 100.0 0.0 0.013 0.006


Project: ETAP Page: 23

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1197 0.400 2 100.0 0.0 0.015 0.007

Bus1198 0.400 2 100.0 0.0 0.013 0.006

Bus1199 0.400 2 100.0 0.0 0.013 0.007

Bus1200 0.400 2 100.0 0.0 0.004 0.002

Bus1201 0.400 2 100.0 0.0 0.013 0.006

Bus1202 0.400 2 100.0 0.0 0.015 0.007

Bus1203 0.400 2 100.0 0.0 0.013 0.006

Bus1204 0.400 2 100.0 0.0 0.013 0.007

Bus1205 0.400 2 100.0 0.0 0.004 0.002

Bus1206 0.400 2 100.0 0.0 0.022 0.011

Bus1207 0.400 2 100.0 0.0 0.013 0.006

Bus1208 0.400 2 100.0 0.0 0.015 0.007

Bus1209 0.400 2 100.0 0.0 0.013 0.006

Bus1210 0.400 2 100.0 0.0 0.013 0.007

Bus1211 0.400 2 100.0 0.0 0.004 0.002

Bus1212 0.400 2 100.0 0.0 0.013 0.006

Bus1213 0.400 2 100.0 0.0 0.015 0.007

Bus1214 0.400 2 100.0 0.0 0.013 0.006

Bus1215 0.400 2 100.0 0.0 0.013 0.007

Bus1216 0.400 2 100.0 0.0 0.004 0.002

Bus1223 13.800 2 100.0 0.0

Bus1224 0.400 2 100.0 0.0 0.072 0.035 0.651 0.316

Bus1225 13.800 2 100.0 0.0

Bus1237 0.400 2 100.0 0.0 0.067 0.032 0.602 0.291

Bus1238 13.800 2 100.0 0.0

Bus1239 0.400 2 100.0 0.0 0.013 0.006

Bus1240 0.400 2 100.0 0.0 0.015 0.007

Bus1241 0.400 2 100.0 0.0 0.013 0.006

Bus1242 0.400 2 100.0 0.0 0.013 0.007

Bus1243 0.400 2 100.0 0.0 0.004 0.002

Bus1244 0.400 2 100.0 0.0 0.013 0.006

Bus1245 0.400 2 100.0 0.0 0.015 0.007

Bus1246 0.400 2 100.0 0.0 0.013 0.006

Bus1247 0.400 2 100.0 0.0 0.013 0.007

Bus1248 0.400 2 100.0 0.0 0.004 0.002


Project: ETAP Page: 24

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1249 0.400 2 100.0 0.0 0.013 0.006

Bus1250 0.400 2 100.0 0.0 0.015 0.007

Bus1251 0.400 2 100.0 0.0 0.013 0.006

Bus1252 0.400 2 100.0 0.0 0.013 0.007

Bus1253 0.400 2 100.0 0.0 0.004 0.002

Bus1254 0.400 2 100.0 0.0 0.013 0.006

Bus1255 0.400 2 100.0 0.0 0.015 0.007

Bus1256 0.400 2 100.0 0.0 0.013 0.006

Bus1257 0.400 2 100.0 0.0 0.013 0.007

Bus1258 0.400 2 100.0 0.0 0.004 0.002

Bus1259 0.400 2 100.0 0.0 0.013 0.006

Bus1260 0.400 2 100.0 0.0 0.015 0.007

Bus1261 0.400 2 100.0 0.0 0.013 0.006

Bus1262 0.400 2 100.0 0.0 0.013 0.007

Bus1263 0.400 2 100.0 0.0 0.004 0.002

Bus1264 0.400 2 100.0 0.0 0.013 0.006

Bus1265 0.400 2 100.0 0.0 0.015 0.007

Bus1266 0.400 2 100.0 0.0 0.013 0.006

Bus1267 0.400 2 100.0 0.0 0.013 0.007

Bus1268 0.400 2 100.0 0.0 0.004 0.002

Bus1269 0.400 2 100.0 0.0

Bus1270 0.400 2 100.0 0.0 0.013 0.006

Bus1271 0.400 2 100.0 0.0 0.015 0.007

Bus1272 0.400 2 100.0 0.0 0.013 0.006

Bus1273 0.400 2 100.0 0.0 0.013 0.007

Bus1274 0.400 2 100.0 0.0 0.004 0.002

Bus1275 0.400 2 100.0 0.0 0.013 0.006

Bus1276 0.400 2 100.0 0.0 0.015 0.007

Bus1277 0.400 2 100.0 0.0 0.013 0.006

Bus1278 0.400 2 100.0 0.0 0.013 0.007

Bus1279 0.400 2 100.0 0.0 0.004 0.002

Bus1280 0.400 2 100.0 0.0 0.013 0.006

Bus1281 0.400 2 100.0 0.0 0.015 0.007

Bus1282 0.400 2 100.0 0.0 0.013 0.006

Bus1283 0.400 2 100.0 0.0 0.013 0.007


Project: ETAP Page: 25

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1284 0.400 2 100.0 0.0 0.004 0.002

Bus1285 0.400 2 100.0 0.0 0.013 0.006

Bus1286 0.400 2 100.0 0.0 0.015 0.007

Bus1287 0.400 2 100.0 0.0 0.013 0.006

Bus1288 0.400 2 100.0 0.0 0.013 0.007

Bus1289 0.400 2 100.0 0.0 0.004 0.002

Bus1290 0.400 2 100.0 0.0 0.013 0.006

Bus1291 0.400 2 100.0 0.0 0.015 0.007

Bus1292 0.400 2 100.0 0.0 0.013 0.006

Bus1293 0.400 2 100.0 0.0 0.013 0.007

Bus1294 0.400 2 100.0 0.0 0.004 0.002

Bus1295 0.400 2 100.0 0.0 0.013 0.006

Bus1296 0.400 2 100.0 0.0 0.015 0.007

Bus1297 0.400 2 100.0 0.0 0.013 0.006

Bus1298 0.400 2 100.0 0.0 0.013 0.007

Bus1299 0.400 2 100.0 0.0 0.004 0.002

Bus1300 0.400 2 100.0 0.0 0.013 0.006

Bus1301 0.400 2 100.0 0.0 0.015 0.007

Bus1302 0.400 2 100.0 0.0 0.013 0.006

Bus1303 0.400 2 100.0 0.0 0.013 0.007

Bus1304 0.400 2 100.0 0.0 0.004 0.002

Bus1305 0.400 2 100.0 0.0 0.013 0.006

Bus1306 0.400 2 100.0 0.0 0.015 0.007

Bus1307 0.400 2 100.0 0.0 0.013 0.006

Bus1308 0.400 2 100.0 0.0 0.013 0.007

Bus1309 0.400 2 100.0 0.0 0.004 0.002

Bus1310 0.400 2 100.0 0.0 0.022 0.011

Bus1315 0.400 2 100.0 0.0 0.021 0.010

Bus1316 13.800 2 100.0 0.0

DB-B01-01 0.400 1 100.0 0.0

DB-B01-001 0.400 2 100.0 0.0

DB-B01-02 0.400 1 100.0 0.0

DB-B01-002 0.400 2 100.0 0.0

DB-B01-03 0.400 1 100.0 0.0

DB-B01-003 0.400 2 100.0 0.0


Project: ETAP Page: 26

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

DB-B01-04 0.400 1 100.0 0.0

DB-B01-004 0.400 2 100.0 0.0

DB-B01-05 0.400 1 100.0 0.0

DB-B01-005 0.400 2 100.0 0.0

DB-B01-06 0.400 1 100.0 0.0

DB-B01-006 0.400 2 100.0 0.0

DB-B01-7 0.400 1 100.0 0.0

DB-B01-07 0.400 2 100.0 0.0

DB-B01-8 0.400 1 100.0 0.0

DB-B01-08 0.400 2 100.0 0.0

DB-B01-09 0.400 1 100.0 0.0

DB-B01-009 0.400 2 100.0 0.0

DB-B01-10 0.400 1 100.0 0.0

DB-B01-010 0.400 2 100.0 0.0

DB-B01-11 0.400 1 100.0 0.0

DB-B01-011 0.400 2 100.0 0.0

DB-B01-12 0.400 1 100.0 0.0

DB-B01-012 0.400 2 100.0 0.0

DB-B01-13 0.400 1 100.0 0.0

DB-B01-013 0.400 2 100.0 0.0

DB-B01-14 0.400 1 100.0 0.0

DB-B01-014 0.400 2 100.0 0.0

DB-B01-15 0.400 1 100.0 0.0

DB-B01-16 0.400 1 100.0 0.0

DB-B01-17 0.400 1 100.0 0.0

DB-B01-017 0.400 2 100.0 0.0

DB-B01-18 0.400 1 100.0 0.0

DB-B01-018 0.400 2 100.0 0.0

DB-B01-19 0.400 2 100.0 0.0

DB-B01-019 0.400 1 100.0 0.0

DB-B01-20 0.400 2 100.0 0.0

DB-B01-020 0.400 1 100.0 0.0

DB-B01-21 0.400 2 100.0 0.0

DB-B01-021 0.400 1 100.0 0.0

DB-B01-22 0.400 2 100.0 0.0


Project: ETAP Page: 27

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

DB-B01-022 0.400 1 100.0 0.0

DB-B01-23 0.400 2 100.0 0.0

DB-B01-023 0.400 1 100.0 0.0

DB-B01-24 0.400 2 100.0 0.0

DB-B01-024 0.400 1 100.0 0.0

DB-B01-25 0.400 2 100.0 0.0

DB-B01-025 0.400 1 100.0 0.0

DB-B01-26 0.400 2 100.0 0.0

DB-B01-026 0.400 1 100.0 0.0

DB-B01-27 0.400 2 100.0 0.0

DB-B01-027 0.400 1 100.0 0.0

DB-B01-28 0.400 2 100.0 0.0

DB-B01-028 0.400 1 100.0 0.0

DB-B01-29 0.400 2 100.0 0.0

DB-B01-029 0.400 1 100.0 0.0

DB-B01-30 0.400 1 100.0 0.0

DB-B01-030 0.400 2 100.0 0.0

DB-B01-31 0.400 1 100.0 0.0

DB-B01-031 0.400 2 100.0 0.0

DB-B01-32 0.400 1 100.0 0.0

DB-B01-032 0.400 2 100.0 0.0

DB-B01-33 0.400 1 100.0 0.0

DB-B01-033 0.400 2 100.0 0.0

DB-B01-34 0.400 1 100.0 0.0

DB-B01-034 0.400 2 100.0 0.0

DB-B01-35 0.400 1 100.0 0.0

DB-B01-035 0.400 2 100.0 0.0

DB-B01-36 0.400 1 100.0 0.0

DB-B01-036 0.400 2 100.0 0.0

DB-B01-37 0.400 1 100.0 0.0

DB-B01-037 0.400 2 100.0 0.0

DB-B01-38 0.400 2 100.0 0.0

DB-B01-38. 0.400 1 100.0 0.0

DB-B01-39 0.400 1 100.0 0.0

DB-B01-039 0.400 2 100.0 0.0


Project: ETAP Page: 28

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

DB-B01-40 0.400 2 100.0 0.0

DB-B01-040 0.400 1 100.0 0.0

DB-B01-41 0.400 2 100.0 0.0

DB-B01-041 0.400 1 100.0 0.0

DB-B01-42 0.400 2 100.0 0.0

DB-B01-042 0.400 1 100.0 0.0

DB-B01-116 0.400 2 100.0 0.0

DB-B01-117 0.400 2 100.0 0.0

DB-B02-1 0.400 2 100.0 0.0

DB-B02-01 0.400 1 100.0 0.0

DB-B02-2 0.400 2 100.0 0.0

DB-B02-02 0.400 1 100.0 0.0

DB-B02-3 0.400 2 100.0 0.0

DB-B02-03 0.400 1 100.0 0.0

DB-B02-4 0.400 1 100.0 0.0

DB-B02-04 0.400 2 100.0 0.0

DB-B02-5 0.400 1 100.0 0.0

DB-B02-05 0.400 2 100.0 0.0

DB-B02-6 0.400 1 100.0 0.0

DB-B02-06 0.400 2 100.0 0.0

DB-B02-7 0.400 1 100.0 0.0

DB-B02-07 0.400 2 100.0 0.0

DB-B02-8 0.400 2 100.0 0.0

DB-B02-08 0.400 1 100.0 0.0

DB-B02-9 0.400 2 100.0 0.0

DB-B02-10 0.400 1 100.0 0.0

DB-B02-010 0.400 2 100.0 0.0

DB-B02-11 0.400 2 100.0 0.0

DB-B02-011 0.400 1 100.0 0.0

DB-B02-12 0.400 1 100.0 0.0

DB-B02-012 0.400 2 100.0 0.0

DB-B02-13 0.400 1 100.0 0.0

DB-B02-013 0.400 2 100.0 0.0

DB-B02-14 0.400 1 100.0 0.0

DB-B02-014 0.400 2 100.0 0.0


Project: ETAP Page: 29

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

DB-B02-15 0.400 1 100.0 0.0

DB-B02-015 0.400 2 100.0 0.0

DB-B02-16 0.400 1 100.0 0.0

DB-B02-016 0.400 2 100.0 0.0

DB-B03-1 0.400 2 100.0 0.0

DB-B03-01 0.400 1 100.0 0.0

DB-B03-2 0.400 2 100.0 0.0

DB-B03-02 0.400 1 100.0 0.0

DB-B03-3 0.400 2 100.0 0.0

DB-B03-03 0.400 1 100.0 0.0

DB-B03-4 0.400 2 100.0 0.0

DB-B03-04 0.400 1 100.0 0.0

DB-B04-1 0.400 2 100.0 0.0

DB-B04-01 0.400 1 100.0 0.0

DB-B04-2 0.400 1 100.0 0.0

DB-B04-02 0.400 2 100.0 0.0

DB-B06 0.400 1 100.0 0.0

DB-B08-09 0.400 1 100.0 0.0

DB-B14 0.400 1 100.0 0.0

DB-B21 0.400 1 100.0 0.0

MV SWGR#1 13.800 1 100.0 0.0

MV SWGR#2 13.800 2 100.0 0.0

Total Number of Buses: 930 0.443 0.215 12.306 5.960 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus42 13.800 Swing 2 100.0 0.0

Bus155 13.800 Swing 1 100.0 0.0

0.000 0.000
Project: ETAP Page: 30

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Line/Cable/Busway Input Data

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

1-PC-001 14NALN3 500 195.0 0.0 1 75 0.000078 0.000106

1-PC-002 14NALN3 500 375.0 0.0 1 75 0.000078 0.000106

1-PC-003 14NALN3 500 170.0 0.0 1 75 0.000078 0.000106

1-PC-004 14NALN3 500 200.0 0.0 1 75 0.000078 0.000106

1-PC-006 14NALN3 500 15.0 0.0 1 75 0.000078 0.000106

1-PC-007 14NALN3 500 220.0 0.0 1 75 0.000078 0.000106

2-PC-001 14NALN3 500 195.0 0.0 1 75 0.000078 0.000106

2-PC-002 14NALN3 500 375.0 0.0 1 75 0.000078 0.000106

2-PC-003 14NALN3 500 170.0 0.0 1 75 0.000078 0.000106

2-PC-004 14NALN3 500 200.0 0.0 1 75 0.000078 0.000106

2-PC-006 14NALN3 500 15.0 0.0 1 75 0.000078 0.000106

2-PC-007 14NALN3 500 220.0 0.0 1 75 0.000078 0.000106

2-PC-008 14NALN3 500 1000.0 0.0 1 75 0.000078 0.000106

11-PC-20 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-120 0.6NCUS4 70 24.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-210 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909


Project: ETAP Page: 31

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

11-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-220 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-230 0.6NCUS4 70 13.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-240 0.6NCUS4 6 80.0 0.0 1 75 3.748336 0.105000 0.0000351

11-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-310 0.6NCUS4 70 40.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-311 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-312 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-313 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-314 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-315 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-320 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-321 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-322 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-323 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-324 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-325 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-330 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-331 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-332 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-333 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-334 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 32

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

11-PC-335 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-410 0.6NCUS4 70 12.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-411 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-412 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-413 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-414 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-415 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-420 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-421 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-422 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-423 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-424 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-425 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-430 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-431 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-432 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-433 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-434 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-435 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-500 1.0MALN4 185 108.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-510 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-511 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-512 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-513 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-514 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-515 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-520 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-521 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-522 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-523 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-524 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-525 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-530 0.6NCUS4 35 60.0 0.0 1 75 0.637980 0.092000 0.0000483

11-PC-600 1.0MALN4 185 119.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-610 0.6NCUS4 70 9.0 0.0 1 75 0.327336 0.086710 0.0000909


Project: ETAP Page: 33

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

11-PC-611 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-612 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-613 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-614 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-615 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-620 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-621 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-622 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-623 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-624 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-625 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-630 0.6NCUS4 6 60.0 0.0 1 75 3.748336 0.105000 0.0000351

11-PC-700 1.0MALN4 185 64.0 0.0 2 75 0.201717 0.227000 0.0001565

11-PC-710 0.6NCUS4 25 80.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-720 0.6NCUS4 70 90.0 0.0 1 75 0.327336 0.086710 0.0000909

11-PC-721 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

11-PC-722 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

11-PC-723 0.6NCUS4 6 15.0 0.0 1 75 3.748336 0.105000 0.0000351

11-PC-730 0.6NCUS4 35 80.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-50 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-51 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-52 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-53 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-54 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-56 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-57 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-58 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-59 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-60 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 34

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

12-PC-120 0.6NCUS4 70 24.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-130 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-210 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-220 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-230 0.6NCUS4 70 13.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-240 0.6NCUS4 6 80.0 0.0 1 75 3.748336 0.105000 0.0000351

12-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-310 0.6NCUS4 50 40.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-311 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-312 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 35

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

12-PC-313 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-314 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-320 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-321 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-322 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-323 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-324 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-330 0.6NCUS4 50 10.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-331 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-332 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-333 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-334 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-410 0.6NCUS4 50 12.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-411 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-412 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-413 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-414 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-420 0.6NCUS4 50 23.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-421 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-422 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-423 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-424 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-430 0.6NCUS4 50 38.0 0.0 1 75 0.471356 0.086710 0.0000486

12-PC-431 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-432 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-433 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-434 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-500 1.0MALN4 185 108.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-510 0.6NCUS4 70 22.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-520 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-530 0.6NCUS4 35 80.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-540 0.6NCUS4 16 150.0 0.0 1 75 1.402049 0.090000 0.0000449

12-PC-600 1.0MALN4 185 120.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-610 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-611 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 36

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

12-PC-612 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-613 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-614 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-615 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-620 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-621 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-622 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-623 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-624 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-625 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

12-PC-700 1.0MALN4 185 72.0 0.0 2 75 0.201717 0.227000 0.0001565

12-PC-710 0.6NCUN4 300 83.0 0.0 1 75 0.079259 0.082000

12-PC-710-A 0.6NCUN4 300 40.0 0.0 1 75 0.079259 0.082000

12-PC-711 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-712 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-713 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-714 0.6NCUS4 70 15.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-720 0.6NCUS4 35 14.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-730 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

12-PC-731 0.6NCUS4 35 20.0 0.0 1 75 0.637980 0.092000 0.0000483

12-PC-732 0.6NCUS4 6 25.0 0.0 1 75 3.748336 0.105000 0.0000351

12-PC-733 0.6NCUS4 6 25.0 0.0 1 75 3.748336 0.105000 0.0000351

13-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-101 1.0MALN4 185 36.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-102 1.0MALN4 185 66.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-103 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-104 1.0MALN4 185 87.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-105 1.0MALN4 185 89.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-106 1.0MALN4 185 133.0 0.0 2 75 0.201717 0.227000 0.0001565

13-PC-110 0.6NCUS4 120 20.0 0.0 1 75 0.188657 0.082940 0.0001135

13-PC-111 0.6NCUS4 35 35.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-112 0.6NCUS4 35 18.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-113 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-114 0.6NCUS4 35 25.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-120 0.6NCUS4 120 11.0 0.0 1 75 0.188657 0.082940 0.0001135

13-PC-121 0.6NCUS4 35 35.0 0.0 1 75 0.637980 0.092000 0.0000483


Project: ETAP Page: 37

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

13-PC-122 0.6NCUS4 35 18.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-123 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-124 0.6NCUS4 35 25.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-130 0.6NCUS4 35 28.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-210 0.6NCUN4 185 30.0 0.0 1 75 0.124468 0.082940

13-PC-211 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-212 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-213 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-214 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-215 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-216 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-220 0.6NCUN4 185 13.0 0.0 1 75 0.124468 0.082940

13-PC-221 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-222 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-223 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-224 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-225 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-226 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-310 0.6NCUN4 185 21.0 0.0 1 75 0.124468 0.082940

13-PC-311 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-312 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-313 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-314 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-315 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-316 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-320 0.6NCUN4 185 10.0 0.0 1 75 0.124468 0.082940

13-PC-321 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-322 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-323 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-324 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-325 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-326 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-330 0.6NCUS4 35 31.0 0.0 1 75 0.637980 0.092000 0.0000483

13-PC-410 0.6NCUS4 50 9.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-411 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-412 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 38

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

13-PC-413 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-414 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-420 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-421 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-422 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-423 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-424 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-430 0.6NCUS4 50 40.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-431 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-432 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-433 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-434 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-440 0.6NCUS4 10 30.0 0.0 1 75 2.222296 0.100000 0.0000396

13-PC-450 0.6NCUS4 6 30.0 0.0 1 75 3.748336 0.105000 0.0000351

13-PC-510 0.6NCUS4 50 13.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-511 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-512 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-513 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-514 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-520 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-521 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-522 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-523 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-524 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-610 0.6NCUS4 50 9.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-611 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-612 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-613 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-614 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-620 0.6NCUS4 50 24.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-621 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-622 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-623 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-624 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-630 0.6NCUS4 50 38.0 0.0 1 75 0.471356 0.086710 0.0000486

13-PC-631 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 39

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

13-PC-632 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-633 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-634 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-710 0.6NCUN4 185 14.0 0.0 1 75 0.124468 0.082940

13-PC-711 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-712 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-713 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-714 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-720 0.6NCUN4 185 25.0 0.0 1 75 0.124468 0.082940

13-PC-721 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-722 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-723 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-724 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

13-PC-730 0.6NCUS4 35 110.0 0.0 1 75 0.637980 0.092000 0.0000483

14-PC-100 1.0MALN4 185 75.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-110 0.6NCUS4 35 95.0 0.0 1 75 0.637980 0.092000 0.0000483

14-PC-120 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

14-PC-130 0.6NCUS4 35 75.0 0.0 1 75 0.637980 0.092000 0.0000483

14-PC-140 0.6NCUS4 25 37.0 0.0 1 75 0.830070 0.102540 0.0000452

14-PC-150 0.6NCUS4 16 33.0 0.0 1 75 1.402049 0.090000 0.0000449

14-PC-160 0.6NCUS4 10 60.0 0.0 1 75 2.222296 0.100000 0.0000396

14-PC-170 0.6NCUS4 25 92.0 0.0 1 75 0.830070 0.102540 0.0000452

14-PC-180 0.6NCUS4 35 105.0 0.0 1 75 0.637980 0.092000 0.0000483

14-PC-190 0.6NCUS4 10 110.0 0.0 1 75 2.222296 0.100000 0.0000396

14-PC-200 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-300 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-400 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-500 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-600 1.0MALN4 185 158.0 0.0 2 75 0.201717 0.227000 0.0001565

14-PC-700 1.0MALN4 185 158.0 0.0 2 75 0.201717 0.227000 0.0001565

15-PC-100 1.0NCUN1 630 40.0 0.0 3 75 0.041871 0.102000

16-PC-100 1.0NCUN1 630 35.0 0.0 3 75 0.041871 0.102000

16-PC-200 1.0MALN4 185 127.0 0.0 2 75 0.201717 0.227000 0.0001565

16-PC-210 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

16-PC-211 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-212 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 40

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

16-PC-213 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-214 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-220 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

16-PC-221 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-222 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-223 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-224 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

16-PC-230 0.6NCUS4 35 70.0 0.0 1 75 0.637980 0.092000 0.0000483

17-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-120 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-130 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-210 0.6NCUS4 70 30.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 41

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

17-PC-220 0.6NCUS4 70 30.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-230 0.6NCUS4 70 45.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-240 0.6NCUS4 6 87.0 0.0 1 75 3.748336 0.105000 0.0000351

17-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-310 0.6NCUS4 70 40.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-311 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-312 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-313 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-314 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-315 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-320 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-321 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-322 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-323 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-324 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-325 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-330 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-331 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-332 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-333 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-334 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-335 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-410 0.6NCUS4 70 12.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-411 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-412 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 42

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

17-PC-413 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-414 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-415 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-420 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-421 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-422 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-423 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-424 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-425 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-430 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-431 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-432 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-433 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-434 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-435 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-500 1.0MALN4 185 120.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-510 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-511 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-512 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-513 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-514 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-515 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-520 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

17-PC-521 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-522 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-523 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-524 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-525 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

17-PC-530 0.6NCUS4 35 115.0 0.0 1 75 0.637980 0.092000 0.0000483

17-PC-600 1.0MALN4 185 65.0 0.0 2 75 0.201717 0.227000 0.0001565

17-PC-610 0.6NCUS4 35 13.0 0.0 1 75 0.637980 0.092000 0.0000483

17-PC-620 0.6NCUS4 35 48.0 0.0 1 75 0.637980 0.092000 0.0000483

17-PC-630 0.6NCUS4 35 65.0 0.0 1 75 0.637980 0.092000 0.0000483

17-PC-700 1.0MALN4 185 144.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909


Project: ETAP Page: 43

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

21-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-120 0.6NCUS4 70 24.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-130 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-210 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-220 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-230 0.6NCUS4 70 13.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 44

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

21-PC-240 0.6NCUS4 6 80.0 0.0 1 75 3.748336 0.105000 0.0000351

21-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-310 0.6NCUS4 70 40.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-311 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-312 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-313 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-314 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-315 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-320 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-321 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-322 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-323 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-324 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-325 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-330 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-331 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-332 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-333 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-334 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-335 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-410 0.6NCUS4 70 12.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-411 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-412 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-413 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-414 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-415 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-420 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-421 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-422 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-423 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-424 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-425 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-430 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-431 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-432 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 45

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

21-PC-433 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-434 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-435 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-500 1.0MALN4 185 108.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-510 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-511 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-512 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-513 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-514 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-515 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-520 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-521 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-522 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-523 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-524 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-525 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-530 0.6NCUS4 35 60.0 0.0 1 75 0.637980 0.092000 0.0000483

21-PC-600 1.0MALN4 185 119.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-610 0.6NCUS4 70 9.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-611 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-612 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-613 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-614 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-615 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-620 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

21-PC-621 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-622 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-623 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-624 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-625 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-700 1.0MALN4 185 64.0 0.0 2 75 0.201717 0.227000 0.0001565

21-PC-710 0.6NCUS4 25 80.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-720 0.6NCUS4 25 44.0 0.0 1 75 0.830070 0.102540 0.0000452

21-PC-730 0.6NCUS4 35 50.0 0.0 1 75 0.637980 0.092000 0.0000483

21-PC-740 0.6NCUS4 35 80.0 0.0 1 75 0.637980 0.092000 0.0000483

22-PC-4 0.6NCUS4 35 80.0 0.0 1 75 0.637980 0.092000 0.0000483


Project: ETAP Page: 46

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

22-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

22-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-120 0.6NCUS4 70 24.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-130 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

22-PC-210 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-220 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-230 0.6NCUS4 70 13.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 47

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

22-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-240 0.6NCUS4 6 80.0 0.0 1 75 3.748336 0.105000 0.0000351

22-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

22-PC-310 0.6NCUS4 50 40.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-311 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-312 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-313 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-314 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-320 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-321 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-322 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-323 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-324 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-330 0.6NCUS4 50 10.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-331 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-332 0.6NCUS4 25 20.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-333 0.6NCUS4 25 50.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-334 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

22-PC-410 0.6NCUS4 50 12.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-411 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-412 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-413 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-414 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-420 0.6NCUS4 50 23.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-421 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-422 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-423 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-424 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-430 0.6NCUS4 50 38.0 0.0 1 75 0.471356 0.086710 0.0000486

22-PC-431 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-432 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-433 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-434 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-500 1.0MALN4 185 108.0 0.0 2 75 0.201717 0.227000 0.0001565


Project: ETAP Page: 48

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

22-PC-510 0.6NCUS4 70 22.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-511 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-512 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-513 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-514 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-515 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-520 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-521 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-522 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-523 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-524 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-525 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-600 1.0MALN4 185 120.0 0.0 2 75 0.201717 0.227000 0.0001565

22-PC-610 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-611 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-612 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-613 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-614 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-615 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-620 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

22-PC-621 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-622 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-623 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-624 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

22-PC-625 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-110 0.6NCUS4 120 20.0 0.0 1 75 0.188657 0.082940 0.0001135

23-PC-111 0.6NCUS4 35 35.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-112 0.6NCUS4 35 18.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-113 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-114 0.6NCUS4 35 25.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-120 0.6NCUS4 120 11.0 0.0 1 75 0.188657 0.082940 0.0001135

23-PC-121 0.6NCUS4 35 35.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-122 0.6NCUS4 35 18.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-123 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-124 0.6NCUS4 35 25.0 0.0 1 75 0.637980 0.092000 0.0000483


Project: ETAP Page: 49

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

23-PC-130 0.6NCUS4 35 28.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-200 1.0MALN4 185 36.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-210 0.6NCUN4 185 30.0 0.0 1 75 0.124468 0.082940

23-PC-211 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-212 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-213 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-214 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-215 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-216 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-220 0.6NCUN4 185 13.0 0.0 1 75 0.124468 0.082940

23-PC-221 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-222 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-223 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-224 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-225 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-226 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-300 1.0MALN4 185 66.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-310 0.6NCUN4 185 21.0 0.0 1 75 0.124468 0.082940

23-PC-311 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-312 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-313 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-314 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-315 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-316 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-320 0.6NCUN4 185 10.0 0.0 1 75 0.124468 0.082940

23-PC-321 0.6NCUS4 25 55.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-322 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-323 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-324 0.6NCUS4 25 58.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-325 0.6NCUS4 25 28.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-326 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-330 0.6NCUS4 35 31.0 0.0 1 75 0.637980 0.092000 0.0000483

23-PC-400 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-410 0.6NCUS4 50 9.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-411 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-412 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 50

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

23-PC-413 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-414 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-420 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-421 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-422 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-423 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-424 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-430 0.6NCUS4 50 40.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-431 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-432 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-433 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-434 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-440 0.6NCUS4 10 30.0 0.0 1 75 2.222296 0.100000 0.0000396

23-PC-450 0.6NCUS4 6 30.0 0.0 1 75 3.748336 0.105000 0.0000351

23-PC-500 1.0MALN4 185 87.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-510 0.6NCUS4 50 13.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-511 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0511 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-512 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0512 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-513 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0513 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-514 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0514 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-520 0.6NCUS4 50 25.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-521 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0521 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-522 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0522 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-523 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0523 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-524 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-0524 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-600 1.0MALN4 185 89.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-610 0.6NCUS4 50 9.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-620 0.6NCUS4 50 24.0 0.0 1 75 0.471356 0.086710 0.0000486


Project: ETAP Page: 51

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

23-PC-630 0.6NCUS4 50 38.0 0.0 1 75 0.471356 0.086710 0.0000486

23-PC-631 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-632 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-633 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-634 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-700 1.0MALN4 185 133.0 0.0 2 75 0.201717 0.227000 0.0001565

23-PC-710 0.6NCUN4 185 14.0 0.0 1 75 0.124468 0.082940

23-PC-711 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-712 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-713 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-714 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-720 0.6NCUN4 185 25.0 0.0 1 75 0.124468 0.082940

23-PC-721 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-722 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-723 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

23-PC-724 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

24-PC-100 1.0MALN4 185 75.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-110 0.6NCUS4 35 15.0 0.0 1 75 0.637980 0.092000 0.0000483

24-PC-120 0.6NCUS4 35 75.0 0.0 1 75 0.637980 0.092000 0.0000483

24-PC-130 0.6NCUS4 25 37.0 0.0 1 75 0.830070 0.102540 0.0000452

24-PC-140 0.6NCUS4 16 35.0 0.0 1 75 1.402049 0.090000 0.0000449

24-PC-150 0.6NCUS4 10 60.0 0.0 1 75 2.222296 0.100000 0.0000396

24-PC-160 0.6NCUS4 25 92.0 0.0 1 75 0.830070 0.102540 0.0000452

24-PC-170 0.6NCUS4 35 105.0 0.0 1 75 0.637980 0.092000 0.0000483

24-PC-180 0.6NCUS4 10 110.0 0.0 1 75 2.222296 0.100000 0.0000396

24-PC-190 0.6NCUS4 6 78.0 0.0 1 75 3.748336 0.105000 0.0000351

24-PC-200 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-300 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-400 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-500 1.0MALN4 185 85.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-600 1.0MALN4 185 158.0 0.0 2 75 0.201717 0.227000 0.0001565

24-PC-700 1.0MALN4 185 158.0 0.0 2 75 0.201717 0.227000 0.0001565

25-PC-100 1.0NCUN1 630 40.0 0.0 3 75 0.041871 0.102000

26-PC-100 1.0NCUN1 630 35.0 0.0 3 75 0.041871 0.102000

27-PC-100 1.0MALN4 185 23.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-110 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909


Project: ETAP Page: 52

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

27-PC-111 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-112 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-113 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-114 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-115 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-120 0.6NCUS4 70 24.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-121 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-122 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-123 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-124 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-125 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-130 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-131 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-132 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-133 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-134 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-135 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-200 1.0MALN4 185 43.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-210 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-211 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-212 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-213 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-214 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-215 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-220 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-221 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-222 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-223 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-224 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-225 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-230 0.6NCUS4 70 13.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-231 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-232 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-233 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-234 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-235 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 53

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

27-PC-240 0.6NCUS4 6 80.0 0.0 1 75 3.748336 0.105000 0.0000351

27-PC-300 1.0MALN4 185 35.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-310 0.6NCUS4 70 40.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-311 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-312 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-313 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-314 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-315 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-320 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-321 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-322 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-323 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-324 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-325 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-330 0.6NCUS4 70 10.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-331 0.6NCUS4 25 19.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-332 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-333 0.6NCUS4 25 38.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-334 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-335 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-400 1.0MALN4 185 54.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-410 0.6NCUS4 70 12.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-411 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-412 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-413 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-414 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-415 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-420 0.6NCUS4 70 23.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-421 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-422 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-423 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-424 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-425 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-430 0.6NCUS4 70 38.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-431 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-432 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452


Project: ETAP Page: 54

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

27-PC-433 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-434 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-435 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-500 1.0MALN4 185 108.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC -510 0.6NCUS4 70 9.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-510 0.6NCUS4 70 20.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-511 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0511 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-512 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0512 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-513 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0513 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-514 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0514 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-515 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0515 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-520 0.6NCUS4 70 11.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC- 520 0.6NCUS4 70 25.0 0.0 1 75 0.327336 0.086710 0.0000909

27-PC-521 0.6NCUS4 25 52.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0521 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-522 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0522 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-523 0.6NCUS4 25 45.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0523 0.6NCUS4 25 15.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-524 0.6NCUS4 25 25.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0524 0.6NCUS4 25 35.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-525 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-0525 0.6NCUS4 25 18.0 0.0 1 75 0.830070 0.102540 0.0000452

27-PC-530 0.6NCUS4 35 60.0 0.0 1 75 0.637980 0.092000 0.0000483

27-PC- 530 0.6NCUS4 35 120.0 0.0 1 75 0.637980 0.092000 0.0000483

27-PC-600 1.0MALN4 185 119.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-700 1.0MALN4 185 64.0 0.0 2 75 0.201717 0.227000 0.0001565

27-PC-710 0.6NCUS4 35 13.0 0.0 1 75 0.637980 0.092000 0.0000483

27-PC-720 0.6NCUS4 35 78.0 0.0 1 75 0.637980 0.092000 0.0000483

27-PC-730 0.6NCUS4 35 65.0 0.0 1 75 0.637980 0.092000 0.0000483

Cable2 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113


Project: ETAP Page: 55

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

ohms or siemens/1000 m per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (m) % Tol. #/Phase T (°C) R X Y

Cable3 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable4 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable5 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable7 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable12 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable13 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable16 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable17 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable18 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable19 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable20 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable21 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

Cable22 14NCUS3 185 15.0 0.0 1 75 0.000123 0.000113

PC-1 14NALN3 500 100.0 0.0 4 75 0.000078 0.000106

PC-13 14NALN3 500 100.0 0.0 4 75 0.000078 0.000106

PC-161 14NALN3 500 1000.0 0.0 1 75 0.000078 0.000106

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 56

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

1S/S1-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S2-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

1S/S3-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

1S/S4-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

1S/S05--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

1S/S06--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
1S/S07--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S1-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S2-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S3-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S4-TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
2S/S05--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S06--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000

2S/S07--TR 3-Phase 1.500 13.800 0.400 6.00 2.00 0 0 0 0 2.500 6.0000 Dyn 0.000
Project: ETAP Page: 57

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

1S/S1-TR 2W XFMR Bus326 1S/S1-LV-PANEL 183.36 366.72 410.00

1S/S2-TR 2W XFMR Bus327 1S/S2-LV-PANEL2 183.36 366.72 410.00

1S/S3-TR 2W XFMR Bus18 1S/S3-LV-PANEL 183.36 366.72 410.00

1S/S4-TR 2W XFMR Bus459 1S/S4-LV-PANEL 183.36 366.72 410.00

1S/S05--TR 2W XFMR Bus508 1S/S5-LV-PANEL1 183.36 366.72 410.00

1S/S06--TR 2W XFMR Bus510 1S/S6-LV-PANEL 183.36 366.72 410.00

1S/S07--TR 2W XFMR Bus512 1S/S7-LV-PANEL 183.36 366.72 410.00

2S/S1-TR 2W XFMR Bus1223 21-MDP 183.36 366.72 410.00

2S/S2-TR 2W XFMR Bus1134 2S/S2-LV-PANEL3 183.36 366.72 410.00

2S/S3-TR 2W XFMR Bus293 2S/S3 183.36 366.72 410.00

2S/S4-TR 2W XFMR Bus969 2S/S4 183.36 366.72 410.00

2S/S05--TR 2W XFMR Bus1225 2S/S5 183.36 366.72 410.00

2S/S06--TR 2W XFMR Bus1238 2S/S6 183.36 366.72 410.00

2S/S07--TR 2W XFMR Bus1316 2S/S7 183.36 366.72 410.00

1-PC-001 Cable BUS-1S/S-01 MV SWGR#1 0.00 0.00 0.00

1-PC-002 Cable BUS-1S/S-02 BUS-1S/S-01 0.00 0.00 0.00

1-PC-003 Cable BUS-1S/S-03 BUS-1S/S-02 0.00 0.00 0.00

1-PC-004 Cable BUS-1S/S-04 BUS-1S/S-03 0.00 0.00 0.00

1-PC-006 Cable BUS-1S/S-06 BUS-1S/S-05 0.00 0.00 0.00

1-PC-007 Cable BUS-1S/S-07 BUS-1S/S-06 0.00 0.00 0.00

2-PC-001 Cable BUS-2S/S-1 MV SWGR#2 0.00 0.00 0.00

2-PC-002 Cable BUS-2S/S-2 BUS-2S/S-1 0.00 0.00 0.00

2-PC-003 Cable BUS-2S/S-3 BUS-2S/S-2 0.00 0.00 0.00

2-PC-004 Cable BUS-2S/S-4 BUS-2S/S-3 0.00 0.00 0.00

2-PC-006 Cable BUS-2S/S-6 BUS-2S/S-5 0.00 0.00 0.00

2-PC-007 Cable BUS-2S/S-7 BUS-2S/S-6 0.00 0.00 0.00

2-PC-008 Cable MV SWGR#2 BUS-2S/S-7 0.00 0.01 0.01

11-PC-20 Cable 11-SMDP-1 DB-B01-8 777.42 205.94 804.24 0.0000006

11-PC-100 Cable 1S/S1-LV-PANEL 11-SMDP-1 144.98 163.16 218.27 0.0000012

11-PC-110 Cable 11-SMDP-1 DB-B01-06 204.58 54.19 211.64 0.0000001

11-PC-111 Cable DB-B01-06 Bus4 2334.57 288.39 2352.32 0.0000003

11-PC-112 Cable DB-B01-06 Bus5 1296.99 160.22 1306.84 0.0000002

11-PC-113 Cable DB-B01-06 Bus6 2697.73 333.26 2718.24 0.0000004

11-PC-114 Cable DB-B01-06 Bus7 1815.78 224.31 1829.58 0.0000003

11-PC-115 Cable DB-B01-06 Bus9 933.83 115.36 940.93 0.0000001

11-PC-120 Cable 11-SMDP-1 DB-B01-7 491.00 130.07 507.94 0.0000003


Project: ETAP Page: 58

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

11-PC-121 Cable DB-B01-7 Bus47 2334.57 288.39 2352.32 0.0000003

11-PC-122 Cable DB-B01-7 Bus48 1296.99 160.22 1306.84 0.0000002

11-PC-123 Cable DB-B01-7 Bus74 2697.73 333.26 2718.24 0.0000004

11-PC-124 Cable DB-B01-7 Bus75 1815.78 224.31 1829.58 0.0000003

11-PC-125 Cable DB-B01-7 Bus76 933.83 115.36 940.93 0.0000001

11-PC-131 Cable DB-B01-8 Bus77 2334.57 288.39 2352.32 0.0000003

11-PC-132 Cable DB-B01-8 Bus78 1296.99 160.22 1306.84 0.0000002

11-PC-133 Cable DB-B01-8 Bus79 2697.73 333.26 2718.24 0.0000004

11-PC-134 Cable DB-B01-8 Bus80 1815.78 224.31 1829.58 0.0000003

11-PC-135 Cable DB-B01-8 Bus81 933.83 115.36 940.93 0.0000001

11-PC-200 Cable 1S/S1-LV-PANEL 11-SMDP-2 271.06 305.03 408.06 0.0000022

11-PC-210 Cable 11-SMDP-2 DB-B01-03 777.42 205.94 804.24 0.0000006

11-PC-211 Cable DB-B01-03 Bus84 2334.57 288.39 2352.32 0.0000003

11-PC-212 Cable DB-B01-03 Bus85 1296.99 160.22 1306.84 0.0000002

11-PC-213 Cable DB-B01-03 Bus86 2697.73 333.26 2718.24 0.0000004

11-PC-214 Cable DB-B01-03 Bus87 1815.78 224.31 1829.58 0.0000003

11-PC-215 Cable DB-B01-03 Bus88 933.83 115.36 940.93 0.0000001

11-PC-220 Cable 11-SMDP-2 DB-B01-04 470.54 124.65 486.77 0.0000003

11-PC-221 Cable DB-B01-04 Bus89 2334.57 288.39 2352.32 0.0000003

11-PC-222 Cable DB-B01-04 Bus90 1296.99 160.22 1306.84 0.0000002

11-PC-223 Cable DB-B01-04 Bus91 2697.73 333.26 2718.24 0.0000004

11-PC-224 Cable DB-B01-04 Bus92 1815.78 224.31 1829.58 0.0000003

11-PC-225 Cable DB-B01-04 Bus93 933.83 115.36 940.93 0.0000001

11-PC-230 Cable 11-SMDP-2 DB-B01-05 265.96 70.45 275.13 0.0000002

11-PC-231 Cable DB-B01-05 Bus94 2334.57 288.39 2352.32 0.0000003

11-PC-232 Cable DB-B01-05 Bus95 1296.99 160.22 1306.84 0.0000002

11-PC-233 Cable DB-B01-05 Bus96 2697.73 333.26 2718.24 0.0000004

11-PC-234 Cable DB-B01-05 Bus97 1815.78 224.31 1829.58 0.0000003

11-PC-235 Cable DB-B01-05 Bus98 933.83 115.36 940.93 0.0000001

11-PC-240 Cable 11-SMDP-2 Bus1 18741.68 525.00 18749.03 0.0000004

11-PC-300 Cable 1S/S1-LV-PANEL 11-SMDP-3 220.63 248.28 332.15 0.0000018

11-PC-310 Cable 11-SMDP-3 DB-B01-09 818.34 216.78 846.56 0.0000006

11-PC-311 Cable DB-B01-09 Bus25 985.71 121.77 993.20 0.0000001

11-PC-312 Cable DB-B01-09 Bus26 1296.99 160.22 1306.84 0.0000002

11-PC-313 Cable DB-B01-09 Bus28 1971.42 243.53 1986.40 0.0000003

11-PC-314 Cable DB-B01-09 Bus29 2334.57 288.39 2352.32 0.0000003

11-PC-315 Cable DB-B01-09 Bus30 2697.73 333.26 2718.24 0.0000004

11-PC-320 Cable 11-SMDP-3 DB-B01-10 511.46 135.48 529.10 0.0000004

11-PC-321 Cable DB-B01-10 Bus31 985.71 121.77 993.20 0.0000001


Project: ETAP Page: 59

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

11-PC-322 Cable DB-B01-10 Bus33 1296.99 160.22 1306.84 0.0000002

11-PC-323 Cable DB-B01-10 Bus37 1971.42 243.53 1986.40 0.0000003

11-PC-324 Cable DB-B01-10 Bus38 2334.57 288.39 2352.32 0.0000003

11-PC-325 Cable DB-B01-10 Bus40 2697.73 333.26 2718.24 0.0000004

11-PC-330 Cable 11-SMDP-3 DB-B01-11 204.58 54.19 211.64 0.0000001

11-PC-331 Cable DB-B01-11 Bus44 985.71 121.77 993.20 0.0000001

11-PC-332 Cable DB-B01-11 Bus82 1296.99 160.22 1306.84 0.0000002

11-PC-333 Cable DB-B01-11 Bus83 1971.42 243.53 1986.40 0.0000003

11-PC-334 Cable DB-B01-11 Bus99 2334.57 288.39 2352.32 0.0000003

11-PC-335 Cable DB-B01-11 Bus100 2697.73 333.26 2718.24 0.0000004

11-PC-400 Cable 1S/S1-LV-PANEL 11-SMDP-04 340.40 383.06 512.45 0.0000027

11-PC-410 Cable 11-SMDP-04 DB-B01-12 245.50 65.03 253.97 0.0000002

11-PC-411 Cable DB-B01-12 Bus24 2697.73 333.26 2718.24 0.0000004

11-PC-412 Cable DB-B01-12 Bus101 1815.78 224.31 1829.58 0.0000003

11-PC-413 Cable DB-B01-12 Bus102 2334.57 288.39 2352.32 0.0000003

11-PC-414 Cable DB-B01-12 Bus103 1296.99 160.22 1306.84 0.0000002

11-PC-415 Cable DB-B01-12 Bus104 933.83 115.36 940.93 0.0000001

11-PC-420 Cable 11-SMDP-04 DB-B01-13 470.54 124.65 486.77 0.0000003

11-PC-421 Cable DB-B01-13 Bus105 2697.73 333.26 2718.24 0.0000004

11-PC-422 Cable DB-B01-13 Bus106 1815.78 224.31 1829.58 0.0000003

11-PC-423 Cable DB-B01-13 Bus107 2334.57 288.39 2352.32 0.0000003

11-PC-424 Cable DB-B01-13 Bus108 1296.99 160.22 1306.84 0.0000002

11-PC-425 Cable DB-B01-13 Bus109 933.83 115.36 940.93 0.0000001

11-PC-430 Cable 11-SMDP-04 DB-B01-14 777.42 205.94 804.24 0.0000006

11-PC-431 Cable DB-B01-14 Bus110 2697.73 333.26 2718.24 0.0000004

11-PC-432 Cable DB-B01-14 Bus111 1815.78 224.31 1829.58 0.0000003

11-PC-433 Cable DB-B01-14 Bus112 2334.57 288.39 2352.32 0.0000003

11-PC-434 Cable DB-B01-14 Bus113 1296.99 160.22 1306.84 0.0000002

11-PC-435 Cable DB-B01-14 Bus114 933.83 115.36 940.93 0.0000001

11-PC-500 Cable 1S/S1-LV-PANEL 11-SMDP-05 680.80 766.13 1024.91 0.0000054

11-PC-510 Cable 11-SMDP-05 DB-B01-01 409.17 108.39 423.28 0.0000003

11-PC-511 Cable DB-B01-01 Bus131 2697.73 333.26 2718.24 0.0000004

11-PC-512 Cable DB-B01-01 Bus132 1815.78 224.31 1829.58 0.0000003

11-PC-513 Cable DB-B01-01 Bus133 2334.57 288.39 2352.32 0.0000003

11-PC-514 Cable DB-B01-01 Bus134 1296.99 160.22 1306.84 0.0000002

11-PC-515 Cable DB-B01-01 Bus135 933.83 115.36 940.93 0.0000001

11-PC-520 Cable 11-SMDP-05 DB-B01-02 225.04 59.61 232.81 0.0000002

11-PC-521 Cable DB-B01-02 Bus136 2697.73 333.26 2718.24 0.0000004

11-PC-522 Cable DB-B01-02 Bus137 1815.78 224.31 1829.58 0.0000003


Project: ETAP Page: 60

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

11-PC-523 Cable DB-B01-02 Bus138 2334.57 288.39 2352.32 0.0000003

11-PC-524 Cable DB-B01-02 Bus139 1296.99 160.22 1306.84 0.0000002

11-PC-525 Cable DB-B01-02 Bus140 933.83 115.36 940.93 0.0000001

11-PC-530 Cable 11-SMDP-05 Bus2 2392.43 345.00 2417.17 0.0000005

11-PC-600 Cable 1S/S1-LV-PANEL 11-SMDP-06 750.14 844.16 1129.29 0.0000060

11-PC-610 Cable 11-SMDP-06 DB-B01-15 184.13 48.77 190.48 0.0000001

11-PC-611 Cable DB-B01-15 Bus20 1296.99 160.22 1306.84 0.0000002

11-PC-612 Cable DB-B01-15 Bus21 2334.57 288.39 2352.32 0.0000003

11-PC-613 Cable DB-B01-15 Bus22 778.19 96.13 784.11 0.0000001

11-PC-614 Cable DB-B01-15 Bus23 1815.78 224.31 1829.58 0.0000003

11-PC-615 Cable DB-B01-15 Bus115 2697.73 333.26 2718.24 0.0000004

11-PC-620 Cable 11-SMDP-06 DB-B01-16 511.46 135.48 529.10 0.0000004

11-PC-621 Cable DB-B01-16 Bus116 1296.99 160.22 1306.84 0.0000002

11-PC-622 Cable DB-B01-16 Bus117 2334.57 288.39 2352.32 0.0000003

11-PC-623 Cable DB-B01-16 Bus118 778.19 96.13 784.11 0.0000001

11-PC-624 Cable DB-B01-16 Bus120 1815.78 224.31 1829.58 0.0000003

11-PC-625 Cable DB-B01-16 Bus121 2697.73 333.26 2718.24 0.0000004

11-PC-630 Cable 11-SMDP-06 Bus122 14056.26 393.75 14061.77 0.0000003

11-PC-700 Cable 1S/S1-LV-PANEL 11-SMDP-16 403.43 454.00 607.35 0.0000032

11-PC-710 Cable 11-SMDP-16 Bus144 4150.35 512.70 4181.90 0.0000006

11-PC-720 Cable 11-SMDP-16 DB-B21 1841.26 487.74 1904.77 0.0000013

11-PC-721 Cable DB-B21 Bus128 778.19 96.13 784.11 0.0000001

11-PC-722 Cable DB-B21 Bus129 598.11 86.25 604.29 0.0000001

11-PC-723 Cable DB-B21 Bus130 3514.07 98.44 3515.44 0.0000001

11-PC-730 Cable 11-SMDP-16 Bus147 3189.90 460.00 3222.90 0.0000006

12-PC-50 Cable DB-B01-33 Bus159 2697.73 333.26 2718.24 0.0000004

12-PC-51 Cable DB-B01-33 Bus160 1815.78 224.31 1829.58 0.0000003

12-PC-52 Cable DB-B01-33 Bus161 2334.57 288.39 2352.32 0.0000003

12-PC-53 Cable DB-B01-33 Bus162 1296.99 160.22 1306.84 0.0000002

12-PC-54 Cable DB-B01-33 Bus163 933.83 115.36 940.93 0.0000001

12-PC-56 Cable DB-B01-34 Bus164 2697.73 333.26 2718.24 0.0000004

12-PC-57 Cable DB-B01-34 Bus169 1815.78 224.31 1829.58 0.0000003

12-PC-58 Cable DB-B01-34 Bus170 2334.57 288.39 2352.32 0.0000003

12-PC-59 Cable DB-B01-34 Bus171 1296.99 160.22 1306.84 0.0000002

12-PC-60 Cable DB-B01-34 Bus172 933.83 115.36 940.93 0.0000001

12-PC-100 Cable 1S/S2-LV-PANEL2 12-SMDP-01 144.98 163.16 218.27 0.0000012

12-PC-110 Cable 12-SMDP-01 DB-B01-040 204.58 54.19 211.64 0.0000001

12-PC-111 Cable DB-B01-040 Bus237 2334.57 288.39 2352.32 0.0000003

12-PC-112 Cable DB-B01-040 Bus238 1296.99 160.22 1306.84 0.0000002


Project: ETAP Page: 61

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

12-PC-113 Cable DB-B01-040 Bus239 2697.73 333.26 2718.24 0.0000004

12-PC-114 Cable DB-B01-040 Bus240 1815.78 224.31 1829.58 0.0000003

12-PC-115 Cable DB-B01-040 Bus241 933.83 115.36 940.93 0.0000001

12-PC-120 Cable 12-SMDP-01 DB-B01-041 491.00 130.07 507.94 0.0000003

12-PC-121 Cable DB-B01-041 Bus242 2334.57 288.39 2352.32 0.0000003

12-PC-122 Cable DB-B01-041 Bus243 1296.99 160.22 1306.84 0.0000002

12-PC-123 Cable DB-B01-041 Bus244 2697.73 333.26 2718.24 0.0000004

12-PC-124 Cable DB-B01-041 Bus245 1815.78 224.31 1829.58 0.0000003

12-PC-125 Cable DB-B01-041 Bus246 933.83 115.36 940.93 0.0000001

12-PC-130 Cable 12-SMDP-01 DB-B01-042 777.42 205.94 804.24 0.0000006

12-PC-131 Cable DB-B01-042 Bus247 2334.57 288.39 2352.32 0.0000003

12-PC-132 Cable DB-B01-042 Bus248 1296.99 160.22 1306.84 0.0000002

12-PC-133 Cable DB-B01-042 Bus249 2697.73 333.26 2718.24 0.0000004

12-PC-134 Cable DB-B01-042 Bus250 1815.78 224.31 1829.58 0.0000003

12-PC-135 Cable DB-B01-042 Bus251 933.83 115.36 940.93 0.0000001

12-PC-200 Cable 1S/S2-LV-PANEL2 12-SMDP-02 271.06 305.03 408.06 0.0000022

12-PC-210 Cable 12-SMDP-02 DB-B01-37 777.42 205.94 804.24 0.0000006

12-PC-211 Cable DB-B01-37 Bus252 2334.57 288.39 2352.32 0.0000003

12-PC-212 Cable DB-B01-37 Bus253 1296.99 160.22 1306.84 0.0000002

12-PC-213 Cable DB-B01-37 Bus254 2697.73 333.26 2718.24 0.0000004

12-PC-214 Cable DB-B01-37 Bus255 1815.78 224.31 1829.58 0.0000003

12-PC-215 Cable DB-B01-37 Bus256 933.83 115.36 940.93 0.0000001

12-PC-220 Cable 12-SMDP-02 DB-B01-38. 470.54 124.65 486.77 0.0000003

12-PC-221 Cable DB-B01-38. Bus257 2334.57 288.39 2352.32 0.0000003

12-PC-222 Cable DB-B01-38. Bus258 1296.99 160.22 1306.84 0.0000002

12-PC-223 Cable DB-B01-38. Bus259 2697.73 333.26 2718.24 0.0000004

12-PC-224 Cable DB-B01-38. Bus260 1815.78 224.31 1829.58 0.0000003

12-PC-225 Cable DB-B01-38. Bus261 933.83 115.36 940.93 0.0000001

12-PC-230 Cable 12-SMDP-02 DB-B01-39 265.96 70.45 275.13 0.0000002

12-PC-231 Cable DB-B01-39 Bus262 2334.57 288.39 2352.32 0.0000003

12-PC-232 Cable DB-B01-39 Bus263 1296.99 160.22 1306.84 0.0000002

12-PC-233 Cable DB-B01-39 Bus264 2697.73 333.26 2718.24 0.0000004

12-PC-234 Cable DB-B01-39 Bus265 1815.78 224.31 1829.58 0.0000003

12-PC-235 Cable DB-B01-39 Bus266 933.83 115.36 940.93 0.0000001

12-PC-240 Cable 12-SMDP-02 Bus267 18741.68 525.00 18749.03 0.0000004

12-PC-300 Cable 1S/S2-LV-PANEL2 12-SMDP-3 220.63 248.28 332.15 0.0000018

12-PC-310 Cable 12-SMDP-3 DB-B02-01 1178.39 216.78 1198.16 0.0000003

12-PC-311 Cable DB-B02-01 Bus123 1815.78 224.31 1829.58 0.0000003

12-PC-312 Cable DB-B02-01 Bus124 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 62

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

12-PC-313 Cable DB-B02-01 Bus125 2334.57 288.39 2352.32 0.0000003

12-PC-314 Cable DB-B02-01 Bus126 1296.99 160.22 1306.84 0.0000002

12-PC-320 Cable 12-SMDP-3 DB-B02-02 736.49 135.48 748.85 0.0000002

12-PC-321 Cable DB-B02-02 Bus46 1815.78 224.31 1829.58 0.0000003

12-PC-322 Cable DB-B02-02 Bus50 933.83 115.36 940.93 0.0000001

12-PC-323 Cable DB-B02-02 Bus119 2334.57 288.39 2352.32 0.0000003

12-PC-324 Cable DB-B02-02 Bus154 1296.99 160.22 1306.84 0.0000002

12-PC-330 Cable 12-SMDP-3 DB-B02-03 294.60 54.19 299.54 0.0000001

12-PC-331 Cable DB-B02-03 Bus165 1815.78 224.31 1829.58 0.0000003

12-PC-332 Cable DB-B02-03 Bus166 933.83 115.36 940.93 0.0000001

12-PC-333 Cable DB-B02-03 Bus167 2334.57 288.39 2352.32 0.0000003

12-PC-334 Cable DB-B02-03 Bus168 1296.99 160.22 1306.84 0.0000002

12-PC-400 Cable 1S/S2-LV-PANEL2 12-SMDP-4 340.40 383.06 512.45 0.0000027

12-PC-410 Cable 12-SMDP-4 DB-B02-4 353.52 65.03 359.45 0.0000001

12-PC-411 Cable DB-B02-4 Bus39 1296.99 160.22 1306.84 0.0000002

12-PC-412 Cable DB-B02-4 Bus127 2334.57 288.39 2352.32 0.0000003

12-PC-413 Cable DB-B02-4 Bus141 933.83 115.36 940.93 0.0000001

12-PC-414 Cable DB-B02-4 Bus142 1815.78 224.31 1829.58 0.0000003

12-PC-420 Cable 12-SMDP-4 DB-B02-5 677.57 124.65 688.94 0.0000002

12-PC-421 Cable DB-B02-5 Bus143 1296.99 160.22 1306.84 0.0000002

12-PC-422 Cable DB-B02-5 Bus145 2334.57 288.39 2352.32 0.0000003

12-PC-423 Cable DB-B02-5 Bus146 933.83 115.36 940.93 0.0000001

12-PC-424 Cable DB-B02-5 Bus148 1815.78 224.31 1829.58 0.0000003

12-PC-430 Cable 12-SMDP-4 DB-B02-6 1119.47 205.94 1138.25 0.0000003

12-PC-431 Cable DB-B02-6 Bus149 1296.99 160.22 1306.84 0.0000002

12-PC-432 Cable DB-B02-6 Bus150 2334.57 288.39 2352.32 0.0000003

12-PC-433 Cable DB-B02-6 Bus151 933.83 115.36 940.93 0.0000001

12-PC-434 Cable DB-B02-6 Bus152 1815.78 224.31 1829.58 0.0000003

12-PC-500 Cable 1S/S2-LV-PANEL2 12-SMDP-5 680.80 766.13 1024.91 0.0000054

12-PC-510 Cable 12-SMDP-5 DB-B01-33 450.09 119.23 465.61 0.0000003

12-PC-520 Cable 12-SMDP-5 DB-B01-34 225.04 59.61 232.81 0.0000002

12-PC-530 Cable 12-SMDP-5 Bus181 3189.90 460.00 3222.90 0.0000006

12-PC-540 Cable 12-SMDP-5 Bus178 13144.21 843.75 13171.26 0.0000011

12-PC-600 Cable 1S/S2-LV-PANEL2 12-SMDP-6 756.44 851.25 1138.78 0.0000060

12-PC-610 Cable 12-SMDP-6 DB-B01-35 409.17 108.39 423.28 0.0000003

12-PC-611 Cable DB-B01-35 Bus194 1296.99 160.22 1306.84 0.0000002

12-PC-612 Cable DB-B01-35 Bus195 2334.57 288.39 2352.32 0.0000003

12-PC-613 Cable DB-B01-35 Bus196 778.19 96.13 784.11 0.0000001

12-PC-614 Cable DB-B01-35 Bus197 1815.78 224.31 1829.58 0.0000003


Project: ETAP Page: 63

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

12-PC-615 Cable DB-B01-35 Bus198 2697.73 333.26 2718.24 0.0000004

12-PC-620 Cable 12-SMDP-6 DB-B01-36 204.58 54.19 211.64 0.0000001

12-PC-621 Cable DB-B01-36 Bus199 1296.99 160.22 1306.84 0.0000002

12-PC-622 Cable DB-B01-36 Bus200 2334.57 288.39 2352.32 0.0000003

12-PC-623 Cable DB-B01-36 Bus201 778.19 96.13 784.11 0.0000001

12-PC-624 Cable DB-B01-36 Bus202 1815.78 224.31 1829.58 0.0000003

12-PC-625 Cable DB-B01-36 Bus203 2697.73 333.26 2718.24 0.0000004

12-PC-700 Cable 1S/S2-LV-PANEL2 12-SMDP-7 453.86 510.75 683.27 0.0000036

12-PC-710 Cable 12-SMDP-7 DB-B06 411.15 425.38 591.60

12-PC-710-A Cable DB-B06 Bus3 198.15 205.00 285.11

12-PC-711 Cable DB-B06 Bus10 598.11 86.25 604.29 0.0000001

12-PC-712 Cable DB-B06 Bus11 598.11 86.25 604.29 0.0000001

12-PC-713 Cable DB-B06 Bus12 598.11 86.25 604.29 0.0000001

12-PC-714 Cable DB-B06 Bus14 306.88 81.29 317.46 0.0000002

12-PC-720 Cable 12-SMDP-7 Bus17 558.23 80.50 564.01 0.0000001

12-PC-730 Cable 12-SMDP-7 DB-B14 470.54 124.65 486.77 0.0000003

12-PC-731 Cable DB-B14 Bus322 797.48 115.00 805.72 0.0000002

12-PC-732 Cable DB-B14 Bus323 5856.77 164.06 5859.07 0.0000001

12-PC-733 Cable DB-B14 Bus324 5856.77 164.06 5859.07 0.0000001

13-PC-100 Cable 1S/S3-LV-PANEL 13-SMDP-1 144.98 163.16 218.27 0.0000012

13-PC-101 Cable 1S/S3-LV-PANEL 13-SMDP-2 226.93 255.38 341.64 0.0000018

13-PC-102 Cable 1S/S3-LV-PANEL 13-SMDP-3 416.04 468.19 626.33 0.0000033

13-PC-103 Cable 1S/S3-LV-PANEL 13-SMDP-04 271.06 305.03 408.06 0.0000022

13-PC-104 Cable 1S/S3-LV-PANEL 13-SMDP-5 548.42 617.16 825.62 0.0000044

13-PC-105 Cable 1S/S3-LV-PANEL 13-SMDP-6 561.03 631.34 844.60 0.0000045

13-PC-106 Cable 1S/S3-LV-PANEL 13-SMDP-7 838.39 943.47 1262.15 0.0000067

13-PC-110 Cable 13-SMDP-1 DB-B04-01 235.82 103.68 257.60 0.0000004

13-PC-111 Cable DB-B04-01 Bus297 1395.58 201.25 1410.02 0.0000003

13-PC-112 Cable DB-B04-01 Bus298 717.73 103.50 725.15 0.0000001

13-PC-113 Cable DB-B04-01 Bus299 2334.57 288.39 2352.32 0.0000003

13-PC-114 Cable DB-B04-01 Bus300 996.84 143.75 1007.16 0.0000002

13-PC-120 Cable 13-SMDP-1 DB-B04-2 129.70 57.02 141.68 0.0000002

13-PC-121 Cable DB-B04-2 Bus394 1395.58 201.25 1410.02 0.0000003

13-PC-122 Cable DB-B04-2 Bus395 717.73 103.50 725.15 0.0000001

13-PC-123 Cable DB-B04-2 Bus396 2334.57 288.39 2352.32 0.0000003

13-PC-124 Cable DB-B04-2 Bus397 996.84 143.75 1007.16 0.0000002

13-PC-130 Cable 13-SMDP-1 Bus398 1116.47 161.00 1128.01 0.0000002

13-PC-210 Cable 13-SMDP-2 DB-B03-02 233.38 155.51 280.44

13-PC-211 Cable DB-B03-02 Bus312 2853.37 352.48 2875.06 0.0000004


Project: ETAP Page: 64

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

13-PC-212 Cable DB-B03-02 Bus313 1815.78 224.31 1829.58 0.0000003

13-PC-213 Cable DB-B03-02 Bus314 1296.99 160.22 1306.84 0.0000002

13-PC-214 Cable DB-B03-02 Bus315 3009.01 371.71 3031.88 0.0000004

13-PC-215 Cable DB-B03-02 Bus316 1452.62 179.45 1463.67 0.0000002

13-PC-216 Cable DB-B03-02 Bus13 933.83 115.36 940.93 0.0000001

13-PC-220 Cable 13-SMDP-2 DB-B03-04 101.13 67.39 121.53

13-PC-221 Cable DB-B03-04 Bus180 2853.37 352.48 2875.06 0.0000004

13-PC-222 Cable DB-B03-04 Bus182 1815.78 224.31 1829.58 0.0000003

13-PC-223 Cable DB-B03-04 Bus183 1296.99 160.22 1306.84 0.0000002

13-PC-224 Cable DB-B03-04 Bus184 3009.01 371.71 3031.88 0.0000004

13-PC-225 Cable DB-B03-04 Bus185 1452.62 179.45 1463.67 0.0000002

13-PC-226 Cable DB-B03-04 Bus186 933.83 115.36 940.93 0.0000001

13-PC-310 Cable 13-SMDP-3 DB-B03-01 163.36 108.86 196.31

13-PC-311 Cable DB-B03-01 Bus177 2853.37 352.48 2875.06 0.0000004

13-PC-312 Cable DB-B03-01 Bus179 1815.78 224.31 1829.58 0.0000003

13-PC-313 Cable DB-B03-01 Bus187 1296.99 160.22 1306.84 0.0000002

13-PC-314 Cable DB-B03-01 Bus188 3009.01 371.71 3031.88 0.0000004

13-PC-315 Cable DB-B03-01 Bus189 1452.62 179.45 1463.67 0.0000002

13-PC-316 Cable DB-B03-01 Bus190 933.83 115.36 940.93 0.0000001

13-PC-320 Cable 13-SMDP-3 DB-B03-03 77.79 51.84 93.48

13-PC-321 Cable DB-B03-03 Bus191 2853.37 352.48 2875.06 0.0000004

13-PC-322 Cable DB-B03-03 Bus192 1815.78 224.31 1829.58 0.0000003

13-PC-323 Cable DB-B03-03 Bus193 1296.99 160.22 1306.84 0.0000002

13-PC-324 Cable DB-B03-03 Bus204 3009.01 371.71 3031.88 0.0000004

13-PC-325 Cable DB-B03-03 Bus205 1452.62 179.45 1463.67 0.0000002

13-PC-326 Cable DB-B03-03 Bus206 933.83 115.36 940.93 0.0000001

13-PC-330 Cable 13-SMDP-3 Bus8 1236.09 178.25 1248.87 0.0000002

13-PC-410 Cable 13-SMDP-04 DB-B02-7 265.14 48.77 269.59 0.0000001

13-PC-411 Cable DB-B02-7 Bus301 1296.99 160.22 1306.84 0.0000002

13-PC-412 Cable DB-B02-7 Bus302 2334.57 288.39 2352.32 0.0000003

13-PC-413 Cable DB-B02-7 Bus303 933.83 115.36 940.93 0.0000001

13-PC-414 Cable DB-B02-7 Bus304 1815.78 224.31 1829.58 0.0000003

13-PC-420 Cable 13-SMDP-04 DB-B02-08 736.49 135.48 748.85 0.0000002

13-PC-421 Cable DB-B02-08 Bus309 1296.99 160.22 1306.84 0.0000002

13-PC-422 Cable DB-B02-08 Bus310 2334.57 288.39 2352.32 0.0000003

13-PC-423 Cable DB-B02-08 Bus311 933.83 115.36 940.93 0.0000001

13-PC-424 Cable DB-B02-08 Bus317 1815.78 224.31 1829.58 0.0000003

13-PC-430 Cable 13-SMDP-04 DB-B08-09 1178.39 216.78 1198.16 0.0000003

13-PC-431 Cable DB-B08-09 Bus318 1296.99 160.22 1306.84 0.0000002


Project: ETAP Page: 65

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

13-PC-432 Cable DB-B08-09 Bus319 2334.57 288.39 2352.32 0.0000003

13-PC-433 Cable DB-B08-09 Bus320 933.83 115.36 940.93 0.0000001

13-PC-434 Cable DB-B08-09 Bus321 1815.78 224.31 1829.58 0.0000003

13-PC-440 Cable 13-SMDP-04 Bus335 4166.80 187.50 4171.02 0.0000002

13-PC-450 Cable 13-SMDP-04 Bus278 7028.13 196.88 7030.89 0.0000002

13-PC-510 Cable 13-SMDP-5 DB-B02-10 382.98 70.45 389.40 0.0000001

13-PC-511 Cable DB-B02-10 Bus393 1296.99 160.22 1306.84 0.0000002

13-PC-512 Cable DB-B02-10 Bus399 2334.57 288.39 2352.32 0.0000003

13-PC-513 Cable DB-B02-10 Bus400 933.83 115.36 940.93 0.0000001

13-PC-514 Cable DB-B02-10 Bus401 1815.78 224.31 1829.58 0.0000003

13-PC-520 Cable 13-SMDP-5 DB-B02-011 736.49 135.48 748.85 0.0000002

13-PC-521 Cable DB-B02-011 Bus402 1296.99 160.22 1306.84 0.0000002

13-PC-522 Cable DB-B02-011 Bus403 2334.57 288.39 2352.32 0.0000003

13-PC-523 Cable DB-B02-011 Bus404 933.83 115.36 940.93 0.0000001

13-PC-524 Cable DB-B02-011 Bus405 1815.78 224.31 1829.58 0.0000003

13-PC-610 Cable 13-SMDP-6 DB-B02-12 265.14 48.77 269.59 0.0000001

13-PC-611 Cable DB-B02-12 Bus174 1296.99 160.22 1306.84 0.0000002

13-PC-612 Cable DB-B02-12 Bus175 2334.57 288.39 2352.32 0.0000003

13-PC-613 Cable DB-B02-12 Bus176 933.83 115.36 940.93 0.0000001

13-PC-614 Cable DB-B02-12 Bus207 1815.78 224.31 1829.58 0.0000003

13-PC-620 Cable 13-SMDP-6 DB-B02-13 707.03 130.07 718.90 0.0000002

13-PC-621 Cable DB-B02-13 Bus208 1296.99 160.22 1306.84 0.0000002

13-PC-622 Cable DB-B02-13 Bus209 2334.57 288.39 2352.32 0.0000003

13-PC-623 Cable DB-B02-13 Bus210 933.83 115.36 940.93 0.0000001

13-PC-624 Cable DB-B02-13 Bus211 1815.78 224.31 1829.58 0.0000003

13-PC-630 Cable 13-SMDP-6 DB-B02-14 1119.47 205.94 1138.25 0.0000003

13-PC-631 Cable DB-B02-14 Bus216 1296.99 160.22 1306.84 0.0000002

13-PC-632 Cable DB-B02-14 Bus217 2334.57 288.39 2352.32 0.0000003

13-PC-633 Cable DB-B02-14 Bus218 933.83 115.36 940.93 0.0000001

13-PC-634 Cable DB-B02-14 Bus219 1815.78 224.31 1829.58 0.0000003

13-PC-710 Cable 13-SMDP-7 DB-B02-15 108.91 72.57 130.87

13-PC-711 Cable DB-B02-15 Bus220 1296.99 160.22 1306.84 0.0000002

13-PC-712 Cable DB-B02-15 Bus221 2334.57 288.39 2352.32 0.0000003

13-PC-713 Cable DB-B02-15 Bus222 933.83 115.36 940.93 0.0000001

13-PC-714 Cable DB-B02-15 Bus223 1815.78 224.31 1829.58 0.0000003

13-PC-720 Cable 13-SMDP-7 DB-B02-16 194.48 129.59 233.70

13-PC-721 Cable DB-B02-16 Bus224 1296.99 160.22 1306.84 0.0000002

13-PC-722 Cable DB-B02-16 Bus225 2334.57 288.39 2352.32 0.0000003

13-PC-723 Cable DB-B02-16 Bus226 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 66

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

13-PC-724 Cable DB-B02-16 Bus227 1815.78 224.31 1829.58 0.0000003

13-PC-730 Cable 13-SMDP-7 Bus232 4386.11 632.50 4431.48 0.0000009

14-PC-100 Cable 1S/S4-LV-PANEL 14-SMDP-01 472.77 532.03 711.74 0.0000038

14-PC-110 Cable 14-SMDP-01 Bus460 3788.01 546.25 3827.19 0.0000007

14-PC-120 Cable 14-SMDP-01 Bus462 598.11 86.25 604.29 0.0000001

14-PC-130 Cable 14-SMDP-01 Bus463 2990.53 431.25 3021.47 0.0000006

14-PC-140 Cable 14-SMDP-01 Bus464 1919.54 237.12 1934.13 0.0000003

14-PC-150 Cable 14-SMDP-01 Bus465 2891.73 185.63 2897.68 0.0000002

14-PC-160 Cable 14-SMDP-01 Bus467 8333.61 375.00 8342.04 0.0000004

14-PC-170 Cable 14-SMDP-01 Bus377 4772.91 589.61 4809.19 0.0000007

14-PC-180 Cable 14-SMDP-01 Bus469 4186.74 603.75 4230.05 0.0000008

14-PC-190 Cable 14-SMDP-01 Bus470 15278.28 687.50 15293.74 0.0000007

14-PC-200 Cable 1S/S4-LV-PANEL Bus471 535.81 602.97 806.64 0.0000043

14-PC-300 Cable 1S/S4-LV-PANEL Bus475 535.81 602.97 806.64 0.0000043

14-PC-400 Cable 1S/S4-LV-PANEL Bus476 535.81 602.97 806.64 0.0000043

14-PC-500 Cable 1S/S4-LV-PANEL Bus477 535.81 602.97 806.64 0.0000043

14-PC-600 Cable 1S/S4-LV-PANEL Bus474 995.98 1120.81 1499.40 0.0000079

14-PC-700 Cable 1S/S4-LV-PANEL Bus472 995.98 1120.81 1499.40 0.0000079

15-PC-100 Cable 1S/S5-LV-PANEL1 Bus509 34.89 85.00 91.88

16-PC-100 Cable 1S/S6-LV-PANEL Bus536 30.53 74.38 80.40

16-PC-200 Cable 1S/S6-LV-PANEL 16-SMDP-2 800.57 900.91 1205.21 0.0000064

16-PC-210 Cable 16-SMDP-2 DB-B01-17 409.17 108.39 423.28 0.0000003

16-PC-211 Cable DB-B01-17 Bus157 2697.73 333.26 2718.24 0.0000004

16-PC-212 Cable DB-B01-17 Bus158 1815.78 224.31 1829.58 0.0000003

16-PC-213 Cable DB-B01-17 Bus173 2334.57 288.39 2352.32 0.0000003

16-PC-214 Cable DB-B01-17 Bus212 1296.99 160.22 1306.84 0.0000002

16-PC-215 Cable DB-B01-17 Bus213 933.83 115.36 940.93 0.0000001

16-PC-220 Cable 16-SMDP-2 DB-B01-18 225.04 59.61 232.81 0.0000002

16-PC-221 Cable DB-B01-18 Bus271 2697.73 333.26 2718.24 0.0000004

16-PC-222 Cable DB-B01-18 Bus272 1815.78 224.31 1829.58 0.0000003

16-PC-223 Cable DB-B01-18 Bus273 2334.57 288.39 2352.32 0.0000003

16-PC-224 Cable DB-B01-18 Bus274 1296.99 160.22 1306.84 0.0000002

16-PC-225 Cable DB-B01-18 Bus275 933.83 115.36 940.93 0.0000001

16-PC-230 Cable 16-SMDP-2 Bus535 2791.16 402.50 2820.04 0.0000005

17-PC-100 Cable 1S/S7-LV-PANEL 17-SMDP-01 144.98 163.16 218.27 0.0000012

17-PC-110 Cable 17-SMDP-01 DB-B01-022 204.58 54.19 211.64 0.0000001

17-PC-111 Cable DB-B01-022 Bus406 2334.57 288.39 2352.32 0.0000003

17-PC-112 Cable DB-B01-022 Bus407 1296.99 160.22 1306.84 0.0000002

17-PC-113 Cable DB-B01-022 Bus408 2697.73 333.26 2718.24 0.0000004


Project: ETAP Page: 67

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

17-PC-114 Cable DB-B01-022 Bus409 1815.78 224.31 1829.58 0.0000003

17-PC-115 Cable DB-B01-022 Bus410 933.83 115.36 940.93 0.0000001

17-PC-120 Cable 17-SMDP-01 DB-B01-023 511.46 135.48 529.10 0.0000004

17-PC-121 Cable DB-B01-023 Bus411 2334.57 288.39 2352.32 0.0000003

17-PC-122 Cable DB-B01-023 Bus412 1296.99 160.22 1306.84 0.0000002

17-PC-123 Cable DB-B01-023 Bus413 2697.73 333.26 2718.24 0.0000004

17-PC-124 Cable DB-B01-023 Bus414 1815.78 224.31 1829.58 0.0000003

17-PC-125 Cable DB-B01-023 Bus415 933.83 115.36 940.93 0.0000001

17-PC-130 Cable 17-SMDP-01 DB-B01-024 777.42 205.94 804.24 0.0000006

17-PC-131 Cable DB-B01-024 Bus416 2334.57 288.39 2352.32 0.0000003

17-PC-132 Cable DB-B01-024 Bus417 1296.99 160.22 1306.84 0.0000002

17-PC-133 Cable DB-B01-024 Bus418 2697.73 333.26 2718.24 0.0000004

17-PC-134 Cable DB-B01-024 Bus419 1815.78 224.31 1829.58 0.0000003

17-PC-135 Cable DB-B01-024 Bus420 933.83 115.36 940.93 0.0000001

17-PC-200 Cable 1S/S7-LV-PANEL 17-SMDP-02 271.06 305.03 408.06 0.0000022

17-PC-210 Cable 17-SMDP-02 DB-B01-019 613.75 162.58 634.92 0.0000004

17-PC-211 Cable DB-B01-019 Bus421 2334.57 288.39 2352.32 0.0000003

17-PC-212 Cable DB-B01-019 Bus422 1296.99 160.22 1306.84 0.0000002

17-PC-213 Cable DB-B01-019 Bus423 2697.73 333.26 2718.24 0.0000004

17-PC-214 Cable DB-B01-019 Bus424 1815.78 224.31 1829.58 0.0000003

17-PC-215 Cable DB-B01-019 Bus425 933.83 115.36 940.93 0.0000001

17-PC-220 Cable 17-SMDP-02 DB-B01-020 613.75 162.58 634.92 0.0000004

17-PC-221 Cable DB-B01-020 Bus426 2334.57 288.39 2352.32 0.0000003

17-PC-222 Cable DB-B01-020 Bus427 1296.99 160.22 1306.84 0.0000002

17-PC-223 Cable DB-B01-020 Bus428 2697.73 333.26 2718.24 0.0000004

17-PC-224 Cable DB-B01-020 Bus429 1815.78 224.31 1829.58 0.0000003

17-PC-225 Cable DB-B01-020 Bus430 933.83 115.36 940.93 0.0000001

17-PC-230 Cable 17-SMDP-02 DB-B01-021 920.63 243.87 952.38 0.0000007

17-PC-231 Cable DB-B01-021 Bus431 2334.57 288.39 2352.32 0.0000003

17-PC-232 Cable DB-B01-021 Bus432 1296.99 160.22 1306.84 0.0000002

17-PC-233 Cable DB-B01-021 Bus433 2697.73 333.26 2718.24 0.0000004

17-PC-234 Cable DB-B01-021 Bus434 1815.78 224.31 1829.58 0.0000003

17-PC-235 Cable DB-B01-021 Bus435 933.83 115.36 940.93 0.0000001

17-PC-240 Cable 17-SMDP-02 Bus436 20381.58 570.94 20389.57 0.0000005

17-PC-300 Cable 1S/S7-LV-PANEL 17-SMDP-03 220.63 248.28 332.15 0.0000018

17-PC-310 Cable 17-SMDP-03 DB-B01-025 818.34 216.78 846.56 0.0000006

17-PC-311 Cable DB-B01-025 Bus437 985.71 121.77 993.20 0.0000001

17-PC-312 Cable DB-B01-025 Bus438 1296.99 160.22 1306.84 0.0000002

17-PC-313 Cable DB-B01-025 Bus439 1971.42 243.53 1986.40 0.0000003


Project: ETAP Page: 68

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

17-PC-314 Cable DB-B01-025 Bus440 2334.57 288.39 2352.32 0.0000003

17-PC-315 Cable DB-B01-025 Bus441 2697.73 333.26 2718.24 0.0000004

17-PC-320 Cable 17-SMDP-03 DB-B01-026 511.46 135.48 529.10 0.0000004

17-PC-321 Cable DB-B01-026 Bus442 985.71 121.77 993.20 0.0000001

17-PC-322 Cable DB-B01-026 Bus443 1296.99 160.22 1306.84 0.0000002

17-PC-323 Cable DB-B01-026 Bus444 1971.42 243.53 1986.40 0.0000003

17-PC-324 Cable DB-B01-026 Bus445 2334.57 288.39 2352.32 0.0000003

17-PC-325 Cable DB-B01-026 Bus446 2697.73 333.26 2718.24 0.0000004

17-PC-330 Cable 17-SMDP-03 DB-B01-027 204.58 54.19 211.64 0.0000001

17-PC-331 Cable DB-B01-027 Bus447 985.71 121.77 993.20 0.0000001

17-PC-332 Cable DB-B01-027 Bus448 1296.99 160.22 1306.84 0.0000002

17-PC-333 Cable DB-B01-027 Bus449 1971.42 243.53 1986.40 0.0000003

17-PC-334 Cable DB-B01-027 Bus450 2334.57 288.39 2352.32 0.0000003

17-PC-335 Cable DB-B01-027 Bus451 2697.73 333.26 2718.24 0.0000004

17-PC-400 Cable 1S/S7-LV-PANEL 17-SMDP-04 340.40 383.06 512.45 0.0000027

17-PC-410 Cable 17-SMDP-04 DB-B01-028 245.50 65.03 253.97 0.0000002

17-PC-411 Cable DB-B01-028 Bus452 2697.73 333.26 2718.24 0.0000004

17-PC-412 Cable DB-B01-028 Bus453 1815.78 224.31 1829.58 0.0000003

17-PC-413 Cable DB-B01-028 Bus454 2334.57 288.39 2352.32 0.0000003

17-PC-414 Cable DB-B01-028 Bus455 1296.99 160.22 1306.84 0.0000002

17-PC-415 Cable DB-B01-028 Bus456 933.83 115.36 940.93 0.0000001

17-PC-420 Cable 17-SMDP-04 DB-B01-029 470.54 124.65 486.77 0.0000003

17-PC-421 Cable DB-B01-029 Bus457 2697.73 333.26 2718.24 0.0000004

17-PC-422 Cable DB-B01-029 Bus458 1815.78 224.31 1829.58 0.0000003

17-PC-423 Cable DB-B01-029 Bus461 2334.57 288.39 2352.32 0.0000003

17-PC-424 Cable DB-B01-029 Bus466 1296.99 160.22 1306.84 0.0000002

17-PC-425 Cable DB-B01-029 Bus468 933.83 115.36 940.93 0.0000001

17-PC-430 Cable 17-SMDP-04 DB-B01-30 777.42 205.94 804.24 0.0000006

17-PC-431 Cable DB-B01-30 Bus473 2697.73 333.26 2718.24 0.0000004

17-PC-432 Cable DB-B01-30 Bus478 1815.78 224.31 1829.58 0.0000003

17-PC-433 Cable DB-B01-30 Bus479 2334.57 288.39 2352.32 0.0000003

17-PC-434 Cable DB-B01-30 Bus480 1296.99 160.22 1306.84 0.0000002

17-PC-435 Cable DB-B01-30 Bus481 933.83 115.36 940.93 0.0000001

17-PC-500 Cable 1S/S7-LV-PANEL 17-SMDP-05 756.44 851.25 1138.78 0.0000060

17-PC-510 Cable 17-SMDP-05 DB-B01-31 204.58 54.19 211.64 0.0000001

17-PC-511 Cable DB-B01-31 Bus482 1296.99 160.22 1306.84 0.0000002

17-PC-512 Cable DB-B01-31 Bus483 2334.57 288.39 2352.32 0.0000003

17-PC-513 Cable DB-B01-31 Bus484 778.19 96.13 784.11 0.0000001

17-PC-514 Cable DB-B01-31 Bus485 1815.78 224.31 1829.58 0.0000003


Project: ETAP Page: 69

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

17-PC-515 Cable DB-B01-31 Bus486 2697.73 333.26 2718.24 0.0000004

17-PC-520 Cable 17-SMDP-05 DB-B01-32 409.17 108.39 423.28 0.0000003

17-PC-521 Cable DB-B01-32 Bus487 1296.99 160.22 1306.84 0.0000002

17-PC-522 Cable DB-B01-32 Bus488 2334.57 288.39 2352.32 0.0000003

17-PC-523 Cable DB-B01-32 Bus489 778.19 96.13 784.11 0.0000001

17-PC-524 Cable DB-B01-32 Bus490 1815.78 224.31 1829.58 0.0000003

17-PC-525 Cable DB-B01-32 Bus491 2697.73 333.26 2718.24 0.0000004

17-PC-530 Cable 17-SMDP-05 Bus492 4585.48 661.25 4632.92 0.0000009

17-PC-600 Cable 1S/S7-LV-PANEL 17-SMDP-6 409.74 461.09 616.84 0.0000033

17-PC-610 Cable 17-SMDP-6 Bus514 518.36 74.75 523.72 0.0000001

17-PC-620 Cable 17-SMDP-6 Bus513 1913.94 276.00 1933.74 0.0000004

17-PC-630 Cable 17-SMDP-6 Bus503 2591.79 373.75 2618.60 0.0000005

17-PC-700 Cable 1S/S7-LV-PANEL 17-SMDP-07 907.73 1021.50 1366.54 0.0000072

21-PC-100 Cable 21-MDP 21-SMDP-1 144.98 163.16 218.27 0.0000012

21-PC-110 Cable 21-SMDP-1 DB-B01-006 204.58 54.19 211.64 0.0000001

21-PC-111 Cable DB-B01-006 Bus1135 2334.57 288.39 2352.32 0.0000003

21-PC-112 Cable DB-B01-006 Bus1136 1296.99 160.22 1306.84 0.0000002

21-PC-113 Cable DB-B01-006 Bus1137 2697.73 333.26 2718.24 0.0000004

21-PC-114 Cable DB-B01-006 Bus1138 1815.78 224.31 1829.58 0.0000003

21-PC-115 Cable DB-B01-006 Bus1139 933.83 115.36 940.93 0.0000001

21-PC-120 Cable 21-SMDP-1 DB-B01-07 491.00 130.07 507.94 0.0000003

21-PC-121 Cable DB-B01-07 Bus1140 2334.57 288.39 2352.32 0.0000003

21-PC-122 Cable DB-B01-07 Bus1141 1296.99 160.22 1306.84 0.0000002

21-PC-123 Cable DB-B01-07 Bus1142 2697.73 333.26 2718.24 0.0000004

21-PC-124 Cable DB-B01-07 Bus1143 1815.78 224.31 1829.58 0.0000003

21-PC-125 Cable DB-B01-07 Bus1144 933.83 115.36 940.93 0.0000001

21-PC-130 Cable 21-SMDP-1 DB-B01-08 777.42 205.94 804.24 0.0000006

21-PC-131 Cable DB-B01-08 Bus1145 2334.57 288.39 2352.32 0.0000003

21-PC-132 Cable DB-B01-08 Bus1146 1296.99 160.22 1306.84 0.0000002

21-PC-133 Cable DB-B01-08 Bus1147 2697.73 333.26 2718.24 0.0000004

21-PC-134 Cable DB-B01-08 Bus1148 1815.78 224.31 1829.58 0.0000003

21-PC-135 Cable DB-B01-08 Bus1149 933.83 115.36 940.93 0.0000001

21-PC-200 Cable 21-MDP 21-SMDP-2 271.06 305.03 408.06 0.0000022

21-PC-210 Cable 21-SMDP-2 DB-B01-003 777.42 205.94 804.24 0.0000006

21-PC-211 Cable DB-B01-003 Bus1150 2334.57 288.39 2352.32 0.0000003

21-PC-212 Cable DB-B01-003 Bus1151 1296.99 160.22 1306.84 0.0000002

21-PC-213 Cable DB-B01-003 Bus1152 2697.73 333.26 2718.24 0.0000004

21-PC-214 Cable DB-B01-003 Bus1153 1815.78 224.31 1829.58 0.0000003

21-PC-215 Cable DB-B01-003 Bus1154 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 70

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

21-PC-220 Cable 21-SMDP-2 DB-B01-004 470.54 124.65 486.77 0.0000003

21-PC-221 Cable DB-B01-004 Bus1155 2334.57 288.39 2352.32 0.0000003

21-PC-222 Cable DB-B01-004 Bus1156 1296.99 160.22 1306.84 0.0000002

21-PC-223 Cable DB-B01-004 Bus1157 2697.73 333.26 2718.24 0.0000004

21-PC-224 Cable DB-B01-004 Bus1158 1815.78 224.31 1829.58 0.0000003

21-PC-225 Cable DB-B01-004 Bus1159 933.83 115.36 940.93 0.0000001

21-PC-230 Cable 21-SMDP-2 DB-B01-005 265.96 70.45 275.13 0.0000002

21-PC-231 Cable DB-B01-005 Bus1160 2334.57 288.39 2352.32 0.0000003

21-PC-232 Cable DB-B01-005 Bus1161 1296.99 160.22 1306.84 0.0000002

21-PC-233 Cable DB-B01-005 Bus1162 2697.73 333.26 2718.24 0.0000004

21-PC-234 Cable DB-B01-005 Bus1163 1815.78 224.31 1829.58 0.0000003

21-PC-235 Cable DB-B01-005 Bus1164 933.83 115.36 940.93 0.0000001

21-PC-240 Cable 21-SMDP-2 Bus1165 18741.68 525.00 18749.03 0.0000004

21-PC-300 Cable 21-MDP 21-SMDP-3 220.63 248.28 332.15 0.0000018

21-PC-310 Cable 21-SMDP-3 DB-B01-009 818.34 216.78 846.56 0.0000006

21-PC-311 Cable DB-B01-009 Bus1166 985.71 121.77 993.20 0.0000001

21-PC-312 Cable DB-B01-009 Bus1167 1296.99 160.22 1306.84 0.0000002

21-PC-313 Cable DB-B01-009 Bus1168 1971.42 243.53 1986.40 0.0000003

21-PC-314 Cable DB-B01-009 Bus1169 2334.57 288.39 2352.32 0.0000003

21-PC-315 Cable DB-B01-009 Bus1170 2697.73 333.26 2718.24 0.0000004

21-PC-320 Cable 21-SMDP-3 DB-B01-010 511.46 135.48 529.10 0.0000004

21-PC-321 Cable DB-B01-010 Bus1171 985.71 121.77 993.20 0.0000001

21-PC-322 Cable DB-B01-010 Bus1172 1296.99 160.22 1306.84 0.0000002

21-PC-323 Cable DB-B01-010 Bus1173 1971.42 243.53 1986.40 0.0000003

21-PC-324 Cable DB-B01-010 Bus1174 2334.57 288.39 2352.32 0.0000003

21-PC-325 Cable DB-B01-010 Bus1175 2697.73 333.26 2718.24 0.0000004

21-PC-330 Cable 21-SMDP-3 DB-B01-011 204.58 54.19 211.64 0.0000001

21-PC-331 Cable DB-B01-011 Bus1176 985.71 121.77 993.20 0.0000001

21-PC-332 Cable DB-B01-011 Bus1177 1296.99 160.22 1306.84 0.0000002

21-PC-333 Cable DB-B01-011 Bus1178 1971.42 243.53 1986.40 0.0000003

21-PC-334 Cable DB-B01-011 Bus1179 2334.57 288.39 2352.32 0.0000003

21-PC-335 Cable DB-B01-011 Bus1180 2697.73 333.26 2718.24 0.0000004

21-PC-400 Cable 21-MDP 21-SMDP-04 340.40 383.06 512.45 0.0000027

21-PC-410 Cable 21-SMDP-04 DB-B01-012 245.50 65.03 253.97 0.0000002

21-PC-411 Cable DB-B01-012 Bus1181 2697.73 333.26 2718.24 0.0000004

21-PC-412 Cable DB-B01-012 Bus1182 1815.78 224.31 1829.58 0.0000003

21-PC-413 Cable DB-B01-012 Bus1183 2334.57 288.39 2352.32 0.0000003

21-PC-414 Cable DB-B01-012 Bus1184 1296.99 160.22 1306.84 0.0000002

21-PC-415 Cable DB-B01-012 Bus1185 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 71

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

21-PC-420 Cable 21-SMDP-04 DB-B01-013 470.54 124.65 486.77 0.0000003

21-PC-421 Cable DB-B01-013 Bus1186 2697.73 333.26 2718.24 0.0000004

21-PC-422 Cable DB-B01-013 Bus1187 1815.78 224.31 1829.58 0.0000003

21-PC-423 Cable DB-B01-013 Bus1188 2334.57 288.39 2352.32 0.0000003

21-PC-424 Cable DB-B01-013 Bus1189 1296.99 160.22 1306.84 0.0000002

21-PC-425 Cable DB-B01-013 Bus1190 933.83 115.36 940.93 0.0000001

21-PC-430 Cable 21-SMDP-04 DB-B01-014 777.42 205.94 804.24 0.0000006

21-PC-431 Cable DB-B01-014 Bus1191 2697.73 333.26 2718.24 0.0000004

21-PC-432 Cable DB-B01-014 Bus1192 1815.78 224.31 1829.58 0.0000003

21-PC-433 Cable DB-B01-014 Bus1193 2334.57 288.39 2352.32 0.0000003

21-PC-434 Cable DB-B01-014 Bus1194 1296.99 160.22 1306.84 0.0000002

21-PC-435 Cable DB-B01-014 Bus1195 933.83 115.36 940.93 0.0000001

21-PC-500 Cable 21-MDP 21-SMDP-5 680.80 766.13 1024.91 0.0000054

21-PC-510 Cable 21-SMDP-5 DB-B01-001 409.17 108.39 423.28 0.0000003

21-PC-511 Cable DB-B01-001 Bus1196 2697.73 333.26 2718.24 0.0000004

21-PC-512 Cable DB-B01-001 Bus1197 1815.78 224.31 1829.58 0.0000003

21-PC-513 Cable DB-B01-001 Bus1198 2334.57 288.39 2352.32 0.0000003

21-PC-514 Cable DB-B01-001 Bus1199 1296.99 160.22 1306.84 0.0000002

21-PC-515 Cable DB-B01-001 Bus1200 933.83 115.36 940.93 0.0000001

21-PC-520 Cable 21-SMDP-5 DB-B01-002 225.04 59.61 232.81 0.0000002

21-PC-521 Cable DB-B01-002 Bus1201 2697.73 333.26 2718.24 0.0000004

21-PC-522 Cable DB-B01-002 Bus1202 1815.78 224.31 1829.58 0.0000003

21-PC-523 Cable DB-B01-002 Bus1203 2334.57 288.39 2352.32 0.0000003

21-PC-524 Cable DB-B01-002 Bus1204 1296.99 160.22 1306.84 0.0000002

21-PC-525 Cable DB-B01-002 Bus1205 933.83 115.36 940.93 0.0000001

21-PC-530 Cable 21-SMDP-5 Bus1206 2392.43 345.00 2417.17 0.0000005

21-PC-600 Cable 21-MDP 21-SMDP-6 750.14 844.16 1129.29 0.0000060

21-PC-610 Cable 21-SMDP-6 DB-B01-116 184.13 48.77 190.48 0.0000001

21-PC-611 Cable DB-B01-116 Bus1207 2334.57 288.39 2352.32 0.0000003

21-PC-612 Cable DB-B01-116 Bus1208 1296.99 160.22 1306.84 0.0000002

21-PC-613 Cable DB-B01-116 Bus1209 3009.01 371.71 3031.88 0.0000004

21-PC-614 Cable DB-B01-116 Bus1210 1971.42 243.53 1986.40 0.0000003

21-PC-615 Cable DB-B01-116 Bus1211 933.83 115.36 940.93 0.0000001

21-PC-620 Cable 21-SMDP-6 DB-B01-117 511.46 135.48 529.10 0.0000004

21-PC-621 Cable DB-B01-117 Bus1212 2334.57 288.39 2352.32 0.0000003

21-PC-622 Cable DB-B01-117 Bus1213 1296.99 160.22 1306.84 0.0000002

21-PC-623 Cable DB-B01-117 Bus1214 3009.01 371.71 3031.88 0.0000004

21-PC-624 Cable DB-B01-117 Bus1215 1971.42 243.53 1986.40 0.0000003

21-PC-625 Cable DB-B01-117 Bus1216 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 72

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

21-PC-700 Cable 21-MDP 21-SMDP-7 403.43 454.00 607.35 0.0000032

21-PC-710 Cable 21-SMDP-7 Bus214 4150.35 512.70 4181.90 0.0000006

21-PC-720 Cable 21-SMDP-7 Bus15 2282.69 281.99 2300.05 0.0000003

21-PC-730 Cable 21-SMDP-7 Bus156 1993.69 287.50 2014.31 0.0000004

21-PC-740 Cable 21-SMDP-7 Bus153 3189.90 460.00 3222.90 0.0000006

22-PC-4 Cable 22-SMDP-5 Bus305 3189.90 460.00 3222.90 0.0000006

22-PC-100 Cable 2S/S2-LV-PANEL3 22-SMDP-01 144.98 163.16 218.27 0.0000012

22-PC-110 Cable 22-SMDP-01 DB-B01-40 204.58 54.19 211.64 0.0000001

22-PC-111 Cable DB-B01-40 Bus1048 2334.57 288.39 2352.32 0.0000003

22-PC-112 Cable DB-B01-40 Bus1049 1296.99 160.22 1306.84 0.0000002

22-PC-113 Cable DB-B01-40 Bus215 2697.73 333.26 2718.24 0.0000004

22-PC-114 Cable DB-B01-40 Bus1051 1815.78 224.31 1829.58 0.0000003

22-PC-115 Cable DB-B01-40 Bus1052 933.83 115.36 940.93 0.0000001

22-PC-120 Cable 22-SMDP-01 DB-B01-41 491.00 130.07 507.94 0.0000003

22-PC-121 Cable DB-B01-41 Bus1053 2334.57 288.39 2352.32 0.0000003

22-PC-122 Cable DB-B01-41 Bus1054 1296.99 160.22 1306.84 0.0000002

22-PC-123 Cable DB-B01-41 Bus1055 2697.73 333.26 2718.24 0.0000004

22-PC-124 Cable DB-B01-41 Bus1056 1815.78 224.31 1829.58 0.0000003

22-PC-125 Cable DB-B01-41 Bus1057 933.83 115.36 940.93 0.0000001

22-PC-130 Cable 22-SMDP-01 DB-B01-42 777.42 205.94 804.24 0.0000006

22-PC-131 Cable DB-B01-42 Bus1058 2334.57 288.39 2352.32 0.0000003

22-PC-132 Cable DB-B01-42 Bus1059 1296.99 160.22 1306.84 0.0000002

22-PC-133 Cable DB-B01-42 Bus1060 2697.73 333.26 2718.24 0.0000004

22-PC-134 Cable DB-B01-42 Bus1061 1815.78 224.31 1829.58 0.0000003

22-PC-135 Cable DB-B01-42 Bus1062 933.83 115.36 940.93 0.0000001

22-PC-200 Cable 2S/S2-LV-PANEL3 22-SMDP-02 271.06 305.03 408.06 0.0000022

22-PC-210 Cable 22-SMDP-02 DB-B01-037 777.42 205.94 804.24 0.0000006

22-PC-211 Cable DB-B01-037 Bus1063 2334.57 288.39 2352.32 0.0000003

22-PC-212 Cable DB-B01-037 Bus1064 1296.99 160.22 1306.84 0.0000002

22-PC-213 Cable DB-B01-037 Bus1065 2697.73 333.26 2718.24 0.0000004

22-PC-214 Cable DB-B01-037 Bus1066 1815.78 224.31 1829.58 0.0000003

22-PC-215 Cable DB-B01-037 Bus1067 933.83 115.36 940.93 0.0000001

22-PC-220 Cable 22-SMDP-02 DB-B01-38 470.54 124.65 486.77 0.0000003

22-PC-221 Cable DB-B01-38 Bus1068 2334.57 288.39 2352.32 0.0000003

22-PC-222 Cable DB-B01-38 Bus1069 1296.99 160.22 1306.84 0.0000002

22-PC-223 Cable DB-B01-38 Bus1070 2697.73 333.26 2718.24 0.0000004

22-PC-224 Cable DB-B01-38 Bus1071 1815.78 224.31 1829.58 0.0000003

22-PC-225 Cable DB-B01-38 Bus1072 933.83 115.36 940.93 0.0000001

22-PC-230 Cable 22-SMDP-02 DB-B01-039 265.96 70.45 275.13 0.0000002


Project: ETAP Page: 73

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

22-PC-231 Cable DB-B01-039 Bus1073 2334.57 288.39 2352.32 0.0000003

22-PC-232 Cable DB-B01-039 Bus1074 1296.99 160.22 1306.84 0.0000002

22-PC-233 Cable DB-B01-039 Bus1075 2697.73 333.26 2718.24 0.0000004

22-PC-234 Cable DB-B01-039 Bus1076 1815.78 224.31 1829.58 0.0000003

22-PC-235 Cable DB-B01-039 Bus1077 933.83 115.36 940.93 0.0000001

22-PC-240 Cable 22-SMDP-02 Bus1078 18741.68 525.00 18749.03 0.0000004

22-PC-300 Cable 2S/S2-LV-PANEL3 22-SMDP-03 220.63 248.28 332.15 0.0000018

22-PC-310 Cable 22-SMDP-03 DB-B02-1 1178.39 216.78 1198.16 0.0000003

22-PC-311 Cable DB-B02-1 Bus1079 1815.78 224.31 1829.58 0.0000003

22-PC-312 Cable DB-B02-1 Bus1080 933.83 115.36 940.93 0.0000001

22-PC-313 Cable DB-B02-1 Bus1081 2334.57 288.39 2352.32 0.0000003

22-PC-314 Cable DB-B02-1 Bus1082 1296.99 160.22 1306.84 0.0000002

22-PC-320 Cable 22-SMDP-03 DB-B02-2 736.49 135.48 748.85 0.0000002

22-PC-321 Cable DB-B02-2 Bus1083 1815.78 224.31 1829.58 0.0000003

22-PC-322 Cable DB-B02-2 Bus1084 933.83 115.36 940.93 0.0000001

22-PC-323 Cable DB-B02-2 Bus1085 2334.57 288.39 2352.32 0.0000003

22-PC-324 Cable DB-B02-2 Bus1086 1296.99 160.22 1306.84 0.0000002

22-PC-330 Cable 22-SMDP-03 DB-B02-3 294.60 54.19 299.54 0.0000001

22-PC-331 Cable DB-B02-3 Bus1087 1815.78 224.31 1829.58 0.0000003

22-PC-332 Cable DB-B02-3 Bus1088 1037.59 128.18 1045.48 0.0000001

22-PC-333 Cable DB-B02-3 Bus1089 2593.97 320.44 2613.69 0.0000004

22-PC-334 Cable DB-B02-3 Bus1090 1815.78 224.31 1829.58 0.0000003

22-PC-400 Cable 2S/S2-LV-PANEL3 22-SMDP-04 340.40 383.06 512.45 0.0000027

22-PC-410 Cable 22-SMDP-04 DB-B02-04 353.52 65.03 359.45 0.0000001

22-PC-411 Cable DB-B02-04 Bus1091 1296.99 160.22 1306.84 0.0000002

22-PC-412 Cable DB-B02-04 Bus1092 2334.57 288.39 2352.32 0.0000003

22-PC-413 Cable DB-B02-04 Bus1093 933.83 115.36 940.93 0.0000001

22-PC-414 Cable DB-B02-04 Bus1094 1815.78 224.31 1829.58 0.0000003

22-PC-420 Cable 22-SMDP-04 DB-B02-05 677.57 124.65 688.94 0.0000002

22-PC-421 Cable DB-B02-05 Bus1095 1296.99 160.22 1306.84 0.0000002

22-PC-422 Cable DB-B02-05 Bus1096 2334.57 288.39 2352.32 0.0000003

22-PC-423 Cable DB-B02-05 Bus1097 933.83 115.36 940.93 0.0000001

22-PC-424 Cable DB-B02-05 Bus1098 1815.78 224.31 1829.58 0.0000003

22-PC-430 Cable 22-SMDP-04 DB-B02-06 1119.47 205.94 1138.25 0.0000003

22-PC-431 Cable DB-B02-06 Bus1099 1296.99 160.22 1306.84 0.0000002

22-PC-432 Cable DB-B02-06 Bus1100 2334.57 288.39 2352.32 0.0000003

22-PC-433 Cable DB-B02-06 Bus1101 933.83 115.36 940.93 0.0000001

22-PC-434 Cable DB-B02-06 Bus1102 1815.78 224.31 1829.58 0.0000003

22-PC-500 Cable 2S/S2-LV-PANEL3 22-SMDP-5 680.80 766.13 1024.91 0.0000054


Project: ETAP Page: 74

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

22-PC-510 Cable 22-SMDP-5 DB-B01-033 450.09 119.23 465.61 0.0000003

22-PC-511 Cable DB-B01-033 Bus1103 2697.73 333.26 2718.24 0.0000004

22-PC-512 Cable DB-B01-033 Bus1104 1815.78 224.31 1829.58 0.0000003

22-PC-513 Cable DB-B01-033 Bus1105 2334.57 288.39 2352.32 0.0000003

22-PC-514 Cable DB-B01-033 Bus1106 1296.99 160.22 1306.84 0.0000002

22-PC-515 Cable DB-B01-033 Bus1107 933.83 115.36 940.93 0.0000001

22-PC-520 Cable 22-SMDP-5 DB-B01-034 225.04 59.61 232.81 0.0000002

22-PC-521 Cable DB-B01-034 Bus1108 2697.73 333.26 2718.24 0.0000004

22-PC-522 Cable DB-B01-034 Bus1109 1815.78 224.31 1829.58 0.0000003

22-PC-523 Cable DB-B01-034 Bus1110 2334.57 288.39 2352.32 0.0000003

22-PC-524 Cable DB-B01-034 Bus1111 1296.99 160.22 1306.84 0.0000002

22-PC-525 Cable DB-B01-034 Bus1112 933.83 115.36 940.93 0.0000001

22-PC-600 Cable 2S/S2-LV-PANEL3 22-SMDP-06 756.44 851.25 1138.78 0.0000060

22-PC-610 Cable 22-SMDP-06 DB-B01-035 409.17 108.39 423.28 0.0000003

22-PC-611 Cable DB-B01-035 Bus1115 1296.99 160.22 1306.84 0.0000002

22-PC-612 Cable DB-B01-035 Bus1116 2334.57 288.39 2352.32 0.0000003

22-PC-613 Cable DB-B01-035 Bus1117 778.19 96.13 784.11 0.0000001

22-PC-614 Cable DB-B01-035 Bus1118 1815.78 224.31 1829.58 0.0000003

22-PC-615 Cable DB-B01-035 Bus1119 2697.73 333.26 2718.24 0.0000004

22-PC-620 Cable 22-SMDP-06 DB-B01-036 204.58 54.19 211.64 0.0000001

22-PC-621 Cable DB-B01-036 Bus1120 1296.99 160.22 1306.84 0.0000002

22-PC-622 Cable DB-B01-036 Bus1121 2334.57 288.39 2352.32 0.0000003

22-PC-623 Cable DB-B01-036 Bus1122 778.19 96.13 784.11 0.0000001

22-PC-624 Cable DB-B01-036 Bus1123 1815.78 224.31 1829.58 0.0000003

22-PC-625 Cable DB-B01-036 Bus1124 2697.73 333.26 2718.24 0.0000004

23-PC-100 Cable 2S/S3 23-SMDP-01 144.98 163.16 218.27 0.0000012

23-PC-110 Cable 23-SMDP-01 DB-B04-1 235.82 103.68 257.60 0.0000004

23-PC-111 Cable DB-B04-1 Bus970 1395.58 201.25 1410.02 0.0000003

23-PC-112 Cable DB-B04-1 Bus971 717.73 103.50 725.15 0.0000001

23-PC-113 Cable DB-B04-1 Bus972 2334.57 288.39 2352.32 0.0000003

23-PC-114 Cable DB-B04-1 Bus973 996.84 143.75 1007.16 0.0000002

23-PC-120 Cable 23-SMDP-01 DB-B04-02 129.70 57.02 141.68 0.0000002

23-PC-121 Cable DB-B04-02 Bus974 1395.58 201.25 1410.02 0.0000003

23-PC-122 Cable DB-B04-02 Bus975 717.73 103.50 725.15 0.0000001

23-PC-123 Cable DB-B04-02 Bus976 2334.57 288.39 2352.32 0.0000003

23-PC-124 Cable DB-B04-02 Bus977 996.84 143.75 1007.16 0.0000002

23-PC-130 Cable 23-SMDP-01 Bus978 1116.47 161.00 1128.01 0.0000002

23-PC-200 Cable 2S/S3 23-SMDP-02 226.93 255.38 341.64 0.0000018

23-PC-210 Cable 23-SMDP-02 DB-B03-2 233.38 155.51 280.44


Project: ETAP Page: 75

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

23-PC-211 Cable DB-B03-2 Bus979 2853.37 352.48 2875.06 0.0000004

23-PC-212 Cable DB-B03-2 Bus980 1815.78 224.31 1829.58 0.0000003

23-PC-213 Cable DB-B03-2 Bus981 1296.99 160.22 1306.84 0.0000002

23-PC-214 Cable DB-B03-2 Bus982 3009.01 371.71 3031.88 0.0000004

23-PC-215 Cable DB-B03-2 Bus983 1452.62 179.45 1463.67 0.0000002

23-PC-216 Cable DB-B03-2 Bus984 933.83 115.36 940.93 0.0000001

23-PC-220 Cable 23-SMDP-02 DB-B03-4 101.13 67.39 121.53

23-PC-221 Cable DB-B03-4 Bus985 2853.37 352.48 2875.06 0.0000004

23-PC-222 Cable DB-B03-4 Bus986 1815.78 224.31 1829.58 0.0000003

23-PC-223 Cable DB-B03-4 Bus987 1296.99 160.22 1306.84 0.0000002

23-PC-224 Cable DB-B03-4 Bus988 3009.01 371.71 3031.88 0.0000004

23-PC-225 Cable DB-B03-4 Bus989 1452.62 179.45 1463.67 0.0000002

23-PC-226 Cable DB-B03-4 Bus990 933.83 115.36 940.93 0.0000001

23-PC-300 Cable 2S/S3 23-SMDP-03 416.04 468.19 626.33 0.0000033

23-PC-310 Cable 23-SMDP-03 DB-B03-1 163.36 108.86 196.31

23-PC-311 Cable DB-B03-1 Bus991 2853.37 352.48 2875.06 0.0000004

23-PC-312 Cable DB-B03-1 Bus992 1815.78 224.31 1829.58 0.0000003

23-PC-313 Cable DB-B03-1 Bus993 1296.99 160.22 1306.84 0.0000002

23-PC-314 Cable DB-B03-1 Bus994 3009.01 371.71 3031.88 0.0000004

23-PC-315 Cable DB-B03-1 Bus995 1452.62 179.45 1463.67 0.0000002

23-PC-316 Cable DB-B03-1 Bus996 933.83 115.36 940.93 0.0000001

23-PC-320 Cable 23-SMDP-03 DB-B03-3 77.79 51.84 93.48

23-PC-321 Cable DB-B03-3 Bus997 2853.37 352.48 2875.06 0.0000004

23-PC-322 Cable DB-B03-3 Bus998 1815.78 224.31 1829.58 0.0000003

23-PC-323 Cable DB-B03-3 Bus999 1296.99 160.22 1306.84 0.0000002

23-PC-324 Cable DB-B03-3 Bus1000 3009.01 371.71 3031.88 0.0000004

23-PC-325 Cable DB-B03-3 Bus1001 1452.62 179.45 1463.67 0.0000002

23-PC-326 Cable DB-B03-3 Bus1002 933.83 115.36 940.93 0.0000001

23-PC-330 Cable 23-SMDP-03 Bus1003 1236.09 178.25 1248.87 0.0000002

23-PC-400 Cable 2S/S3 23-SMDP-04 271.06 305.03 408.06 0.0000022

23-PC-410 Cable 23-SMDP-04 DB-B02-07 265.14 48.77 269.59 0.0000001

23-PC-411 Cable DB-B02-07 Bus1004 1296.99 160.22 1306.84 0.0000002

23-PC-412 Cable DB-B02-07 Bus1005 2334.57 288.39 2352.32 0.0000003

23-PC-413 Cable DB-B02-07 Bus1006 933.83 115.36 940.93 0.0000001

23-PC-414 Cable DB-B02-07 Bus1007 1815.78 224.31 1829.58 0.0000003

23-PC-420 Cable 23-SMDP-04 DB-B02-8 736.49 135.48 748.85 0.0000002

23-PC-421 Cable DB-B02-8 Bus1008 1296.99 160.22 1306.84 0.0000002

23-PC-422 Cable DB-B02-8 Bus1009 2334.57 288.39 2352.32 0.0000003

23-PC-423 Cable DB-B02-8 Bus1010 933.83 115.36 940.93 0.0000001


Project: ETAP Page: 76

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

23-PC-424 Cable DB-B02-8 Bus1011 1815.78 224.31 1829.58 0.0000003

23-PC-430 Cable 23-SMDP-04 DB-B02-9 1178.39 216.78 1198.16 0.0000003

23-PC-431 Cable DB-B02-9 Bus1013 1296.99 160.22 1306.84 0.0000002

23-PC-432 Cable DB-B02-9 Bus1014 2334.57 288.39 2352.32 0.0000003

23-PC-433 Cable DB-B02-9 Bus1015 933.83 115.36 940.93 0.0000001

23-PC-434 Cable DB-B02-9 Bus1016 1815.78 224.31 1829.58 0.0000003

23-PC-440 Cable 23-SMDP-04 Bus1017 4166.80 187.50 4171.02 0.0000002

23-PC-450 Cable 23-SMDP-04 Bus1012 7028.13 196.88 7030.89 0.0000002

23-PC-500 Cable 2S/S3 23-SMDP-05 548.42 617.16 825.62 0.0000044

23-PC-510 Cable 23-SMDP-05 DB-B02-010 382.98 70.45 389.40 0.0000001

23-PC-511 Cable DB-B02-010 Bus1018 1296.99 160.22 1306.84 0.0000002

23-PC-0511 Cable DB-B02-012 Bus1026 1296.99 160.22 1306.84 0.0000002

23-PC-512 Cable DB-B02-010 Bus1019 2334.57 288.39 2352.32 0.0000003

23-PC-0512 Cable DB-B02-012 Bus1027 2334.57 288.39 2352.32 0.0000003

23-PC-513 Cable DB-B02-010 Bus1020 933.83 115.36 940.93 0.0000001

23-PC-0513 Cable DB-B02-012 Bus1028 933.83 115.36 940.93 0.0000001

23-PC-514 Cable DB-B02-010 Bus1021 1815.78 224.31 1829.58 0.0000003

23-PC-0514 Cable DB-B02-012 Bus1029 1815.78 224.31 1829.58 0.0000003

23-PC-520 Cable 23-SMDP-05 DB-B02-11 736.49 135.48 748.85 0.0000002

23-PC-521 Cable DB-B02-11 Bus1022 1296.99 160.22 1306.84 0.0000002

23-PC-0521 Cable DB-B02-013 Bus1030 1296.99 160.22 1306.84 0.0000002

23-PC-522 Cable DB-B02-11 Bus1023 2334.57 288.39 2352.32 0.0000003

23-PC-0522 Cable DB-B02-013 Bus1031 2334.57 288.39 2352.32 0.0000003

23-PC-523 Cable DB-B02-11 Bus1024 933.83 115.36 940.93 0.0000001

23-PC-0523 Cable DB-B02-013 Bus1032 933.83 115.36 940.93 0.0000001

23-PC-524 Cable DB-B02-11 Bus1025 1815.78 224.31 1829.58 0.0000003

23-PC-0524 Cable DB-B02-013 Bus1033 1815.78 224.31 1829.58 0.0000003

23-PC-600 Cable 2S/S3 23-SMDP-06 561.03 631.34 844.60 0.0000045

23-PC-610 Cable 23-SMDP-06 DB-B02-012 265.14 48.77 269.59 0.0000001

23-PC-620 Cable 23-SMDP-06 DB-B02-013 707.03 130.07 718.90 0.0000002

23-PC-630 Cable 23-SMDP-06 DB-B02-014 1119.47 205.94 1138.25 0.0000003

23-PC-631 Cable DB-B02-014 Bus1034 1296.99 160.22 1306.84 0.0000002

23-PC-632 Cable DB-B02-014 Bus1035 2334.57 288.39 2352.32 0.0000003

23-PC-633 Cable DB-B02-014 Bus1036 933.83 115.36 940.93 0.0000001

23-PC-634 Cable DB-B02-014 Bus1037 1815.78 224.31 1829.58 0.0000003

23-PC-700 Cable 2S/S3 23-SMDP-07 838.39 943.47 1262.15 0.0000067

23-PC-710 Cable 23-SMDP-07 DB-B02-015 108.91 72.57 130.87

23-PC-711 Cable DB-B02-015 Bus1038 1296.99 160.22 1306.84 0.0000002

23-PC-712 Cable DB-B02-015 Bus1039 2334.57 288.39 2352.32 0.0000003


Project: ETAP Page: 77

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

23-PC-713 Cable DB-B02-015 Bus1040 933.83 115.36 940.93 0.0000001

23-PC-714 Cable DB-B02-015 Bus1041 1815.78 224.31 1829.58 0.0000003

23-PC-720 Cable 23-SMDP-07 DB-B02-016 194.48 129.59 233.70

23-PC-721 Cable DB-B02-016 Bus1042 1296.99 160.22 1306.84 0.0000002

23-PC-722 Cable DB-B02-016 Bus1043 2334.57 288.39 2352.32 0.0000003

23-PC-723 Cable DB-B02-016 Bus1044 933.83 115.36 940.93 0.0000001

23-PC-724 Cable DB-B02-016 Bus1045 1815.78 224.31 1829.58 0.0000003

24-PC-100 Cable 2S/S4 24-SMDP-01 472.77 532.03 711.74 0.0000038

24-PC-110 Cable 24-SMDP-01 Bus954 598.11 86.25 604.29 0.0000001

24-PC-120 Cable 24-SMDP-01 Bus956 2990.53 431.25 3021.47 0.0000006

24-PC-130 Cable 24-SMDP-01 Bus957 1919.54 237.12 1934.13 0.0000003

24-PC-140 Cable 24-SMDP-01 Bus958 3066.98 196.88 3073.30 0.0000003

24-PC-150 Cable 24-SMDP-01 Bus959 8333.61 375.00 8342.04 0.0000004

24-PC-160 Cable 24-SMDP-01 Bus960 4772.91 589.61 4809.19 0.0000007

24-PC-170 Cable 24-SMDP-01 Bus955 4186.74 603.75 4230.05 0.0000008

24-PC-180 Cable 24-SMDP-01 Bus961 15278.28 687.50 15293.74 0.0000007

24-PC-190 Cable 24-SMDP-01 Bus962 18273.14 511.88 18280.30 0.0000004

24-PC-200 Cable 2S/S4 Bus963 535.81 602.97 806.64 0.0000043

24-PC-300 Cable 2S/S4 Bus964 535.81 602.97 806.64 0.0000043

24-PC-400 Cable 2S/S4 Bus965 535.81 602.97 806.64 0.0000043

24-PC-500 Cable 2S/S4 Bus966 535.81 602.97 806.64 0.0000043

24-PC-600 Cable 2S/S4 Bus967 995.98 1120.81 1499.40 0.0000079

24-PC-700 Cable 2S/S4 Bus968 995.98 1120.81 1499.40 0.0000079

25-PC-100 Cable 2S/S5 Bus1224 34.89 85.00 91.88

26-PC-100 Cable 2S/S6 Bus1237 30.53 74.38 80.40

27-PC-100 Cable 2S/S7 27-SMDP-01 144.98 163.16 218.27 0.0000012

27-PC-110 Cable 27-SMDP-01 DB-B01-22 204.58 54.19 211.64 0.0000001

27-PC-111 Cable DB-B01-22 Bus1239 2334.57 288.39 2352.32 0.0000003

27-PC-112 Cable DB-B01-22 Bus1240 1296.99 160.22 1306.84 0.0000002

27-PC-113 Cable DB-B01-22 Bus1241 2697.73 333.26 2718.24 0.0000004

27-PC-114 Cable DB-B01-22 Bus1242 1815.78 224.31 1829.58 0.0000003

27-PC-115 Cable DB-B01-22 Bus1243 933.83 115.36 940.93 0.0000001

27-PC-120 Cable 27-SMDP-01 DB-B01-23 491.00 130.07 507.94 0.0000003

27-PC-121 Cable DB-B01-23 Bus1244 2334.57 288.39 2352.32 0.0000003

27-PC-122 Cable DB-B01-23 Bus1245 1296.99 160.22 1306.84 0.0000002

27-PC-123 Cable DB-B01-23 Bus1246 2697.73 333.26 2718.24 0.0000004

27-PC-124 Cable DB-B01-23 Bus1247 1815.78 224.31 1829.58 0.0000003

27-PC-125 Cable DB-B01-23 Bus1248 933.83 115.36 940.93 0.0000001

27-PC-130 Cable 27-SMDP-01 DB-B01-24 777.42 205.94 804.24 0.0000006


Project: ETAP Page: 78

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

27-PC-131 Cable DB-B01-24 Bus1249 2334.57 288.39 2352.32 0.0000003

27-PC-132 Cable DB-B01-24 Bus1250 1296.99 160.22 1306.84 0.0000002

27-PC-133 Cable DB-B01-24 Bus1251 2697.73 333.26 2718.24 0.0000004

27-PC-134 Cable DB-B01-24 Bus1252 1815.78 224.31 1829.58 0.0000003

27-PC-135 Cable DB-B01-24 Bus1253 933.83 115.36 940.93 0.0000001

27-PC-200 Cable 2S/S7 27-SMDP-02 271.06 305.03 408.06 0.0000022

27-PC-210 Cable 27-SMDP-02 DB-B01-19 777.42 205.94 804.24 0.0000006

27-PC-211 Cable DB-B01-19 Bus1254 2334.57 288.39 2352.32 0.0000003

27-PC-212 Cable DB-B01-19 Bus1255 1296.99 160.22 1306.84 0.0000002

27-PC-213 Cable DB-B01-19 Bus1256 2697.73 333.26 2718.24 0.0000004

27-PC-214 Cable DB-B01-19 Bus1257 1815.78 224.31 1829.58 0.0000003

27-PC-215 Cable DB-B01-19 Bus1258 933.83 115.36 940.93 0.0000001

27-PC-220 Cable 27-SMDP-02 DB-B01-20 470.54 124.65 486.77 0.0000003

27-PC-221 Cable DB-B01-20 Bus1259 2334.57 288.39 2352.32 0.0000003

27-PC-222 Cable DB-B01-20 Bus1260 1296.99 160.22 1306.84 0.0000002

27-PC-223 Cable DB-B01-20 Bus1261 2697.73 333.26 2718.24 0.0000004

27-PC-224 Cable DB-B01-20 Bus1262 1815.78 224.31 1829.58 0.0000003

27-PC-225 Cable DB-B01-20 Bus1263 933.83 115.36 940.93 0.0000001

27-PC-230 Cable 27-SMDP-02 DB-B01-21 265.96 70.45 275.13 0.0000002

27-PC-231 Cable DB-B01-21 Bus1264 2334.57 288.39 2352.32 0.0000003

27-PC-232 Cable DB-B01-21 Bus1265 1296.99 160.22 1306.84 0.0000002

27-PC-233 Cable DB-B01-21 Bus1266 2697.73 333.26 2718.24 0.0000004

27-PC-234 Cable DB-B01-21 Bus1267 1815.78 224.31 1829.58 0.0000003

27-PC-235 Cable DB-B01-21 Bus1268 933.83 115.36 940.93 0.0000001

27-PC-240 Cable 27-SMDP-02 Bus1269 18741.68 525.00 18749.03 0.0000004

27-PC-300 Cable 2S/S7 27-SMDP-03 220.63 248.28 332.15 0.0000018

27-PC-310 Cable 27-SMDP-03 DB-B01-25 818.34 216.78 846.56 0.0000006

27-PC-311 Cable DB-B01-25 Bus1270 985.71 121.77 993.20 0.0000001

27-PC-312 Cable DB-B01-25 Bus1271 1296.99 160.22 1306.84 0.0000002

27-PC-313 Cable DB-B01-25 Bus1272 1971.42 243.53 1986.40 0.0000003

27-PC-314 Cable DB-B01-25 Bus1273 2334.57 288.39 2352.32 0.0000003

27-PC-315 Cable DB-B01-25 Bus1274 933.83 115.36 940.93 0.0000001

27-PC-320 Cable 27-SMDP-03 DB-B01-26 511.46 135.48 529.10 0.0000004

27-PC-321 Cable DB-B01-26 Bus1275 985.71 121.77 993.20 0.0000001

27-PC-322 Cable DB-B01-26 Bus1276 1296.99 160.22 1306.84 0.0000002

27-PC-323 Cable DB-B01-26 Bus1277 1971.42 243.53 1986.40 0.0000003

27-PC-324 Cable DB-B01-26 Bus1278 2334.57 288.39 2352.32 0.0000003

27-PC-325 Cable DB-B01-26 Bus1279 933.83 115.36 940.93 0.0000001

27-PC-330 Cable 27-SMDP-03 DB-B01-27 204.58 54.19 211.64 0.0000001


Project: ETAP Page: 79

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

27-PC-331 Cable DB-B01-27 Bus1280 985.71 121.77 993.20 0.0000001

27-PC-332 Cable DB-B01-27 Bus1281 1296.99 160.22 1306.84 0.0000002

27-PC-333 Cable DB-B01-27 Bus1282 1971.42 243.53 1986.40 0.0000003

27-PC-334 Cable DB-B01-27 Bus1283 2334.57 288.39 2352.32 0.0000003

27-PC-335 Cable DB-B01-27 Bus1284 933.83 115.36 940.93 0.0000001

27-PC-400 Cable 2S/S7 27-SMDP-04 340.40 383.06 512.45 0.0000027

27-PC-410 Cable 27-SMDP-04 DB-B01-28 245.50 65.03 253.97 0.0000002

27-PC-411 Cable DB-B01-28 Bus1285 2697.73 333.26 2718.24 0.0000004

27-PC-412 Cable DB-B01-28 Bus1286 1815.78 224.31 1829.58 0.0000003

27-PC-413 Cable DB-B01-28 Bus1287 2334.57 288.39 2352.32 0.0000003

27-PC-414 Cable DB-B01-28 Bus1288 1296.99 160.22 1306.84 0.0000002

27-PC-415 Cable DB-B01-28 Bus1289 933.83 115.36 940.93 0.0000001

27-PC-420 Cable 27-SMDP-04 DB-B01-29 470.54 124.65 486.77 0.0000003

27-PC-421 Cable DB-B01-29 Bus1290 2697.73 333.26 2718.24 0.0000004

27-PC-422 Cable DB-B01-29 Bus1291 1815.78 224.31 1829.58 0.0000003

27-PC-423 Cable DB-B01-29 Bus1292 2334.57 288.39 2352.32 0.0000003

27-PC-424 Cable DB-B01-29 Bus1293 1296.99 160.22 1306.84 0.0000002

27-PC-425 Cable DB-B01-29 Bus1294 933.83 115.36 940.93 0.0000001

27-PC-430 Cable 27-SMDP-04 DB-B01-030 777.42 205.94 804.24 0.0000006

27-PC-431 Cable DB-B01-030 Bus1295 2697.73 333.26 2718.24 0.0000004

27-PC-432 Cable DB-B01-030 Bus1296 1815.78 224.31 1829.58 0.0000003

27-PC-433 Cable DB-B01-030 Bus1297 2334.57 288.39 2352.32 0.0000003

27-PC-434 Cable DB-B01-030 Bus1298 1296.99 160.22 1306.84 0.0000002

27-PC-435 Cable DB-B01-030 Bus1299 933.83 115.36 940.93 0.0000001

27-PC-500 Cable 2S/S7 27-SMDP-05 680.80 766.13 1024.91 0.0000054

27-PC -510 Cable 27-SMDP-06 DB-B01-031 184.13 48.77 190.48 0.0000001

27-PC-510 Cable 27-SMDP-05 DB-B01-017 409.17 108.39 423.28 0.0000003

27-PC-511 Cable DB-B01-017 Bus1300 2697.73 333.26 2718.24 0.0000004

27-PC-0511 Cable DB-B01-031 Bus282 1296.99 160.22 1306.84 0.0000002

27-PC-512 Cable DB-B01-017 Bus1301 1815.78 224.31 1829.58 0.0000003

27-PC-0512 Cable DB-B01-031 Bus283 2334.57 288.39 2352.32 0.0000003

27-PC-513 Cable DB-B01-017 Bus1302 2334.57 288.39 2352.32 0.0000003

27-PC-0513 Cable DB-B01-031 Bus284 778.19 96.13 784.11 0.0000001

27-PC-514 Cable DB-B01-017 Bus1303 1296.99 160.22 1306.84 0.0000002

27-PC-0514 Cable DB-B01-031 Bus285 1815.78 224.31 1829.58 0.0000003

27-PC-515 Cable DB-B01-017 Bus1304 933.83 115.36 940.93 0.0000001

27-PC-0515 Cable DB-B01-031 Bus286 933.83 115.36 940.93 0.0000001

27-PC-520 Cable 27-SMDP-05 DB-B01-018 225.04 59.61 232.81 0.0000002

27-PC- 520 Cable 27-SMDP-06 DB-B01-032 511.46 135.48 529.10 0.0000004


Project: ETAP Page: 80

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

27-PC-521 Cable DB-B01-018 Bus1305 2697.73 333.26 2718.24 0.0000004

27-PC-0521 Cable DB-B01-032 Bus287 1296.99 160.22 1306.84 0.0000002

27-PC-522 Cable DB-B01-018 Bus1306 1815.78 224.31 1829.58 0.0000003

27-PC-0522 Cable DB-B01-032 Bus288 2334.57 288.39 2352.32 0.0000003

27-PC-523 Cable DB-B01-018 Bus1307 2334.57 288.39 2352.32 0.0000003

27-PC-0523 Cable DB-B01-032 Bus289 778.19 96.13 784.11 0.0000001

27-PC-524 Cable DB-B01-018 Bus1308 1296.99 160.22 1306.84 0.0000002

27-PC-0524 Cable DB-B01-032 Bus290 1815.78 224.31 1829.58 0.0000003

27-PC-525 Cable DB-B01-018 Bus1309 933.83 115.36 940.93 0.0000001

27-PC-0525 Cable DB-B01-032 Bus291 933.83 115.36 940.93 0.0000001

27-PC-530 Cable 27-SMDP-05 Bus1310 2392.43 345.00 2417.17 0.0000005

27-PC- 530 Cable 27-SMDP-06 Bus292 4784.85 690.00 4834.35 0.0000009

27-PC-600 Cable 2S/S7 27-SMDP-06 750.14 844.16 1129.29 0.0000060

27-PC-700 Cable 2S/S7 27-SMDP-07 403.43 454.00 607.35 0.0000032

27-PC-710 Cable 27-SMDP-07 Bus231 518.36 74.75 523.72 0.0000001

27-PC-720 Cable 27-SMDP-07 Bus1315 3110.15 448.50 3142.32 0.0000006

27-PC-730 Cable 27-SMDP-07 Bus233 2591.79 373.75 2618.60 0.0000005

Cable2 Cable BUS-1S/S-03 Bus18 0.00 0.00 0.00

Cable3 Cable BUS-1S/S-04 Bus459 0.00 0.00 0.00

Cable4 Cable BUS-1S/S-07 Bus512 0.00 0.00 0.00

Cable5 Cable BUS-1S/S-05 Bus508 0.00 0.00 0.00

Cable7 Cable BUS-1S/S-06 Bus510 0.00 0.00 0.00

Cable12 Cable BUS-1S/S-01 Bus326 0.00 0.00 0.00

Cable13 Cable BUS-1S/S-02 Bus327 0.00 0.00 0.00

Cable16 Cable BUS-2S/S-4 Bus969 0.00 0.00 0.00

Cable17 Cable BUS-2S/S-3 Bus293 0.00 0.00 0.00

Cable18 Cable BUS-2S/S-2 Bus1134 0.00 0.00 0.00

Cable19 Cable BUS-2S/S-1 Bus1223 0.00 0.00 0.00

Cable20 Cable BUS-2S/S-5 Bus1225 0.00 0.00 0.00

Cable21 Cable BUS-2S/S-6 Bus1238 0.00 0.00 0.00

Cable22 Cable BUS-2S/S-7 Bus1316 0.00 0.00 0.00

PC-1 Cable Bus155 MV SWGR#1 0.00 0.00 0.00

PC-13 Cable Bus42 MV SWGR#2 0.00 0.00 0.00

PC-161 Cable MV SWGR#1 BUS-1S/S-07 0.00 0.01 0.01


Project: ETAP Page: 81

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

1S/S1-LV-PANEL 0.400 98.734 -1.6 0.000 0.000 -0.002 -0.008 11-SMDP-1 0.168 0.082 272.8 89.8

11-SMDP-2 0.167 0.082 271.9 89.8

11-SMDP-3 0.167 0.082 272.2 89.8

11-SMDP-04 0.166 0.082 271.0 89.7

11-SMDP-05 0.131 0.065 213.6 89.6

11-SMDP-06 0.110 0.055 179.7 89.5

11-SMDP-16 0.087 0.042 141.6 89.9

Bus326 -0.994 -0.482 1615.1 90.0 2.500

1S/S2-LV-PANEL2 0.400 98.779 -1.6 0.000 0.000 -0.001 -0.009 12-SMDP-01 0.168 0.082 272.9 89.8

12-SMDP-02 0.167 0.082 272.1 89.8

12-SMDP-3 0.115 0.056 186.8 89.8

12-SMDP-4 0.114 0.056 186.2 89.7

12-SMDP-5 0.136 0.068 221.9 89.6

12-SMDP-6 0.110 0.055 179.5 89.5

12-SMDP-7 0.173 0.086 283.0 89.5

Bus327 -0.982 -0.477 1595.1 90.0 2.500

1S/S3-LV-PANEL 0.400 99.008 -1.5 0.000 0.000 -0.001 -0.007 13-SMDP-1 0.151 0.074 244.6 89.8

13-SMDP-2 0.164 0.080 265.7 89.8

13-SMDP-3 0.190 0.094 309.7 89.6

13-SMDP-04 0.126 0.062 205.0 89.8

13-SMDP-5 0.077 0.038 124.6 89.7

13-SMDP-6 0.114 0.056 185.8 89.6

13-SMDP-7 0.104 0.051 168.7 89.6

Bus18 -0.925 -0.449 1498.1 90.0 2.500

1S/S4-LV-PANEL 0.400 98.718 -1.6 0.000 0.000 0.000 0.000 14-SMDP-01 0.161 0.079 262.2 89.9

Bus471 0.153 0.075 249.5 89.8

Bus475 0.153 0.075 249.5 89.8

Bus476 0.153 0.075 249.5 89.8

Bus477 0.153 0.075 249.5 89.8

Bus474 0.109 0.054 177.8 89.7

Bus472 0.109 0.054 177.8 89.7


Project: ETAP Page: 82

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus459 -0.992 -0.487 1615.6 89.8 2.500

1S/S5-LV-PANEL1 0.400 99.808 -1.1 0.000 0.000 0.000 0.000 Bus509 0.716 0.351 1153.6 89.8

Bus508 -0.716 -0.351 1153.6 89.8 2.500

1S/S6-LV-PANEL 0.400 99.516 -1.3 0.000 0.000 0.000 -0.001 Bus536 0.659 0.323 1064.5 89.8

16-SMDP-2 0.133 0.065 215.4 89.8

Bus510 -0.792 -0.387 1278.9 89.8 2.500

1S/S7-LV-PANEL 0.400 99.270 -1.4 0.000 0.000 -0.001 -0.005 17-SMDP-01 0.170 0.083 274.7 89.9

17-SMDP-02 0.169 0.082 273.6 89.9

17-SMDP-03 0.169 0.083 274.2 89.9

17-SMDP-04 0.169 0.083 273.0 89.8

17-SMDP-05 0.112 0.055 181.3 89.7

17-SMDP-6 0.072 0.035 115.6 90.0

17-SMDP-07 0.000 0.000 0.0 -71.2

Bus512 -0.859 -0.416 1387.5 90.0 2.500

2S/S2-LV-PANEL3 0.400 99.431 -1.3 0.000 0.000 -0.001 -0.004 22-SMDP-01 0.171 0.083 275.2 89.9

22-SMDP-02 0.170 0.083 274.5 89.9

22-SMDP-03 0.117 0.057 188.4 89.9

22-SMDP-04 0.116 0.057 187.9 89.9

22-SMDP-5 0.133 0.066 215.8 89.7

22-SMDP-06 0.112 0.055 181.4 89.7

Bus1134 -0.818 -0.396 1318.8 90.0 2.500

2S/S3 0.400 99.108 -1.4 0.000 0.000 -0.001 -0.007 23-SMDP-01 0.151 0.074 245.0 89.8

23-SMDP-02 0.164 0.080 266.1 89.8

23-SMDP-03 0.191 0.094 310.2 89.6

23-SMDP-04 0.127 0.062 205.3 89.8

23-SMDP-05 0.077 0.038 124.8 89.8

23-SMDP-06 0.115 0.057 186.0 89.7

23-SMDP-07 0.076 0.038 123.7 89.6

Bus293 -0.899 -0.436 1455.4 90.0 2.500

2S/S4 0.400 98.706 -1.6 0.000 0.000 0.000 0.000 24-SMDP-01 0.165 0.080 268.0 90.0

Bus963 0.153 0.075 249.4 89.8

Bus964 0.153 0.075 249.4 89.8

Bus965 0.153 0.075 249.4 89.8


Project: ETAP Page: 83

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus966 0.153 0.075 249.4 89.8

Bus967 0.109 0.054 177.8 89.7

Bus968 0.109 0.054 177.8 89.7

Bus969 -0.996 -0.488 1621.3 89.8 2.500

2S/S5 0.400 99.807 -1.1 0.000 0.000 0.000 0.000 Bus1224 0.716 0.351 1153.9 89.8

Bus1225 -0.716 -0.351 1153.9 89.8 2.500

2S/S6 0.400 100.010 -1.1 0.000 0.000 0.000 0.000 Bus1237 0.665 0.325 1068.5 89.8

Bus1238 -0.665 -0.325 1068.5 89.8 2.500

2S/S7 0.400 98.794 -1.6 0.000 0.000 -0.002 -0.008 27-SMDP-01 0.168 0.082 273.0 89.8

27-SMDP-02 0.167 0.082 272.2 89.8

27-SMDP-03 0.167 0.082 272.2 89.8

27-SMDP-04 0.167 0.082 271.2 89.7

27-SMDP-05 0.131 0.065 213.8 89.6

27-SMDP-06 0.110 0.055 179.6 89.5

27-SMDP-07 0.071 0.034 114.9 90.0

Bus1316 -0.979 -0.474 1589.7 90.0 2.500

11-SMDP-1 0.400 98.352 -1.7 0.000 0.000 -0.001 0.000 DB-B01-8 0.056 0.027 90.9 90.0

1S/S1-LV-PANEL -0.167 -0.081 272.8 89.9

DB-B01-06 0.056 0.027 91.4 90.1

DB-B01-7 0.056 0.027 91.1 90.0

11-SMDP-2 0.400 98.023 -1.8 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.166 -0.081 271.9 89.9

DB-B01-03 0.055 0.027 90.6 90.0

DB-B01-04 0.056 0.027 90.8 90.0

DB-B01-05 0.056 0.027 91.0 90.0

Bus1 0.000 0.000 0.3 90.5

11-SMDP-3 0.400 98.154 -1.7 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.166 -0.081 272.2 89.9

DB-B01-09 0.056 0.027 90.8 90.0

DB-B01-10 0.056 0.027 91.0 90.0

DB-B01-11 0.056 0.027 91.2 90.1

11-SMDP-04 0.400 97.843 -1.8 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.165 -0.081 271.0 89.9

DB-B01-12 0.055 0.027 90.9 90.0

DB-B01-13 0.055 0.027 90.7 90.0

DB-B01-14 0.055 0.027 90.4 90.0


Project: ETAP Page: 84

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

11-SMDP-05 0.400 97.329 -1.9 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.129 -0.063 213.6 89.8

DB-B01-01 0.055 0.027 90.2 90.0

DB-B01-02 0.055 0.027 90.4 90.0

Bus2 0.021 0.010 34.4 90.1

11-SMDP-06 0.400 97.431 -1.9 0.000 0.000 -0.001 0.000 1S/S1-LV-PANEL -0.109 -0.053 179.7 89.8

DB-B01-15 0.055 0.027 90.6 90.0

DB-B01-16 0.055 0.027 90.2 90.0

Bus122 0.000 0.000 0.4 90.7

11-SMDP-16 0.400 98.183 -1.7 0.000 0.000 0.000 0.000 1S/S1-LV-PANEL -0.087 -0.042 141.6 90.0

Bus144 0.009 0.004 14.1 90.1

DB-B21 0.043 0.021 69.5 90.0

Bus147 0.036 0.017 58.1 90.2

12-SMDP-01 0.400 98.397 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.167 -0.081 272.9 89.9

DB-B01-040 0.056 0.027 91.4 90.1

DB-B01-041 0.056 0.027 91.2 90.0

DB-B01-042 0.056 0.027 91.0 90.0

12-SMDP-02 0.400 98.067 -1.8 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.166 -0.081 272.1 89.9

DB-B01-37 0.055 0.027 90.7 90.0

DB-B01-38. 0.056 0.027 90.9 90.0

DB-B01-39 0.056 0.027 91.1 90.0

Bus267 0.000 0.000 0.3 90.5

12-SMDP-3 0.400 98.381 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.114 -0.056 186.8 89.8

DB-B02-01 0.038 0.019 62.3 90.0

DB-B02-02 0.038 0.019 62.4 90.0

DB-B02-03 0.038 0.019 62.6 90.0

12-SMDP-4 0.400 98.167 -1.7 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.114 -0.056 186.2 89.8

DB-B02-4 0.038 0.018 62.4 90.0

DB-B02-5 0.038 0.018 62.3 90.0

DB-B02-6 0.038 0.018 62.1 90.0

12-SMDP-5 0.400 97.320 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.134 -0.066 221.9 89.8

DB-B01-33 0.055 0.027 90.2 90.0

DB-B01-34 0.055 0.027 90.4 90.0

Bus181 0.021 0.010 34.3 90.1


Project: ETAP Page: 85

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus178 0.005 0.002 8.3 90.2

12-SMDP-6 0.400 97.466 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.109 -0.053 179.6 89.8

DB-B01-35 0.055 0.027 90.4 90.0

DB-B01-36 0.055 0.027 90.6 90.0

12-SMDP-7 0.400 97.538 -1.9 0.000 0.000 -0.001 0.000 1S/S2-LV-PANEL2 -0.172 -0.084 283.0 89.8

DB-B06 0.102 0.051 169.2 89.6

Bus17 0.023 0.011 37.1 90.2

DB-B14 0.047 0.023 77.7 90.1

13-SMDP-1 0.400 98.665 -1.6 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.150 -0.073 244.6 89.9

DB-B04-01 0.067 0.032 108.1 90.0

DB-B04-2 0.067 0.032 108.3 90.1

Bus398 0.018 0.009 29.0 90.1

13-SMDP-2 0.400 98.426 -1.6 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.163 -0.079 265.7 89.9

DB-B03-02 0.082 0.040 133.2 90.0

DB-B03-04 0.082 0.040 133.5 90.0

13-SMDP-3 0.400 97.763 -1.8 0.000 0.000 -0.002 0.000 1S/S3-LV-PANEL -0.188 -0.092 309.7 89.8

DB-B03-01 0.081 0.039 132.4 90.0

DB-B03-03 0.081 0.039 132.9 90.1

Bus8 0.028 0.014 46.7 90.1

13-SMDP-04 0.400 98.471 -1.6 0.000 0.000 0.000 0.000 1S/S3-LV-PANEL -0.126 -0.061 205.0 89.9

DB-B02-7 0.038 0.019 62.7 90.0

DB-B02-08 0.038 0.019 62.5 90.0

DB-B08-09 0.038 0.019 62.4 90.0

Bus335 0.011 0.005 17.6 90.1

Bus278 0.000 0.000 0.4 90.8

13-SMDP-5 0.400 98.348 -1.6 0.000 0.000 0.000 0.000 1S/S3-LV-PANEL -0.076 -0.037 124.6 89.9

DB-B02-10 0.038 0.019 62.5 90.0

DB-B02-011 0.038 0.019 62.4 90.0

13-SMDP-6 0.400 98.001 -1.7 0.000 0.000 -0.001 0.000 1S/S3-LV-PANEL -0.113 -0.055 185.8 89.8

DB-B02-12 0.038 0.018 62.4 90.0

DB-B02-13 0.038 0.018 62.2 90.0

DB-B02-14 0.038 0.018 62.0 90.0

13-SMDP-7 0.400 97.641 -1.8 0.000 0.000 -0.002 0.000 1S/S3-LV-PANEL -0.103 -0.050 168.7 89.8
Project: ETAP Page: 86

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B02-15 0.038 0.018 62.5 90.1

DB-B02-16 0.038 0.018 62.2 89.9

Bus232 0.028 0.013 46.2 90.2

14-SMDP-01 0.400 97.524 -1.9 0.000 0.000 0.000 0.000 1S/S4-LV-PANEL -0.160 -0.077 262.2 90.1

Bus460 0.024 0.011 38.7 90.1

Bus462 0.032 0.015 52.3 90.0

Bus463 0.032 0.015 52.4 90.1

Bus464 0.009 0.005 15.5 90.0

Bus465 0.012 0.006 19.0 90.1

Bus467 0.001 0.001 2.0 90.0

Bus377 0.012 0.006 19.0 90.1

Bus469 0.028 0.013 46.1 90.2

Bus470 0.011 0.005 17.2 90.3

16-SMDP-2 0.400 97.855 -1.7 0.000 0.000 0.000 0.000 1S/S6-LV-PANEL -0.132 -0.063 215.4 90.1

DB-B01-17 0.055 0.027 90.7 90.0

DB-B01-18 0.055 0.027 90.8 90.0

Bus535 0.021 0.010 34.6 90.1

17-SMDP-01 0.400 98.886 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.169 -0.082 274.7 90.0

DB-B01-022 0.057 0.027 91.9 90.1

DB-B01-023 0.057 0.027 91.6 90.0

DB-B01-024 0.056 0.027 91.5 90.1

17-SMDP-02 0.400 98.555 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.168 -0.081 273.6 90.0

DB-B01-019 0.056 0.027 91.3 90.0

DB-B01-020 0.056 0.027 91.3 90.0

DB-B01-021 0.056 0.027 91.1 90.1

Bus436 0.000 0.000 0.3 90.3

17-SMDP-03 0.400 98.687 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.169 -0.082 274.2 90.0

DB-B01-025 0.056 0.027 91.3 90.0

DB-B01-026 0.056 0.027 91.5 90.0

DB-B01-027 0.056 0.027 91.7 90.0

17-SMDP-04 0.400 98.374 -1.6 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.167 -0.081 273.0 90.0

DB-B01-028 0.056 0.027 91.3 90.0

DB-B01-029 0.056 0.027 91.2 90.0


Project: ETAP Page: 87

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-30 0.056 0.027 91.0 90.0

17-SMDP-05 0.400 97.947 -1.7 0.000 0.000 -0.001 0.000 1S/S7-LV-PANEL -0.111 -0.054 181.3 89.9

DB-B01-31 0.056 0.027 91.0 90.0

DB-B01-32 0.055 0.027 90.8 90.0

Bus492 0.000 0.000 0.4 91.3

17-SMDP-6 0.400 98.814 -1.5 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL -0.071 -0.034 115.6 90.0

Bus514 0.022 0.011 35.5 90.1

Bus513 0.020 0.010 33.2 90.1

Bus503 0.029 0.014 47.0 90.1

17-SMDP-07 0.400 99.270 -1.4 0.000 0.000 0.000 0.000 1S/S7-LV-PANEL 0.000 0.000 0.0 -98.6

21-MDP 0.400 98.793 -1.6 0.000 0.000 -0.002 -0.008 21-SMDP-1 0.168 0.082 273.0 89.8

21-SMDP-2 0.167 0.082 272.2 89.8

21-SMDP-3 0.167 0.082 272.4 89.8

21-SMDP-04 0.167 0.082 271.2 89.7

21-SMDP-5 0.131 0.065 213.8 89.6

21-SMDP-6 0.110 0.055 179.5 89.6

21-SMDP-7 0.071 0.034 115.3 90.0

Bus1223 -0.980 -0.474 1590.2 90.0 2.500

21-SMDP-1 0.400 98.411 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.167 -0.081 273.0 89.9

DB-B01-006 0.056 0.027 91.4 90.1

DB-B01-07 0.056 0.027 91.2 90.0

DB-B01-08 0.056 0.027 91.0 90.0

21-SMDP-2 0.400 98.081 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.166 -0.081 272.2 89.9

DB-B01-003 0.055 0.027 90.7 90.0

DB-B01-004 0.056 0.027 90.9 90.0

DB-B01-005 0.056 0.027 91.1 90.0

Bus1165 0.000 0.000 0.3 90.5

21-SMDP-3 0.400 98.213 -1.7 0.000 0.000 -0.001 0.000 21-MDP -0.167 -0.081 272.4 89.9

DB-B01-009 0.056 0.027 90.8 90.0

DB-B01-010 0.056 0.027 91.0 90.0

DB-B01-011 0.056 0.027 91.3 90.1

21-SMDP-04 0.400 97.902 -1.8 0.000 0.000 -0.001 0.000 21-MDP -0.165 -0.081 271.2 89.9

DB-B01-012 0.056 0.027 90.9 90.0


Project: ETAP Page: 88

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-013 0.055 0.027 90.7 90.0

DB-B01-014 0.055 0.027 90.5 90.0

21-SMDP-5 0.400 97.386 -1.9 0.000 0.000 -0.001 0.000 21-MDP -0.130 -0.063 213.8 89.8

DB-B01-001 0.055 0.027 90.3 90.0

DB-B01-002 0.055 0.027 90.5 90.0

Bus1206 0.021 0.010 34.4 90.1

21-SMDP-6 0.400 97.492 -1.9 0.000 0.000 -0.001 0.000 21-MDP -0.109 -0.053 179.5 89.8

DB-B01-116 0.055 0.027 90.6 90.1

DB-B01-117 0.055 0.027 90.3 90.0

21-SMDP-7 0.400 98.345 -1.7 0.000 0.000 0.000 0.000 21-MDP -0.071 -0.034 115.3 90.1

Bus214 0.009 0.004 14.1 90.1

Bus15 0.013 0.006 20.6 90.1

Bus156 0.014 0.007 22.5 90.1

Bus153 0.036 0.017 58.2 90.2

22-SMDP-01 0.400 99.046 -1.4 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.170 -0.082 275.2 90.0

DB-B01-40 0.057 0.027 92.0 90.1

DB-B01-41 0.057 0.027 91.8 90.0

DB-B01-42 0.057 0.027 91.6 90.1

22-SMDP-02 0.400 98.714 -1.5 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.169 -0.082 274.5 90.0

DB-B01-037 0.056 0.027 91.3 90.1

DB-B01-38 0.056 0.027 91.5 90.0

DB-B01-039 0.056 0.027 91.6 90.0

Bus1078 0.000 0.000 0.3 90.3

22-SMDP-03 0.400 99.030 -1.4 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.116 -0.056 188.4 90.0

DB-B02-1 0.039 0.019 62.7 90.0

DB-B02-2 0.039 0.019 62.9 90.0

DB-B02-3 0.039 0.019 63.0 90.0

22-SMDP-04 0.400 98.814 -1.5 0.000 0.000 0.000 0.000 2S/S2-LV-PANEL3 -0.116 -0.056 187.9 90.0

DB-B02-04 0.039 0.019 62.8 90.0

DB-B02-05 0.039 0.019 62.7 90.0

DB-B02-06 0.039 0.019 62.6 90.0

22-SMDP-5 0.400 98.013 -1.6 0.000 0.000 0.000 0.000 Bus305 0.021 0.010 34.6 90.1

2S/S2-LV-PANEL3 -0.132 -0.064 215.8 90.0


Project: ETAP Page: 89

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-033 0.056 0.027 90.8 90.0

DB-B01-034 0.056 0.027 91.0 90.1

22-SMDP-06 0.400 98.106 -1.6 0.000 0.000 -0.001 0.000 2S/S2-LV-PANEL3 -0.111 -0.054 181.4 89.9

DB-B01-035 0.056 0.027 91.0 90.0

DB-B01-036 0.056 0.027 91.2 90.0

23-SMDP-01 0.400 98.766 -1.5 0.000 0.000 -0.001 0.000 2S/S3 -0.151 -0.073 245.0 89.9

DB-B04-1 0.067 0.032 108.2 90.0

DB-B04-02 0.067 0.032 108.4 90.1

Bus978 0.018 0.009 29.0 90.1

23-SMDP-02 0.400 98.526 -1.6 0.000 0.000 -0.001 0.000 2S/S3 -0.163 -0.079 266.1 89.9

DB-B03-2 0.082 0.040 133.3 90.0

DB-B03-4 0.082 0.040 133.6 90.0

23-SMDP-03 0.400 97.862 -1.7 0.000 0.000 -0.002 0.000 2S/S3 -0.189 -0.092 310.2 89.9

DB-B03-1 0.081 0.039 132.6 90.0

DB-B03-3 0.081 0.039 133.0 90.1

Bus1003 0.029 0.014 46.7 90.1

23-SMDP-04 0.400 98.572 -1.6 0.000 0.000 0.000 0.000 2S/S3 -0.126 -0.061 205.3 89.9

DB-B02-07 0.039 0.019 62.7 90.0

DB-B02-8 0.038 0.019 62.6 90.0

DB-B02-9 0.038 0.019 62.4 90.0

Bus1017 0.011 0.005 17.6 90.1

Bus1012 0.000 0.000 0.4 90.7

23-SMDP-05 0.400 98.448 -1.6 0.000 0.000 0.000 0.000 2S/S3 -0.076 -0.037 124.8 89.9

DB-B02-010 0.038 0.019 62.6 90.0

DB-B02-11 0.038 0.019 62.5 90.0

23-SMDP-06 0.400 98.100 -1.7 0.000 0.000 -0.001 0.000 2S/S3 -0.114 -0.055 186.1 89.9

DB-B02-012 0.038 0.018 62.4 90.0

DB-B02-013 0.038 0.018 62.2 90.0

DB-B02-014 0.038 0.018 62.1 90.0

23-SMDP-07 0.400 98.106 -1.7 0.000 0.000 -0.001 0.000 2S/S3 -0.075 -0.037 123.7 89.8

DB-B02-015 0.038 0.019 62.7 90.1

DB-B02-016 0.038 0.019 62.5 90.0

24-SMDP-01 0.400 97.487 -1.9 0.000 0.000 0.000 0.000 2S/S4 -0.163 -0.078 268.0 90.2
Project: ETAP Page: 90

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus954 0.032 0.015 52.3 90.0

Bus956 0.032 0.015 52.4 90.1

Bus957 0.009 0.005 15.5 90.0

Bus958 0.012 0.006 18.9 90.1

Bus959 0.001 0.001 2.0 90.0

Bus960 0.012 0.006 19.0 90.1

Bus955 0.028 0.013 46.1 90.2

Bus961 0.027 0.013 44.6 90.8

Bus962 0.010 0.005 17.2 90.4

27-SMDP-01 0.400 98.412 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.167 -0.081 273.0 89.9

DB-B01-22 0.056 0.027 91.4 90.1

DB-B01-23 0.056 0.027 91.2 90.0

DB-B01-24 0.056 0.027 91.0 90.0

27-SMDP-02 0.400 98.082 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.166 -0.081 272.2 89.9

DB-B01-19 0.055 0.027 90.7 90.0

DB-B01-20 0.056 0.027 90.9 90.0

DB-B01-21 0.056 0.027 91.1 90.0

Bus1269 0.000 0.000 0.3 90.5

27-SMDP-03 0.400 98.214 -1.7 0.000 0.000 -0.001 0.000 2S/S7 -0.166 -0.081 272.2 89.9

DB-B01-25 0.056 0.027 90.8 90.0

DB-B01-26 0.056 0.027 91.0 90.0

DB-B01-27 0.056 0.027 91.3 90.0

27-SMDP-04 0.400 97.902 -1.8 0.000 0.000 -0.001 0.000 2S/S7 -0.165 -0.081 271.2 89.9

DB-B01-28 0.056 0.027 90.9 90.0

DB-B01-29 0.055 0.027 90.7 90.0

DB-B01-030 0.055 0.027 90.5 90.0

27-SMDP-05 0.400 97.387 -1.9 0.000 0.000 -0.001 0.000 2S/S7 -0.130 -0.063 213.8 89.8

DB-B01-017 0.055 0.027 90.3 90.0

DB-B01-018 0.055 0.027 90.5 90.0

Bus1310 0.021 0.010 34.4 90.1

27-SMDP-06 0.400 97.491 -1.9 0.000 0.000 -0.001 0.000 DB-B01-031 0.055 0.027 90.7 90.0

DB-B01-032 0.055 0.027 90.2 89.9

Bus292 0.000 0.000 0.4 91.8


Project: ETAP Page: 91

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

2S/S7 -0.109 -0.054 179.6 89.7

27-SMDP-07 0.400 98.347 -1.7 0.000 0.000 0.000 0.000 2S/S7 -0.070 -0.034 114.9 90.0

Bus231 0.022 0.010 35.3 90.1

Bus1315 0.020 0.010 32.9 90.1

Bus233 0.029 0.014 46.7 90.1

Bus1 0.400 97.990 -1.8 0.000 0.000 0.000 0.000 11-SMDP-2 0.000 0.000 0.3 90.4

BUS-1S/S-01 13.800 100.000 0.0 0.000 0.000 0.000 0.000 MV SWGR#1 -3.985 -2.054 187.6 88.9

BUS-1S/S-02 2.967 1.533 139.7 88.8

Bus326 1.018 0.522 47.9 89.0

BUS-1S/S-02 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-01 -2.967 -1.533 139.7 88.8

BUS-1S/S-03 1.961 1.017 92.4 88.8

Bus327 1.006 0.515 47.3 89.0

BUS-1S/S-03 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-02 -1.961 -1.017 92.4 88.8

BUS-1S/S-04 1.016 0.534 48.0 88.5

Bus18 0.945 0.483 44.4 89.0

BUS-1S/S-04 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-03 -1.016 -0.534 48.0 88.5

Bus459 1.016 0.534 48.0 88.5

BUS-1S/S-05 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 -0.728 -0.375 34.3 88.9

Bus508 0.728 0.375 34.3 88.9

BUS-1S/S-06 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-05 0.728 0.375 34.3 88.9

BUS-1S/S-07 -1.535 -0.792 72.3 88.9

Bus510 0.807 0.416 38.0 88.9

BUS-1S/S-07 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 1.535 0.792 72.3 88.9

Bus512 0.876 0.447 41.1 89.1

MV SWGR#1 -2.411 -1.238 113.4 89.0

Bus2 0.400 96.779 -1.8 0.000 0.000 0.021 0.010 11-SMDP-05 -0.021 -0.010 34.4 90.0

BUS-2S/S-1 13.800 100.000 0.0 0.000 0.000 0.000 0.000 MV SWGR#2 -3.773 -1.942 177.5 88.9

BUS-2S/S-2 2.771 1.428 130.4 88.9

Bus1223 1.003 0.514 47.1 89.0

BUS-2S/S-2 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-1 -2.771 -1.428 130.4 88.9

BUS-2S/S-3 1.938 1.004 91.3 88.8

Bus1134 0.833 0.424 39.1 89.1

BUS-2S/S-3 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-2 -1.938 -1.004 91.3 88.8
Project: ETAP Page: 92

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

BUS-2S/S-4 1.019 0.535 48.2 88.5

Bus293 0.919 0.469 43.2 89.1

BUS-2S/S-4 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-3 -1.019 -0.535 48.2 88.5

Bus969 1.019 0.535 48.2 88.5

BUS-2S/S-5 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 -0.728 -0.375 34.3 88.9

Bus1225 0.728 0.375 34.3 88.9

BUS-2S/S-6 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-5 0.728 0.375 34.3 88.9

BUS-2S/S-7 -1.404 -0.721 66.0 88.9

Bus1238 0.675 0.346 31.7 89.0

BUS-2S/S-7 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 1.404 0.721 66.0 88.9

MV SWGR#2 -2.406 -1.235 113.1 89.0

Bus1316 1.002 0.513 47.1 89.0

Bus3 0.400 96.886 -2.0 0.000 0.000 -0.001 0.000 DB-B06 0.001 0.000 0.9 99.5

Bus4 0.400 97.900 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 20.8 89.9

Bus5 0.400 98.025 -1.6 0.000 0.000 0.014 0.007 DB-B01-06 -0.014 -0.007 22.8 89.8

Bus6 0.400 97.849 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 20.9 89.9

Bus7 0.400 97.968 -1.6 0.000 0.000 0.013 0.006 DB-B01-06 -0.013 -0.006 21.1 89.9

Bus8 0.400 97.378 -1.7 0.000 0.000 0.028 0.014 13-SMDP-3 -0.028 -0.014 46.7 90.1

Bus9 0.400 98.186 -1.7 0.000 0.000 0.003 0.002 DB-B01-06 -0.003 -0.002 5.6 89.1

Bus10 0.400 96.738 -2.0 0.000 0.000 0.022 0.011 DB-B06 -0.022 -0.011 36.9 89.6

Bus11 0.400 96.753 -2.0 0.000 0.000 0.020 0.010 DB-B06 -0.020 -0.010 33.1 89.5

Bus12 0.400 96.763 -2.0 0.000 0.000 0.018 0.009 DB-B06 -0.018 -0.009 30.5 89.5

Bus13 0.400 98.021 -1.6 0.000 0.000 0.015 0.007 DB-B03-02 -0.015 -0.007 24.1 89.8

Bus14 0.400 96.737 -2.0 0.000 0.000 0.041 0.020 DB-B06 -0.041 -0.020 68.8 89.6

Bus15 0.400 98.034 -1.6 0.000 0.000 0.013 0.006 21-SMDP-7 -0.013 -0.006 20.6 90.0

Bus17 0.400 97.399 -1.9 0.000 0.000 0.023 0.011 12-SMDP-7 -0.023 -0.011 37.1 90.2

Bus18 13.800 100.000 0.0 0.000 0.000 0.001 -0.006 BUS-1S/S-03 -0.945 -0.483 44.4 89.0

1S/S3-LV-PANEL 0.945 0.489 44.5 88.8

Bus20 0.400 97.138 -1.9 0.000 0.000 0.012 0.006 DB-B01-15 -0.012 -0.006 20.6 89.7

Bus21 0.400 96.966 -1.8 0.000 0.000 0.014 0.007 DB-B01-15 -0.014 -0.007 22.6 89.9

Bus22 0.400 97.208 -1.9 0.000 0.000 0.012 0.006 DB-B01-15 -0.012 -0.006 20.6 89.5

Bus23 0.400 97.064 -1.8 0.000 0.000 0.013 0.006 DB-B01-15 -0.013 -0.006 20.8 89.8

Bus24 0.400 97.318 -1.7 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.7 89.9
Project: ETAP Page: 93

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus25 0.400 97.497 -1.7 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.7 89.7

Bus26 0.400 97.438 -1.6 0.000 0.000 0.014 0.007 DB-B01-09 -0.014 -0.007 22.7 89.8

Bus28 0.400 97.362 -1.6 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.7 89.9

Bus29 0.400 97.309 -1.6 0.000 0.000 0.013 0.006 DB-B01-09 -0.013 -0.006 20.9 89.9

Bus30 0.400 97.532 -1.7 0.000 0.000 0.003 0.002 DB-B01-09 -0.003 -0.002 5.6 89.6

Bus31 0.400 97.692 -1.7 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 20.7 89.8

Bus33 0.400 97.633 -1.7 0.000 0.000 0.014 0.007 DB-B01-10 -0.014 -0.007 22.7 89.8

Bus37 0.400 97.556 -1.7 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 20.8 89.9

Bus38 0.400 97.504 -1.6 0.000 0.000 0.013 0.006 DB-B01-10 -0.013 -0.006 21.0 89.9

Bus39 0.400 97.888 -1.7 0.000 0.000 0.009 0.005 DB-B02-4 -0.009 -0.005 15.1 89.7

Bus40 0.400 97.726 -1.7 0.000 0.000 0.003 0.002 DB-B01-10 -0.003 -0.002 5.7 89.7

* Bus42 13.800 100.000 0.0 6.180 3.176 0.000 0.000 MV SWGR#2 6.180 3.176 290.7 88.9

Bus44 0.400 97.888 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 20.8 89.8

Bus46 0.400 97.889 -1.6 0.000 0.000 0.009 0.004 DB-B02-02 -0.009 -0.004 15.1 89.8

Bus47 0.400 97.717 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 20.8 89.9

Bus48 0.400 97.843 -1.6 0.000 0.000 0.014 0.007 DB-B01-7 -0.014 -0.007 22.8 89.8

Bus50 0.400 97.964 -1.6 0.000 0.000 0.010 0.005 DB-B02-02 -0.010 -0.005 17.1 89.7

Bus74 0.400 97.667 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 20.8 89.9

Bus75 0.400 97.785 -1.6 0.000 0.000 0.013 0.006 DB-B01-7 -0.013 -0.006 21.0 89.9

Bus76 0.400 98.003 -1.7 0.000 0.000 0.003 0.002 DB-B01-7 -0.003 -0.002 5.6 89.1

Bus77 0.400 97.535 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 20.7 89.9

Bus78 0.400 97.660 -1.6 0.000 0.000 0.014 0.007 DB-B01-8 -0.014 -0.007 22.7 89.8

Bus79 0.400 97.485 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 20.8 89.9

Bus80 0.400 97.603 -1.6 0.000 0.000 0.013 0.006 DB-B01-8 -0.013 -0.006 21.0 89.9

Bus81 0.400 97.821 -1.6 0.000 0.000 0.003 0.002 DB-B01-8 -0.003 -0.002 5.6 89.0

Bus82 0.400 97.828 -1.7 0.000 0.000 0.014 0.007 DB-B01-11 -0.014 -0.007 22.8 89.8

Bus83 0.400 97.752 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 20.8 89.9

Bus84 0.400 97.209 -1.7 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.7 89.9

Bus85 0.400 97.333 -1.7 0.000 0.000 0.014 0.007 DB-B01-03 -0.014 -0.007 22.6 89.8

Bus86 0.400 97.158 -1.6 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.7 89.9

Bus87 0.400 97.276 -1.7 0.000 0.000 0.013 0.006 DB-B01-03 -0.013 -0.006 20.9 89.9

Bus88 0.400 97.493 -1.7 0.000 0.000 0.003 0.002 DB-B01-03 -0.003 -0.002 5.6 88.9

Bus89 0.400 97.403 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 20.7 89.9
Project: ETAP Page: 94

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus90 0.400 97.528 -1.7 0.000 0.000 0.014 0.007 DB-B01-04 -0.014 -0.007 22.7 89.8

Bus91 0.400 97.352 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 20.7 89.9

Bus92 0.400 97.471 -1.7 0.000 0.000 0.013 0.006 DB-B01-04 -0.013 -0.006 21.0 89.9

Bus93 0.400 97.688 -1.7 0.000 0.000 0.003 0.002 DB-B01-04 -0.003 -0.002 5.6 88.9

Bus94 0.400 97.533 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 20.7 89.9

Bus95 0.400 97.658 -1.7 0.000 0.000 0.014 0.007 DB-B01-05 -0.014 -0.007 22.7 89.8

Bus96 0.400 97.482 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 20.8 89.9

Bus97 0.400 97.601 -1.7 0.000 0.000 0.013 0.006 DB-B01-05 -0.013 -0.006 21.0 89.9

Bus98 0.400 97.818 -1.7 0.000 0.000 0.003 0.002 DB-B01-05 -0.003 -0.002 5.6 89.0

Bus99 0.400 97.699 -1.7 0.000 0.000 0.013 0.006 DB-B01-11 -0.013 -0.006 21.0 89.9

Bus100 0.400 97.922 -1.7 0.000 0.000 0.003 0.002 DB-B01-11 -0.003 -0.002 5.7 89.7

Bus101 0.400 97.415 -1.7 0.000 0.000 0.014 0.007 DB-B01-12 -0.014 -0.007 22.7 89.9

Bus102 0.400 97.367 -1.7 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.7 89.9

Bus103 0.400 97.507 -1.8 0.000 0.000 0.013 0.006 DB-B01-12 -0.013 -0.006 20.9 89.8

Bus104 0.400 97.652 -1.8 0.000 0.000 0.003 0.002 DB-B01-12 -0.003 -0.002 5.6 88.9

Bus105 0.400 97.175 -1.7 0.000 0.000 0.012 0.006 DB-B01-13 -0.012 -0.006 20.7 89.9

Bus106 0.400 97.272 -1.7 0.000 0.000 0.014 0.007 DB-B01-13 -0.014 -0.007 22.6 89.9

Bus107 0.400 97.224 -1.7 0.000 0.000 0.013 0.006 DB-B01-13 -0.013 -0.006 20.7 89.9

Bus108 0.400 97.364 -1.7 0.000 0.000 0.013 0.006 DB-B01-13 -0.013 -0.006 20.9 89.8

Bus109 0.400 97.509 -1.8 0.000 0.000 0.003 0.002 DB-B01-13 -0.003 -0.002 5.6 88.8

Bus110 0.400 96.982 -1.7 0.000 0.000 0.012 0.006 DB-B01-14 -0.012 -0.006 20.6 89.9

Bus111 0.400 97.078 -1.7 0.000 0.000 0.014 0.007 DB-B01-14 -0.014 -0.007 22.6 89.8

Bus112 0.400 97.030 -1.7 0.000 0.000 0.012 0.006 DB-B01-14 -0.012 -0.006 20.7 89.9

Bus113 0.400 97.170 -1.7 0.000 0.000 0.013 0.006 DB-B01-14 -0.013 -0.006 20.9 89.8

Bus114 0.400 97.315 -1.8 0.000 0.000 0.003 0.002 DB-B01-14 -0.003 -0.002 5.6 88.7

Bus115 0.400 97.214 -1.9 0.000 0.000 0.003 0.002 DB-B01-15 -0.003 -0.002 5.6 89.5

Bus116 0.400 96.931 -1.8 0.000 0.000 0.012 0.006 DB-B01-16 -0.012 -0.006 20.5 89.7

Bus117 0.400 96.760 -1.8 0.000 0.000 0.014 0.007 DB-B01-16 -0.014 -0.007 22.5 89.9

Bus118 0.400 97.001 -1.9 0.000 0.000 0.012 0.006 DB-B01-16 -0.012 -0.006 20.5 89.5

Bus119 0.400 97.837 -1.6 0.000 0.000 0.009 0.004 DB-B02-02 -0.009 -0.004 15.1 89.9

Bus120 0.400 96.857 -1.8 0.000 0.000 0.013 0.006 DB-B01-16 -0.013 -0.006 20.8 89.8

Bus121 0.400 97.007 -1.9 0.000 0.000 0.003 0.002 DB-B01-16 -0.003 -0.002 5.6 89.5

Bus122 0.400 97.399 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 0.000 0.000 0.4 90.7
Project: ETAP Page: 95

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus123 0.400 97.703 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.8

Bus124 0.400 97.778 -1.6 0.000 0.000 0.010 0.005 DB-B02-01 -0.010 -0.005 17.1 89.7

Bus125 0.400 97.651 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.9

Bus126 0.400 97.754 -1.6 0.000 0.000 0.009 0.004 DB-B02-01 -0.009 -0.004 15.0 89.7

Bus127 0.400 97.753 -1.7 0.000 0.000 0.010 0.005 DB-B02-4 -0.010 -0.005 17.1 89.9

Bus128 0.400 97.182 -1.6 0.000 0.000 0.012 0.006 DB-B21 -0.012 -0.006 19.7 89.6

Bus129 0.400 97.107 -1.6 0.000 0.000 0.027 0.013 DB-B21 -0.027 -0.013 44.3 89.8

Bus130 0.400 97.161 -1.6 0.000 0.000 0.003 0.002 DB-B21 -0.003 -0.002 5.5 89.7

Bus131 0.400 96.703 -1.8 0.000 0.000 0.012 0.006 DB-B01-01 -0.012 -0.006 20.5 89.9

Bus132 0.400 96.799 -1.9 0.000 0.000 0.014 0.007 DB-B01-01 -0.014 -0.007 22.5 89.8

Bus133 0.400 96.752 -1.8 0.000 0.000 0.012 0.006 DB-B01-01 -0.012 -0.006 20.6 89.8

Bus134 0.400 96.891 -1.9 0.000 0.000 0.013 0.006 DB-B01-01 -0.013 -0.006 20.8 89.7

Bus135 0.400 97.035 -1.9 0.000 0.000 0.003 0.002 DB-B01-01 -0.003 -0.002 5.5 88.4

Bus136 0.400 96.819 -1.8 0.000 0.000 0.012 0.006 DB-B01-02 -0.012 -0.006 20.6 89.9

Bus137 0.400 96.915 -1.9 0.000 0.000 0.014 0.007 DB-B01-02 -0.014 -0.007 22.5 89.8

Bus138 0.400 96.868 -1.9 0.000 0.000 0.012 0.006 DB-B01-02 -0.012 -0.006 20.6 89.8

Bus139 0.400 97.007 -1.9 0.000 0.000 0.013 0.006 DB-B01-02 -0.013 -0.006 20.8 89.7

Bus140 0.400 97.152 -1.9 0.000 0.000 0.003 0.002 DB-B01-02 -0.003 -0.002 5.5 88.4

Bus141 0.400 97.925 -1.7 0.000 0.000 0.009 0.005 DB-B02-4 -0.009 -0.005 15.0 89.6

Bus142 0.400 97.837 -1.7 0.000 0.000 0.009 0.004 DB-B02-4 -0.009 -0.004 15.1 89.8

Bus143 0.400 97.752 -1.7 0.000 0.000 0.009 0.004 DB-B02-5 -0.009 -0.004 15.0 89.7

Bus144 0.400 97.797 -1.7 0.000 0.000 0.009 0.004 11-SMDP-16 -0.009 -0.004 14.1 90.0

Bus145 0.400 97.617 -1.6 0.000 0.000 0.010 0.005 DB-B02-5 -0.010 -0.005 17.1 89.9

Bus146 0.400 97.788 -1.7 0.000 0.000 0.009 0.005 DB-B02-5 -0.009 -0.005 15.0 89.6

Bus147 0.400 96.947 -1.5 0.000 0.000 0.035 0.017 11-SMDP-16 -0.035 -0.017 58.1 90.0

Bus148 0.400 97.700 -1.6 0.000 0.000 0.009 0.004 DB-B02-5 -0.009 -0.004 15.0 89.8

Bus149 0.400 97.566 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.7

Bus150 0.400 97.432 -1.6 0.000 0.000 0.010 0.005 DB-B02-6 -0.010 -0.005 17.0 89.9

Bus151 0.400 97.602 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.6

Bus152 0.400 97.515 -1.6 0.000 0.000 0.009 0.004 DB-B02-6 -0.009 -0.004 15.0 89.8

Bus153 0.400 97.106 -1.5 0.000 0.000 0.035 0.017 21-SMDP-7 -0.035 -0.017 58.2 90.0

Bus154 0.400 97.940 -1.6 0.000 0.000 0.009 0.005 DB-B02-02 -0.009 -0.005 15.1 89.8

* Bus155 13.800 100.000 0.0 6.396 3.292 0.000 0.000 MV SWGR#1 6.396 3.292 301.0 88.9
Project: ETAP Page: 96

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus156 0.400 98.046 -1.6 0.000 0.000 0.014 0.007 21-SMDP-7 -0.014 -0.007 22.5 90.0

Bus157 0.400 97.225 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 20.7 90.0

Bus158 0.400 97.321 -1.6 0.000 0.000 0.014 0.007 DB-B01-17 -0.014 -0.007 22.7 90.0

Bus159 0.400 96.668 -1.8 0.000 0.000 0.012 0.006 DB-B01-33 -0.012 -0.006 20.5 89.9

Bus160 0.400 96.764 -1.8 0.000 0.000 0.014 0.007 DB-B01-33 -0.014 -0.007 22.5 89.8

Bus161 0.400 96.717 -1.8 0.000 0.000 0.012 0.006 DB-B01-33 -0.012 -0.006 20.6 89.8

Bus162 0.400 96.856 -1.9 0.000 0.000 0.013 0.006 DB-B01-33 -0.013 -0.006 20.8 89.7

Bus163 0.400 97.000 -1.9 0.000 0.000 0.003 0.002 DB-B01-33 -0.003 -0.002 5.5 88.3

Bus164 0.400 96.810 -1.8 0.000 0.000 0.012 0.006 DB-B01-34 -0.012 -0.006 20.6 89.9

Bus165 0.400 98.075 -1.6 0.000 0.000 0.009 0.005 DB-B02-03 -0.009 -0.005 15.1 89.8

Bus166 0.400 98.150 -1.6 0.000 0.000 0.010 0.005 DB-B02-03 -0.010 -0.005 17.1 89.7

Bus167 0.400 98.023 -1.6 0.000 0.000 0.009 0.004 DB-B02-03 -0.009 -0.004 15.1 89.9

Bus168 0.400 98.127 -1.6 0.000 0.000 0.009 0.005 DB-B02-03 -0.009 -0.005 15.1 89.8

Bus169 0.400 96.906 -1.9 0.000 0.000 0.014 0.007 DB-B01-34 -0.014 -0.007 22.5 89.8

Bus170 0.400 96.859 -1.8 0.000 0.000 0.012 0.006 DB-B01-34 -0.012 -0.006 20.6 89.8

Bus171 0.400 96.998 -1.9 0.000 0.000 0.013 0.006 DB-B01-34 -0.013 -0.006 20.8 89.7

Bus172 0.400 97.143 -1.9 0.000 0.000 0.003 0.002 DB-B01-34 -0.003 -0.002 5.5 88.4

Bus173 0.400 97.273 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 20.7 90.0

Bus174 0.400 97.760 -1.7 0.000 0.000 0.009 0.005 DB-B02-12 -0.009 -0.005 15.0 89.7

Bus175 0.400 97.625 -1.7 0.000 0.000 0.010 0.005 DB-B02-12 -0.010 -0.005 17.1 89.9

Bus176 0.400 97.796 -1.7 0.000 0.000 0.009 0.005 DB-B02-12 -0.009 -0.005 15.0 89.6

Bus177 0.400 97.180 -1.7 0.000 0.000 0.013 0.006 DB-B03-01 -0.013 -0.006 21.5 89.9

Bus178 0.400 96.621 -1.8 0.000 0.000 0.005 0.002 12-SMDP-5 -0.005 -0.002 8.3 90.0

Bus179 0.400 97.305 -1.7 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 23.3 89.8

Bus180 0.400 97.906 -1.6 0.000 0.000 0.013 0.006 DB-B03-04 -0.013 -0.006 21.7 89.9

Bus181 0.400 96.588 -1.8 0.000 0.000 0.021 0.010 12-SMDP-5 -0.021 -0.010 34.3 90.0

Bus182 0.400 98.033 -1.6 0.000 0.000 0.014 0.007 DB-B03-04 -0.014 -0.007 23.5 89.9

Bus183 0.400 98.151 -1.6 0.000 0.000 0.012 0.006 DB-B03-04 -0.012 -0.006 19.1 89.8

Bus184 0.400 97.858 -1.5 0.000 0.000 0.014 0.007 DB-B03-04 -0.014 -0.007 22.9 89.9

Bus185 0.400 98.105 -1.6 0.000 0.000 0.013 0.007 DB-B03-04 -0.013 -0.007 21.9 89.9

Bus186 0.400 98.166 -1.6 0.000 0.000 0.015 0.007 DB-B03-04 -0.015 -0.007 24.1 89.8

Bus187 0.400 97.422 -1.8 0.000 0.000 0.011 0.006 DB-B03-01 -0.011 -0.006 19.0 89.7

Bus188 0.400 97.132 -1.7 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 22.8 89.9
Project: ETAP Page: 97

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus189 0.400 97.377 -1.8 0.000 0.000 0.013 0.006 DB-B03-01 -0.013 -0.006 21.7 89.8

Bus190 0.400 97.437 -1.8 0.000 0.000 0.014 0.007 DB-B03-01 -0.014 -0.007 23.9 89.7

Bus191 0.400 97.273 -1.7 0.000 0.000 0.013 0.006 DB-B03-03 -0.013 -0.006 21.5 89.9

Bus192 0.400 97.398 -1.7 0.000 0.000 0.014 0.007 DB-B03-03 -0.014 -0.007 23.3 89.8

Bus193 0.400 97.515 -1.8 0.000 0.000 0.012 0.006 DB-B03-03 -0.012 -0.006 19.0 89.7

Bus194 0.400 97.030 -1.8 0.000 0.000 0.012 0.006 DB-B01-35 -0.012 -0.006 20.6 89.7

Bus195 0.400 96.859 -1.8 0.000 0.000 0.014 0.007 DB-B01-35 -0.014 -0.007 22.5 89.9

Bus196 0.400 97.101 -1.8 0.000 0.000 0.012 0.006 DB-B01-35 -0.012 -0.006 20.6 89.5

Bus197 0.400 96.957 -1.8 0.000 0.000 0.013 0.006 DB-B01-35 -0.013 -0.006 20.8 89.8

Bus198 0.400 97.107 -1.8 0.000 0.000 0.003 0.002 DB-B01-35 -0.003 -0.002 5.6 89.5

Bus199 0.400 97.159 -1.8 0.000 0.000 0.012 0.006 DB-B01-36 -0.012 -0.006 20.6 89.7

Bus200 0.400 96.988 -1.8 0.000 0.000 0.014 0.007 DB-B01-36 -0.014 -0.007 22.6 89.9

Bus201 0.400 97.230 -1.9 0.000 0.000 0.012 0.006 DB-B01-36 -0.012 -0.006 20.6 89.5

Bus202 0.400 97.086 -1.8 0.000 0.000 0.013 0.006 DB-B01-36 -0.013 -0.006 20.8 89.8

Bus203 0.400 97.236 -1.9 0.000 0.000 0.003 0.002 DB-B01-36 -0.003 -0.002 5.6 89.5

Bus204 0.400 97.225 -1.7 0.000 0.000 0.014 0.007 DB-B03-03 -0.014 -0.007 22.8 89.9

Bus205 0.400 97.470 -1.7 0.000 0.000 0.013 0.006 DB-B03-03 -0.013 -0.006 21.7 89.8

Bus206 0.400 97.531 -1.8 0.000 0.000 0.015 0.007 DB-B03-03 -0.015 -0.007 23.9 89.7

Bus207 0.400 97.708 -1.7 0.000 0.000 0.009 0.004 DB-B02-12 -0.009 -0.004 15.0 89.8

Bus208 0.400 97.574 -1.7 0.000 0.000 0.009 0.004 DB-B02-13 -0.009 -0.004 15.0 89.7

Bus209 0.400 97.440 -1.6 0.000 0.000 0.010 0.005 DB-B02-13 -0.010 -0.005 17.1 89.9

Bus210 0.400 97.610 -1.7 0.000 0.000 0.009 0.005 DB-B02-13 -0.009 -0.005 15.0 89.6

Bus211 0.400 97.523 -1.6 0.000 0.000 0.009 0.004 DB-B02-13 -0.009 -0.004 15.0 89.8

Bus212 0.400 97.414 -1.6 0.000 0.000 0.013 0.006 DB-B01-17 -0.013 -0.006 21.0 90.0

Bus213 0.400 97.559 -1.6 0.000 0.000 0.003 0.002 DB-B01-17 -0.003 -0.002 5.7 89.8

Bus214 0.400 97.958 -1.6 0.000 0.000 0.009 0.004 21-SMDP-7 -0.009 -0.004 14.1 90.0

Bus215 0.400 98.539 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.0 90.0

Bus216 0.400 97.401 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.7

Bus217 0.400 97.267 -1.6 0.000 0.000 0.010 0.005 DB-B02-14 -0.010 -0.005 17.0 89.8

Bus218 0.400 97.437 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.5

Bus219 0.400 97.350 -1.6 0.000 0.000 0.009 0.004 DB-B02-14 -0.009 -0.004 15.0 89.8

Bus220 0.400 97.457 -1.8 0.000 0.000 0.009 0.004 DB-B02-15 -0.009 -0.004 15.0 89.6

Bus221 0.400 97.322 -1.8 0.000 0.000 0.010 0.005 DB-B02-15 -0.010 -0.005 17.0 89.8
Project: ETAP Page: 98

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus222 0.400 97.493 -1.8 0.000 0.000 0.009 0.005 DB-B02-15 -0.009 -0.005 14.9 89.5

Bus223 0.400 97.405 -1.8 0.000 0.000 0.009 0.004 DB-B02-15 -0.009 -0.004 15.0 89.7

Bus224 0.400 97.413 -1.8 0.000 0.000 0.009 0.004 DB-B02-16 -0.009 -0.004 15.0 89.6

Bus225 0.400 97.279 -1.8 0.000 0.000 0.010 0.005 DB-B02-16 -0.010 -0.005 17.0 89.8

Bus226 0.400 97.449 -1.8 0.000 0.000 0.009 0.005 DB-B02-16 -0.009 -0.005 14.9 89.5

Bus227 0.400 97.362 -1.8 0.000 0.000 0.009 0.004 DB-B02-16 -0.009 -0.004 15.0 89.7

Bus231 0.400 98.225 -1.7 0.000 0.000 0.022 0.010 27-SMDP-07 -0.022 -0.010 35.3 90.1

Bus232 0.400 96.289 -1.6 0.000 0.000 0.028 0.013 13-SMDP-7 -0.028 -0.013 46.2 90.0

Bus233 0.400 97.538 -1.5 0.000 0.000 0.028 0.014 27-SMDP-07 -0.028 -0.014 46.7 90.0

Bus237 0.400 97.945 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 20.8 89.9

Bus238 0.400 98.070 -1.6 0.000 0.000 0.014 0.007 DB-B01-040 -0.014 -0.007 22.8 89.8

Bus239 0.400 97.894 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 20.9 89.9

Bus240 0.400 98.013 -1.6 0.000 0.000 0.013 0.006 DB-B01-040 -0.013 -0.006 21.1 89.9

Bus241 0.400 98.231 -1.7 0.000 0.000 0.003 0.002 DB-B01-040 -0.003 -0.002 5.6 89.1

Bus242 0.400 97.762 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 20.8 89.9

Bus243 0.400 97.887 -1.6 0.000 0.000 0.014 0.007 DB-B01-041 -0.014 -0.007 22.8 89.8

Bus244 0.400 97.711 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 20.8 89.9

Bus245 0.400 97.830 -1.6 0.000 0.000 0.013 0.006 DB-B01-041 -0.013 -0.006 21.0 89.9

Bus246 0.400 98.048 -1.6 0.000 0.000 0.003 0.002 DB-B01-041 -0.003 -0.002 5.6 89.1

Bus247 0.400 97.580 -1.6 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 20.7 89.9

Bus248 0.400 97.705 -1.6 0.000 0.000 0.014 0.007 DB-B01-042 -0.014 -0.007 22.7 89.8

Bus249 0.400 97.529 -1.5 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 20.8 89.9

Bus250 0.400 97.648 -1.6 0.000 0.000 0.013 0.006 DB-B01-042 -0.013 -0.006 21.0 89.9

Bus251 0.400 97.865 -1.6 0.000 0.000 0.003 0.002 DB-B01-042 -0.003 -0.002 5.6 89.1

Bus252 0.400 97.253 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.7 89.9

Bus253 0.400 97.377 -1.7 0.000 0.000 0.014 0.007 DB-B01-37 -0.014 -0.007 22.7 89.8

Bus254 0.400 97.202 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.7 89.9

Bus255 0.400 97.321 -1.6 0.000 0.000 0.013 0.006 DB-B01-37 -0.013 -0.006 20.9 89.9

Bus256 0.400 97.537 -1.7 0.000 0.000 0.003 0.002 DB-B01-37 -0.003 -0.002 5.6 88.9

Bus257 0.400 97.447 -1.7 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 20.7 89.9

Bus258 0.400 97.572 -1.7 0.000 0.000 0.014 0.007 DB-B01-38. -0.014 -0.007 22.7 89.8

Bus259 0.400 97.396 -1.6 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 20.8 89.9

Bus260 0.400 97.515 -1.7 0.000 0.000 0.013 0.006 DB-B01-38. -0.013 -0.006 21.0 89.9
Project: ETAP Page: 99

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus261 0.400 97.732 -1.7 0.000 0.000 0.003 0.002 DB-B01-38. -0.003 -0.002 5.6 89.0

Bus262 0.400 97.577 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 20.7 89.9

Bus263 0.400 97.702 -1.7 0.000 0.000 0.014 0.007 DB-B01-39 -0.014 -0.007 22.7 89.8

Bus264 0.400 97.526 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 20.8 89.9

Bus265 0.400 97.645 -1.7 0.000 0.000 0.013 0.006 DB-B01-39 -0.013 -0.006 21.0 89.9

Bus266 0.400 97.862 -1.7 0.000 0.000 0.003 0.002 DB-B01-39 -0.003 -0.002 5.6 89.0

Bus267 0.400 98.035 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 0.000 0.000 0.3 90.4

Bus271 0.400 97.342 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 20.7 90.0

Bus272 0.400 97.438 -1.6 0.000 0.000 0.014 0.007 DB-B01-18 -0.014 -0.007 22.7 90.0

Bus273 0.400 97.390 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 20.8 90.0

Bus274 0.400 97.531 -1.6 0.000 0.000 0.013 0.006 DB-B01-18 -0.013 -0.006 21.0 90.0

Bus275 0.400 97.676 -1.6 0.000 0.000 0.003 0.002 DB-B01-18 -0.003 -0.002 5.7 89.9

Bus278 0.400 98.455 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 0.000 0.000 0.4 90.7

Bus282 0.400 97.198 -1.8 0.000 0.000 0.012 0.006 DB-B01-031 -0.012 -0.006 20.6 89.7

Bus283 0.400 97.026 -1.8 0.000 0.000 0.014 0.007 DB-B01-031 -0.014 -0.007 22.6 89.9

Bus284 0.400 97.268 -1.9 0.000 0.000 0.012 0.006 DB-B01-031 -0.012 -0.006 20.6 89.6

Bus285 0.400 97.124 -1.8 0.000 0.000 0.013 0.006 DB-B01-031 -0.013 -0.006 20.8 89.8

Bus286 0.400 97.340 -1.9 0.000 0.000 0.003 0.002 DB-B01-031 -0.003 -0.002 5.5 88.6

Bus287 0.400 96.991 -1.8 0.000 0.000 0.012 0.006 DB-B01-032 -0.012 -0.006 20.5 89.7

Bus288 0.400 96.819 -1.8 0.000 0.000 0.014 0.007 DB-B01-032 -0.014 -0.007 22.5 89.9

Bus289 0.400 97.061 -1.8 0.000 0.000 0.012 0.006 DB-B01-032 -0.012 -0.006 20.5 89.5

Bus290 0.400 96.917 -1.8 0.000 0.000 0.013 0.006 DB-B01-032 -0.013 -0.006 20.8 89.8

Bus291 0.400 97.133 -1.8 0.000 0.000 0.003 0.002 DB-B01-032 -0.003 -0.002 5.5 88.5

Bus292 0.400 97.479 -1.9 0.000 0.000 0.000 0.000 27-SMDP-06 0.000 0.000 0.4 91.7

Bus293 13.800 100.000 0.0 0.000 0.000 0.000 -0.005 BUS-2S/S-3 -0.919 -0.469 43.2 89.1

2S/S3 0.918 0.474 43.2 88.8

Bus297 0.400 98.227 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.3 89.9

Bus298 0.400 98.346 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.6 89.8

Bus299 0.400 98.065 -1.5 0.000 0.000 0.016 0.008 DB-B04-01 -0.016 -0.008 26.4 89.9

Bus300 0.400 98.282 -1.5 0.000 0.000 0.018 0.009 DB-B04-01 -0.018 -0.009 28.6 89.9

Bus301 0.400 98.229 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.8

Bus302 0.400 98.094 -1.5 0.000 0.000 0.010 0.005 DB-B02-7 -0.010 -0.005 17.2 89.9

Bus303 0.400 98.265 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.7
Project: ETAP Page: 100

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus304 0.400 98.177 -1.6 0.000 0.000 0.009 0.005 DB-B02-7 -0.009 -0.005 15.1 89.9

Bus305 0.400 97.277 -1.5 0.000 0.000 0.021 0.010 22-SMDP-5 -0.021 -0.010 34.6 90.0

Bus309 0.400 98.030 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.8

Bus310 0.400 97.895 -1.5 0.000 0.000 0.010 0.005 DB-B02-08 -0.010 -0.005 17.1 89.9

Bus311 0.400 98.066 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.7

Bus312 0.400 97.762 -1.6 0.000 0.000 0.013 0.006 DB-B03-02 -0.013 -0.006 21.6 89.9

Bus313 0.400 97.888 -1.6 0.000 0.000 0.014 0.007 DB-B03-02 -0.014 -0.007 23.5 89.9

Bus314 0.400 98.006 -1.6 0.000 0.000 0.012 0.006 DB-B03-02 -0.012 -0.006 19.1 89.8

Bus315 0.400 97.714 -1.6 0.000 0.000 0.014 0.007 DB-B03-02 -0.014 -0.007 22.9 89.9

Bus316 0.400 97.960 -1.6 0.000 0.000 0.013 0.006 DB-B03-02 -0.013 -0.006 21.8 89.9

Bus317 0.400 97.978 -1.5 0.000 0.000 0.009 0.005 DB-B02-08 -0.009 -0.005 15.1 89.8

Bus318 0.400 97.844 -1.5 0.000 0.000 0.009 0.005 DB-B08-09 -0.009 -0.005 15.1 89.8

Bus319 0.400 97.709 -1.5 0.000 0.000 0.010 0.005 DB-B08-09 -0.010 -0.005 17.1 89.9

Bus320 0.400 97.880 -1.5 0.000 0.000 0.009 0.005 DB-B08-09 -0.009 -0.005 15.1 89.7

Bus321 0.400 97.792 -1.5 0.000 0.000 0.009 0.004 DB-B08-09 -0.009 -0.004 15.1 89.8

Bus322 0.400 97.052 -1.8 0.000 0.000 0.026 0.013 DB-B14 -0.026 -0.013 42.9 89.8

Bus323 0.400 96.638 -1.7 0.000 0.000 0.010 0.005 DB-B14 -0.010 -0.005 17.4 89.9

Bus324 0.400 96.638 -1.7 0.000 0.000 0.010 0.005 DB-B14 -0.010 -0.005 17.4 89.9

Bus326 13.800 100.000 0.0 0.000 0.000 0.000 -0.007 BUS-1S/S-01 -1.018 -0.522 47.9 89.0

1S/S1-LV-PANEL 1.018 0.529 48.0 88.7

Bus327 13.800 100.000 0.0 0.000 0.000 0.001 -0.007 BUS-1S/S-02 -1.006 -0.515 47.3 89.0

1S/S2-LV-PANEL2 1.005 0.522 47.4 88.7

Bus335 0.400 98.003 -1.5 0.000 0.000 0.011 0.005 13-SMDP-04 -0.011 -0.005 17.6 90.0

Bus377 0.400 96.925 -1.8 0.000 0.000 0.011 0.006 14-SMDP-01 -0.011 -0.006 19.0 90.0

Bus393 0.400 98.056 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.8

Bus394 0.400 98.314 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.4 89.9

Bus395 0.400 98.432 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.6 89.8

Bus396 0.400 98.151 -1.5 0.000 0.000 0.016 0.008 DB-B04-2 -0.016 -0.008 26.4 89.9

Bus397 0.400 98.369 -1.5 0.000 0.000 0.018 0.009 DB-B04-2 -0.018 -0.009 28.7 89.9

Bus398 0.400 98.449 -1.5 0.000 0.000 0.018 0.009 13-SMDP-1 -0.018 -0.009 29.0 90.1

Bus399 0.400 97.921 -1.6 0.000 0.000 0.010 0.005 DB-B02-10 -0.010 -0.005 17.1 89.9

Bus400 0.400 98.092 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.7

Bus401 0.400 98.004 -1.6 0.000 0.000 0.009 0.005 DB-B02-10 -0.009 -0.005 15.1 89.8
Project: ETAP Page: 101

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus402 0.400 97.907 -1.6 0.000 0.000 0.009 0.005 DB-B02-011 -0.009 -0.005 15.1 89.8

Bus403 0.400 97.772 -1.5 0.000 0.000 0.010 0.005 DB-B02-011 -0.010 -0.005 17.1 89.9

Bus404 0.400 97.943 -1.6 0.000 0.000 0.009 0.005 DB-B02-011 -0.009 -0.005 15.1 89.7

Bus405 0.400 97.855 -1.6 0.000 0.000 0.009 0.004 DB-B02-011 -0.009 -0.004 15.1 89.8

Bus406 0.400 98.431 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 20.9 90.0

Bus407 0.400 98.557 -1.4 0.000 0.000 0.014 0.007 DB-B01-022 -0.014 -0.007 23.0 89.9

Bus408 0.400 98.380 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 21.0 90.0

Bus409 0.400 98.500 -1.4 0.000 0.000 0.013 0.006 DB-B01-022 -0.013 -0.006 21.2 89.9

Bus410 0.400 98.719 -1.4 0.000 0.000 0.004 0.002 DB-B01-022 -0.004 -0.002 5.7 89.6

Bus411 0.400 98.234 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 20.9 90.0

Bus412 0.400 98.360 -1.4 0.000 0.000 0.014 0.007 DB-B01-023 -0.014 -0.007 22.9 89.9

Bus413 0.400 98.183 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 20.9 90.0

Bus414 0.400 98.303 -1.4 0.000 0.000 0.013 0.006 DB-B01-023 -0.013 -0.006 21.2 89.9

Bus415 0.400 98.521 -1.4 0.000 0.000 0.003 0.002 DB-B01-023 -0.003 -0.002 5.7 89.6

Bus416 0.400 98.064 -1.4 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 20.9 89.9

Bus417 0.400 98.190 -1.4 0.000 0.000 0.014 0.007 DB-B01-024 -0.014 -0.007 22.9 89.9

Bus418 0.400 98.013 -1.3 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 20.9 90.0

Bus419 0.400 98.133 -1.4 0.000 0.000 0.013 0.006 DB-B01-024 -0.013 -0.006 21.1 89.9

Bus420 0.400 98.351 -1.4 0.000 0.000 0.003 0.002 DB-B01-024 -0.003 -0.002 5.7 89.5

Bus421 0.400 97.840 -1.4 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 20.8 89.9

Bus422 0.400 97.966 -1.5 0.000 0.000 0.014 0.007 DB-B01-019 -0.014 -0.007 22.8 89.9

Bus423 0.400 97.789 -1.4 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 20.9 90.0

Bus424 0.400 97.908 -1.5 0.000 0.000 0.013 0.006 DB-B01-019 -0.013 -0.006 21.1 89.9

Bus425 0.400 98.126 -1.5 0.000 0.000 0.003 0.002 DB-B01-019 -0.003 -0.002 5.7 89.5

Bus426 0.400 97.840 -1.4 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 20.8 89.9

Bus427 0.400 97.966 -1.5 0.000 0.000 0.014 0.007 DB-B01-020 -0.014 -0.007 22.8 89.9

Bus428 0.400 97.789 -1.4 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 20.9 90.0

Bus429 0.400 97.908 -1.5 0.000 0.000 0.013 0.006 DB-B01-020 -0.013 -0.006 21.1 89.9

Bus430 0.400 98.126 -1.5 0.000 0.000 0.003 0.002 DB-B01-020 -0.003 -0.002 5.7 89.5

Bus431 0.400 97.645 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 20.8 89.9

Bus432 0.400 97.770 -1.4 0.000 0.000 0.014 0.007 DB-B01-021 -0.014 -0.007 22.8 89.9

Bus433 0.400 97.594 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 20.8 89.9

Bus434 0.400 97.713 -1.4 0.000 0.000 0.013 0.006 DB-B01-021 -0.013 -0.006 21.0 89.9
Project: ETAP Page: 102

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus435 0.400 97.931 -1.5 0.000 0.000 0.003 0.002 DB-B01-021 -0.003 -0.002 5.7 89.4

Bus436 0.400 98.517 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 0.000 0.000 0.3 90.2

Bus437 0.400 98.026 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 20.8 89.9

Bus438 0.400 97.966 -1.4 0.000 0.000 0.014 0.007 DB-B01-025 -0.014 -0.007 22.8 89.9

Bus439 0.400 97.890 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 20.9 89.9

Bus440 0.400 97.837 -1.4 0.000 0.000 0.013 0.006 DB-B01-025 -0.013 -0.006 21.1 89.9

Bus441 0.400 98.060 -1.4 0.000 0.000 0.003 0.002 DB-B01-025 -0.003 -0.002 5.7 89.8

Bus442 0.400 98.222 -1.5 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 20.9 89.9

Bus443 0.400 98.162 -1.4 0.000 0.000 0.014 0.007 DB-B01-026 -0.014 -0.007 22.9 89.9

Bus444 0.400 98.085 -1.4 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 20.9 89.9

Bus445 0.400 98.032 -1.4 0.000 0.000 0.013 0.006 DB-B01-026 -0.013 -0.006 21.1 89.9

Bus446 0.400 98.256 -1.5 0.000 0.000 0.003 0.002 DB-B01-026 -0.003 -0.002 5.7 89.8

Bus447 0.400 98.419 -1.5 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 20.9 89.9

Bus448 0.400 98.359 -1.5 0.000 0.000 0.014 0.007 DB-B01-027 -0.014 -0.007 22.9 89.9

Bus449 0.400 98.282 -1.4 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 21.0 89.9

Bus450 0.400 98.229 -1.4 0.000 0.000 0.013 0.006 DB-B01-027 -0.013 -0.006 21.1 90.0

Bus451 0.400 98.453 -1.5 0.000 0.000 0.003 0.002 DB-B01-027 -0.003 -0.002 5.7 89.8

Bus452 0.400 97.845 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 20.8 89.9

Bus453 0.400 97.943 -1.5 0.000 0.000 0.014 0.007 DB-B01-028 -0.014 -0.007 22.8 89.9

Bus454 0.400 97.894 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 20.9 89.9

Bus455 0.400 98.036 -1.5 0.000 0.000 0.013 0.006 DB-B01-028 -0.013 -0.006 21.1 89.9

Bus456 0.400 98.181 -1.6 0.000 0.000 0.003 0.002 DB-B01-028 -0.003 -0.002 5.7 89.4

Bus457 0.400 97.702 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 20.8 89.9

Bus458 0.400 97.799 -1.5 0.000 0.000 0.014 0.007 DB-B01-029 -0.014 -0.007 22.8 89.9

Bus459 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-04 -1.016 -0.534 48.0 88.5

1S/S4-LV-PANEL 1.015 0.534 48.0 88.5

Bus460 0.400 96.546 -1.7 0.000 0.000 0.023 0.011 14-SMDP-01 -0.023 -0.011 38.7 90.0

Bus461 0.400 97.751 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 20.8 89.9

Bus462 0.400 97.315 -1.8 0.000 0.000 0.032 0.015 14-SMDP-01 -0.032 -0.015 52.3 90.0

Bus463 0.400 96.477 -1.7 0.000 0.000 0.032 0.015 14-SMDP-01 -0.032 -0.015 52.4 90.0

Bus464 0.400 97.327 -1.8 0.000 0.000 0.009 0.005 14-SMDP-01 -0.009 -0.005 15.5 90.0

Bus465 0.400 97.171 -1.8 0.000 0.000 0.011 0.006 14-SMDP-01 -0.011 -0.006 19.0 90.0

Bus466 0.400 97.892 -1.5 0.000 0.000 0.013 0.006 DB-B01-029 -0.013 -0.006 21.1 89.9
Project: ETAP Page: 103

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus467 0.400 97.415 -1.9 0.000 0.000 0.001 0.001 14-SMDP-01 -0.001 -0.001 2.0 90.0

Bus468 0.400 98.037 -1.6 0.000 0.000 0.003 0.002 DB-B01-029 -0.003 -0.002 5.7 89.4

Bus469 0.400 96.235 -1.6 0.000 0.000 0.028 0.013 14-SMDP-01 -0.028 -0.013 46.1 90.0

Bus470 0.400 95.845 -1.5 0.000 0.000 0.010 0.005 14-SMDP-01 -0.010 -0.005 17.2 90.0

Bus471 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0

Bus472 0.400 97.009 -2.0 0.000 0.000 0.108 0.052 1S/S4-LV-PANEL -0.108 -0.052 177.8 90.0

Bus473 0.400 97.507 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 20.7 89.9

Bus474 0.400 97.009 -2.0 0.000 0.000 0.108 0.052 1S/S4-LV-PANEL -0.108 -0.052 177.8 90.0

Bus475 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0

Bus476 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0

Bus477 0.400 97.429 -1.9 0.000 0.000 0.152 0.073 1S/S4-LV-PANEL -0.152 -0.073 249.5 90.0

Bus478 0.400 97.604 -1.5 0.000 0.000 0.014 0.007 DB-B01-30 -0.014 -0.007 22.7 89.9

Bus479 0.400 97.556 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 20.8 89.9

Bus480 0.400 97.696 -1.5 0.000 0.000 0.013 0.006 DB-B01-30 -0.013 -0.006 21.0 89.9

Bus481 0.400 97.842 -1.5 0.000 0.000 0.003 0.002 DB-B01-30 -0.003 -0.002 5.7 89.3

Bus482 0.400 97.638 -1.6 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 20.7 89.8

Bus483 0.400 97.465 -1.6 0.000 0.000 0.014 0.007 DB-B01-31 -0.014 -0.007 22.7 89.9

Bus484 0.400 97.709 -1.7 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 20.8 89.7

Bus485 0.400 97.564 -1.6 0.000 0.000 0.013 0.006 DB-B01-31 -0.013 -0.006 21.0 89.9

Bus486 0.400 97.715 -1.7 0.000 0.000 0.003 0.002 DB-B01-31 -0.003 -0.002 5.7 89.7

Bus487 0.400 97.508 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.7 89.8

Bus488 0.400 97.336 -1.6 0.000 0.000 0.014 0.007 DB-B01-32 -0.014 -0.007 22.7 89.9

Bus489 0.400 97.579 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.7 89.7

Bus490 0.400 97.434 -1.6 0.000 0.000 0.013 0.006 DB-B01-32 -0.013 -0.006 20.9 89.9

Bus491 0.400 97.585 -1.6 0.000 0.000 0.003 0.002 DB-B01-32 -0.003 -0.002 5.6 89.7

Bus492 0.400 97.936 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 0.000 0.000 0.4 91.2

Bus503 0.400 98.002 -1.3 0.000 0.000 0.029 0.014 17-SMDP-6 -0.029 -0.014 47.0 90.0

Bus508 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-05 -0.728 -0.375 34.3 88.9

1S/S5-LV-PANEL1 0.728 0.375 34.3 88.9

Bus509 0.400 99.260 -1.4 0.000 0.000 0.714 0.346 1S/S5-LV-PANEL1 -0.714 -0.346 1153.6 90.0

Bus510 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-06 -0.807 -0.416 38.0 88.9

1S/S6-LV-PANEL 0.807 0.417 38.0 88.9

Bus512 13.800 100.000 0.0 0.000 0.000 -0.001 -0.004 BUS-1S/S-07 -0.876 -0.447 41.1 89.1
Project: ETAP Page: 104

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

1S/S7-LV-PANEL 0.876 0.450 41.2 88.9

Bus513 0.400 98.390 -1.4 0.000 0.000 0.020 0.010 17-SMDP-6 -0.020 -0.010 33.2 90.0

Bus514 0.400 98.691 -1.5 0.000 0.000 0.022 0.011 17-SMDP-6 -0.022 -0.011 35.5 90.0

Bus535 0.400 97.211 -1.5 0.000 0.000 0.021 0.010 16-SMDP-2 -0.021 -0.010 34.6 90.0

Bus536 0.400 99.074 -1.5 0.000 0.000 0.658 0.319 1S/S6-LV-PANEL -0.658 -0.319 1064.5 90.0

Bus954 0.400 97.278 -1.9 0.000 0.000 0.032 0.015 24-SMDP-01 -0.032 -0.015 52.3 90.0

Bus955 0.400 96.198 -1.7 0.000 0.000 0.028 0.013 24-SMDP-01 -0.028 -0.013 46.1 90.0

Bus956 0.400 96.441 -1.7 0.000 0.000 0.032 0.015 24-SMDP-01 -0.032 -0.015 52.4 90.0

Bus957 0.400 97.290 -1.9 0.000 0.000 0.009 0.005 24-SMDP-01 -0.009 -0.005 15.5 90.0

Bus958 0.400 97.113 -1.8 0.000 0.000 0.011 0.006 24-SMDP-01 -0.011 -0.006 18.9 90.0

Bus959 0.400 97.378 -1.9 0.000 0.000 0.001 0.001 24-SMDP-01 -0.001 -0.001 2.0 90.0

Bus960 0.400 96.888 -1.8 0.000 0.000 0.011 0.006 24-SMDP-01 -0.011 -0.006 19.0 90.0

Bus961 0.400 93.125 -0.8 0.000 0.000 0.026 0.013 24-SMDP-01 -0.026 -0.013 44.6 90.0

Bus962 0.400 95.501 -1.4 0.000 0.000 0.010 0.005 24-SMDP-01 -0.010 -0.005 17.2 90.0

Bus963 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0

Bus964 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0

Bus965 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0

Bus966 0.400 97.417 -1.9 0.000 0.000 0.152 0.073 2S/S4 -0.152 -0.073 249.4 90.0

Bus967 0.400 96.997 -2.0 0.000 0.000 0.108 0.052 2S/S4 -0.108 -0.052 177.8 90.0

Bus968 0.400 96.997 -2.0 0.000 0.000 0.108 0.052 2S/S4 -0.108 -0.052 177.8 90.0

Bus969 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-4 -1.019 -0.535 48.2 88.5

2S/S4 1.019 0.536 48.2 88.5

Bus970 0.400 98.327 -1.5 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.4 89.9

Bus971 0.400 98.446 -1.5 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.6 89.8

Bus972 0.400 98.165 -1.4 0.000 0.000 0.016 0.008 DB-B04-1 -0.016 -0.008 26.4 89.9

Bus973 0.400 98.382 -1.5 0.000 0.000 0.018 0.009 DB-B04-1 -0.018 -0.009 28.7 89.9

Bus974 0.400 98.414 -1.5 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.4 89.9

Bus975 0.400 98.532 -1.5 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.6 89.8

Bus976 0.400 98.251 -1.4 0.000 0.000 0.016 0.008 DB-B04-02 -0.016 -0.008 26.5 89.9

Bus977 0.400 98.469 -1.5 0.000 0.000 0.018 0.009 DB-B04-02 -0.018 -0.009 28.7 89.9

Bus978 0.400 98.549 -1.5 0.000 0.000 0.018 0.009 23-SMDP-01 -0.018 -0.009 29.0 90.0

Bus979 0.400 97.861 -1.5 0.000 0.000 0.013 0.006 DB-B03-2 -0.013 -0.006 21.7 89.9

Bus980 0.400 97.987 -1.5 0.000 0.000 0.014 0.007 DB-B03-2 -0.014 -0.007 23.5 89.9
Project: ETAP Page: 105

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus981 0.400 98.105 -1.6 0.000 0.000 0.012 0.006 DB-B03-2 -0.012 -0.006 19.1 89.8

Bus982 0.400 97.813 -1.5 0.000 0.000 0.014 0.007 DB-B03-2 -0.014 -0.007 22.9 89.9

Bus983 0.400 98.060 -1.6 0.000 0.000 0.013 0.007 DB-B03-2 -0.013 -0.007 21.9 89.9

Bus984 0.400 98.121 -1.6 0.000 0.000 0.015 0.007 DB-B03-2 -0.015 -0.007 24.1 89.8

Bus985 0.400 98.005 -1.5 0.000 0.000 0.013 0.006 DB-B03-4 -0.013 -0.006 21.7 89.9

Bus986 0.400 98.132 -1.5 0.000 0.000 0.014 0.007 DB-B03-4 -0.014 -0.007 23.5 89.9

Bus987 0.400 98.250 -1.6 0.000 0.000 0.012 0.006 DB-B03-4 -0.012 -0.006 19.2 89.9

Bus988 0.400 97.958 -1.5 0.000 0.000 0.014 0.007 DB-B03-4 -0.014 -0.007 23.0 89.9

Bus989 0.400 98.204 -1.6 0.000 0.000 0.013 0.007 DB-B03-4 -0.013 -0.007 21.9 89.9

Bus990 0.400 98.265 -1.6 0.000 0.000 0.015 0.007 DB-B03-4 -0.015 -0.007 24.2 89.8

Bus991 0.400 97.278 -1.7 0.000 0.000 0.013 0.006 DB-B03-1 -0.013 -0.006 21.5 89.9

Bus992 0.400 97.404 -1.7 0.000 0.000 0.014 0.007 DB-B03-1 -0.014 -0.007 23.3 89.9

Bus993 0.400 97.521 -1.7 0.000 0.000 0.012 0.006 DB-B03-1 -0.012 -0.006 19.0 89.7

Bus994 0.400 97.231 -1.7 0.000 0.000 0.014 0.007 DB-B03-1 -0.014 -0.007 22.8 89.9

Bus995 0.400 97.476 -1.7 0.000 0.000 0.013 0.006 DB-B03-1 -0.013 -0.006 21.7 89.8

Bus996 0.400 97.536 -1.7 0.000 0.000 0.015 0.007 DB-B03-1 -0.015 -0.007 23.9 89.7

Bus997 0.400 97.371 -1.7 0.000 0.000 0.013 0.006 DB-B03-3 -0.013 -0.006 21.5 89.9

Bus998 0.400 97.497 -1.7 0.000 0.000 0.014 0.007 DB-B03-3 -0.014 -0.007 23.4 89.9

Bus999 0.400 97.614 -1.7 0.000 0.000 0.012 0.006 DB-B03-3 -0.012 -0.006 19.0 89.8

Bus1000 0.400 97.323 -1.7 0.000 0.000 0.014 0.007 DB-B03-3 -0.014 -0.007 22.8 89.9

Bus1001 0.400 97.569 -1.7 0.000 0.000 0.013 0.006 DB-B03-3 -0.013 -0.006 21.7 89.8

Bus1002 0.400 97.629 -1.7 0.000 0.000 0.015 0.007 DB-B03-3 -0.015 -0.007 24.0 89.7

Bus1003 0.400 97.477 -1.7 0.000 0.000 0.028 0.014 23-SMDP-03 -0.028 -0.014 46.7 90.0

Bus1004 0.400 98.329 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.2 89.8

Bus1005 0.400 98.193 -1.5 0.000 0.000 0.011 0.005 DB-B02-07 -0.011 -0.005 17.2 89.9

Bus1006 0.400 98.365 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.1 89.7

Bus1007 0.400 98.277 -1.5 0.000 0.000 0.009 0.005 DB-B02-07 -0.009 -0.005 15.1 89.9

Bus1008 0.400 98.129 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.8

Bus1009 0.400 97.994 -1.5 0.000 0.000 0.010 0.005 DB-B02-8 -0.010 -0.005 17.2 89.9

Bus1010 0.400 98.166 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.7

Bus1011 0.400 98.077 -1.5 0.000 0.000 0.009 0.005 DB-B02-8 -0.009 -0.005 15.1 89.9

Bus1012 0.400 98.556 -1.6 0.000 0.000 0.000 0.000 23-SMDP-04 0.000 0.000 0.4 90.6

Bus1013 0.400 97.943 -1.5 0.000 0.000 0.009 0.005 DB-B02-9 -0.009 -0.005 15.1 89.8
Project: ETAP Page: 106

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1014 0.400 97.808 -1.4 0.000 0.000 0.010 0.005 DB-B02-9 -0.010 -0.005 17.1 89.9

Bus1015 0.400 97.979 -1.5 0.000 0.000 0.009 0.005 DB-B02-9 -0.009 -0.005 15.1 89.7

Bus1016 0.400 97.891 -1.5 0.000 0.000 0.009 0.004 DB-B02-9 -0.009 -0.004 15.1 89.8

Bus1017 0.400 98.103 -1.5 0.000 0.000 0.011 0.005 23-SMDP-04 -0.011 -0.005 17.6 90.0

Bus1018 0.400 98.156 -1.5 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.8

Bus1019 0.400 98.020 -1.5 0.000 0.000 0.010 0.005 DB-B02-010 -0.010 -0.005 17.2 89.9

Bus1020 0.400 98.192 -1.6 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.7

Bus1021 0.400 98.104 -1.5 0.000 0.000 0.009 0.005 DB-B02-010 -0.009 -0.005 15.1 89.9

Bus1022 0.400 98.006 -1.5 0.000 0.000 0.009 0.005 DB-B02-11 -0.009 -0.005 15.1 89.8

Bus1023 0.400 97.871 -1.5 0.000 0.000 0.010 0.005 DB-B02-11 -0.010 -0.005 17.1 89.9

Bus1024 0.400 98.043 -1.5 0.000 0.000 0.009 0.005 DB-B02-11 -0.009 -0.005 15.1 89.7

Bus1025 0.400 97.955 -1.5 0.000 0.000 0.009 0.004 DB-B02-11 -0.009 -0.004 15.1 89.8

Bus1026 0.400 97.859 -1.6 0.000 0.000 0.009 0.005 DB-B02-012 -0.009 -0.005 15.1 89.7

Bus1027 0.400 97.724 -1.6 0.000 0.000 0.010 0.005 DB-B02-012 -0.010 -0.005 17.1 89.9

Bus1028 0.400 97.895 -1.6 0.000 0.000 0.009 0.005 DB-B02-012 -0.009 -0.005 15.1 89.6

Bus1029 0.400 97.807 -1.6 0.000 0.000 0.009 0.004 DB-B02-012 -0.009 -0.004 15.1 89.8

Bus1030 0.400 97.673 -1.6 0.000 0.000 0.009 0.004 DB-B02-013 -0.009 -0.004 15.0 89.7

Bus1031 0.400 97.538 -1.6 0.000 0.000 0.010 0.005 DB-B02-013 -0.010 -0.005 17.1 89.9

Bus1032 0.400 97.709 -1.6 0.000 0.000 0.009 0.005 DB-B02-013 -0.009 -0.005 15.0 89.6

Bus1033 0.400 97.621 -1.6 0.000 0.000 0.009 0.004 DB-B02-013 -0.009 -0.004 15.0 89.8

Bus1034 0.400 97.500 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.7

Bus1035 0.400 97.366 -1.6 0.000 0.000 0.010 0.005 DB-B02-014 -0.010 -0.005 17.0 89.9

Bus1036 0.400 97.536 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.6

Bus1037 0.400 97.449 -1.6 0.000 0.000 0.009 0.004 DB-B02-014 -0.009 -0.004 15.0 89.8

Bus1038 0.400 97.921 -1.7 0.000 0.000 0.009 0.005 DB-B02-015 -0.009 -0.005 15.1 89.7

Bus1039 0.400 97.786 -1.6 0.000 0.000 0.010 0.005 DB-B02-015 -0.010 -0.005 17.1 89.9

Bus1040 0.400 97.957 -1.7 0.000 0.000 0.009 0.005 DB-B02-015 -0.009 -0.005 15.0 89.6

Bus1041 0.400 97.869 -1.6 0.000 0.000 0.009 0.004 DB-B02-015 -0.009 -0.004 15.1 89.8

Bus1042 0.400 97.877 -1.7 0.000 0.000 0.009 0.005 DB-B02-016 -0.009 -0.005 15.1 89.7

Bus1043 0.400 97.742 -1.6 0.000 0.000 0.010 0.005 DB-B02-016 -0.010 -0.005 17.1 89.9

Bus1044 0.400 97.913 -1.7 0.000 0.000 0.009 0.005 DB-B02-016 -0.009 -0.005 15.0 89.6

Bus1045 0.400 97.826 -1.7 0.000 0.000 0.009 0.004 DB-B02-016 -0.009 -0.004 15.1 89.8

Bus1048 0.400 98.590 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.0 90.0
Project: ETAP Page: 107

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1049 0.400 98.717 -1.3 0.000 0.000 0.014 0.007 DB-B01-40 -0.014 -0.007 23.0 89.9

Bus1051 0.400 98.659 -1.3 0.000 0.000 0.013 0.006 DB-B01-40 -0.013 -0.006 21.2 90.0

Bus1052 0.400 98.879 -1.4 0.000 0.000 0.004 0.002 DB-B01-40 -0.004 -0.002 5.7 89.7

Bus1053 0.400 98.406 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 20.9 90.0

Bus1054 0.400 98.532 -1.3 0.000 0.000 0.014 0.007 DB-B01-41 -0.014 -0.007 23.0 89.9

Bus1055 0.400 98.355 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 21.0 90.0

Bus1056 0.400 98.475 -1.3 0.000 0.000 0.013 0.006 DB-B01-41 -0.013 -0.006 21.2 90.0

Bus1057 0.400 98.694 -1.4 0.000 0.000 0.004 0.002 DB-B01-41 -0.004 -0.002 5.7 89.7

Bus1058 0.400 98.223 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 20.9 90.0

Bus1059 0.400 98.349 -1.3 0.000 0.000 0.014 0.007 DB-B01-42 -0.014 -0.007 22.9 89.9

Bus1060 0.400 98.172 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 20.9 90.0

Bus1061 0.400 98.291 -1.3 0.000 0.000 0.013 0.006 DB-B01-42 -0.013 -0.006 21.2 89.9

Bus1062 0.400 98.510 -1.3 0.000 0.000 0.003 0.002 DB-B01-42 -0.003 -0.002 5.7 89.6

Bus1063 0.400 97.893 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 20.8 90.0

Bus1064 0.400 98.019 -1.4 0.000 0.000 0.014 0.007 DB-B01-037 -0.014 -0.007 22.8 89.9

Bus1065 0.400 97.842 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 20.9 90.0

Bus1066 0.400 97.961 -1.4 0.000 0.000 0.013 0.006 DB-B01-037 -0.013 -0.006 21.1 89.9

Bus1067 0.400 98.179 -1.4 0.000 0.000 0.003 0.002 DB-B01-037 -0.003 -0.002 5.7 89.5

Bus1068 0.400 98.089 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 20.9 90.0

Bus1069 0.400 98.215 -1.4 0.000 0.000 0.014 0.007 DB-B01-38 -0.014 -0.007 22.9 89.9

Bus1070 0.400 98.038 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 20.9 90.0

Bus1071 0.400 98.157 -1.4 0.000 0.000 0.013 0.006 DB-B01-38 -0.013 -0.006 21.1 89.9

Bus1072 0.400 98.376 -1.4 0.000 0.000 0.003 0.002 DB-B01-38 -0.003 -0.002 5.7 89.6

Bus1073 0.400 98.220 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 20.9 90.0

Bus1074 0.400 98.346 -1.4 0.000 0.000 0.014 0.007 DB-B01-039 -0.014 -0.007 22.9 89.9

Bus1075 0.400 98.169 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 20.9 90.0

Bus1076 0.400 98.288 -1.4 0.000 0.000 0.013 0.006 DB-B01-039 -0.013 -0.006 21.2 89.9

Bus1077 0.400 98.507 -1.5 0.000 0.000 0.003 0.002 DB-B01-039 -0.003 -0.002 5.7 89.6

Bus1078 0.400 98.681 -1.5 0.000 0.000 0.000 0.000 22-SMDP-02 0.000 0.000 0.3 90.2

Bus1079 0.400 98.346 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9

Bus1080 0.400 98.422 -1.3 0.000 0.000 0.011 0.005 DB-B02-1 -0.011 -0.005 17.2 89.9

Bus1081 0.400 98.294 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9

Bus1082 0.400 98.398 -1.3 0.000 0.000 0.009 0.005 DB-B02-1 -0.009 -0.005 15.2 89.9
Project: ETAP Page: 108

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1083 0.400 98.534 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9

Bus1084 0.400 98.609 -1.3 0.000 0.000 0.011 0.005 DB-B02-2 -0.011 -0.005 17.3 89.9

Bus1085 0.400 98.482 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9

Bus1086 0.400 98.586 -1.3 0.000 0.000 0.009 0.005 DB-B02-2 -0.009 -0.005 15.2 89.9

Bus1087 0.400 98.722 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 89.9

Bus1088 0.400 98.786 -1.4 0.000 0.000 0.011 0.005 DB-B02-3 -0.011 -0.005 17.3 89.9

Bus1089 0.400 98.643 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 90.0

Bus1090 0.400 98.722 -1.3 0.000 0.000 0.009 0.005 DB-B02-3 -0.009 -0.005 15.2 89.9

Bus1091 0.400 98.533 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9

Bus1092 0.400 98.397 -1.4 0.000 0.000 0.011 0.005 DB-B02-04 -0.011 -0.005 17.2 89.9

Bus1093 0.400 98.570 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9

Bus1094 0.400 98.481 -1.4 0.000 0.000 0.009 0.005 DB-B02-04 -0.009 -0.005 15.2 89.9

Bus1095 0.400 98.396 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.9

Bus1096 0.400 98.260 -1.4 0.000 0.000 0.011 0.005 DB-B02-05 -0.011 -0.005 17.2 89.9

Bus1097 0.400 98.432 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.8

Bus1098 0.400 98.344 -1.4 0.000 0.000 0.009 0.005 DB-B02-05 -0.009 -0.005 15.2 89.9

Bus1099 0.400 98.209 -1.4 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.9

Bus1100 0.400 98.073 -1.3 0.000 0.000 0.010 0.005 DB-B02-06 -0.010 -0.005 17.2 89.9

Bus1101 0.400 98.245 -1.4 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.8

Bus1102 0.400 98.157 -1.3 0.000 0.000 0.009 0.005 DB-B02-06 -0.009 -0.005 15.1 89.9

Bus1103 0.400 97.357 -1.5 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 20.7 89.9

Bus1104 0.400 97.453 -1.6 0.000 0.000 0.014 0.007 DB-B01-033 -0.014 -0.007 22.7 89.9

Bus1105 0.400 97.406 -1.6 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 20.8 89.9

Bus1106 0.400 97.546 -1.6 0.000 0.000 0.013 0.006 DB-B01-033 -0.013 -0.006 21.0 89.8

Bus1107 0.400 97.691 -1.6 0.000 0.000 0.003 0.002 DB-B01-033 -0.003 -0.002 5.6 89.2

Bus1108 0.400 97.500 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 20.7 89.9

Bus1109 0.400 97.597 -1.6 0.000 0.000 0.014 0.007 DB-B01-034 -0.014 -0.007 22.7 89.9

Bus1110 0.400 97.549 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 20.8 89.9

Bus1111 0.400 97.689 -1.6 0.000 0.000 0.013 0.006 DB-B01-034 -0.013 -0.006 21.0 89.9

Bus1112 0.400 97.835 -1.6 0.000 0.000 0.003 0.002 DB-B01-034 -0.003 -0.002 5.6 89.3

Bus1115 0.400 97.667 -1.6 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 20.7 89.8

Bus1116 0.400 97.494 -1.5 0.000 0.000 0.014 0.007 DB-B01-035 -0.014 -0.007 22.7 89.9

Bus1117 0.400 97.738 -1.6 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 20.8 89.7
Project: ETAP Page: 109

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1118 0.400 97.593 -1.5 0.000 0.000 0.013 0.006 DB-B01-035 -0.013 -0.006 21.0 89.9

Bus1119 0.400 97.744 -1.6 0.000 0.000 0.003 0.002 DB-B01-035 -0.003 -0.002 5.7 89.7

Bus1120 0.400 97.797 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 20.8 89.8

Bus1121 0.400 97.624 -1.5 0.000 0.000 0.014 0.007 DB-B01-036 -0.014 -0.007 22.7 89.9

Bus1122 0.400 97.868 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 20.8 89.7

Bus1123 0.400 97.723 -1.6 0.000 0.000 0.013 0.006 DB-B01-036 -0.013 -0.006 21.0 89.9

Bus1124 0.400 97.874 -1.6 0.000 0.000 0.003 0.002 DB-B01-036 -0.003 -0.002 5.7 89.7

Bus1134 13.800 100.000 0.0 0.000 0.000 -0.001 -0.004 BUS-2S/S-2 -0.833 -0.424 39.1 89.1

2S/S2-LV-PANEL3 0.833 0.427 39.2 89.0

Bus1135 0.400 97.958 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 20.8 89.9

Bus1136 0.400 98.084 -1.6 0.000 0.000 0.014 0.007 DB-B01-006 -0.014 -0.007 22.8 89.9

Bus1137 0.400 97.907 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 20.9 89.9

Bus1138 0.400 98.026 -1.6 0.000 0.000 0.013 0.006 DB-B01-006 -0.013 -0.006 21.1 89.9

Bus1139 0.400 98.245 -1.6 0.000 0.000 0.003 0.002 DB-B01-006 -0.003 -0.002 5.7 89.2

Bus1140 0.400 97.775 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 20.8 89.9

Bus1141 0.400 97.901 -1.6 0.000 0.000 0.014 0.007 DB-B01-07 -0.014 -0.007 22.8 89.8

Bus1142 0.400 97.725 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 20.8 89.9

Bus1143 0.400 97.844 -1.6 0.000 0.000 0.013 0.006 DB-B01-07 -0.013 -0.006 21.0 89.9

Bus1144 0.400 98.061 -1.6 0.000 0.000 0.003 0.002 DB-B01-07 -0.003 -0.002 5.6 89.1

Bus1145 0.400 97.593 -1.5 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 20.7 89.9

Bus1146 0.400 97.718 -1.6 0.000 0.000 0.014 0.007 DB-B01-08 -0.014 -0.007 22.7 89.8

Bus1147 0.400 97.543 -1.5 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 20.8 89.9

Bus1148 0.400 97.661 -1.6 0.000 0.000 0.013 0.006 DB-B01-08 -0.013 -0.006 21.0 89.9

Bus1149 0.400 97.879 -1.6 0.000 0.000 0.003 0.002 DB-B01-08 -0.003 -0.002 5.6 89.1

Bus1150 0.400 97.266 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.7 89.9

Bus1151 0.400 97.391 -1.7 0.000 0.000 0.014 0.007 DB-B01-003 -0.014 -0.007 22.7 89.8

Bus1152 0.400 97.216 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.7 89.9

Bus1153 0.400 97.334 -1.6 0.000 0.000 0.013 0.006 DB-B01-003 -0.013 -0.006 20.9 89.9

Bus1154 0.400 97.551 -1.7 0.000 0.000 0.003 0.002 DB-B01-003 -0.003 -0.002 5.6 88.9

Bus1155 0.400 97.461 -1.7 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 20.7 89.9

Bus1156 0.400 97.586 -1.7 0.000 0.000 0.014 0.007 DB-B01-004 -0.014 -0.007 22.7 89.8

Bus1157 0.400 97.410 -1.6 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 20.8 89.9

Bus1158 0.400 97.529 -1.7 0.000 0.000 0.013 0.006 DB-B01-004 -0.013 -0.006 21.0 89.9
Project: ETAP Page: 110

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1159 0.400 97.746 -1.7 0.000 0.000 0.003 0.002 DB-B01-004 -0.003 -0.002 5.6 89.0

Bus1160 0.400 97.591 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 20.7 89.9

Bus1161 0.400 97.716 -1.7 0.000 0.000 0.014 0.007 DB-B01-005 -0.014 -0.007 22.7 89.8

Bus1162 0.400 97.540 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 20.8 89.9

Bus1163 0.400 97.659 -1.7 0.000 0.000 0.013 0.006 DB-B01-005 -0.013 -0.006 21.0 89.9

Bus1164 0.400 97.876 -1.7 0.000 0.000 0.003 0.002 DB-B01-005 -0.003 -0.002 5.6 89.0

Bus1165 0.400 98.048 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 0.000 0.000 0.3 90.4

Bus1166 0.400 97.555 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.7 89.8

Bus1167 0.400 97.496 -1.6 0.000 0.000 0.014 0.007 DB-B01-009 -0.014 -0.007 22.7 89.8

Bus1168 0.400 97.420 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.8 89.9

Bus1169 0.400 97.367 -1.6 0.000 0.000 0.013 0.006 DB-B01-009 -0.013 -0.006 20.9 89.9

Bus1170 0.400 97.590 -1.6 0.000 0.000 0.003 0.002 DB-B01-009 -0.003 -0.002 5.6 89.7

Bus1171 0.400 97.750 -1.7 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 20.7 89.8

Bus1172 0.400 97.691 -1.6 0.000 0.000 0.014 0.007 DB-B01-010 -0.014 -0.007 22.7 89.8

Bus1173 0.400 97.614 -1.6 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 20.8 89.9

Bus1174 0.400 97.562 -1.6 0.000 0.000 0.013 0.006 DB-B01-010 -0.013 -0.006 21.0 89.9

Bus1175 0.400 97.785 -1.7 0.000 0.000 0.003 0.002 DB-B01-010 -0.003 -0.002 5.7 89.7

Bus1176 0.400 97.946 -1.7 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 20.8 89.8

Bus1177 0.400 97.886 -1.7 0.000 0.000 0.014 0.007 DB-B01-011 -0.014 -0.007 22.8 89.8

Bus1178 0.400 97.810 -1.6 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 20.8 89.9

Bus1179 0.400 97.757 -1.6 0.000 0.000 0.013 0.006 DB-B01-011 -0.013 -0.006 21.0 89.9

Bus1180 0.400 97.980 -1.7 0.000 0.000 0.003 0.002 DB-B01-011 -0.003 -0.002 5.7 89.7

Bus1181 0.400 97.376 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 20.7 89.9

Bus1182 0.400 97.473 -1.7 0.000 0.000 0.014 0.007 DB-B01-012 -0.014 -0.007 22.7 89.9

Bus1183 0.400 97.425 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 20.8 89.9

Bus1184 0.400 97.565 -1.7 0.000 0.000 0.013 0.006 DB-B01-012 -0.013 -0.006 21.0 89.8

Bus1185 0.400 97.710 -1.8 0.000 0.000 0.003 0.002 DB-B01-012 -0.003 -0.002 5.6 88.9

Bus1186 0.400 97.233 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.7 89.9

Bus1187 0.400 97.330 -1.7 0.000 0.000 0.014 0.007 DB-B01-013 -0.014 -0.007 22.7 89.9

Bus1188 0.400 97.282 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.7 89.9

Bus1189 0.400 97.422 -1.7 0.000 0.000 0.013 0.006 DB-B01-013 -0.013 -0.006 20.9 89.8

Bus1190 0.400 97.567 -1.8 0.000 0.000 0.003 0.002 DB-B01-013 -0.003 -0.002 5.6 88.9

Bus1191 0.400 97.039 -1.7 0.000 0.000 0.012 0.006 DB-B01-014 -0.012 -0.006 20.6 89.9
Project: ETAP Page: 111

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1192 0.400 97.136 -1.7 0.000 0.000 0.014 0.007 DB-B01-014 -0.014 -0.007 22.6 89.9

Bus1193 0.400 97.088 -1.7 0.000 0.000 0.013 0.006 DB-B01-014 -0.013 -0.006 20.7 89.9

Bus1194 0.400 97.228 -1.7 0.000 0.000 0.013 0.006 DB-B01-014 -0.013 -0.006 20.9 89.8

Bus1195 0.400 97.373 -1.7 0.000 0.000 0.003 0.002 DB-B01-014 -0.003 -0.002 5.6 88.8

Bus1196 0.400 96.760 -1.8 0.000 0.000 0.012 0.006 DB-B01-001 -0.012 -0.006 20.6 89.9

Bus1197 0.400 96.857 -1.8 0.000 0.000 0.014 0.007 DB-B01-001 -0.014 -0.007 22.5 89.8

Bus1198 0.400 96.809 -1.8 0.000 0.000 0.012 0.006 DB-B01-001 -0.012 -0.006 20.6 89.8

Bus1199 0.400 96.949 -1.8 0.000 0.000 0.013 0.006 DB-B01-001 -0.013 -0.006 20.8 89.7

Bus1200 0.400 97.093 -1.9 0.000 0.000 0.003 0.002 DB-B01-001 -0.003 -0.002 5.5 88.4

Bus1201 0.400 96.877 -1.8 0.000 0.000 0.012 0.006 DB-B01-002 -0.012 -0.006 20.6 89.9

Bus1202 0.400 96.973 -1.8 0.000 0.000 0.014 0.007 DB-B01-002 -0.014 -0.007 22.6 89.8

Bus1203 0.400 96.925 -1.8 0.000 0.000 0.012 0.006 DB-B01-002 -0.012 -0.006 20.6 89.8

Bus1204 0.400 97.065 -1.9 0.000 0.000 0.013 0.006 DB-B01-002 -0.013 -0.006 20.8 89.7

Bus1205 0.400 97.209 -1.9 0.000 0.000 0.003 0.002 DB-B01-002 -0.003 -0.002 5.5 88.5

Bus1206 0.400 96.836 -1.8 0.000 0.000 0.021 0.010 21-SMDP-5 -0.021 -0.010 34.4 90.0

Bus1207 0.400 97.056 -1.8 0.000 0.000 0.012 0.006 DB-B01-116 -0.012 -0.006 20.6 89.8

Bus1208 0.400 97.181 -1.8 0.000 0.000 0.014 0.007 DB-B01-116 -0.014 -0.007 22.6 89.8

Bus1209 0.400 96.964 -1.8 0.000 0.000 0.012 0.006 DB-B01-116 -0.012 -0.006 20.7 89.9

Bus1210 0.400 97.103 -1.8 0.000 0.000 0.013 0.006 DB-B01-116 -0.013 -0.006 20.9 89.8

Bus1211 0.400 97.340 -1.9 0.000 0.000 0.003 0.002 DB-B01-116 -0.003 -0.002 5.5 88.6

Bus1212 0.400 96.850 -1.8 0.000 0.000 0.012 0.006 DB-B01-117 -0.012 -0.006 20.6 89.8

Bus1213 0.400 96.974 -1.8 0.000 0.000 0.014 0.007 DB-B01-117 -0.014 -0.007 22.5 89.7

Bus1214 0.400 96.757 -1.8 0.000 0.000 0.012 0.006 DB-B01-117 -0.012 -0.006 20.6 89.9

Bus1215 0.400 96.896 -1.8 0.000 0.000 0.013 0.006 DB-B01-117 -0.013 -0.006 20.8 89.8

Bus1216 0.400 97.133 -1.8 0.000 0.000 0.003 0.002 DB-B01-117 -0.003 -0.002 5.5 88.5

Bus1223 13.800 100.000 0.0 0.000 0.000 0.000 -0.006 BUS-2S/S-1 -1.003 -0.514 47.1 89.0

21-MDP 1.002 0.520 47.2 88.8

Bus1224 0.400 99.259 -1.4 0.000 0.000 0.714 0.346 2S/S5 -0.714 -0.346 1153.9 90.0

Bus1225 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-5 -0.728 -0.375 34.3 88.9

2S/S5 0.728 0.375 34.3 88.9

Bus1237 0.400 99.566 -1.3 0.000 0.000 0.663 0.321 2S/S6 -0.663 -0.321 1068.5 90.0

Bus1238 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-6 -0.675 -0.346 31.7 89.0

2S/S6 0.675 0.346 31.7 89.0


Project: ETAP Page: 112

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1239 0.400 97.959 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 20.8 89.9

Bus1240 0.400 98.085 -1.6 0.000 0.000 0.014 0.007 DB-B01-22 -0.014 -0.007 22.8 89.9

Bus1241 0.400 97.908 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 20.9 89.9

Bus1242 0.400 98.027 -1.6 0.000 0.000 0.013 0.006 DB-B01-22 -0.013 -0.006 21.1 89.9

Bus1243 0.400 98.245 -1.6 0.000 0.000 0.003 0.002 DB-B01-22 -0.003 -0.002 5.7 89.2

Bus1244 0.400 97.776 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 20.8 89.9

Bus1245 0.400 97.902 -1.6 0.000 0.000 0.014 0.007 DB-B01-23 -0.014 -0.007 22.8 89.9

Bus1246 0.400 97.726 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 20.8 89.9

Bus1247 0.400 97.844 -1.6 0.000 0.000 0.013 0.006 DB-B01-23 -0.013 -0.006 21.0 89.9

Bus1248 0.400 98.062 -1.6 0.000 0.000 0.003 0.002 DB-B01-23 -0.003 -0.002 5.6 89.2

Bus1249 0.400 97.594 -1.5 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 20.7 89.9

Bus1250 0.400 97.719 -1.6 0.000 0.000 0.014 0.007 DB-B01-24 -0.014 -0.007 22.7 89.8

Bus1251 0.400 97.544 -1.5 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 20.8 89.9

Bus1252 0.400 97.662 -1.6 0.000 0.000 0.013 0.006 DB-B01-24 -0.013 -0.006 21.0 89.9

Bus1253 0.400 97.880 -1.6 0.000 0.000 0.003 0.002 DB-B01-24 -0.003 -0.002 5.6 89.1

Bus1254 0.400 97.267 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.7 89.9

Bus1255 0.400 97.392 -1.7 0.000 0.000 0.014 0.007 DB-B01-19 -0.014 -0.007 22.7 89.8

Bus1256 0.400 97.217 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.7 89.9

Bus1257 0.400 97.335 -1.6 0.000 0.000 0.013 0.006 DB-B01-19 -0.013 -0.006 20.9 89.9

Bus1258 0.400 97.551 -1.7 0.000 0.000 0.003 0.002 DB-B01-19 -0.003 -0.002 5.6 89.0

Bus1259 0.400 97.461 -1.7 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 20.7 89.9

Bus1260 0.400 97.586 -1.7 0.000 0.000 0.014 0.007 DB-B01-20 -0.014 -0.007 22.7 89.8

Bus1261 0.400 97.411 -1.6 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 20.8 89.9

Bus1262 0.400 97.529 -1.7 0.000 0.000 0.013 0.006 DB-B01-20 -0.013 -0.006 21.0 89.9

Bus1263 0.400 97.746 -1.7 0.000 0.000 0.003 0.002 DB-B01-20 -0.003 -0.002 5.6 89.0

Bus1264 0.400 97.591 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 20.7 89.9

Bus1265 0.400 97.717 -1.7 0.000 0.000 0.014 0.007 DB-B01-21 -0.014 -0.007 22.7 89.8

Bus1266 0.400 97.541 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 20.8 89.9

Bus1267 0.400 97.659 -1.7 0.000 0.000 0.013 0.006 DB-B01-21 -0.013 -0.006 21.0 89.9

Bus1268 0.400 97.877 -1.7 0.000 0.000 0.003 0.002 DB-B01-21 -0.003 -0.002 5.6 89.1

Bus1269 0.400 98.047 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 0.000 0.000 0.3 90.4

Bus1270 0.400 97.557 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.7 89.7

Bus1271 0.400 97.497 -1.6 0.000 0.000 0.014 0.007 DB-B01-25 -0.014 -0.007 22.7 89.8
Project: ETAP Page: 113

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1272 0.400 97.421 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.7 89.9

Bus1273 0.400 97.368 -1.6 0.000 0.000 0.013 0.006 DB-B01-25 -0.013 -0.006 20.9 89.9

Bus1274 0.400 97.657 -1.6 0.000 0.000 0.003 0.002 DB-B01-25 -0.003 -0.002 5.6 89.0

Bus1275 0.400 97.752 -1.7 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 20.7 89.8

Bus1276 0.400 97.692 -1.6 0.000 0.000 0.014 0.007 DB-B01-26 -0.014 -0.007 22.7 89.8

Bus1277 0.400 97.616 -1.6 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 20.8 89.9

Bus1278 0.400 97.563 -1.6 0.000 0.000 0.013 0.006 DB-B01-26 -0.013 -0.006 21.0 89.9

Bus1279 0.400 97.852 -1.7 0.000 0.000 0.003 0.002 DB-B01-26 -0.003 -0.002 5.6 89.0

Bus1280 0.400 97.947 -1.7 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 20.8 89.8

Bus1281 0.400 97.887 -1.7 0.000 0.000 0.014 0.007 DB-B01-27 -0.014 -0.007 22.8 89.8

Bus1282 0.400 97.811 -1.6 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 20.8 89.9

Bus1283 0.400 97.758 -1.6 0.000 0.000 0.013 0.006 DB-B01-27 -0.013 -0.006 21.0 89.9

Bus1284 0.400 98.048 -1.7 0.000 0.000 0.003 0.002 DB-B01-27 -0.003 -0.002 5.6 89.1

Bus1285 0.400 97.377 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 20.7 89.9

Bus1286 0.400 97.473 -1.7 0.000 0.000 0.014 0.007 DB-B01-28 -0.014 -0.007 22.7 89.9

Bus1287 0.400 97.425 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 20.8 89.9

Bus1288 0.400 97.566 -1.7 0.000 0.000 0.013 0.006 DB-B01-28 -0.013 -0.006 21.0 89.8

Bus1289 0.400 97.711 -1.8 0.000 0.000 0.003 0.002 DB-B01-28 -0.003 -0.002 5.6 88.9

Bus1290 0.400 97.234 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.7 89.9

Bus1291 0.400 97.330 -1.7 0.000 0.000 0.014 0.007 DB-B01-29 -0.014 -0.007 22.7 89.9

Bus1292 0.400 97.283 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.7 89.9

Bus1293 0.400 97.423 -1.7 0.000 0.000 0.013 0.006 DB-B01-29 -0.013 -0.006 20.9 89.8

Bus1294 0.400 97.568 -1.7 0.000 0.000 0.003 0.002 DB-B01-29 -0.003 -0.002 5.6 88.9

Bus1295 0.400 97.040 -1.7 0.000 0.000 0.012 0.006 DB-B01-030 -0.012 -0.006 20.6 89.9

Bus1296 0.400 97.136 -1.7 0.000 0.000 0.014 0.007 DB-B01-030 -0.014 -0.007 22.6 89.9

Bus1297 0.400 97.089 -1.7 0.000 0.000 0.013 0.006 DB-B01-030 -0.013 -0.006 20.7 89.9

Bus1298 0.400 97.229 -1.7 0.000 0.000 0.013 0.006 DB-B01-030 -0.013 -0.006 20.9 89.8

Bus1299 0.400 97.373 -1.7 0.000 0.000 0.003 0.002 DB-B01-030 -0.003 -0.002 5.6 88.8

Bus1300 0.400 96.761 -1.8 0.000 0.000 0.012 0.006 DB-B01-017 -0.012 -0.006 20.6 89.9

Bus1301 0.400 96.857 -1.8 0.000 0.000 0.014 0.007 DB-B01-017 -0.014 -0.007 22.5 89.8

Bus1302 0.400 96.810 -1.8 0.000 0.000 0.012 0.006 DB-B01-017 -0.012 -0.006 20.6 89.8

Bus1303 0.400 96.949 -1.8 0.000 0.000 0.013 0.006 DB-B01-017 -0.013 -0.006 20.8 89.7

Bus1304 0.400 97.094 -1.9 0.000 0.000 0.003 0.002 DB-B01-017 -0.003 -0.002 5.5 88.4
Project: ETAP Page: 114

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1305 0.400 96.877 -1.8 0.000 0.000 0.012 0.006 DB-B01-018 -0.012 -0.006 20.6 89.9

Bus1306 0.400 96.973 -1.8 0.000 0.000 0.014 0.007 DB-B01-018 -0.014 -0.007 22.6 89.8

Bus1307 0.400 96.926 -1.8 0.000 0.000 0.012 0.006 DB-B01-018 -0.012 -0.006 20.6 89.8

Bus1308 0.400 97.066 -1.9 0.000 0.000 0.013 0.006 DB-B01-018 -0.013 -0.006 20.8 89.7

Bus1309 0.400 97.210 -1.9 0.000 0.000 0.003 0.002 DB-B01-018 -0.003 -0.002 5.5 88.5

Bus1310 0.400 96.837 -1.8 0.000 0.000 0.021 0.010 27-SMDP-05 -0.021 -0.010 34.4 90.0

Bus1315 0.400 97.663 -1.6 0.000 0.000 0.020 0.010 27-SMDP-07 -0.020 -0.010 32.9 90.0

Bus1316 13.800 100.000 0.0 0.000 0.000 0.000 -0.007 BUS-2S/S-7 -1.002 -0.513 47.1 89.0

2S/S7 1.002 0.520 47.2 88.8

DB-B01-01 0.400 97.069 -1.9 0.000 0.000 0.000 0.000 11-SMDP-05 -0.055 -0.026 90.2 90.0

Bus131 0.012 0.006 20.5 89.9

Bus132 0.014 0.007 22.5 89.8

Bus133 0.012 0.006 20.6 89.9

Bus134 0.013 0.006 20.8 89.7

Bus135 0.003 0.002 5.5 88.4

DB-B01-001 0.400 97.127 -1.9 0.000 0.000 0.000 0.000 21-SMDP-5 -0.055 -0.027 90.3 90.0

Bus1196 0.012 0.006 20.6 89.9

Bus1197 0.014 0.007 22.5 89.9

Bus1198 0.012 0.006 20.6 89.9

Bus1199 0.013 0.006 20.8 89.7

Bus1200 0.003 0.002 5.5 88.4

DB-B01-02 0.400 97.185 -1.9 0.000 0.000 0.000 0.000 11-SMDP-05 -0.055 -0.027 90.4 90.0

Bus136 0.012 0.006 20.6 89.9

Bus137 0.014 0.007 22.5 89.8

Bus138 0.012 0.006 20.6 89.9

Bus139 0.013 0.006 20.8 89.7

Bus140 0.003 0.002 5.5 88.4

DB-B01-002 0.400 97.243 -1.9 0.000 0.000 0.000 0.000 21-SMDP-5 -0.055 -0.027 90.5 90.0

Bus1201 0.012 0.006 20.6 89.9

Bus1202 0.014 0.007 22.6 89.9

Bus1203 0.012 0.006 20.6 89.9

Bus1204 0.013 0.006 20.8 89.7

Bus1205 0.003 0.002 5.5 88.5


Project: ETAP Page: 115

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-03 0.400 97.527 -1.7 0.000 0.000 0.000 0.000 11-SMDP-2 -0.055 -0.027 90.6 90.0

Bus84 0.013 0.006 20.7 89.9

Bus85 0.014 0.007 22.6 89.8

Bus86 0.013 0.006 20.7 90.0

Bus87 0.013 0.006 20.9 89.9

Bus88 0.003 0.002 5.6 88.9

DB-B01-003 0.400 97.585 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.055 -0.027 90.7 90.0

Bus1150 0.013 0.006 20.7 89.9

Bus1151 0.014 0.007 22.7 89.8

Bus1152 0.013 0.006 20.7 90.0

Bus1153 0.013 0.006 20.9 89.9

Bus1154 0.003 0.002 5.6 89.0

DB-B01-04 0.400 97.722 -1.7 0.000 0.000 0.000 0.000 11-SMDP-2 -0.055 -0.027 90.8 90.0

Bus89 0.013 0.006 20.7 89.9

Bus90 0.014 0.007 22.7 89.8

Bus91 0.013 0.006 20.7 90.0

Bus92 0.013 0.006 21.0 89.9

Bus93 0.003 0.002 5.6 89.0

DB-B01-004 0.400 97.780 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.055 -0.027 90.9 90.0

Bus1155 0.013 0.006 20.7 89.9

Bus1156 0.014 0.007 22.7 89.9

Bus1157 0.013 0.006 20.8 90.0

Bus1158 0.013 0.006 21.0 89.9

Bus1159 0.003 0.002 5.6 89.0

DB-B01-05 0.400 97.852 -1.8 0.000 0.000 0.000 0.000 11-SMDP-2 -0.056 -0.027 91.0 90.0

Bus94 0.013 0.006 20.7 89.9

Bus95 0.014 0.007 22.7 89.9

Bus96 0.013 0.006 20.8 90.0

Bus97 0.013 0.006 21.0 89.9

Bus98 0.003 0.002 5.6 89.0

DB-B01-005 0.400 97.910 -1.7 0.000 0.000 0.000 0.000 21-SMDP-2 -0.056 -0.027 91.1 90.0

Bus1160 0.013 0.006 20.7 89.9

Bus1161 0.014 0.007 22.7 89.9


Project: ETAP Page: 116

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1162 0.013 0.006 20.8 90.0

Bus1163 0.013 0.006 21.0 89.9

Bus1164 0.003 0.002 5.6 89.1

DB-B01-06 0.400 98.221 -1.7 0.000 0.000 0.000 0.000 11-SMDP-1 -0.056 -0.027 91.4 90.0

Bus4 0.013 0.006 20.8 90.0

Bus5 0.014 0.007 22.8 89.9

Bus6 0.013 0.006 20.9 90.0

Bus7 0.013 0.006 21.1 89.9

Bus9 0.003 0.002 5.6 89.1

DB-B01-006 0.400 98.279 -1.7 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.4 90.0

Bus1135 0.013 0.006 20.8 90.0

Bus1136 0.014 0.007 22.8 89.9

Bus1137 0.013 0.006 20.9 90.0

Bus1138 0.013 0.006 21.1 89.9

Bus1139 0.003 0.002 5.7 89.2

DB-B01-7 0.400 98.037 -1.7 0.000 0.000 0.000 0.000 11-SMDP-1 -0.056 -0.027 91.1 90.0

Bus47 0.013 0.006 20.8 90.0

Bus48 0.014 0.007 22.8 89.9

Bus74 0.013 0.006 20.8 90.0

Bus75 0.013 0.006 21.0 89.9

Bus76 0.003 0.002 5.6 89.1

DB-B01-07 0.400 98.096 -1.6 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.2 90.0

Bus1140 0.013 0.006 20.8 90.0

Bus1141 0.014 0.007 22.8 89.9

Bus1142 0.013 0.006 20.8 90.0

Bus1143 0.013 0.006 21.0 89.9

Bus1144 0.003 0.002 5.6 89.1

DB-B01-8 0.400 97.855 -1.6 0.000 0.000 0.000 0.000 11-SMDP-1 -0.055 -0.027 90.9 90.0

Bus77 0.013 0.006 20.7 89.9

Bus78 0.014 0.007 22.7 89.9

Bus79 0.013 0.006 20.8 90.0

Bus80 0.013 0.006 21.0 89.9

Bus81 0.003 0.002 5.6 89.0


Project: ETAP Page: 117

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-08 0.400 97.913 -1.6 0.000 0.000 0.000 0.000 21-SMDP-1 -0.056 -0.027 91.0 90.0

Bus1145 0.013 0.006 20.7 90.0

Bus1146 0.014 0.007 22.7 89.9

Bus1147 0.013 0.006 20.8 90.0

Bus1148 0.013 0.006 21.0 89.9

Bus1149 0.003 0.002 5.6 89.1

DB-B01-09 0.400 97.632 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.055 -0.027 90.8 90.0

Bus25 0.013 0.006 20.7 89.8

Bus26 0.014 0.007 22.7 89.8

Bus28 0.013 0.006 20.7 89.9

Bus29 0.013 0.006 20.9 89.9

Bus30 0.003 0.002 5.6 89.7

DB-B01-009 0.400 97.690 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.055 -0.027 90.8 90.0

Bus1166 0.013 0.006 20.7 89.8

Bus1167 0.014 0.007 22.7 89.9

Bus1168 0.013 0.006 20.8 89.9

Bus1169 0.013 0.006 20.9 89.9

Bus1170 0.003 0.002 5.6 89.7

DB-B01-10 0.400 97.827 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.055 -0.027 91.0 90.0

Bus31 0.013 0.006 20.7 89.8

Bus33 0.014 0.007 22.7 89.9

Bus37 0.013 0.006 20.8 89.9

Bus38 0.013 0.006 21.0 89.9

Bus40 0.003 0.002 5.7 89.7

DB-B01-010 0.400 97.885 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.056 -0.027 91.0 90.0

Bus1171 0.013 0.006 20.7 89.8

Bus1172 0.014 0.007 22.7 89.9

Bus1173 0.013 0.006 20.8 89.9

Bus1174 0.013 0.006 21.0 90.0

Bus1175 0.003 0.002 5.7 89.7

DB-B01-11 0.400 98.023 -1.7 0.000 0.000 0.000 0.000 11-SMDP-3 -0.056 -0.027 91.2 90.0

Bus44 0.013 0.006 20.8 89.8

Bus82 0.014 0.007 22.8 89.9


Project: ETAP Page: 118

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus83 0.013 0.006 20.8 89.9

Bus99 0.013 0.006 21.0 90.0

Bus100 0.003 0.002 5.7 89.7

DB-B01-011 0.400 98.081 -1.7 0.000 0.000 0.000 0.000 21-SMDP-3 -0.056 -0.027 91.3 90.0

Bus1176 0.013 0.006 20.8 89.8

Bus1177 0.014 0.007 22.8 89.9

Bus1178 0.013 0.006 20.8 89.9

Bus1179 0.013 0.006 21.0 90.0

Bus1180 0.003 0.002 5.7 89.7

DB-B01-12 0.400 97.686 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.9 90.0

Bus24 0.013 0.006 20.7 90.0

Bus101 0.014 0.007 22.7 89.9

Bus102 0.013 0.006 20.7 89.9

Bus103 0.013 0.006 20.9 89.8

Bus104 0.003 0.002 5.6 88.9

DB-B01-012 0.400 97.745 -1.8 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.9 90.0

Bus1181 0.013 0.006 20.7 90.0

Bus1182 0.014 0.007 22.7 89.9

Bus1183 0.013 0.006 20.8 89.9

Bus1184 0.013 0.006 21.0 89.8

Bus1185 0.003 0.002 5.6 88.9

DB-B01-13 0.400 97.543 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.7 90.0

Bus105 0.013 0.006 20.7 89.9

Bus106 0.014 0.007 22.6 89.9

Bus107 0.013 0.006 20.7 89.9

Bus108 0.013 0.006 20.9 89.8

Bus109 0.003 0.002 5.6 88.8

DB-B01-013 0.400 97.601 -1.8 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.7 90.0

Bus1186 0.013 0.006 20.7 90.0

Bus1187 0.014 0.007 22.7 89.9

Bus1188 0.013 0.006 20.7 89.9

Bus1189 0.013 0.006 20.9 89.8

Bus1190 0.003 0.002 5.6 88.9


Project: ETAP Page: 119

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-14 0.400 97.349 -1.8 0.000 0.000 0.000 0.000 11-SMDP-04 -0.055 -0.027 90.4 89.9

Bus110 0.013 0.006 20.6 89.9

Bus111 0.014 0.007 22.6 89.9

Bus112 0.013 0.006 20.7 89.9

Bus113 0.013 0.006 20.9 89.8

Bus114 0.003 0.002 5.6 88.7

DB-B01-014 0.400 97.407 -1.7 0.000 0.000 0.000 0.000 21-SMDP-04 -0.055 -0.027 90.5 90.0

Bus1191 0.013 0.006 20.6 89.9

Bus1192 0.014 0.007 22.6 89.9

Bus1193 0.013 0.006 20.7 89.9

Bus1194 0.013 0.006 20.9 89.8

Bus1195 0.003 0.002 5.6 88.8

DB-B01-15 0.400 97.314 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 -0.055 -0.027 90.6 90.0

Bus20 0.012 0.006 20.6 89.7

Bus21 0.014 0.007 22.6 89.9

Bus22 0.012 0.006 20.6 89.5

Bus23 0.013 0.006 20.8 89.8

Bus115 0.003 0.002 5.6 89.5

DB-B01-16 0.400 97.106 -1.9 0.000 0.000 0.000 0.000 11-SMDP-06 -0.055 -0.027 90.2 89.9

Bus116 0.012 0.006 20.5 89.7

Bus117 0.014 0.007 22.5 89.9

Bus118 0.012 0.006 20.5 89.5

Bus120 0.013 0.006 20.8 89.8

Bus121 0.003 0.002 5.6 89.5

DB-B01-17 0.400 97.594 -1.6 0.000 0.000 0.000 0.000 16-SMDP-2 -0.055 -0.027 90.7 90.0

Bus157 0.013 0.006 20.7 90.0

Bus158 0.014 0.007 22.7 90.0

Bus173 0.013 0.006 20.7 90.0

Bus212 0.013 0.006 21.0 90.0

Bus213 0.003 0.002 5.7 89.8

DB-B01-017 0.400 97.127 -1.9 0.000 0.000 0.000 0.000 27-SMDP-05 -0.055 -0.027 90.3 90.0

Bus1300 0.012 0.006 20.6 89.9

Bus1301 0.014 0.007 22.5 89.9


Project: ETAP Page: 120

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1302 0.012 0.006 20.6 89.9

Bus1303 0.013 0.006 20.8 89.7

Bus1304 0.003 0.002 5.5 88.4

DB-B01-18 0.400 97.711 -1.6 0.000 0.000 0.000 0.000 16-SMDP-2 -0.055 -0.027 90.8 90.0

Bus271 0.013 0.006 20.7 90.0

Bus272 0.014 0.007 22.7 90.0

Bus273 0.013 0.006 20.8 90.0

Bus274 0.013 0.006 21.0 90.0

Bus275 0.003 0.002 5.7 89.9

DB-B01-018 0.400 97.244 -1.9 0.000 0.000 0.000 0.000 27-SMDP-05 -0.055 -0.027 90.5 90.0

Bus1305 0.012 0.006 20.6 89.9

Bus1306 0.014 0.007 22.6 89.9

Bus1307 0.012 0.006 20.6 89.9

Bus1308 0.013 0.006 20.8 89.7

Bus1309 0.003 0.002 5.5 88.5

DB-B01-19 0.400 97.586 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.055 -0.027 90.7 90.0

Bus1254 0.013 0.006 20.7 89.9

Bus1255 0.014 0.007 22.7 89.8

Bus1256 0.013 0.006 20.7 90.0

Bus1257 0.013 0.006 20.9 89.9

Bus1258 0.003 0.002 5.6 89.0

DB-B01-019 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.3 90.0

Bus421 0.013 0.006 20.8 90.0

Bus422 0.014 0.007 22.8 89.9

Bus423 0.013 0.006 20.9 90.0

Bus424 0.013 0.006 21.1 90.0

Bus425 0.003 0.002 5.7 89.5

DB-B01-20 0.400 97.781 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.055 -0.027 90.9 90.0

Bus1259 0.013 0.006 20.7 89.9

Bus1260 0.014 0.007 22.7 89.9

Bus1261 0.013 0.006 20.8 90.0

Bus1262 0.013 0.006 21.0 89.9

Bus1263 0.003 0.002 5.6 89.0


Project: ETAP Page: 121

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-020 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.3 90.0

Bus426 0.013 0.006 20.8 90.0

Bus427 0.014 0.007 22.8 89.9

Bus428 0.013 0.006 20.9 90.0

Bus429 0.013 0.006 21.1 90.0

Bus430 0.003 0.002 5.7 89.5

DB-B01-21 0.400 97.911 -1.7 0.000 0.000 0.000 0.000 27-SMDP-02 -0.056 -0.027 91.1 90.0

Bus1264 0.013 0.006 20.7 89.9

Bus1265 0.014 0.007 22.7 89.9

Bus1266 0.013 0.006 20.8 90.0

Bus1267 0.013 0.006 21.0 89.9

Bus1268 0.003 0.002 5.6 89.1

DB-B01-021 0.400 97.965 -1.5 0.000 0.000 0.000 0.000 17-SMDP-02 -0.056 -0.027 91.1 90.0

Bus431 0.013 0.006 20.8 90.0

Bus432 0.014 0.007 22.8 89.9

Bus433 0.013 0.006 20.8 90.0

Bus434 0.013 0.006 21.0 90.0

Bus435 0.003 0.002 5.7 89.4

DB-B01-22 0.400 98.280 -1.7 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.4 90.0

Bus1239 0.013 0.006 20.8 90.0

Bus1240 0.014 0.007 22.8 89.9

Bus1241 0.013 0.006 20.9 90.0

Bus1242 0.013 0.006 21.1 89.9

Bus1243 0.003 0.002 5.7 89.2

DB-B01-022 0.400 98.754 -1.5 0.000 0.000 0.000 0.000 17-SMDP-01 -0.057 -0.027 91.9 90.0

Bus406 0.013 0.006 20.9 90.0

Bus407 0.014 0.007 23.0 90.0

Bus408 0.013 0.006 21.0 90.0

Bus409 0.013 0.006 21.2 90.0

Bus410 0.004 0.002 5.7 89.6

DB-B01-23 0.400 98.097 -1.6 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.2 90.0

Bus1244 0.013 0.006 20.8 90.0

Bus1245 0.014 0.007 22.8 89.9


Project: ETAP Page: 122

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1246 0.013 0.006 20.8 90.0

Bus1247 0.013 0.006 21.0 89.9

Bus1248 0.003 0.002 5.6 89.2

DB-B01-023 0.400 98.557 -1.4 0.000 0.000 0.000 0.000 17-SMDP-01 -0.056 -0.027 91.6 90.0

Bus411 0.013 0.006 20.9 90.0

Bus412 0.014 0.007 22.9 90.0

Bus413 0.013 0.006 20.9 90.0

Bus414 0.013 0.006 21.2 90.0

Bus415 0.003 0.002 5.7 89.6

DB-B01-24 0.400 97.914 -1.6 0.000 0.000 0.000 0.000 27-SMDP-01 -0.056 -0.027 91.0 90.0

Bus1249 0.013 0.006 20.7 90.0

Bus1250 0.014 0.007 22.7 89.9

Bus1251 0.013 0.006 20.8 90.0

Bus1252 0.013 0.006 21.0 89.9

Bus1253 0.003 0.002 5.6 89.1

DB-B01-024 0.400 98.386 -1.4 0.000 0.000 0.000 0.000 17-SMDP-01 -0.056 -0.027 91.5 90.0

Bus416 0.013 0.006 20.9 90.0

Bus417 0.014 0.007 22.9 89.9

Bus418 0.013 0.006 20.9 90.0

Bus419 0.013 0.006 21.1 90.0

Bus420 0.003 0.002 5.7 89.5

DB-B01-25 0.400 97.691 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.055 -0.027 90.8 89.9

Bus1270 0.013 0.006 20.7 89.8

Bus1271 0.014 0.007 22.7 89.9

Bus1272 0.013 0.006 20.7 89.9

Bus1273 0.013 0.006 20.9 89.9

Bus1274 0.003 0.002 5.6 89.0

DB-B01-025 0.400 98.161 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.3 90.0

Bus437 0.013 0.006 20.8 89.9

Bus438 0.014 0.007 22.8 89.9

Bus439 0.013 0.006 20.9 90.0

Bus440 0.013 0.006 21.1 90.0

Bus441 0.003 0.002 5.7 89.8


Project: ETAP Page: 123

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-26 0.400 97.886 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.056 -0.027 91.0 90.0

Bus1275 0.013 0.006 20.7 89.8

Bus1276 0.014 0.007 22.7 89.9

Bus1277 0.013 0.006 20.8 89.9

Bus1278 0.013 0.006 21.0 89.9

Bus1279 0.003 0.002 5.6 89.0

DB-B01-026 0.400 98.358 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.5 90.0

Bus442 0.013 0.006 20.9 89.9

Bus443 0.014 0.007 22.9 89.9

Bus444 0.013 0.006 20.9 90.0

Bus445 0.013 0.006 21.1 90.0

Bus446 0.003 0.002 5.7 89.9

DB-B01-27 0.400 98.083 -1.7 0.000 0.000 0.000 0.000 27-SMDP-03 -0.056 -0.027 91.3 90.0

Bus1280 0.013 0.006 20.8 89.8

Bus1281 0.014 0.007 22.8 89.9

Bus1282 0.013 0.006 20.8 89.9

Bus1283 0.013 0.006 21.0 90.0

Bus1284 0.003 0.002 5.6 89.1

DB-B01-027 0.400 98.555 -1.5 0.000 0.000 0.000 0.000 17-SMDP-03 -0.056 -0.027 91.7 90.0

Bus447 0.013 0.006 20.9 89.9

Bus448 0.014 0.007 22.9 90.0

Bus449 0.013 0.006 21.0 90.0

Bus450 0.013 0.006 21.1 90.0

Bus451 0.004 0.002 5.7 89.9

DB-B01-28 0.400 97.745 -1.8 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.9 90.0

Bus1285 0.013 0.006 20.7 90.0

Bus1286 0.014 0.007 22.7 89.9

Bus1287 0.013 0.006 20.8 89.9

Bus1288 0.013 0.006 21.0 89.8

Bus1289 0.003 0.002 5.6 88.9

DB-B01-028 0.400 98.216 -1.6 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.3 90.0

Bus452 0.013 0.006 20.8 90.0

Bus453 0.014 0.007 22.8 90.0


Project: ETAP Page: 124

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus454 0.013 0.006 20.9 90.0

Bus455 0.013 0.006 21.1 89.9

Bus456 0.003 0.002 5.7 89.4

DB-B01-29 0.400 97.602 -1.8 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.7 90.0

Bus1290 0.013 0.006 20.7 90.0

Bus1291 0.014 0.007 22.7 89.9

Bus1292 0.013 0.006 20.7 89.9

Bus1293 0.013 0.006 20.9 89.8

Bus1294 0.003 0.002 5.6 88.9

DB-B01-029 0.400 98.072 -1.6 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.2 90.0

Bus457 0.013 0.006 20.8 90.0

Bus458 0.014 0.007 22.8 90.0

Bus461 0.013 0.006 20.8 90.0

Bus466 0.013 0.006 21.1 89.9

Bus468 0.003 0.002 5.7 89.4

DB-B01-30 0.400 97.876 -1.5 0.000 0.000 0.000 0.000 17-SMDP-04 -0.056 -0.027 91.0 90.0

Bus473 0.013 0.006 20.7 90.0

Bus478 0.014 0.007 22.7 90.0

Bus479 0.013 0.006 20.8 90.0

Bus480 0.013 0.006 21.0 89.9

Bus481 0.003 0.002 5.7 89.3

DB-B01-030 0.400 97.408 -1.7 0.000 0.000 0.000 0.000 27-SMDP-04 -0.055 -0.027 90.5 90.0

Bus1295 0.013 0.006 20.6 89.9

Bus1296 0.014 0.007 22.6 89.9

Bus1297 0.013 0.006 20.7 89.9

Bus1298 0.013 0.006 20.9 89.8

Bus1299 0.003 0.002 5.6 88.8

DB-B01-31 0.400 97.816 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 -0.056 -0.027 91.0 90.0

Bus482 0.013 0.006 20.7 89.8

Bus483 0.014 0.007 22.7 90.0

Bus484 0.013 0.006 20.8 89.7

Bus485 0.013 0.006 21.0 89.9

Bus486 0.003 0.002 5.7 89.7


Project: ETAP Page: 125

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-031 0.400 97.374 -1.9 0.000 0.000 0.000 0.000 27-SMDP-06 -0.055 -0.027 90.7 90.0

Bus282 0.012 0.006 20.6 89.8

Bus283 0.014 0.007 22.6 89.9

Bus284 0.012 0.006 20.6 89.6

Bus285 0.013 0.006 20.8 89.9

Bus286 0.003 0.002 5.5 88.6

DB-B01-32 0.400 97.685 -1.7 0.000 0.000 0.000 0.000 17-SMDP-05 -0.055 -0.027 90.8 90.0

Bus487 0.013 0.006 20.7 89.8

Bus488 0.014 0.007 22.7 90.0

Bus489 0.013 0.006 20.7 89.7

Bus490 0.013 0.006 20.9 89.9

Bus491 0.003 0.002 5.6 89.7

DB-B01-032 0.400 97.167 -1.8 0.000 0.000 0.000 0.000 27-SMDP-06 -0.055 -0.027 90.2 89.9

Bus287 0.012 0.006 20.5 89.7

Bus288 0.014 0.007 22.5 89.9

Bus289 0.012 0.006 20.5 89.6

Bus290 0.013 0.006 20.8 89.8

Bus291 0.003 0.002 5.5 88.5

DB-B01-33 0.400 97.034 -1.9 0.000 0.000 0.000 0.000 Bus159 0.012 0.006 20.5 89.9

Bus160 0.014 0.007 22.5 89.8

Bus161 0.012 0.006 20.6 89.9

Bus162 0.013 0.006 20.8 89.7

Bus163 0.003 0.002 5.5 88.3

12-SMDP-5 -0.055 -0.026 90.2 90.0

DB-B01-033 0.400 97.726 -1.6 0.000 0.000 0.000 0.000 22-SMDP-5 -0.055 -0.027 90.8 90.0

Bus1103 0.013 0.006 20.7 90.0

Bus1104 0.014 0.007 22.7 89.9

Bus1105 0.013 0.006 20.8 90.0

Bus1106 0.013 0.006 21.0 89.9

Bus1107 0.003 0.002 5.6 89.2

DB-B01-34 0.400 97.176 -1.9 0.000 0.000 0.000 0.000 Bus164 0.012 0.006 20.6 89.9

Bus169 0.014 0.007 22.5 89.8

Bus170 0.012 0.006 20.6 89.9


Project: ETAP Page: 126

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus171 0.013 0.006 20.8 89.7

Bus172 0.003 0.002 5.5 88.4

12-SMDP-5 -0.055 -0.026 90.4 90.0

DB-B01-034 0.400 97.869 -1.6 0.000 0.000 0.000 0.000 22-SMDP-5 -0.056 -0.027 91.0 90.0

Bus1108 0.013 0.006 20.7 90.0

Bus1109 0.014 0.007 22.7 89.9

Bus1110 0.013 0.006 20.8 90.0

Bus1111 0.013 0.006 21.0 89.9

Bus1112 0.003 0.002 5.6 89.3

DB-B01-35 0.400 97.206 -1.9 0.000 0.000 0.000 0.000 12-SMDP-6 -0.055 -0.027 90.4 89.9

Bus194 0.012 0.006 20.6 89.7

Bus195 0.014 0.007 22.5 89.9

Bus196 0.012 0.006 20.6 89.5

Bus197 0.013 0.006 20.8 89.8

Bus198 0.003 0.002 5.6 89.5

DB-B01-035 0.400 97.845 -1.6 0.000 0.000 0.000 0.000 22-SMDP-06 -0.056 -0.027 91.0 90.0

Bus1115 0.013 0.006 20.7 89.9

Bus1116 0.014 0.007 22.7 90.0

Bus1117 0.013 0.006 20.8 89.8

Bus1118 0.013 0.006 21.0 89.9

Bus1119 0.003 0.002 5.7 89.7

DB-B01-36 0.400 97.336 -1.9 0.000 0.000 0.000 0.000 12-SMDP-6 -0.055 -0.027 90.6 90.0

Bus199 0.012 0.006 20.6 89.7

Bus200 0.014 0.007 22.6 89.9

Bus201 0.012 0.006 20.6 89.6

Bus202 0.013 0.006 20.8 89.8

Bus203 0.003 0.002 5.6 89.5

DB-B01-036 0.400 97.975 -1.6 0.000 0.000 0.000 0.000 22-SMDP-06 -0.056 -0.027 91.2 90.0

Bus1120 0.013 0.006 20.8 89.9

Bus1121 0.014 0.007 22.7 90.0

Bus1122 0.013 0.006 20.8 89.8

Bus1123 0.013 0.006 21.0 89.9

Bus1124 0.003 0.002 5.7 89.8


Project: ETAP Page: 127

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-37 0.400 97.571 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.055 -0.027 90.7 90.0

Bus252 0.013 0.006 20.7 89.9

Bus253 0.014 0.007 22.7 89.8

Bus254 0.013 0.006 20.7 90.0

Bus255 0.013 0.006 20.9 89.9

Bus256 0.003 0.002 5.6 88.9

DB-B01-037 0.400 98.214 -1.4 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.3 90.0

Bus1063 0.013 0.006 20.8 90.0

Bus1064 0.014 0.007 22.8 89.9

Bus1065 0.013 0.006 20.9 90.0

Bus1066 0.013 0.006 21.1 90.0

Bus1067 0.003 0.002 5.7 89.6

DB-B01-38 0.400 98.411 -1.4 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.5 90.0

Bus1068 0.013 0.006 20.9 90.0

Bus1069 0.014 0.007 22.9 90.0

Bus1070 0.013 0.006 20.9 90.0

Bus1071 0.013 0.006 21.1 90.0

Bus1072 0.003 0.002 5.7 89.6

DB-B01-38. 0.400 97.766 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.055 -0.027 90.9 90.0

Bus257 0.013 0.006 20.7 89.9

Bus258 0.014 0.007 22.7 89.9

Bus259 0.013 0.006 20.8 90.0

Bus260 0.013 0.006 21.0 89.9

Bus261 0.003 0.002 5.6 89.0

DB-B01-39 0.400 97.897 -1.7 0.000 0.000 0.000 0.000 12-SMDP-02 -0.056 -0.027 91.1 90.0

Bus262 0.013 0.006 20.7 89.9

Bus263 0.014 0.007 22.7 89.9

Bus264 0.013 0.006 20.8 90.0

Bus265 0.013 0.006 21.0 89.9

Bus266 0.003 0.002 5.6 89.0

DB-B01-039 0.400 98.542 -1.5 0.000 0.000 0.000 0.000 22-SMDP-02 -0.056 -0.027 91.6 90.0

Bus1073 0.013 0.006 20.9 90.0

Bus1074 0.014 0.007 22.9 90.0


Project: ETAP Page: 128

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1075 0.013 0.006 20.9 90.0

Bus1076 0.013 0.006 21.2 90.0

Bus1077 0.003 0.002 5.7 89.6

DB-B01-40 0.400 98.914 -1.4 0.000 0.000 0.000 0.000 22-SMDP-01 -0.057 -0.027 92.0 90.0

Bus1048 0.013 0.006 21.0 90.0

Bus1049 0.014 0.007 23.0 90.0

Bus215 0.013 0.006 21.0 90.0

Bus1051 0.013 0.006 21.2 90.0

Bus1052 0.004 0.002 5.7 89.7

DB-B01-040 0.400 98.266 -1.7 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.4 90.0

Bus237 0.013 0.006 20.8 90.0

Bus238 0.014 0.007 22.8 89.9

Bus239 0.013 0.006 20.9 90.0

Bus240 0.013 0.006 21.1 89.9

Bus241 0.003 0.002 5.6 89.1

DB-B01-41 0.400 98.729 -1.4 0.000 0.000 0.000 0.000 22-SMDP-01 -0.057 -0.027 91.8 90.0

Bus1053 0.013 0.006 20.9 90.0

Bus1054 0.014 0.007 23.0 90.0

Bus1055 0.013 0.006 21.0 90.0

Bus1056 0.013 0.006 21.2 90.0

Bus1057 0.004 0.002 5.7 89.7

DB-B01-041 0.400 98.082 -1.6 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.2 90.0

Bus242 0.013 0.006 20.8 90.0

Bus243 0.014 0.007 22.8 89.9

Bus244 0.013 0.006 20.8 90.0

Bus245 0.013 0.006 21.0 89.9

Bus246 0.003 0.002 5.6 89.1

DB-B01-42 0.400 98.545 -1.3 0.000 0.000 0.000 0.000 22-SMDP-01 -0.056 -0.027 91.6 90.0

Bus1058 0.013 0.006 20.9 90.0

Bus1059 0.014 0.007 22.9 90.0

Bus1060 0.013 0.006 20.9 90.0

Bus1061 0.013 0.006 21.2 90.0

Bus1062 0.003 0.002 5.7 89.6


Project: ETAP Page: 129

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B01-042 0.400 97.900 -1.6 0.000 0.000 0.000 0.000 12-SMDP-01 -0.056 -0.027 91.0 90.0

Bus247 0.013 0.006 20.7 90.0

Bus248 0.014 0.007 22.7 89.9

Bus249 0.013 0.006 20.8 90.0

Bus250 0.013 0.006 21.0 89.9

Bus251 0.003 0.002 5.6 89.1

DB-B01-116 0.400 97.374 -1.9 0.000 0.000 0.000 0.000 21-SMDP-6 -0.055 -0.027 90.6 90.1

Bus1207 0.012 0.006 20.6 89.9

Bus1208 0.014 0.007 22.6 89.8

Bus1209 0.013 0.006 20.7 89.9

Bus1210 0.013 0.006 20.9 89.9

Bus1211 0.003 0.002 5.5 88.6

DB-B01-117 0.400 97.167 -1.9 0.000 0.000 0.000 0.000 21-SMDP-6 -0.055 -0.027 90.3 90.0

Bus1212 0.012 0.006 20.6 89.9

Bus1213 0.014 0.007 22.5 89.8

Bus1214 0.012 0.006 20.6 89.9

Bus1215 0.013 0.006 20.8 89.9

Bus1216 0.003 0.002 5.5 88.5

DB-B02-1 0.400 98.528 -1.3 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 62.7 90.0

Bus1079 0.009 0.005 15.2 89.9

Bus1080 0.011 0.005 17.2 89.9

Bus1081 0.009 0.005 15.2 90.0

Bus1082 0.009 0.005 15.2 89.9

DB-B02-01 0.400 97.883 -1.6 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.018 62.3 89.9

Bus123 0.009 0.004 15.0 89.8

Bus124 0.010 0.005 17.1 89.7

Bus125 0.009 0.004 15.0 89.9

Bus126 0.009 0.004 15.0 89.8

DB-B02-2 0.400 98.716 -1.4 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 62.9 90.0

Bus1083 0.009 0.005 15.2 90.0

Bus1084 0.011 0.005 17.3 89.9

Bus1085 0.009 0.005 15.2 90.0

Bus1086 0.009 0.005 15.2 89.9


Project: ETAP Page: 130

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B02-02 0.400 98.069 -1.6 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.019 62.4 89.9

Bus46 0.009 0.004 15.1 89.9

Bus50 0.010 0.005 17.1 89.7

Bus119 0.009 0.004 15.1 89.9

Bus154 0.009 0.005 15.1 89.8

DB-B02-3 0.400 98.904 -1.4 0.000 0.000 0.000 0.000 22-SMDP-03 -0.039 -0.019 63.0 90.0

Bus1087 0.009 0.005 15.2 90.0

Bus1088 0.011 0.005 17.3 89.9

Bus1089 0.009 0.005 15.2 90.0

Bus1090 0.009 0.005 15.2 90.0

DB-B02-03 0.400 98.256 -1.7 0.000 0.000 0.000 0.000 12-SMDP-3 -0.038 -0.019 62.6 90.0

Bus165 0.009 0.005 15.1 89.9

Bus166 0.010 0.005 17.1 89.7

Bus167 0.009 0.005 15.1 89.9

Bus168 0.009 0.005 15.1 89.8

DB-B02-4 0.400 98.017 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.4 90.0

Bus39 0.009 0.005 15.1 89.8

Bus127 0.010 0.005 17.1 89.9

Bus141 0.009 0.005 15.0 89.7

Bus142 0.009 0.004 15.1 89.8

DB-B02-04 0.400 98.663 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.039 -0.019 62.8 90.0

Bus1091 0.009 0.005 15.2 89.9

Bus1092 0.011 0.005 17.2 90.0

Bus1093 0.009 0.005 15.2 89.9

Bus1094 0.009 0.005 15.2 90.0

DB-B02-5 0.400 97.880 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.3 89.9

Bus143 0.009 0.004 15.0 89.8

Bus145 0.010 0.005 17.1 89.9

Bus146 0.009 0.005 15.0 89.6

Bus148 0.009 0.004 15.0 89.8

DB-B02-05 0.400 98.525 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.039 -0.019 62.7 90.0

Bus1095 0.009 0.005 15.2 89.9

Bus1096 0.011 0.005 17.2 90.0


Project: ETAP Page: 131

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1097 0.009 0.005 15.2 89.9

Bus1098 0.009 0.005 15.2 89.9

DB-B02-6 0.400 97.695 -1.7 0.000 0.000 0.000 0.000 12-SMDP-4 -0.038 -0.018 62.1 89.9

Bus149 0.009 0.004 15.0 89.7

Bus150 0.010 0.005 17.0 89.9

Bus151 0.009 0.004 15.0 89.6

Bus152 0.009 0.004 15.0 89.8

DB-B02-06 0.400 98.338 -1.4 0.000 0.000 0.000 0.000 22-SMDP-04 -0.038 -0.019 62.6 90.0

Bus1099 0.009 0.005 15.1 89.9

Bus1100 0.011 0.005 17.2 90.0

Bus1101 0.009 0.005 15.1 89.8

Bus1102 0.009 0.005 15.1 89.9

DB-B02-7 0.400 98.359 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.019 62.7 90.0

Bus301 0.009 0.005 15.1 89.8

Bus302 0.011 0.005 17.2 89.9

Bus303 0.009 0.005 15.1 89.7

Bus304 0.009 0.005 15.1 89.9

DB-B02-07 0.400 98.459 -1.6 0.000 0.000 0.000 0.000 23-SMDP-04 -0.039 -0.019 62.7 90.0

Bus1004 0.009 0.005 15.2 89.8

Bus1005 0.011 0.005 17.2 90.0

Bus1006 0.009 0.005 15.1 89.8

Bus1007 0.009 0.005 15.1 89.9

DB-B02-8 0.400 98.259 -1.5 0.000 0.000 0.000 0.000 23-SMDP-04 -0.038 -0.019 62.6 90.0

Bus1008 0.009 0.005 15.1 89.8

Bus1009 0.011 0.005 17.2 89.9

Bus1010 0.009 0.005 15.1 89.7

Bus1011 0.009 0.005 15.1 89.9

DB-B02-08 0.400 98.159 -1.6 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.019 62.5 90.0

Bus309 0.009 0.005 15.1 89.8

Bus310 0.010 0.005 17.1 89.9

Bus311 0.009 0.005 15.1 89.7

Bus317 0.009 0.005 15.1 89.9

DB-B02-9 0.400 98.072 -1.5 0.000 0.000 0.000 0.000 23-SMDP-04 -0.038 -0.019 62.4 90.0
Project: ETAP Page: 132

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus1013 0.009 0.005 15.1 89.8

Bus1014 0.010 0.005 17.1 89.9

Bus1015 0.009 0.005 15.1 89.7

Bus1016 0.009 0.004 15.1 89.9

DB-B02-10 0.400 98.185 -1.6 0.000 0.000 0.000 0.000 13-SMDP-5 -0.038 -0.019 62.5 90.0

Bus393 0.009 0.005 15.1 89.8

Bus399 0.010 0.005 17.1 89.9

Bus400 0.009 0.005 15.1 89.7

Bus401 0.009 0.005 15.1 89.9

DB-B02-010 0.400 98.285 -1.6 0.000 0.000 0.000 0.000 23-SMDP-05 -0.038 -0.019 62.6 90.0

Bus1018 0.009 0.005 15.1 89.8

Bus1019 0.011 0.005 17.2 89.9

Bus1020 0.009 0.005 15.1 89.7

Bus1021 0.009 0.005 15.1 89.9

DB-B02-11 0.400 98.136 -1.6 0.000 0.000 0.000 0.000 23-SMDP-05 -0.038 -0.019 62.5 90.0

Bus1022 0.009 0.005 15.1 89.8

Bus1023 0.010 0.005 17.1 89.9

Bus1024 0.009 0.005 15.1 89.7

Bus1025 0.009 0.005 15.1 89.9

DB-B02-011 0.400 98.036 -1.6 0.000 0.000 0.000 0.000 13-SMDP-5 -0.038 -0.019 62.4 90.0

Bus402 0.009 0.005 15.1 89.8

Bus403 0.010 0.005 17.1 89.9

Bus404 0.009 0.005 15.1 89.7

Bus405 0.009 0.004 15.1 89.9

DB-B02-12 0.400 97.889 -1.7 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.4 90.0

Bus174 0.009 0.005 15.0 89.7

Bus175 0.010 0.005 17.1 89.9

Bus176 0.009 0.005 15.0 89.6

Bus207 0.009 0.004 15.0 89.8

DB-B02-012 0.400 97.988 -1.7 0.000 0.000 0.000 0.000 Bus1026 0.009 0.005 15.1 89.8

Bus1027 0.010 0.005 17.1 89.9

Bus1028 0.009 0.005 15.1 89.7

Bus1029 0.009 0.004 15.1 89.8


Project: ETAP Page: 133

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

23-SMDP-06 -0.038 -0.018 62.4 90.0

DB-B02-13 0.400 97.703 -1.7 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.2 89.9

Bus208 0.009 0.004 15.0 89.7

Bus209 0.010 0.005 17.1 89.9

Bus210 0.009 0.005 15.0 89.6

Bus211 0.009 0.004 15.0 89.8

DB-B02-013 0.400 97.802 -1.6 0.000 0.000 0.000 0.000 Bus1030 0.009 0.004 15.0 89.7

Bus1031 0.010 0.005 17.1 89.9

Bus1032 0.009 0.005 15.0 89.6

Bus1033 0.009 0.004 15.0 89.8

23-SMDP-06 -0.038 -0.018 62.2 89.9

DB-B02-14 0.400 97.530 -1.6 0.000 0.000 0.000 0.000 13-SMDP-6 -0.038 -0.018 62.0 89.9

Bus216 0.009 0.004 15.0 89.7

Bus217 0.010 0.005 17.0 89.9

Bus218 0.009 0.004 15.0 89.6

Bus219 0.009 0.004 15.0 89.8

DB-B02-014 0.400 97.628 -1.6 0.000 0.000 0.000 0.000 23-SMDP-06 -0.038 -0.018 62.1 89.9

Bus1034 0.009 0.004 15.0 89.7

Bus1035 0.010 0.005 17.0 89.9

Bus1036 0.009 0.005 15.0 89.6

Bus1037 0.009 0.004 15.0 89.8

DB-B02-15 0.400 97.585 -1.8 0.000 0.000 0.001 0.000 13-SMDP-7 -0.038 -0.018 62.5 90.1

Bus220 0.009 0.004 15.0 89.6

Bus221 0.010 0.005 17.0 89.9

Bus222 0.009 0.005 14.9 89.5

Bus223 0.009 0.004 15.0 89.8

DB-B02-015 0.400 98.050 -1.7 0.000 0.000 0.000 0.000 23-SMDP-07 -0.038 -0.019 62.7 90.1

Bus1038 0.009 0.005 15.1 89.7

Bus1039 0.010 0.005 17.1 89.9

Bus1040 0.009 0.005 15.0 89.6

Bus1041 0.009 0.004 15.1 89.8

DB-B02-16 0.400 97.541 -1.8 0.000 0.000 0.000 0.000 13-SMDP-7 -0.038 -0.018 62.2 89.9

Bus224 0.009 0.004 15.0 89.6


Project: ETAP Page: 134

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus225 0.010 0.005 17.0 89.9

Bus226 0.009 0.005 14.9 89.5

Bus227 0.009 0.004 15.0 89.8

DB-B02-016 0.400 98.006 -1.7 0.000 0.000 0.000 0.000 23-SMDP-07 -0.038 -0.019 62.5 90.0

Bus1042 0.009 0.005 15.1 89.7

Bus1043 0.010 0.005 17.1 89.9

Bus1044 0.009 0.005 15.0 89.6

Bus1045 0.009 0.004 15.1 89.8

DB-B03-1 0.400 97.684 -1.8 0.000 0.000 0.000 0.000 23-SMDP-03 -0.081 -0.039 132.6 90.0

Bus991 0.013 0.006 21.5 90.0

Bus992 0.014 0.007 23.3 89.9

Bus993 0.012 0.006 19.0 89.8

Bus994 0.014 0.007 22.8 90.0

Bus995 0.013 0.006 21.7 89.8

Bus996 0.015 0.007 23.9 89.7

DB-B03-01 0.400 97.585 -1.8 0.000 0.000 0.000 0.000 13-SMDP-3 -0.081 -0.039 132.4 90.0

Bus177 0.013 0.006 21.5 90.0

Bus179 0.014 0.007 23.3 89.9

Bus187 0.012 0.006 19.0 89.8

Bus188 0.014 0.007 22.8 90.0

Bus189 0.013 0.006 21.7 89.8

Bus190 0.015 0.007 23.9 89.7

DB-B03-2 0.400 98.269 -1.6 0.000 0.000 0.000 0.000 23-SMDP-02 -0.082 -0.040 133.3 90.0

Bus979 0.013 0.006 21.7 90.0

Bus980 0.014 0.007 23.5 90.0

Bus981 0.012 0.006 19.1 89.9

Bus982 0.014 0.007 22.9 90.0

Bus983 0.013 0.007 21.8 89.9

Bus984 0.015 0.007 24.1 89.9

DB-B03-02 0.400 98.169 -1.6 0.000 0.000 0.000 0.000 13-SMDP-2 -0.082 -0.039 133.2 90.0

Bus312 0.013 0.006 21.6 90.0

Bus313 0.014 0.007 23.5 89.9

Bus314 0.012 0.006 19.1 89.9


Project: ETAP Page: 135

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus315 0.014 0.007 22.9 90.0

Bus316 0.013 0.007 21.8 89.9

Bus13 0.015 0.007 24.1 89.8

DB-B03-3 0.400 97.777 -1.7 0.000 0.000 0.001 0.000 23-SMDP-03 -0.081 -0.039 133.0 90.1

Bus997 0.013 0.006 21.5 90.0

Bus998 0.014 0.007 23.4 89.9

Bus999 0.012 0.006 19.0 89.8

Bus1000 0.014 0.007 22.8 90.0

Bus1001 0.013 0.006 21.7 89.8

Bus1002 0.015 0.007 24.0 89.7

DB-B03-03 0.400 97.678 -1.8 0.000 0.000 0.001 0.000 13-SMDP-3 -0.081 -0.039 132.9 90.1

Bus191 0.013 0.006 21.5 90.0

Bus192 0.014 0.007 23.3 89.9

Bus193 0.012 0.006 19.0 89.8

Bus204 0.014 0.007 22.8 90.0

Bus205 0.013 0.006 21.7 89.8

Bus206 0.015 0.007 23.9 89.7

DB-B03-4 0.400 98.414 -1.6 0.000 0.000 0.000 0.000 23-SMDP-02 -0.082 -0.040 133.6 90.1

Bus985 0.013 0.006 21.7 90.0

Bus986 0.014 0.007 23.5 90.0

Bus987 0.012 0.006 19.2 89.9

Bus988 0.014 0.007 23.0 90.0

Bus989 0.013 0.007 21.9 89.9

Bus990 0.015 0.007 24.2 89.9

DB-B03-04 0.400 98.314 -1.6 0.000 0.000 0.000 0.000 13-SMDP-2 -0.082 -0.040 133.5 90.0

Bus180 0.013 0.006 21.7 90.0

Bus182 0.014 0.007 23.5 89.9

Bus183 0.012 0.006 19.1 89.9

Bus184 0.014 0.007 22.9 90.0

Bus185 0.013 0.007 21.9 89.9

Bus186 0.015 0.007 24.1 89.8

DB-B04-1 0.400 98.573 -1.5 0.000 0.000 0.000 0.000 23-SMDP-01 -0.067 -0.032 108.2 90.0

Bus970 0.016 0.008 26.4 89.9


Project: ETAP Page: 136

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus971 0.016 0.008 26.6 89.8

Bus972 0.016 0.008 26.4 90.0

Bus973 0.018 0.009 28.7 89.9

DB-B04-01 0.400 98.473 -1.6 0.000 0.000 0.000 0.000 13-SMDP-1 -0.066 -0.032 108.1 90.0

Bus297 0.016 0.008 26.3 89.9

Bus298 0.016 0.008 26.6 89.8

Bus299 0.016 0.008 26.4 90.0

Bus300 0.018 0.009 28.6 89.9

DB-B04-2 0.400 98.559 -1.6 0.000 0.000 0.000 0.000 13-SMDP-1 -0.067 -0.032 108.3 90.1

Bus394 0.016 0.008 26.4 89.9

Bus395 0.016 0.008 26.6 89.8

Bus396 0.016 0.008 26.4 90.0

Bus397 0.018 0.009 28.7 89.9

DB-B04-02 0.400 98.659 -1.5 0.000 0.000 0.000 0.000 23-SMDP-01 -0.067 -0.032 108.4 90.1

Bus974 0.016 0.008 26.4 89.9

Bus975 0.016 0.008 26.6 89.8

Bus976 0.016 0.008 26.5 90.0

Bus977 0.018 0.009 28.7 89.9

DB-B06 0.400 96.885 -2.0 0.000 0.000 0.001 0.000 12-SMDP-7 -0.102 -0.050 169.2 89.7

Bus3 -0.001 0.000 0.9 99.5

Bus10 0.022 0.011 36.9 89.6

Bus11 0.020 0.010 33.1 89.5

Bus12 0.018 0.009 30.5 89.5

Bus14 0.041 0.020 68.8 89.6

DB-B08-09 0.400 97.972 -1.5 0.000 0.000 0.000 0.000 13-SMDP-04 -0.038 -0.018 62.4 89.9

Bus318 0.009 0.005 15.1 89.8

Bus319 0.010 0.005 17.1 89.9

Bus320 0.009 0.005 15.1 89.7

Bus321 0.009 0.004 15.1 89.9

DB-B14 0.400 97.280 -1.8 0.000 0.000 0.000 0.000 12-SMDP-7 -0.047 -0.023 77.7 90.1

Bus322 0.026 0.013 42.9 89.8

Bus323 0.011 0.005 17.4 90.1

Bus324 0.011 0.005 17.4 90.1


Project: ETAP Page: 137

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

DB-B21 0.400 97.283 -1.6 0.000 0.000 0.000 0.000 11-SMDP-16 -0.042 -0.021 69.5 89.9

Bus128 0.012 0.006 19.7 89.6

Bus129 0.027 0.013 44.3 89.8

Bus130 0.003 0.002 5.5 89.7

MV SWGR#1 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-1S/S-01 3.985 2.054 187.6 88.9

Bus155 -6.396 -3.292 301.0 88.9

BUS-1S/S-07 2.411 1.238 113.4 89.0

MV SWGR#2 13.800 100.000 0.0 0.000 0.000 0.000 0.000 BUS-2S/S-1 3.773 1.942 177.5 88.9

BUS-2S/S-7 2.406 1.235 113.1 89.0

Bus42 -6.180 -3.176 290.7 88.9


* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: ETAP Page: 138

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

1S/S1-LV-PANEL 0.400 2500.0 -0.002 -0.008 1.105 90.0 1615.1 64.6


1S/S2-LV-PANEL2 0.400 2500.0 -0.001 -0.009 1.092 90.0 1595.1 63.8
1S/S3-LV-PANEL 0.400 2500.0 -0.001 -0.007 1.028 90.0 1498.1 59.9
1S/S4-LV-PANEL 0.400 2500.0 0.000 0.000 1.105 89.8 1615.6 64.6
1S/S5-LV-PANEL1 0.400 2500.0 0.798 89.8 1153.6 46.1
1S/S6-LV-PANEL 0.400 2500.0 0.000 -0.001 0.882 89.8 1278.9 51.2
1S/S7-LV-PANEL 0.400 2500.0 -0.001 -0.005 0.954 90.0 1387.5 55.5
2S/S2-LV-PANEL3 0.400 2500.0 -0.001 -0.004 0.908 90.0 1318.8 52.8
2S/S3 0.400 2500.0 -0.001 -0.007 0.999 90.0 1455.4 58.2
2S/S4 0.400 2500.0 0.000 0.000 1.109 89.8 1621.3 64.9
2S/S5 0.400 2500.0 0.798 89.8 1153.9 46.2
2S/S6 0.400 2500.0 0.740 89.8 1068.5 42.7
2S/S7 0.400 2500.0 -0.002 -0.008 1.088 90.0 1589.7 63.6
11-SMDP-1 0.400 400.0 -0.001 0.000 0.186 89.9 272.8 68.2
11-SMDP-2 0.400 400.0 -0.001 0.000 0.185 89.9 271.9 68.0
11-SMDP-3 0.400 400.0 -0.001 0.000 0.185 89.9 272.2 68.0
11-SMDP-04 0.400 400.0 -0.001 0.000 0.184 89.9 271.0 67.7
11-SMDP-05 0.400 400.0 -0.001 0.000 0.144 89.8 213.6 53.4
11-SMDP-06 0.400 400.0 -0.001 0.000 0.121 89.8 179.7 44.9
11-SMDP-16 0.400 400.0 0.000 0.000 0.096 90.0 141.6 35.4
12-SMDP-01 0.400 400.0 -0.001 0.000 0.186 89.9 272.9 68.2
12-SMDP-02 0.400 400.0 -0.001 0.000 0.185 89.9 272.1 68.0
12-SMDP-3 0.400 400.0 -0.001 0.000 0.127 89.8 186.8 46.7
12-SMDP-4 0.400 400.0 -0.001 0.000 0.127 89.8 186.2 46.6
12-SMDP-5 0.400 400.0 -0.001 0.000 0.150 89.8 221.9 55.5
12-SMDP-6 0.400 400.0 -0.001 0.000 0.121 89.8 179.6 44.9
12-SMDP-7 0.400 400.0 -0.001 0.000 0.191 89.8 283.0 70.8
13-SMDP-1 0.400 400.0 -0.001 0.000 0.167 89.9 244.6 61.2
13-SMDP-2 0.400 400.0 -0.001 0.000 0.181 89.9 265.7 66.4
13-SMDP-3 0.400 400.0 -0.002 0.000 0.210 89.8 309.7 77.4
13-SMDP-04 0.400 400.0 0.000 0.000 0.140 89.9 205.0 51.3
13-SMDP-5 0.400 400.0 0.000 0.000 0.085 89.9 124.6 31.1
13-SMDP-6 0.400 400.0 -0.001 0.000 0.126 89.8 185.8 46.4
13-SMDP-7 0.400 400.0 -0.002 0.000 0.114 89.8 168.7 42.2
14-SMDP-01 0.400 400.0 0.000 0.000 0.177 90.1 262.2 65.5
16-SMDP-2 0.400 400.0 0.000 0.000 0.146 90.1 215.4 53.8
17-SMDP-01 0.400 400.0 0.000 0.000 0.188 90.0 274.7 68.7
17-SMDP-02 0.400 400.0 0.000 0.000 0.187 90.0 273.6 68.4
17-SMDP-03 0.400 400.0 0.000 0.000 0.187 90.0 274.2 68.5
Project: ETAP Page: 139

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

17-SMDP-04 0.400 400.0 0.000 0.000 0.186 90.0 273.0 68.2


17-SMDP-05 0.400 400.0 -0.001 0.000 0.123 89.9 181.3 45.3
17-SMDP-6 0.400 400.0 0.000 0.000 0.079 90.0 115.6 28.9
17-SMDP-07 0.400 1000.0 0.000 100.0 - -
21-MDP 0.400 2500.0 -0.002 -0.008 1.088 90.0 1590.2 63.6
21-SMDP-1 0.400 400.0 -0.001 0.000 0.186 89.9 273.0 68.3
21-SMDP-2 0.400 400.0 -0.001 0.000 0.185 89.9 272.2 68.0
21-SMDP-3 0.400 400.0 -0.001 0.000 0.185 89.9 272.4 68.1
21-SMDP-04 0.400 400.0 -0.001 0.000 0.184 89.9 271.2 67.8
21-SMDP-5 0.400 400.0 -0.001 0.000 0.144 89.8 213.8 53.5
21-SMDP-6 0.400 400.0 -0.001 0.000 0.121 89.8 179.5 44.9
21-SMDP-7 0.400 400.0 0.000 0.000 0.079 90.1 115.3 28.8
22-SMDP-01 0.400 400.0 0.000 0.000 0.189 90.0 275.2 68.8
22-SMDP-02 0.400 400.0 0.000 0.000 0.188 90.0 274.5 68.6
22-SMDP-03 0.400 400.0 0.000 0.000 0.129 90.0 188.4 47.1
22-SMDP-04 0.400 400.0 0.000 0.000 0.129 90.0 187.9 47.0
22-SMDP-5 0.400 400.0 0.000 0.000 0.147 90.0 215.8 54.0
22-SMDP-06 0.400 400.0 -0.001 0.123 89.9 181.4 45.4
23-SMDP-01 0.400 400.0 -0.001 0.000 0.168 89.9 245.0 61.2
23-SMDP-02 0.400 400.0 -0.001 0.000 0.182 89.9 266.1 66.5
23-SMDP-03 0.400 400.0 -0.002 0.000 0.210 89.9 310.2 77.5
23-SMDP-04 0.400 400.0 0.000 0.000 0.140 89.9 205.3 51.3
23-SMDP-05 0.400 400.0 0.000 0.000 0.085 89.9 124.8 31.2
23-SMDP-06 0.400 400.0 -0.001 0.000 0.126 89.9 186.1 46.5
23-SMDP-07 0.400 400.0 -0.001 0.000 0.084 89.8 123.7 30.9
24-SMDP-01 0.400 400.0 0.000 0.000 0.181 90.2 268.0 67.0
27-SMDP-01 0.400 400.0 -0.001 0.000 0.186 89.9 273.0 68.3
27-SMDP-02 0.400 400.0 -0.001 0.000 0.185 89.9 272.2 68.0
27-SMDP-03 0.400 400.0 -0.001 0.000 0.185 89.9 272.2 68.1
27-SMDP-04 0.400 400.0 -0.001 0.000 0.184 89.9 271.2 67.8
27-SMDP-05 0.400 400.0 -0.001 0.000 0.144 89.8 213.8 53.5
27-SMDP-06 0.400 400.0 -0.001 0.000 0.121 89.7 179.6 44.9
27-SMDP-07 0.400 400.0 0.000 0.000 0.078 90.0 114.9 28.7
Bus1 0.400 0.000 0.000 - 0.000 90.4 0.3
BUS-1S/S-01 13.800 400.0 0.000 4.483 88.9 187.6 46.9
BUS-1S/S-02 13.800 0.000 3.339 88.8 139.7
BUS-1S/S-03 13.800 0.000 2.209 88.8 92.4
BUS-1S/S-04 13.800 1.147 88.5 48.0
BUS-1S/S-05 13.800 0.000 0.819 88.9 34.3
BUS-1S/S-06 13.800 1.727 88.9 72.3
BUS-1S/S-07 13.800 0.000 2.710 89.0 113.4
Bus2 0.400 0.000 0.000 0.021 0.010 0.023 90.0 34.4
Project: ETAP Page: 140

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

BUS-2S/S-1 13.800 400.0 0.000 4.244 88.9 177.5 44.4


BUS-2S/S-2 13.800 0.000 3.117 88.9 130.4
BUS-2S/S-3 13.800 0.000 2.183 88.8 91.3
BUS-2S/S-4 13.800 1.151 88.5 48.2
BUS-2S/S-5 13.800 0.000 0.819 88.9 34.3
BUS-2S/S-6 13.800 1.578 88.9 66.0
BUS-2S/S-7 13.800 0.000 2.704 89.0 113.1
Bus3 0.400 400.0 -0.001 0.000 - -
Bus4 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus5 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus6 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus7 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus8 0.400 400.0 0.000 0.000 0.028 0.014 0.031 90.1 46.7 11.7
Bus9 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus10 0.400 0.000 0.000 0.022 0.011 0.025 89.6 36.9
Bus11 0.400 0.000 0.000 0.020 0.010 0.022 89.5 33.1
Bus12 0.400 0.000 0.000 0.019 0.009 0.020 89.5 30.5
Bus13 0.400 0.000 0.000 0.015 0.007 0.016 89.8 24.1
Bus14 0.400 0.000 0.000 0.042 0.020 0.046 89.6 68.8
Bus15 0.400 400.0 0.000 0.013 0.006 0.014 90.0 20.6 5.2
Bus17 0.400 400.0 0.000 0.000 0.023 0.011 0.025 90.2 37.1 9.3
Bus18 13.800 400.0 0.001 -0.006 1.062 89.0 44.4 11.1
Bus20 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.6
Bus21 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus22 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.6
Bus23 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus24 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus25 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.7
Bus26 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus28 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus29 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus30 0.400 0.000 0.000 0.003 0.002 0.004 89.6 5.6
Bus31 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus33 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus37 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus38 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus39 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus40 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus42 13.800 6.948 88.9 290.7
Bus44 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus46 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus47 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Project: ETAP Page: 141

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus48 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8


Bus50 0.400 0.000 0.000 0.010 0.005 0.012 89.7 17.1
Bus74 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus75 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus76 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus77 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus78 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus79 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus80 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus81 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus82 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus83 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus84 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus85 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.6
Bus86 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus87 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus88 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus89 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus90 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus91 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus92 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus93 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus94 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus95 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus96 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus97 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus98 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus99 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus100 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus101 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus102 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus103 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus104 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus105 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus106 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus107 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus108 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus109 0.400 0.000 0.000 0.003 0.002 0.004 88.8 5.6
Bus110 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus111 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.6
Bus112 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus113 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Project: ETAP Page: 142

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus114 0.400 0.000 0.000 0.003 0.002 0.004 88.7 5.6


Bus115 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.6
Bus116 0.400 0.000 0.000 0.012 0.006 0.014 89.7 20.5
Bus117 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.5
Bus118 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.5
Bus119 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus120 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus121 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.6
Bus122 0.400 0.000 0.000 - 0.000 90.7 0.4
Bus123 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus124 0.400 0.000 0.000 0.010 0.005 0.012 89.7 17.1
Bus125 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.0
Bus126 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus127 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus128 0.400 0.000 0.000 0.012 0.006 0.013 89.6 19.7
Bus129 0.400 0.000 0.000 0.027 0.013 0.030 89.8 44.3
Bus130 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.5
Bus131 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.5
Bus132 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus133 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus134 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus135 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus136 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus137 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus138 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus139 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus140 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus141 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus142 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus143 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus144 0.400 0.000 0.009 0.004 0.010 90.0 14.1
Bus145 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus146 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus147 0.400 0.000 0.035 0.017 0.039 90.0 58.1
Bus148 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus149 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus150 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.0
Bus151 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus152 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus153 0.400 400.0 0.000 0.035 0.017 0.039 90.0 58.2 14.5
Bus154 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus155 13.800 7.194 88.9 301.0
Project: ETAP Page: 143

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus156 0.400 400.0 0.000 0.014 0.007 0.015 90.0 22.5 5.6
Bus157 0.400 0.000 0.013 0.006 0.014 90.0 20.7
Bus158 0.400 0.000 0.014 0.007 0.015 90.0 22.7
Bus159 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.5
Bus160 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus161 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus162 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus163 0.400 0.000 0.000 0.003 0.002 0.004 88.3 5.5
Bus164 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus165 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus166 0.400 0.000 0.000 0.011 0.005 0.012 89.7 17.1
Bus167 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus168 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus169 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus170 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus171 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus172 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus173 0.400 0.000 0.013 0.006 0.014 90.0 20.7
Bus174 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus175 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus176 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus177 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.5
Bus178 0.400 0.000 0.005 0.002 0.006 90.0 8.3
Bus179 0.400 0.000 0.000 0.014 0.007 0.016 89.8 23.3
Bus180 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.7
Bus181 0.400 0.000 0.000 0.021 0.010 0.023 90.0 34.3
Bus182 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.5
Bus183 0.400 0.000 0.000 0.012 0.006 0.013 89.8 19.1
Bus184 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus185 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.9
Bus186 0.400 0.000 0.000 0.015 0.007 0.016 89.8 24.1
Bus187 0.400 0.000 0.000 0.012 0.006 0.013 89.7 19.0
Bus188 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus189 0.400 0.000 0.000 0.013 0.006 0.015 89.8 21.7
Bus190 0.400 0.000 0.000 0.015 0.007 0.016 89.7 23.9
Bus191 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.5
Bus192 0.400 0.000 0.000 0.014 0.007 0.016 89.8 23.3
Bus193 0.400 0.000 0.000 0.012 0.006 0.013 89.7 19.0
Bus194 0.400 0.000 0.000 0.012 0.006 0.014 89.7 20.6
Bus195 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.5
Bus196 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.6
Bus197 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Project: ETAP Page: 144

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus198 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.6


Bus199 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.6
Bus200 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus201 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.6
Bus202 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus203 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.6
Bus204 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus205 0.400 0.000 0.000 0.013 0.006 0.015 89.8 21.7
Bus206 0.400 0.000 0.000 0.015 0.007 0.016 89.7 23.9
Bus207 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus208 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus209 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus210 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus211 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus212 0.400 0.000 0.000 0.013 0.006 0.014 90.0 21.0
Bus213 0.400 0.000 0.000 0.003 0.002 0.004 89.8 5.7
Bus214 0.400 400.0 0.000 0.009 0.004 0.010 90.0 14.1 3.5
Bus215 0.400 400.0 0.000 0.013 0.006 0.014 90.0 21.0 5.3
Bus216 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus217 0.400 0.000 0.000 0.010 0.005 0.011 89.8 17.0
Bus218 0.400 0.000 0.000 0.009 0.004 0.010 89.5 15.0
Bus219 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus220 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus221 0.400 0.000 0.000 0.010 0.005 0.011 89.8 17.0
Bus222 0.400 0.000 0.000 0.009 0.004 0.010 89.5 14.9
Bus223 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus224 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus225 0.400 0.000 0.000 0.010 0.005 0.011 89.8 17.0
Bus226 0.400 0.000 0.000 0.009 0.004 0.010 89.5 14.9
Bus227 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus231 0.400 400.0 0.000 0.000 0.022 0.010 0.024 90.1 35.3 8.8
Bus232 0.400 400.0 0.000 0.000 0.028 0.013 0.031 90.0 46.2 11.5
Bus233 0.400 400.0 0.000 0.028 0.014 0.032 90.0 46.7 11.7
Bus237 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus238 0.400 0.000 0.000 0.014 0.007 0.016 89.8 22.8
Bus239 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus240 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus241 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus242 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus243 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus244 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus245 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Project: ETAP Page: 145

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus246 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6


Bus247 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus248 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus249 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus250 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus251 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus252 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus253 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus254 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus255 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus256 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus257 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus258 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus259 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus260 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus261 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus262 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus263 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus264 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus265 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus266 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus267 0.400 0.000 0.000 - 0.000 90.4 0.3
Bus271 0.400 0.000 0.013 0.006 0.014 90.0 20.7
Bus272 0.400 0.000 0.014 0.007 0.015 90.0 22.7
Bus273 0.400 0.000 0.013 0.006 0.014 90.0 20.8
Bus274 0.400 0.000 0.013 0.006 0.014 90.0 21.0
Bus275 0.400 0.000 0.000 0.003 0.002 0.004 89.9 5.7
Bus278 0.400 400.0 0.000 0.000 - 0.000 90.7 0.4 0.1
Bus282 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.6
Bus283 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus284 0.400 0.000 0.000 0.013 0.006 0.014 89.6 20.6
Bus285 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus286 0.400 0.000 0.000 0.003 0.002 0.004 88.6 5.5
Bus287 0.400 0.000 0.000 0.012 0.006 0.014 89.7 20.5
Bus288 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.5
Bus289 0.400 0.000 0.000 0.013 0.006 0.014 89.5 20.5
Bus290 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus291 0.400 0.000 0.000 0.003 0.002 0.004 88.5 5.5
Bus292 0.400 0.000 0.000 0.000 - 0.000 91.7 0.4
Bus293 13.800 400.0 0.000 -0.005 1.031 89.1 43.2 10.8
Bus297 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.3
Bus298 0.400 0.000 0.000 0.016 0.008 0.018 89.8 26.6
Project: ETAP Page: 146

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus299 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4


Bus300 0.400 0.000 0.000 0.018 0.009 0.019 89.9 28.6
Bus301 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus302 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus303 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus304 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus305 0.400 0.000 0.021 0.010 0.023 90.0 34.6
Bus309 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus310 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus311 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus312 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.6
Bus313 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.5
Bus314 0.400 0.000 0.000 0.012 0.006 0.013 89.8 19.1
Bus315 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus316 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.8
Bus317 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus318 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus319 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus320 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus321 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus322 0.400 0.000 0.000 0.026 0.013 0.029 89.8 42.9
Bus323 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.4
Bus324 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.4
Bus326 13.800 0.000 -0.007 1.144 89.0 47.9
Bus327 13.800 0.001 -0.007 1.130 89.0 47.3
Bus335 0.400 400.0 0.000 0.011 0.005 0.012 90.0 17.6 4.4
Bus377 0.400 400.0 0.011 0.006 0.013 90.0 19.0 4.7
Bus393 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus394 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4
Bus395 0.400 0.000 0.000 0.016 0.008 0.018 89.8 26.6
Bus396 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4
Bus397 0.400 0.000 0.000 0.018 0.009 0.020 89.9 28.7
Bus398 0.400 400.0 0.000 0.000 0.018 0.009 0.020 90.1 29.0 7.3
Bus399 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus400 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus401 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus402 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus403 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus404 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus405 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus406 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus407 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.0
Project: ETAP Page: 147

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus408 0.400 0.000 0.013 0.006 0.014 90.0 21.0


Bus409 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.2
Bus410 0.400 0.000 0.000 0.004 0.002 0.004 89.6 5.7
Bus411 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus412 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus413 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus414 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.2
Bus415 0.400 0.000 0.000 0.004 0.002 0.004 89.6 5.7
Bus416 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus417 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus418 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus419 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus420 0.400 0.000 0.000 0.004 0.002 0.004 89.5 5.7
Bus421 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus422 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus423 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus424 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus425 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.7
Bus426 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus427 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus428 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus429 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus430 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.7
Bus431 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus432 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus433 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus434 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus435 0.400 0.000 0.000 0.003 0.002 0.004 89.4 5.7
Bus436 0.400 0.000 - 0.000 90.2 0.3
Bus437 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus438 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus439 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus440 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus441 0.400 0.000 0.000 0.003 0.002 0.004 89.8 5.7
Bus442 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus443 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus444 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus445 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus446 0.400 0.000 0.000 0.003 0.002 0.004 89.8 5.7
Bus447 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus448 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus449 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Project: ETAP Page: 148

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus450 0.400 0.000 0.000 0.013 0.006 0.014 90.0 21.1


Bus451 0.400 0.000 0.000 0.004 0.002 0.004 89.8 5.7
Bus452 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus453 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus454 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus455 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus456 0.400 0.000 0.000 0.003 0.002 0.004 89.4 5.7
Bus457 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus458 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus459 13.800 400.0 0.000 1.147 88.5 48.0 12.0
Bus460 0.400 400.0 0.023 0.011 0.026 90.0 38.7 9.7
Bus461 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus462 0.400 400.0 0.000 0.032 0.015 0.035 90.0 52.3 13.1
Bus463 0.400 400.0 0.032 0.015 0.035 90.0 52.4 13.1
Bus464 0.400 400.0 0.009 0.005 0.010 90.0 15.5 3.9
Bus465 0.400 400.0 0.011 0.006 0.013 90.0 19.0 4.7
Bus466 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus467 0.400 400.0 0.001 0.001 0.001 90.0 2.0 0.5
Bus468 0.400 0.000 0.000 0.003 0.002 0.004 89.4 5.7
Bus469 0.400 400.0 0.028 0.013 0.031 90.0 46.1 11.5
Bus470 0.400 400.0 0.010 0.005 0.011 90.0 17.2 4.3
Bus471 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.5 62.4
Bus472 0.400 400.0 0.011 0.006 0.096 0.047 0.120 90.0 177.8 44.5
Bus473 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus474 0.400 400.0 0.011 0.006 0.096 0.047 0.120 90.0 177.8 44.5
Bus475 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.5 62.4
Bus476 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.5 62.4
Bus477 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.5 62.4
Bus478 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus479 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus480 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus481 0.400 0.000 0.000 0.003 0.002 0.004 89.3 5.7
Bus482 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus483 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus484 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus485 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus486 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus487 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus488 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus489 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.7
Bus490 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus491 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.6
Project: ETAP Page: 149

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus492 0.400 0.000 0.000 - 0.000 91.2 0.4


Bus503 0.400 0.000 0.029 0.014 0.032 90.0 47.0
Bus508 13.800 400.0 0.819 88.9 34.3 8.6
Bus509 0.400 2500.0 0.058 0.028 0.656 0.318 0.793 90.0 1153.6 46.1
Bus510 13.800 400.0 0.000 0.000 0.908 88.9 38.0 9.5
Bus512 13.800 400.0 -0.001 -0.004 0.983 89.1 41.1 10.3
Bus513 0.400 400.0 0.000 0.020 0.010 0.023 90.0 33.2 8.3
Bus514 0.400 400.0 0.000 0.000 0.022 0.011 0.024 90.0 35.5 8.9
Bus535 0.400 400.0 0.021 0.010 0.023 90.0 34.6 8.6
Bus536 0.400 2500.0 0.074 0.036 0.584 0.283 0.731 90.0 1064.5 42.6
Bus954 0.400 400.0 0.032 0.015 0.035 90.0 52.3 13.1
Bus955 0.400 400.0 0.028 0.013 0.031 90.0 46.1 11.5
Bus956 0.400 400.0 0.032 0.015 0.035 90.0 52.4 13.1
Bus957 0.400 400.0 0.009 0.005 0.010 90.0 15.5 3.9
Bus958 0.400 400.0 0.011 0.006 0.013 90.0 18.9 4.7
Bus959 0.400 400.0 0.001 0.001 0.001 90.0 2.0 0.5
Bus960 0.400 400.0 0.011 0.006 0.013 90.0 19.0 4.7
Bus961 0.400 400.0 0.026 0.013 0.029 90.0 44.6 11.2
Bus962 0.400 400.0 0.010 0.005 0.011 90.0 17.2 4.3
Bus963 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.4 62.4
Bus964 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.4 62.4
Bus965 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.4 62.4
Bus966 0.400 400.0 0.016 0.008 0.136 0.066 0.168 90.0 249.4 62.4
Bus967 0.400 400.0 0.011 0.006 0.096 0.047 0.120 90.0 177.8 44.5
Bus968 0.400 400.0 0.011 0.006 0.096 0.047 0.120 90.0 177.8 44.5
Bus969 13.800 400.0 0.000 1.151 88.5 48.2 12.0
Bus970 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4
Bus971 0.400 0.000 0.000 0.016 0.008 0.018 89.8 26.6
Bus972 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4
Bus973 0.400 0.000 0.000 0.018 0.009 0.020 89.9 28.7
Bus974 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.4
Bus975 0.400 0.000 0.000 0.016 0.008 0.018 89.8 26.6
Bus976 0.400 0.000 0.000 0.016 0.008 0.018 89.9 26.5
Bus977 0.400 0.000 0.000 0.018 0.009 0.020 89.9 28.7
Bus978 0.400 400.0 0.000 0.000 0.018 0.009 0.020 90.0 29.0 7.3
Bus979 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.7
Bus980 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.5
Bus981 0.400 0.000 0.000 0.012 0.006 0.013 89.8 19.1
Bus982 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus983 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.9
Bus984 0.400 0.000 0.000 0.015 0.007 0.016 89.8 24.1
Bus985 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.7
Project: ETAP Page: 150

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus986 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.5


Bus987 0.400 0.000 0.000 0.012 0.006 0.013 89.9 19.2
Bus988 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.0
Bus989 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.9
Bus990 0.400 0.000 0.000 0.015 0.007 0.016 89.8 24.2
Bus991 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.5
Bus992 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.3
Bus993 0.400 0.000 0.000 0.012 0.006 0.013 89.7 19.0
Bus994 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus995 0.400 0.000 0.000 0.013 0.006 0.015 89.8 21.7
Bus996 0.400 0.000 0.000 0.015 0.007 0.016 89.7 23.9
Bus997 0.400 0.000 0.000 0.013 0.006 0.015 89.9 21.5
Bus998 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.4
Bus999 0.400 0.000 0.000 0.012 0.006 0.013 89.8 19.0
Bus1000 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus1001 0.400 0.000 0.000 0.013 0.006 0.015 89.8 21.7
Bus1002 0.400 0.000 0.000 0.015 0.007 0.016 89.7 24.0
Bus1003 0.400 400.0 0.000 0.000 0.028 0.014 0.032 90.0 46.7 11.7
Bus1004 0.400 0.000 0.000 0.009 0.005 0.010 89.8 15.2
Bus1005 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1006 0.400 0.000 0.000 0.009 0.005 0.010 89.7 15.1
Bus1007 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.1
Bus1008 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1009 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.2
Bus1010 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1011 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus1012 0.400 400.0 0.000 0.000 - 0.000 90.6 0.4 0.1
Bus1013 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1014 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus1015 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1016 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1017 0.400 400.0 0.000 0.011 0.005 0.012 90.0 17.6 4.4
Bus1018 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1019 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1020 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1021 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus1022 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1023 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus1024 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1025 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1026 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1027 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Project: ETAP Page: 151

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1028 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.1


Bus1029 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1030 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus1031 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus1032 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus1033 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus1034 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.0
Bus1035 0.400 0.000 0.000 0.010 0.005 0.011 89.9 17.0
Bus1036 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus1037 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.0
Bus1038 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1039 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus1040 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus1041 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1042 0.400 0.000 0.000 0.009 0.004 0.010 89.7 15.1
Bus1043 0.400 0.000 0.000 0.010 0.005 0.012 89.9 17.1
Bus1044 0.400 0.000 0.000 0.009 0.004 0.010 89.6 15.0
Bus1045 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1048 0.400 0.000 0.013 0.006 0.014 90.0 21.0
Bus1049 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.0
Bus1051 0.400 0.000 0.000 0.013 0.006 0.015 90.0 21.2
Bus1052 0.400 0.000 0.000 0.004 0.002 0.004 89.7 5.7
Bus1053 0.400 0.000 0.013 0.006 0.014 90.0 20.9
Bus1054 0.400 0.000 0.000 0.014 0.007 0.016 89.9 23.0
Bus1055 0.400 0.000 0.013 0.006 0.014 90.0 21.0
Bus1056 0.400 0.000 0.000 0.013 0.006 0.014 90.0 21.2
Bus1057 0.400 0.000 0.000 0.004 0.002 0.004 89.7 5.7
Bus1058 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus1059 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus1060 0.400 0.000 0.013 0.006 0.014 90.0 20.9
Bus1061 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.2
Bus1062 0.400 0.000 0.000 0.004 0.002 0.004 89.6 5.7
Bus1063 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.8
Bus1064 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.8
Bus1065 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus1066 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus1067 0.400 0.000 0.000 0.003 0.002 0.004 89.5 5.7
Bus1068 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9
Bus1069 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus1070 0.400 0.000 0.013 0.006 0.014 90.0 20.9
Bus1071 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus1072 0.400 0.000 0.000 0.004 0.002 0.004 89.6 5.7
Project: ETAP Page: 152

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1073 0.400 0.000 0.000 0.013 0.006 0.014 90.0 20.9


Bus1074 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.9
Bus1075 0.400 0.000 0.013 0.006 0.014 90.0 20.9
Bus1076 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.2
Bus1077 0.400 0.000 0.000 0.004 0.002 0.004 89.6 5.7
Bus1078 0.400 0.000 - 0.000 90.2 0.3
Bus1079 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1080 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1081 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1082 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1083 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1084 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.3
Bus1085 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1086 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1087 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1088 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.3
Bus1089 0.400 0.000 0.009 0.005 0.010 90.0 15.2
Bus1090 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1091 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1092 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1093 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1094 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1095 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1096 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1097 0.400 0.000 0.000 0.009 0.005 0.010 89.8 15.2
Bus1098 0.400 0.000 0.000 0.009 0.005 0.010 89.9 15.2
Bus1099 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus1100 0.400 0.000 0.000 0.011 0.005 0.012 89.9 17.2
Bus1101 0.400 0.000 0.000 0.009 0.004 0.010 89.8 15.1
Bus1102 0.400 0.000 0.000 0.009 0.004 0.010 89.9 15.1
Bus1103 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1104 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1105 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1106 0.400 0.000 0.000 0.013 0.006 0.014 89.8 21.0
Bus1107 0.400 0.000 0.000 0.003 0.002 0.004 89.2 5.6
Bus1108 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1109 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1110 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1111 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1112 0.400 0.000 0.000 0.003 0.002 0.004 89.3 5.6
Bus1115 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus1116 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Project: ETAP Page: 153

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1117 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8


Bus1118 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1119 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus1120 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus1121 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1122 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus1123 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1124 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus1134 13.800 -0.001 -0.004 0.934 89.1 39.1
Bus1135 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1136 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.8
Bus1137 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1138 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus1139 0.400 0.000 0.000 0.003 0.002 0.004 89.2 5.7
Bus1140 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1141 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus1142 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1143 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1144 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus1145 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1146 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1147 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1148 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1149 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus1150 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1151 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1152 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1153 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1154 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus1155 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1156 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1157 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1158 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1159 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1160 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1161 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1162 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1163 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1164 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1165 0.400 0.000 0.000 - 0.000 90.4 0.3
Bus1166 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus1167 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Project: ETAP Page: 154

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1168 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8


Bus1169 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1170 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.6
Bus1171 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus1172 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1173 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1174 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1175 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus1176 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus1177 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus1178 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1179 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1180 0.400 0.000 0.000 0.003 0.002 0.004 89.7 5.7
Bus1181 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1182 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1183 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1184 0.400 0.000 0.000 0.013 0.006 0.014 89.8 21.0
Bus1185 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus1186 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1187 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1188 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1189 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus1190 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus1191 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1192 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus1193 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1194 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus1195 0.400 0.000 0.000 0.003 0.002 0.004 88.8 5.6
Bus1196 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1197 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus1198 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1199 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus1200 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus1201 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1202 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.6
Bus1203 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1204 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus1205 0.400 0.000 0.000 0.003 0.002 0.004 88.5 5.5
Bus1206 0.400 0.000 0.000 0.021 0.010 0.023 90.0 34.4
Bus1207 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1208 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.6
Bus1209 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Project: ETAP Page: 155

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1210 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9


Bus1211 0.400 0.000 0.000 0.003 0.002 0.004 88.6 5.5
Bus1212 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1213 0.400 0.000 0.000 0.014 0.007 0.015 89.7 22.5
Bus1214 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1215 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus1216 0.400 0.000 0.000 0.003 0.002 0.004 88.5 5.5
Bus1223 13.800 0.000 -0.006 1.127 89.0 47.1
Bus1224 0.400 2500.0 0.072 0.035 0.642 0.311 0.794 90.0 1153.9 46.2
Bus1225 13.800 400.0 0.819 88.9 34.3 8.6
Bus1237 0.400 2500.0 0.067 0.032 0.597 0.289 0.737 90.0 1068.5 42.7
Bus1238 13.800 400.0 0.759 89.0 31.7 7.9
Bus1239 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1240 0.400 0.000 0.000 0.014 0.007 0.016 89.9 22.8
Bus1241 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1242 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.1
Bus1243 0.400 0.000 0.000 0.003 0.002 0.004 89.2 5.7
Bus1244 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1245 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.8
Bus1246 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1247 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1248 0.400 0.000 0.000 0.003 0.002 0.004 89.2 5.6
Bus1249 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1250 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1251 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1252 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1253 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus1254 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1255 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1256 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1257 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1258 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1259 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1260 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1261 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1262 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1263 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1264 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1265 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1266 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1267 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1268 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Project: ETAP Page: 156

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1269 0.400 0.000 0.000 - 0.000 90.4 0.3


Bus1270 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.7
Bus1271 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1272 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1273 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.9
Bus1274 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1275 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.7
Bus1276 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.7
Bus1277 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1278 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1279 0.400 0.000 0.000 0.003 0.002 0.004 89.0 5.6
Bus1280 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.8
Bus1281 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.8
Bus1282 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1283 0.400 0.000 0.000 0.013 0.006 0.014 89.9 21.0
Bus1284 0.400 0.000 0.000 0.003 0.002 0.004 89.1 5.6
Bus1285 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1286 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1287 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.8
Bus1288 0.400 0.000 0.000 0.013 0.006 0.014 89.8 21.0
Bus1289 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus1290 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1291 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.7
Bus1292 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1293 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus1294 0.400 0.000 0.000 0.003 0.002 0.004 88.9 5.6
Bus1295 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1296 0.400 0.000 0.000 0.014 0.007 0.015 89.9 22.6
Bus1297 0.400 0.000 0.000 0.013 0.006 0.014 89.9 20.7
Bus1298 0.400 0.000 0.000 0.013 0.006 0.014 89.8 20.9
Bus1299 0.400 0.000 0.000 0.003 0.002 0.004 88.8 5.6
Bus1300 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1301 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.5
Bus1302 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1303 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus1304 0.400 0.000 0.000 0.003 0.002 0.004 88.4 5.5
Bus1305 0.400 0.000 0.000 0.012 0.006 0.014 89.9 20.6
Bus1306 0.400 0.000 0.000 0.014 0.007 0.015 89.8 22.6
Bus1307 0.400 0.000 0.000 0.012 0.006 0.014 89.8 20.6
Bus1308 0.400 0.000 0.000 0.013 0.006 0.014 89.7 20.8
Bus1309 0.400 0.000 0.000 0.003 0.002 0.004 88.5 5.5
Bus1310 0.400 0.000 0.000 0.021 0.010 0.023 90.0 34.4
Project: ETAP Page: 157

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1315 0.400 400.0 0.000 0.020 0.010 0.022 90.0 32.9 8.2
Bus1316 13.800 400.0 0.000 -0.007 1.126 89.0 47.1 11.8
DB-B01-01 0.400 400.0 0.000 0.000 0.061 90.0 90.2 22.6
DB-B01-001 0.400 400.0 0.000 0.000 0.061 90.0 90.3 22.6
DB-B01-02 0.400 400.0 0.000 0.000 0.061 90.0 90.4 22.6
DB-B01-002 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-03 0.400 400.0 0.000 0.000 0.061 90.0 90.6 22.7
DB-B01-003 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-04 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-004 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-05 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-005 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-06 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.8
DB-B01-006 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.9
DB-B01-7 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-07 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-8 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-08 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-09 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-009 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-10 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-010 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-11 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-011 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-12 0.400 400.0 0.000 0.000 0.061 90.0 90.9 22.7
DB-B01-012 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-13 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-013 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-14 0.400 400.0 0.000 0.000 0.061 89.9 90.4 22.6
DB-B01-014 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-15 0.400 400.0 0.000 0.000 0.061 90.0 90.6 22.7
DB-B01-16 0.400 400.0 0.000 0.000 0.061 89.9 90.2 22.6
DB-B01-17 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-017 0.400 400.0 0.000 0.000 0.061 90.0 90.3 22.6
DB-B01-18 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-018 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-19 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-019 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-20 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-020 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-21 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-021 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
Project: ETAP Page: 158

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

DB-B01-22 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.9


DB-B01-022 0.400 400.0 0.000 0.000 0.063 90.0 91.9 23.0
DB-B01-23 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-023 0.400 400.0 0.000 0.000 0.063 90.0 91.6 22.9
DB-B01-24 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-024 0.400 400.0 0.000 0.000 0.062 90.0 91.5 22.9
DB-B01-25 0.400 400.0 0.000 0.000 0.061 89.9 90.8 22.7
DB-B01-025 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-26 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-026 0.400 400.0 0.000 0.000 0.062 90.0 91.5 22.9
DB-B01-27 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-027 0.400 400.0 0.000 0.000 0.063 90.0 91.7 22.9
DB-B01-28 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-028 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-29 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-029 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-30 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
DB-B01-030 0.400 400.0 0.000 0.000 0.061 90.0 90.5 22.6
DB-B01-31 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-031 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-32 0.400 400.0 0.000 0.000 0.061 90.0 90.8 22.7
DB-B01-032 0.400 400.0 0.000 0.000 0.061 89.9 90.2 22.6
DB-B01-33 0.400 400.0 0.000 0.000 0.061 90.0 90.2 22.5
DB-B01-033 0.400 400.0 0.000 0.000 0.062 90.0 90.8 22.7
DB-B01-34 0.400 400.0 0.000 0.000 0.061 90.0 90.4 22.6
DB-B01-034 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-35 0.400 400.0 0.000 0.000 0.061 89.9 90.4 22.6
DB-B01-035 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.8
DB-B01-36 0.400 400.0 0.000 0.000 0.061 90.0 90.6 22.7
DB-B01-036 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-37 0.400 400.0 0.000 0.000 0.061 90.0 90.7 22.7
DB-B01-037 0.400 400.0 0.000 0.000 0.062 90.0 91.3 22.8
DB-B01-38 0.400 400.0 0.000 0.000 0.062 90.0 91.5 22.9
DB-B01-38. 0.400 400.0 0.000 0.000 0.062 90.0 90.9 22.7
DB-B01-39 0.400 400.0 0.000 0.000 0.062 90.0 91.1 22.8
DB-B01-039 0.400 400.0 0.000 0.000 0.063 90.0 91.6 22.9
DB-B01-40 0.400 400.0 0.000 0.000 0.063 90.0 92.0 23.0
DB-B01-040 0.400 400.0 0.000 0.000 0.062 90.0 91.4 22.9
DB-B01-41 0.400 400.0 0.000 0.000 0.063 90.0 91.8 23.0
DB-B01-041 0.400 400.0 0.000 0.000 0.062 90.0 91.2 22.8
DB-B01-42 0.400 400.0 0.000 0.000 0.063 90.0 91.6 22.9
DB-B01-042 0.400 400.0 0.000 0.000 0.062 90.0 91.0 22.7
Project: ETAP Page: 159

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

DB-B01-116 0.400 400.0 0.000 0.000 0.061 90.1 90.6 22.7


DB-B01-117 0.400 400.0 0.000 0.000 0.061 90.0 90.3 22.6
DB-B02-1 0.400 400.0 0.000 0.000 0.043 90.0 62.7 15.7
DB-B02-01 0.400 400.0 0.000 0.000 0.042 89.9 62.3 15.6
DB-B02-2 0.400 400.0 0.000 0.000 0.043 90.0 62.9 15.7
DB-B02-02 0.400 400.0 0.000 0.000 0.042 89.9 62.4 15.6
DB-B02-3 0.400 400.0 0.000 0.000 0.043 90.0 63.0 15.7
DB-B02-03 0.400 400.0 0.000 0.000 0.043 90.0 62.6 15.6
DB-B02-4 0.400 400.0 0.000 0.000 0.042 90.0 62.4 15.6
DB-B02-04 0.400 400.0 0.000 0.000 0.043 90.0 62.8 15.7
DB-B02-5 0.400 400.0 0.000 0.000 0.042 89.9 62.3 15.6
DB-B02-05 0.400 400.0 0.000 0.000 0.043 90.0 62.7 15.7
DB-B02-6 0.400 400.0 0.000 0.000 0.042 89.9 62.1 15.5
DB-B02-06 0.400 400.0 0.000 0.000 0.043 90.0 62.6 15.7
DB-B02-7 0.400 400.0 0.000 0.000 0.043 90.0 62.7 15.7
DB-B02-07 0.400 400.0 0.000 0.000 0.043 90.0 62.7 15.7
DB-B02-8 0.400 400.0 0.000 0.000 0.043 90.0 62.6 15.6
DB-B02-08 0.400 400.0 0.000 0.000 0.042 90.0 62.5 15.6
DB-B02-9 0.400 400.0 0.000 0.000 0.042 90.0 62.4 15.6
DB-B02-10 0.400 400.0 0.000 0.000 0.043 90.0 62.5 15.6
DB-B02-010 0.400 400.0 0.000 0.000 0.043 90.0 62.6 15.6
DB-B02-11 0.400 400.0 0.000 0.000 0.042 90.0 62.5 15.6
DB-B02-011 0.400 400.0 0.000 0.000 0.042 90.0 62.4 15.6
DB-B02-12 0.400 400.0 0.000 0.000 0.042 90.0 62.4 15.6
DB-B02-012 0.400 400.0 0.000 0.000 0.042 90.0 62.4 15.6
DB-B02-13 0.400 400.0 0.000 0.000 0.042 89.9 62.2 15.5
DB-B02-013 0.400 400.0 0.000 0.000 0.042 89.9 62.2 15.6
DB-B02-14 0.400 400.0 0.000 0.000 0.042 89.9 62.0 15.5
DB-B02-014 0.400 400.0 0.000 0.000 0.042 89.9 62.1 15.5
DB-B02-15 0.400 400.0 0.001 0.000 0.042 90.1 62.5 15.6
DB-B02-015 0.400 400.0 0.000 0.000 0.043 90.1 62.7 15.7
DB-B02-16 0.400 400.0 0.000 0.000 0.042 89.9 62.2 15.6
DB-B02-016 0.400 400.0 0.000 0.000 0.042 90.0 62.5 15.6
DB-B03-1 0.400 400.0 0.000 0.000 0.090 90.0 132.6 33.1
DB-B03-01 0.400 400.0 0.000 0.000 0.090 90.0 132.4 33.1
DB-B03-2 0.400 400.0 0.000 0.000 0.091 90.0 133.3 33.3
DB-B03-02 0.400 400.0 0.000 0.000 0.091 90.0 133.2 33.3
DB-B03-3 0.400 400.0 0.001 0.000 0.090 90.1 133.0 33.2
DB-B03-03 0.400 400.0 0.001 0.000 0.090 90.1 132.9 33.2
DB-B03-4 0.400 400.0 0.000 0.000 0.091 90.1 133.6 33.4
DB-B03-04 0.400 400.0 0.000 0.000 0.091 90.0 133.5 33.4
DB-B04-1 0.400 400.0 0.000 0.000 0.074 90.0 108.2 27.0
Project: ETAP Page: 160

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

DB-B04-01 0.400 400.0 0.000 0.000 0.074 90.0 108.1 27.0


DB-B04-2 0.400 400.0 0.000 0.000 0.074 90.1 108.3 27.1
DB-B04-02 0.400 400.0 0.000 0.000 0.074 90.1 108.4 27.1
DB-B06 0.400 400.0 0.001 0.000 0.114 89.8 170.0 42.5
DB-B08-09 0.400 400.0 0.000 0.000 0.042 89.9 62.4 15.6
DB-B14 0.400 400.0 0.000 0.000 0.052 90.1 77.7 19.4
DB-B21 0.400 400.0 0.000 0.000 0.047 89.9 69.5 17.4
MV SWGR#1 13.800 600.0 0.000 7.194 88.9 301.0 50.2
MV SWGR#2 13.800 1250.0 0.000 6.948 88.9 290.7 23.3

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
Project: ETAP Page: 161

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

1-PC-001 Cable 385.00 187.57 48.72

1-PC-002 Cable 334.00 139.70 41.83

1-PC-003 Cable 334.00 92.42 27.67

1-PC-004 Cable 334.00 48.00 14.37

1-PC-006 Cable 334.00 34.27 10.26

1-PC-007 Cable 334.00 72.26 21.63

2-PC-001 Cable 385.00 177.54 46.11

2-PC-002 Cable 334.00 130.41 39.05

2-PC-003 Cable 334.00 91.32 27.34

2-PC-004 Cable 334.00 48.17 14.42

2-PC-006 Cable 334.00 34.28 10.26

2-PC-007 Cable 334.00 66.03 19.77

2-PC-008 Cable 334.00 113.15 33.88

11-PC-20 Cable 156.00 90.93 58.29

11-PC-100 Cable 404.60 272.78 67.42

11-PC-110 Cable 156.00 91.38 58.58

11-PC-111 Cable 86.60 20.81 24.03

11-PC-112 Cable 86.60 22.82 26.35

11-PC-113 Cable 86.60 20.86 24.08

11-PC-114 Cable 86.60 21.07 24.33

11-PC-115 Cable 86.60 5.65 6.52

11-PC-120 Cable 156.00 91.13 58.42

11-PC-121 Cable 86.60 20.77 23.98

11-PC-122 Cable 86.60 22.77 26.30

11-PC-123 Cable 86.60 20.81 24.04

11-PC-124 Cable 86.60 21.03 24.28

11-PC-125 Cable 86.60 5.63 6.50

11-PC-131 Cable 86.60 20.73 23.94

11-PC-132 Cable 86.60 22.73 26.24

11-PC-133 Cable 86.60 20.77 23.99

11-PC-134 Cable 86.60 20.98 24.23

11-PC-135 Cable 86.60 5.62 6.49

11-PC-200 Cable 404.60 271.92 67.21


Project: ETAP Page: 162

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

11-PC-210 Cable 156.00 90.62 58.09

11-PC-211 Cable 86.60 20.66 23.85

11-PC-212 Cable 86.60 22.64 26.15

11-PC-213 Cable 86.60 20.70 23.91

11-PC-214 Cable 86.60 20.91 24.15

11-PC-215 Cable 86.60 5.59 6.46

11-PC-220 Cable 156.00 90.84 58.23

11-PC-221 Cable 86.60 20.70 23.90

11-PC-222 Cable 86.60 22.69 26.21

11-PC-223 Cable 86.60 20.75 23.96

11-PC-224 Cable 86.60 20.96 24.20

11-PC-225 Cable 86.60 5.61 6.48

11-PC-230 Cable 156.00 91.01 58.34

11-PC-231 Cable 86.60 20.73 23.94

11-PC-232 Cable 86.60 22.73 26.24

11-PC-233 Cable 86.60 20.77 23.99

11-PC-234 Cable 86.60 20.99 24.23

11-PC-235 Cable 86.60 5.62 6.49

11-PC-240 Cable 40.60 0.27 0.67

11-PC-300 Cable 404.60 272.18 67.27

11-PC-310 Cable 156.00 90.76 58.18

11-PC-311 Cable 86.60 20.68 23.88

11-PC-312 Cable 86.60 22.67 26.18

11-PC-313 Cable 86.60 20.74 23.95

11-PC-314 Cable 86.60 20.93 24.17

11-PC-315 Cable 86.60 5.64 6.51

11-PC-320 Cable 156.00 90.97 58.32

11-PC-321 Cable 86.60 20.73 23.93

11-PC-322 Cable 86.60 22.72 26.23

11-PC-323 Cable 86.60 20.78 24.00

11-PC-324 Cable 86.60 20.97 24.22

11-PC-325 Cable 86.60 5.65 6.53

11-PC-330 Cable 156.00 91.25 58.49

11-PC-331 Cable 86.60 20.77 23.99

11-PC-332 Cable 86.60 22.77 26.29


Project: ETAP Page: 163

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

11-PC-333 Cable 86.60 20.83 24.05

11-PC-334 Cable 86.60 21.02 24.27

11-PC-335 Cable 86.60 5.67 6.54

11-PC-400 Cable 404.60 270.96 66.97

11-PC-410 Cable 156.00 90.86 58.25

11-PC-411 Cable 86.60 20.68 23.88

11-PC-412 Cable 86.60 22.68 26.19

11-PC-413 Cable 86.60 20.74 23.95

11-PC-414 Cable 86.60 20.95 24.19

11-PC-415 Cable 86.60 5.60 6.47

11-PC-420 Cable 156.00 90.66 58.12

11-PC-421 Cable 86.60 20.65 23.85

11-PC-422 Cable 86.60 22.64 26.15

11-PC-423 Cable 86.60 20.71 23.92

11-PC-424 Cable 86.60 20.91 24.15

11-PC-425 Cable 86.60 5.59 6.45

11-PC-430 Cable 156.00 90.44 57.97

11-PC-431 Cable 86.60 20.61 23.80

11-PC-432 Cable 86.60 22.60 26.09

11-PC-433 Cable 86.60 20.67 23.87

11-PC-434 Cable 86.60 20.87 24.10

11-PC-435 Cable 86.60 5.57 6.44

11-PC-500 Cable 404.60 213.63 52.80

11-PC-510 Cable 156.00 90.20 57.82

11-PC-511 Cable 86.60 20.54 23.71

11-PC-512 Cable 86.60 22.51 26.00

11-PC-513 Cable 86.60 20.59 23.78

11-PC-514 Cable 86.60 20.78 24.00

11-PC-515 Cable 86.60 5.52 6.38

11-PC-520 Cable 156.00 90.42 57.96

11-PC-521 Cable 86.60 20.56 23.75

11-PC-522 Cable 86.60 22.54 26.03

11-PC-523 Cable 86.60 20.62 23.81

11-PC-524 Cable 86.60 20.81 24.03

11-PC-525 Cable 86.60 5.54 6.39


Project: ETAP Page: 164

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

11-PC-530 Cable 106.80 34.42 32.23

11-PC-600 Cable 404.60 179.67 44.41

11-PC-610 Cable 156.00 90.64 58.10

11-PC-611 Cable 86.60 20.58 23.76

11-PC-612 Cable 86.60 22.56 26.05

11-PC-613 Cable 86.60 20.59 23.77

11-PC-614 Cable 86.60 20.84 24.06

11-PC-615 Cable 86.60 5.60 6.47

11-PC-620 Cable 156.00 90.23 57.84

11-PC-621 Cable 86.60 20.53 23.70

11-PC-622 Cable 86.60 22.51 25.99

11-PC-623 Cable 86.60 20.53 23.71

11-PC-624 Cable 86.60 20.79 24.00

11-PC-625 Cable 86.60 5.59 6.45

11-PC-630 Cable 40.60 0.35 0.87

11-PC-700 Cable 404.60 141.58 34.99

11-PC-710 Cable 90.10 14.07 15.62

11-PC-720 Cable 156.00 69.53 44.57

11-PC-721 Cable 86.60 19.66 22.70

11-PC-722 Cable 104.40 44.29 42.42

11-PC-723 Cable 39.70 5.49 13.84

11-PC-730 Cable 106.80 58.08 54.38

12-PC-50 Cable 86.60 20.53 23.71

12-PC-51 Cable 86.60 22.51 25.99

12-PC-52 Cable 86.60 20.59 23.78

12-PC-53 Cable 86.60 20.78 24.00

12-PC-54 Cable 86.60 5.53 6.39

12-PC-56 Cable 86.60 20.57 23.75

12-PC-57 Cable 86.60 22.55 26.03

12-PC-58 Cable 86.60 20.62 23.81

12-PC-59 Cable 86.60 20.82 24.04

12-PC-60 Cable 86.60 5.55 6.40

12-PC-100 Cable 404.60 272.92 67.45

12-PC-110 Cable 156.00 91.43 58.61

12-PC-111 Cable 86.60 20.82 24.04


Project: ETAP Page: 165

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

12-PC-112 Cable 86.60 22.83 26.36

12-PC-113 Cable 86.60 20.86 24.09

12-PC-114 Cable 86.60 21.08 24.34

12-PC-115 Cable 86.60 5.65 6.52

12-PC-120 Cable 156.00 91.18 58.45

12-PC-121 Cable 86.60 20.78 23.99

12-PC-122 Cable 86.60 22.78 26.31

12-PC-123 Cable 86.60 20.82 24.05

12-PC-124 Cable 86.60 21.04 24.29

12-PC-125 Cable 86.60 5.63 6.51

12-PC-130 Cable 156.00 90.98 58.32

12-PC-131 Cable 86.60 20.74 23.95

12-PC-132 Cable 86.60 22.74 26.25

12-PC-133 Cable 86.60 20.78 24.00

12-PC-134 Cable 86.60 20.99 24.24

12-PC-135 Cable 86.60 5.62 6.49

12-PC-200 Cable 404.60 272.10 67.25

12-PC-210 Cable 156.00 90.67 58.12

12-PC-211 Cable 86.60 20.67 23.86

12-PC-212 Cable 86.60 22.66 26.16

12-PC-213 Cable 86.60 20.71 23.92

12-PC-214 Cable 86.60 20.92 24.16

12-PC-215 Cable 86.60 5.60 6.46

12-PC-220 Cable 156.00 90.88 58.26

12-PC-221 Cable 86.60 20.71 23.91

12-PC-222 Cable 86.60 22.71 26.22

12-PC-223 Cable 86.60 20.76 23.97

12-PC-224 Cable 86.60 20.97 24.21

12-PC-225 Cable 86.60 5.61 6.48

12-PC-230 Cable 156.00 91.06 58.37

12-PC-231 Cable 86.60 20.74 23.95

12-PC-232 Cable 86.60 22.74 26.26

12-PC-233 Cable 86.60 20.78 24.00

12-PC-234 Cable 86.60 21.00 24.25

12-PC-235 Cable 86.60 5.62 6.49


Project: ETAP Page: 166

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

12-PC-240 Cable 40.60 0.27 0.67

12-PC-300 Cable 404.60 186.76 46.16

12-PC-310 Cable 123.80 62.27 50.30

12-PC-311 Cable 86.60 15.04 17.37

12-PC-312 Cable 86.60 17.07 19.71

12-PC-313 Cable 86.60 15.04 17.37

12-PC-314 Cable 86.60 15.03 17.36

12-PC-320 Cable 123.80 62.41 50.42

12-PC-321 Cable 86.60 15.07 17.40

12-PC-322 Cable 86.60 17.11 19.75

12-PC-323 Cable 86.60 15.07 17.40

12-PC-324 Cable 86.60 15.06 17.40

12-PC-330 Cable 123.80 62.59 50.56

12-PC-331 Cable 86.60 15.10 17.44

12-PC-332 Cable 86.60 17.14 19.80

12-PC-333 Cable 86.60 15.10 17.44

12-PC-334 Cable 86.60 15.10 17.43

12-PC-400 Cable 404.60 186.24 46.03

12-PC-410 Cable 123.80 62.42 50.42

12-PC-411 Cable 86.60 15.06 17.39

12-PC-412 Cable 86.60 17.11 19.76

12-PC-413 Cable 86.60 15.04 17.37

12-PC-414 Cable 86.60 15.06 17.39

12-PC-420 Cable 123.80 62.29 50.31

12-PC-421 Cable 86.60 15.03 17.36

12-PC-422 Cable 86.60 17.08 19.73

12-PC-423 Cable 86.60 15.02 17.34

12-PC-424 Cable 86.60 15.04 17.37

12-PC-430 Cable 123.80 62.14 50.20

12-PC-431 Cable 86.60 15.00 17.32

12-PC-432 Cable 86.60 17.05 19.69

12-PC-433 Cable 86.60 14.98 17.30

12-PC-434 Cable 86.60 15.01 17.33

12-PC-500 Cable 404.60 221.88 54.84

12-PC-510 Cable 156.00 90.17 57.80


Project: ETAP Page: 167

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

12-PC-520 Cable 156.00 90.42 57.96

12-PC-530 Cable 104.40 34.35 32.90

12-PC-540 Cable 68.00 8.26 12.15

12-PC-600 Cable 404.60 179.55 44.38

12-PC-610 Cable 152.10 90.37 59.41

12-PC-611 Cable 86.60 20.56 23.74

12-PC-612 Cable 86.60 22.54 26.02

12-PC-613 Cable 86.60 20.57 23.75

12-PC-614 Cable 86.60 20.82 24.04

12-PC-615 Cable 86.60 5.60 6.46

12-PC-620 Cable 156.00 90.63 58.10

12-PC-621 Cable 86.60 20.59 23.78

12-PC-622 Cable 86.60 22.57 26.06

12-PC-623 Cable 86.60 20.60 23.79

12-PC-624 Cable 86.60 20.85 24.07

12-PC-625 Cable 86.60 5.61 6.47

12-PC-700 Cable 404.60 283.02 69.95

12-PC-710 Cable 339.00 169.15 49.90

12-PC-710-A Cable 90.10 0.91 1.01

12-PC-711 Cable 104.40 36.95 35.39

12-PC-712 Cable 104.40 33.11 31.71

12-PC-713 Cable 104.40 30.52 29.23

12-PC-714 Cable 152.10 68.75 45.20

12-PC-720 Cable 104.40 37.12 35.56

12-PC-730 Cable 152.10 77.73 51.11

12-PC-731 Cable 104.40 42.86 41.06

12-PC-732 Cable 39.70 17.35 43.71

12-PC-733 Cable 39.70 17.35 43.71

13-PC-100 Cable 404.60 244.63 60.46

13-PC-101 Cable 404.60 265.72 65.67

13-PC-102 Cable 404.60 309.67 76.54

13-PC-103 Cable 404.60 205.01 50.67

13-PC-104 Cable 404.60 124.59 30.79

13-PC-105 Cable 404.60 185.76 45.91

13-PC-106 Cable 404.60 168.74 41.70


Project: ETAP Page: 168

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

13-PC-110 Cable 208.00 108.09 51.96

13-PC-111 Cable 104.40 26.34 25.23

13-PC-112 Cable 104.40 26.56 25.44

13-PC-113 Cable 86.60 26.42 30.51

13-PC-114 Cable 104.40 28.63 27.42

13-PC-120 Cable 208.00 108.26 52.05

13-PC-121 Cable 104.40 26.37 25.26

13-PC-122 Cable 104.40 26.59 25.47

13-PC-123 Cable 86.60 26.44 30.53

13-PC-124 Cable 104.40 28.65 27.45

13-PC-130 Cable 104.40 29.01 27.79

13-PC-210 Cable 262.20 133.15 50.78

13-PC-211 Cable 86.60 21.63 24.98

13-PC-212 Cable 86.60 23.46 27.09

13-PC-213 Cable 86.60 19.11 22.07

13-PC-214 Cable 86.60 22.91 26.45

13-PC-215 Cable 86.60 21.82 25.20

13-PC-216 Cable 86.60 24.08 27.81

13-PC-220 Cable 262.20 133.50 50.92

13-PC-221 Cable 86.60 21.66 25.01

13-PC-222 Cable 86.60 23.50 27.13

13-PC-223 Cable 86.60 19.14 22.10

13-PC-224 Cable 86.60 22.94 26.49

13-PC-225 Cable 86.60 21.86 25.24

13-PC-226 Cable 86.60 24.12 27.85

13-PC-310 Cable 262.20 132.44 50.51

13-PC-311 Cable 86.60 21.49 24.82

13-PC-312 Cable 86.60 23.31 26.92

13-PC-313 Cable 86.60 18.97 21.91

13-PC-314 Cable 86.60 22.76 26.29

13-PC-315 Cable 86.60 21.67 25.03

13-PC-316 Cable 86.60 23.91 27.61

13-PC-320 Cable 262.20 132.88 50.68

13-PC-321 Cable 86.60 21.51 24.84

13-PC-322 Cable 86.60 23.33 26.94


Project: ETAP Page: 169

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

13-PC-323 Cable 86.60 18.99 21.93

13-PC-324 Cable 86.60 22.79 26.31

13-PC-325 Cable 86.60 21.70 25.05

13-PC-326 Cable 86.60 23.94 27.64

13-PC-330 Cable 104.40 46.69 44.72

13-PC-410 Cable 123.80 62.66 50.61

13-PC-411 Cable 86.60 15.13 17.47

13-PC-412 Cable 86.60 17.18 19.84

13-PC-413 Cable 86.60 15.13 17.47

13-PC-414 Cable 86.60 15.13 17.47

13-PC-420 Cable 123.80 62.49 50.48

13-PC-421 Cable 86.60 15.10 17.43

13-PC-422 Cable 86.60 17.14 19.80

13-PC-423 Cable 86.60 15.09 17.43

13-PC-424 Cable 86.60 15.10 17.43

13-PC-430 Cable 123.80 62.36 50.37

13-PC-431 Cable 86.60 15.07 17.40

13-PC-432 Cable 86.60 17.11 19.76

13-PC-433 Cable 86.60 15.06 17.39

13-PC-434 Cable 86.60 15.07 17.40

13-PC-440 Cable 52.60 17.61 33.49

13-PC-450 Cable 39.70 0.36 0.89

13-PC-510 Cable 123.80 62.53 50.51

13-PC-511 Cable 86.60 15.10 17.44

13-PC-512 Cable 86.60 17.15 19.80

13-PC-513 Cable 86.60 15.10 17.43

13-PC-514 Cable 86.60 15.10 17.44

13-PC-520 Cable 123.80 62.41 50.41

13-PC-521 Cable 86.60 15.08 17.41

13-PC-522 Cable 86.60 17.12 19.77

13-PC-523 Cable 86.60 15.07 17.40

13-PC-524 Cable 86.60 15.08 17.41

13-PC-610 Cable 123.80 62.36 50.37

13-PC-611 Cable 86.60 15.04 17.37

13-PC-612 Cable 86.60 17.09 19.73


Project: ETAP Page: 170

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

13-PC-613 Cable 86.60 15.03 17.36

13-PC-614 Cable 86.60 15.05 17.38

13-PC-620 Cable 123.80 62.18 50.22

13-PC-621 Cable 86.60 15.01 17.33

13-PC-622 Cable 86.60 17.05 19.69

13-PC-623 Cable 86.60 15.00 17.32

13-PC-624 Cable 86.60 15.01 17.34

13-PC-630 Cable 123.80 62.04 50.11

13-PC-631 Cable 86.60 14.98 17.30

13-PC-632 Cable 86.60 17.02 19.66

13-PC-633 Cable 86.60 14.96 17.28

13-PC-634 Cable 86.60 14.98 17.30

13-PC-710 Cable 262.20 62.51 23.84

13-PC-711 Cable 86.60 14.97 17.28

13-PC-712 Cable 86.60 17.02 19.65

13-PC-713 Cable 86.60 14.94 17.26

13-PC-714 Cable 86.60 14.98 17.30

13-PC-720 Cable 262.20 62.24 23.74

13-PC-721 Cable 86.60 14.96 17.27

13-PC-722 Cable 86.60 17.01 19.64

13-PC-723 Cable 86.60 14.94 17.25

13-PC-724 Cable 86.60 14.97 17.29

13-PC-730 Cable 104.40 46.15 44.21

14-PC-100 Cable 414.10 262.18 63.31

14-PC-110 Cable 104.40 38.68 37.05

14-PC-120 Cable 104.40 52.30 50.09

14-PC-130 Cable 104.40 52.43 50.22

14-PC-140 Cable 86.60 15.49 17.89

14-PC-150 Cable 68.00 18.95 27.87

14-PC-160 Cable 52.60 2.04 3.88

14-PC-170 Cable 86.60 18.98 21.92

14-PC-180 Cable 104.40 46.12 44.17

14-PC-190 Cable 52.60 17.22 32.74

14-PC-200 Cable 414.10 249.46 60.24

14-PC-300 Cable 414.10 249.46 60.24


Project: ETAP Page: 171

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

14-PC-400 Cable 414.10 249.46 60.24

14-PC-500 Cable 414.10 249.46 60.24

14-PC-600 Cable 414.10 177.85 42.95

14-PC-700 Cable 404.60 177.85 43.96

15-PC-100 Cable 2340.60 1153.61 49.29

16-PC-100 Cable 2340.60 1064.53 45.48

16-PC-200 Cable 414.10 215.36 52.01

16-PC-210 Cable 158.30 90.69 57.29

16-PC-211 Cable 86.60 20.68 23.88

16-PC-212 Cable 86.60 22.69 26.20

16-PC-213 Cable 86.60 20.75 23.96

16-PC-214 Cable 86.60 20.97 24.21

16-PC-215 Cable 86.60 5.65 6.52

16-PC-220 Cable 158.30 90.80 57.36

16-PC-221 Cable 86.60 20.71 23.91

16-PC-222 Cable 86.60 22.71 26.23

16-PC-223 Cable 86.60 20.77 23.99

16-PC-224 Cable 86.60 20.99 24.24

16-PC-225 Cable 86.60 5.66 6.53

16-PC-230 Cable 106.80 34.56 32.36

17-PC-100 Cable 406.00 274.70 67.66

17-PC-110 Cable 156.00 91.85 58.88

17-PC-111 Cable 86.60 20.94 24.18

17-PC-112 Cable 86.60 22.97 26.52

17-PC-113 Cable 86.60 20.98 24.23

17-PC-114 Cable 86.60 21.20 24.48

17-PC-115 Cable 86.60 5.71 6.60

17-PC-120 Cable 156.00 91.64 58.74

17-PC-121 Cable 86.60 20.89 24.13

17-PC-122 Cable 86.60 22.92 26.47

17-PC-123 Cable 86.60 20.94 24.18

17-PC-124 Cable 86.60 21.16 24.43

17-PC-125 Cable 86.60 5.70 6.58

17-PC-130 Cable 156.00 91.47 58.63

17-PC-131 Cable 86.60 20.86 24.08


Project: ETAP Page: 172

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

17-PC-132 Cable 86.60 22.88 26.42

17-PC-133 Cable 86.60 20.90 24.14

17-PC-134 Cable 86.60 21.12 24.39

17-PC-135 Cable 86.60 5.69 6.57

17-PC-200 Cable 406.00 273.65 67.40

17-PC-210 Cable 156.00 91.27 58.50

17-PC-211 Cable 86.60 20.81 24.03

17-PC-212 Cable 86.60 22.83 26.36

17-PC-213 Cable 86.60 20.85 24.08

17-PC-214 Cable 86.60 21.07 24.33

17-PC-215 Cable 86.60 5.68 6.56

17-PC-220 Cable 156.00 91.27 58.50

17-PC-221 Cable 86.60 20.81 24.03

17-PC-222 Cable 86.60 22.83 26.36

17-PC-223 Cable 86.60 20.85 24.08

17-PC-224 Cable 86.60 21.07 24.33

17-PC-225 Cable 86.60 5.68 6.56

17-PC-230 Cable 156.00 91.07 58.38

17-PC-231 Cable 86.60 20.77 23.98

17-PC-232 Cable 86.60 22.78 26.31

17-PC-233 Cable 86.60 20.81 24.03

17-PC-234 Cable 86.60 21.03 24.28

17-PC-235 Cable 86.60 5.66 6.54

17-PC-240 Cable 40.60 0.29 0.72

17-PC-300 Cable 406.00 274.16 67.53

17-PC-310 Cable 156.00 91.30 58.53

17-PC-311 Cable 86.60 20.83 24.06

17-PC-312 Cable 86.60 22.83 26.36

17-PC-313 Cable 86.60 20.87 24.10

17-PC-314 Cable 86.60 21.06 24.32

17-PC-315 Cable 86.60 5.69 6.57

17-PC-320 Cable 156.00 91.50 58.65

17-PC-321 Cable 86.60 20.88 24.11

17-PC-322 Cable 86.60 22.87 26.41

17-PC-323 Cable 86.60 20.91 24.15


Project: ETAP Page: 173

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

17-PC-324 Cable 86.60 21.10 24.37

17-PC-325 Cable 86.60 5.70 6.58

17-PC-330 Cable 156.00 91.71 58.79

17-PC-331 Cable 86.60 20.92 24.16

17-PC-332 Cable 86.60 22.92 26.47

17-PC-333 Cable 86.60 20.96 24.20

17-PC-334 Cable 86.60 21.15 24.42

17-PC-335 Cable 86.60 5.71 6.59

17-PC-400 Cable 406.00 273.00 67.24

17-PC-410 Cable 156.00 91.34 58.55

17-PC-411 Cable 86.60 20.81 24.03

17-PC-412 Cable 86.60 22.83 26.36

17-PC-413 Cable 86.60 20.87 24.10

17-PC-414 Cable 86.60 21.09 24.36

17-PC-415 Cable 86.60 5.68 6.55

17-PC-420 Cable 156.00 91.18 58.45

17-PC-421 Cable 86.60 20.78 24.00

17-PC-422 Cable 86.60 22.79 26.32

17-PC-423 Cable 86.60 20.84 24.07

17-PC-424 Cable 86.60 21.06 24.32

17-PC-425 Cable 86.60 5.67 6.54

17-PC-430 Cable 156.00 90.98 58.32

17-PC-431 Cable 86.60 20.74 23.95

17-PC-432 Cable 86.60 22.74 26.26

17-PC-433 Cable 86.60 20.80 24.02

17-PC-434 Cable 86.60 21.02 24.27

17-PC-435 Cable 86.60 5.65 6.53

17-PC-500 Cable 406.00 181.27 44.65

17-PC-510 Cable 156.00 91.04 58.36

17-PC-511 Cable 86.60 20.73 23.94

17-PC-512 Cable 86.60 22.70 26.22

17-PC-513 Cable 86.60 20.77 23.98

17-PC-514 Cable 86.60 20.98 24.22

17-PC-515 Cable 86.60 5.65 6.53

17-PC-520 Cable 156.00 90.84 58.23


Project: ETAP Page: 174

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

17-PC-521 Cable 86.60 20.70 23.90

17-PC-522 Cable 86.60 22.67 26.18

17-PC-523 Cable 86.60 20.74 23.94

17-PC-524 Cable 86.60 20.95 24.19

17-PC-525 Cable 86.60 5.64 6.52

17-PC-530 Cable 106.80 0.36 0.33

17-PC-600 Cable 404.60 115.58 28.57

17-PC-610 Cable 156.00 35.48 22.74

17-PC-620 Cable 106.80 33.17 31.05

17-PC-630 Cable 106.80 46.96 43.97

17-PC-700 Cable 404.60 0.02 0.00

21-PC-100 Cable 404.60 273.01 67.48

21-PC-110 Cable 156.00 91.43 58.61

21-PC-111 Cable 86.60 20.82 24.05

21-PC-112 Cable 86.60 22.84 26.37

21-PC-113 Cable 86.60 20.87 24.10

21-PC-114 Cable 86.60 21.08 24.35

21-PC-115 Cable 86.60 5.66 6.53

21-PC-120 Cable 156.00 91.19 58.46

21-PC-121 Cable 86.60 20.78 24.00

21-PC-122 Cable 86.60 22.79 26.32

21-PC-123 Cable 86.60 20.83 24.05

21-PC-124 Cable 86.60 21.04 24.30

21-PC-125 Cable 86.60 5.64 6.51

21-PC-130 Cable 156.00 90.99 58.33

21-PC-131 Cable 86.60 20.74 23.95

21-PC-132 Cable 86.60 22.74 26.26

21-PC-133 Cable 86.60 20.79 24.01

21-PC-134 Cable 86.60 21.00 24.25

21-PC-135 Cable 86.60 5.63 6.50

21-PC-200 Cable 404.60 272.15 67.26

21-PC-210 Cable 156.00 90.68 58.13

21-PC-211 Cable 86.60 20.67 23.87

21-PC-212 Cable 86.60 22.66 26.17

21-PC-213 Cable 86.60 20.72 23.92


Project: ETAP Page: 175

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

21-PC-214 Cable 86.60 20.93 24.17

21-PC-215 Cable 86.60 5.60 6.47

21-PC-220 Cable 156.00 90.89 58.27

21-PC-221 Cable 86.60 20.71 23.92

21-PC-222 Cable 86.60 22.71 26.23

21-PC-223 Cable 86.60 20.76 23.97

21-PC-224 Cable 86.60 20.97 24.22

21-PC-225 Cable 86.60 5.62 6.49

21-PC-230 Cable 156.00 91.06 58.37

21-PC-231 Cable 86.60 20.74 23.95

21-PC-232 Cable 86.60 22.75 26.26

21-PC-233 Cable 86.60 20.79 24.01

21-PC-234 Cable 86.60 21.00 24.25

21-PC-235 Cable 86.60 5.63 6.50

21-PC-240 Cable 40.60 0.27 0.67

21-PC-300 Cable 404.60 272.42 67.33

21-PC-310 Cable 156.00 90.82 58.22

21-PC-311 Cable 86.60 20.70 23.90

21-PC-312 Cable 86.60 22.69 26.20

21-PC-313 Cable 86.60 20.75 23.96

21-PC-314 Cable 86.60 20.94 24.18

21-PC-315 Cable 86.60 5.65 6.52

21-PC-320 Cable 156.00 91.03 58.35

21-PC-321 Cable 86.60 20.74 23.95

21-PC-322 Cable 86.60 22.74 26.26

21-PC-323 Cable 86.60 20.80 24.01

21-PC-324 Cable 86.60 20.99 24.23

21-PC-325 Cable 86.60 5.66 6.53

21-PC-330 Cable 156.00 91.30 58.52

21-PC-331 Cable 86.60 20.79 24.01

21-PC-332 Cable 86.60 22.79 26.31

21-PC-333 Cable 86.60 20.84 24.07

21-PC-334 Cable 86.60 21.03 24.28

21-PC-335 Cable 86.60 5.67 6.55

21-PC-400 Cable 404.60 271.20 67.03


Project: ETAP Page: 176

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

21-PC-410 Cable 156.00 90.92 58.28

21-PC-411 Cable 86.60 20.70 23.90

21-PC-412 Cable 86.60 22.70 26.21

21-PC-413 Cable 86.60 20.76 23.97

21-PC-414 Cable 86.60 20.97 24.21

21-PC-415 Cable 86.60 5.61 6.48

21-PC-420 Cable 156.00 90.72 58.15

21-PC-421 Cable 86.60 20.67 23.86

21-PC-422 Cable 86.60 22.66 26.17

21-PC-423 Cable 86.60 20.73 23.93

21-PC-424 Cable 86.60 20.93 24.17

21-PC-425 Cable 86.60 5.60 6.47

21-PC-430 Cable 156.00 90.50 58.01

21-PC-431 Cable 86.60 20.62 23.81

21-PC-432 Cable 86.60 22.61 26.11

21-PC-433 Cable 86.60 20.68 23.88

21-PC-434 Cable 86.60 20.89 24.12

21-PC-435 Cable 86.60 5.58 6.45

21-PC-500 Cable 404.60 213.83 52.85

21-PC-510 Cable 156.00 90.26 57.86

21-PC-511 Cable 86.60 20.55 23.73

21-PC-512 Cable 86.60 22.53 26.02

21-PC-513 Cable 86.60 20.61 23.80

21-PC-514 Cable 86.60 20.80 24.02

21-PC-515 Cable 86.60 5.53 6.39

21-PC-520 Cable 156.00 90.47 57.99

21-PC-521 Cable 86.60 20.58 23.76

21-PC-522 Cable 86.60 22.56 26.05

21-PC-523 Cable 86.60 20.64 23.83

21-PC-524 Cable 86.60 20.83 24.05

21-PC-525 Cable 86.60 5.55 6.41

21-PC-530 Cable 106.80 34.44 32.25

21-PC-600 Cable 404.60 179.51 44.37

21-PC-610 Cable 156.00 90.64 58.10

21-PC-611 Cable 86.60 20.61 23.80


Project: ETAP Page: 177

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

21-PC-612 Cable 86.60 22.58 26.08

21-PC-613 Cable 86.60 20.65 23.85

21-PC-614 Cable 86.60 20.86 24.09

21-PC-615 Cable 86.60 5.55 6.40

21-PC-620 Cable 156.00 90.26 57.86

21-PC-621 Cable 86.60 20.56 23.74

21-PC-622 Cable 86.60 22.53 26.01

21-PC-623 Cable 86.60 20.60 23.79

21-PC-624 Cable 86.60 20.81 24.03

21-PC-625 Cable 86.60 5.52 6.38

21-PC-700 Cable 404.60 115.32 28.50

21-PC-710 Cable 90.10 14.09 15.64

21-PC-720 Cable 88.60 20.62 23.27

21-PC-730 Cable 106.80 22.46 21.03

21-PC-740 Cable 106.80 58.17 54.47

22-PC-4 Cable 104.40 34.59 33.13

22-PC-100 Cable 404.60 275.22 68.02

22-PC-110 Cable 156.00 92.00 58.98

22-PC-111 Cable 86.60 20.97 24.22

22-PC-112 Cable 86.60 23.01 26.57

22-PC-113 Cable 86.60 21.02 24.27

22-PC-114 Cable 86.60 21.24 24.52

22-PC-115 Cable 86.60 5.73 6.61

22-PC-120 Cable 156.00 91.81 58.85

22-PC-121 Cable 86.60 20.93 24.17

22-PC-122 Cable 86.60 22.96 26.52

22-PC-123 Cable 86.60 20.98 24.22

22-PC-124 Cable 86.60 21.20 24.48

22-PC-125 Cable 86.60 5.71 6.60

22-PC-130 Cable 156.00 91.63 58.74

22-PC-131 Cable 86.60 20.89 24.13

22-PC-132 Cable 86.60 22.92 26.47

22-PC-133 Cable 86.60 20.94 24.18

22-PC-134 Cable 86.60 21.16 24.43

22-PC-135 Cable 86.60 5.70 6.58


Project: ETAP Page: 178

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

22-PC-200 Cable 404.60 274.46 67.83

22-PC-210 Cable 156.00 91.32 58.54

22-PC-211 Cable 86.60 20.82 24.04

22-PC-212 Cable 86.60 22.84 26.38

22-PC-213 Cable 86.60 20.87 24.10

22-PC-214 Cable 86.60 21.09 24.35

22-PC-215 Cable 86.60 5.68 6.56

22-PC-220 Cable 156.00 91.51 58.66

22-PC-221 Cable 86.60 20.86 24.09

22-PC-222 Cable 86.60 22.89 26.43

22-PC-223 Cable 86.60 20.91 24.14

22-PC-224 Cable 86.60 21.13 24.40

22-PC-225 Cable 86.60 5.69 6.58

22-PC-230 Cable 156.00 91.65 58.75

22-PC-231 Cable 86.60 20.89 24.13

22-PC-232 Cable 86.60 22.92 26.47

22-PC-233 Cable 86.60 20.94 24.18

22-PC-234 Cable 86.60 21.16 24.43

22-PC-235 Cable 86.60 5.70 6.59

22-PC-240 Cable 40.60 0.27 0.68

22-PC-300 Cable 404.60 188.42 46.57

22-PC-310 Cable 123.80 62.74 50.68

22-PC-311 Cable 86.60 15.16 17.51

22-PC-312 Cable 86.60 17.23 19.90

22-PC-313 Cable 86.60 15.16 17.50

22-PC-314 Cable 86.60 15.17 17.51

22-PC-320 Cable 123.80 62.87 50.78

22-PC-321 Cable 86.60 15.19 17.54

22-PC-322 Cable 86.60 17.27 19.94

22-PC-323 Cable 86.60 15.19 17.54

22-PC-324 Cable 86.60 15.20 17.55

22-PC-330 Cable 123.80 62.99 50.88

22-PC-331 Cable 86.60 15.22 17.58

22-PC-332 Cable 86.60 17.30 19.98

22-PC-333 Cable 86.60 15.21 17.57


Project: ETAP Page: 179

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

22-PC-334 Cable 86.60 15.22 17.58

22-PC-400 Cable 404.60 187.94 46.45

22-PC-410 Cable 123.80 62.84 50.76

22-PC-411 Cable 86.60 15.19 17.54

22-PC-412 Cable 86.60 17.24 19.91

22-PC-413 Cable 86.60 15.19 17.54

22-PC-414 Cable 86.60 15.19 17.54

22-PC-420 Cable 123.80 62.74 50.68

22-PC-421 Cable 86.60 15.17 17.51

22-PC-422 Cable 86.60 17.22 19.88

22-PC-423 Cable 86.60 15.17 17.51

22-PC-424 Cable 86.60 15.16 17.51

22-PC-430 Cable 123.80 62.61 50.57

22-PC-431 Cable 86.60 15.14 17.48

22-PC-432 Cable 86.60 17.18 19.84

22-PC-433 Cable 86.60 15.13 17.48

22-PC-434 Cable 86.60 15.13 17.47

22-PC-500 Cable 404.60 215.82 53.34

22-PC-510 Cable 156.00 90.85 58.24

22-PC-511 Cable 86.60 20.70 23.91

22-PC-512 Cable 86.60 22.70 26.22

22-PC-513 Cable 86.60 20.76 23.98

22-PC-514 Cable 86.60 20.98 24.22

22-PC-515 Cable 86.60 5.63 6.51

22-PC-520 Cable 156.00 91.02 58.35

22-PC-521 Cable 86.60 20.73 23.94

22-PC-522 Cable 86.60 22.74 26.26

22-PC-523 Cable 86.60 20.80 24.01

22-PC-524 Cable 86.60 21.01 24.26

22-PC-525 Cable 86.60 5.65 6.52

22-PC-600 Cable 404.60 181.43 44.84

22-PC-610 Cable 152.10 91.00 59.83

22-PC-611 Cable 86.60 20.74 23.95

22-PC-612 Cable 86.60 22.71 26.23

22-PC-613 Cable 86.60 20.79 24.01


Project: ETAP Page: 180

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

22-PC-614 Cable 86.60 20.99 24.24

22-PC-615 Cable 86.60 5.66 6.53

22-PC-620 Cable 156.00 91.18 58.45

22-PC-621 Cable 86.60 20.78 23.99

22-PC-622 Cable 86.60 22.75 26.27

22-PC-623 Cable 86.60 20.82 24.04

22-PC-624 Cable 86.60 21.02 24.27

22-PC-625 Cable 86.60 5.67 6.54

23-PC-100 Cable 404.60 244.97 60.55

23-PC-110 Cable 208.00 108.19 52.02

23-PC-111 Cable 104.40 26.38 25.26

23-PC-112 Cable 104.40 26.60 25.48

23-PC-113 Cable 86.60 26.45 30.54

23-PC-114 Cable 104.40 28.66 27.46

23-PC-120 Cable 208.00 108.36 52.09

23-PC-121 Cable 104.40 26.40 25.29

23-PC-122 Cable 104.40 26.62 25.50

23-PC-123 Cable 86.60 26.47 30.57

23-PC-124 Cable 104.40 28.69 27.48

23-PC-130 Cable 104.40 29.04 27.82

23-PC-200 Cable 404.60 266.09 65.77

23-PC-210 Cable 262.20 133.29 50.83

23-PC-211 Cable 86.60 21.65 25.01

23-PC-212 Cable 86.60 23.49 27.13

23-PC-213 Cable 86.60 19.13 22.09

23-PC-214 Cable 86.60 22.93 26.48

23-PC-215 Cable 86.60 21.85 25.23

23-PC-216 Cable 86.60 24.12 27.85

23-PC-220 Cable 262.20 133.62 50.96

23-PC-221 Cable 86.60 21.69 25.04

23-PC-222 Cable 86.60 23.53 27.17

23-PC-223 Cable 86.60 19.16 22.13

23-PC-224 Cable 86.60 22.97 26.52

23-PC-225 Cable 86.60 21.88 25.27

23-PC-226 Cable 86.60 24.15 27.89


Project: ETAP Page: 181

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

23-PC-300 Cable 404.60 310.16 76.66

23-PC-310 Cable 262.20 132.57 50.56

23-PC-311 Cable 86.60 21.52 24.85

23-PC-312 Cable 86.60 23.34 26.95

23-PC-313 Cable 86.60 19.00 21.94

23-PC-314 Cable 86.60 22.79 26.32

23-PC-315 Cable 86.60 21.70 25.06

23-PC-316 Cable 86.60 23.94 27.65

23-PC-320 Cable 262.20 132.97 50.71

23-PC-321 Cable 86.60 21.54 24.87

23-PC-322 Cable 86.60 23.36 26.97

23-PC-323 Cable 86.60 19.02 21.96

23-PC-324 Cable 86.60 22.81 26.34

23-PC-325 Cable 86.60 21.72 25.08

23-PC-326 Cable 86.60 23.97 27.68

23-PC-330 Cable 104.40 46.73 44.76

23-PC-400 Cable 404.60 205.30 50.74

23-PC-410 Cable 123.80 62.72 50.66

23-PC-411 Cable 86.60 15.15 17.50

23-PC-412 Cable 86.60 17.20 19.86

23-PC-413 Cable 86.60 15.15 17.49

23-PC-414 Cable 86.60 15.15 17.49

23-PC-420 Cable 123.80 62.56 50.53

23-PC-421 Cable 86.60 15.12 17.46

23-PC-422 Cable 86.60 17.16 19.82

23-PC-423 Cable 86.60 15.11 17.45

23-PC-424 Cable 86.60 15.12 17.46

23-PC-430 Cable 123.80 62.43 50.43

23-PC-431 Cable 86.60 15.09 17.42

23-PC-432 Cable 86.60 17.13 19.78

23-PC-433 Cable 86.60 15.08 17.42

23-PC-434 Cable 86.60 15.09 17.42

23-PC-440 Cable 52.60 17.63 33.52

23-PC-450 Cable 39.70 0.36 0.89

23-PC-500 Cable 404.60 124.77 30.84


Project: ETAP Page: 182

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

23-PC-510 Cable 123.80 62.60 50.56

23-PC-511 Cable 86.60 15.12 17.46

23-PC-0511 Cable 86.60 15.06 17.40

23-PC-512 Cable 86.60 17.17 19.83

23-PC-0512 Cable 86.60 17.11 19.76

23-PC-513 Cable 86.60 15.12 17.46

23-PC-0513 Cable 86.60 15.06 17.39

23-PC-514 Cable 86.60 15.12 17.46

23-PC-0514 Cable 86.60 15.07 17.40

23-PC-520 Cable 123.80 62.48 50.47

23-PC-521 Cable 86.60 15.10 17.43

23-PC-0521 Cable 86.60 15.03 17.36

23-PC-522 Cable 86.60 17.14 19.79

23-PC-0522 Cable 86.60 17.08 19.72

23-PC-523 Cable 86.60 15.09 17.43

23-PC-0523 Cable 86.60 15.02 17.35

23-PC-524 Cable 86.60 15.10 17.43

23-PC-0524 Cable 86.60 15.03 17.36

23-PC-600 Cable 404.60 186.05 45.98

23-PC-610 Cable 123.80 62.42 50.42

23-PC-620 Cable 123.80 62.25 50.28

23-PC-630 Cable 123.80 62.11 50.17

23-PC-631 Cable 86.60 15.00 17.32

23-PC-632 Cable 86.60 17.04 19.68

23-PC-633 Cable 86.60 14.99 17.31

23-PC-634 Cable 86.60 15.00 17.33

23-PC-700 Cable 404.60 123.69 30.57

23-PC-710 Cable 262.20 62.71 23.92

23-PC-711 Cable 86.60 15.06 17.39

23-PC-712 Cable 86.60 17.11 19.76

23-PC-713 Cable 86.60 15.05 17.37

23-PC-714 Cable 86.60 15.07 17.40

23-PC-720 Cable 262.20 62.51 23.84

23-PC-721 Cable 86.60 15.05 17.38

23-PC-722 Cable 86.60 17.11 19.75


Project: ETAP Page: 183

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

23-PC-723 Cable 86.60 15.04 17.37

23-PC-724 Cable 86.60 15.06 17.39

24-PC-100 Cable 414.10 267.99 64.72

24-PC-110 Cable 104.40 52.27 50.07

24-PC-120 Cable 104.40 52.41 50.20

24-PC-130 Cable 86.60 15.49 17.88

24-PC-140 Cable 68.00 18.94 27.85

24-PC-150 Cable 52.60 2.04 3.88

24-PC-160 Cable 86.60 18.98 21.91

24-PC-170 Cable 104.40 46.10 44.16

24-PC-180 Cable 60.00 44.63 74.38

24-PC-190 Cable 39.70 17.16 43.23

24-PC-200 Cable 414.10 249.43 60.23

24-PC-300 Cable 414.10 249.43 60.23

24-PC-400 Cable 414.10 249.43 60.23

24-PC-500 Cable 414.10 249.43 60.23

24-PC-600 Cable 414.10 177.83 42.94

24-PC-700 Cable 404.60 177.83 43.95

25-PC-100 Cable 2340.60 1153.95 49.30

26-PC-100 Cable 2340.60 1068.55 45.65

27-PC-100 Cable 406.00 273.00 67.24

27-PC-110 Cable 156.00 91.44 58.61

27-PC-111 Cable 86.60 20.82 24.05

27-PC-112 Cable 86.60 22.83 26.37

27-PC-113 Cable 86.60 20.87 24.10

27-PC-114 Cable 86.60 21.08 24.35

27-PC-115 Cable 86.60 5.65 6.53

27-PC-120 Cable 156.00 91.19 58.46

27-PC-121 Cable 86.60 20.78 24.00

27-PC-122 Cable 86.60 22.79 26.31

27-PC-123 Cable 86.60 20.83 24.05

27-PC-124 Cable 86.60 21.04 24.30

27-PC-125 Cable 86.60 5.64 6.51

27-PC-130 Cable 156.00 91.00 58.33

27-PC-131 Cable 86.60 20.74 23.95


Project: ETAP Page: 184

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

27-PC-132 Cable 86.60 22.74 26.26

27-PC-133 Cable 86.60 20.79 24.01

27-PC-134 Cable 86.60 21.00 24.25

27-PC-135 Cable 86.60 5.62 6.50

27-PC-200 Cable 406.00 272.18 67.04

27-PC-210 Cable 156.00 90.68 58.13

27-PC-211 Cable 86.60 20.67 23.87

27-PC-212 Cable 86.60 22.66 26.17

27-PC-213 Cable 86.60 20.72 23.92

27-PC-214 Cable 86.60 20.93 24.17

27-PC-215 Cable 86.60 5.60 6.47

27-PC-220 Cable 156.00 90.90 58.27

27-PC-221 Cable 86.60 20.71 23.92

27-PC-222 Cable 86.60 22.71 26.23

27-PC-223 Cable 86.60 20.76 23.97

27-PC-224 Cable 86.60 20.97 24.22

27-PC-225 Cable 86.60 5.62 6.49

27-PC-230 Cable 156.00 91.07 58.38

27-PC-231 Cable 86.60 20.74 23.95

27-PC-232 Cable 86.60 22.74 26.26

27-PC-233 Cable 86.60 20.79 24.01

27-PC-234 Cable 86.60 21.00 24.25

27-PC-235 Cable 86.60 5.63 6.50

27-PC-240 Cable 40.60 0.29 0.72

27-PC-300 Cable 406.00 272.23 67.05

27-PC-310 Cable 156.00 90.79 58.20

27-PC-311 Cable 86.60 20.69 23.89

27-PC-312 Cable 86.60 22.68 26.19

27-PC-313 Cable 86.60 20.75 23.96

27-PC-314 Cable 86.60 20.94 24.18

27-PC-315 Cable 86.60 5.60 6.47

27-PC-320 Cable 156.00 91.01 58.34

27-PC-321 Cable 86.60 20.74 23.95

27-PC-322 Cable 86.60 22.73 26.25

27-PC-323 Cable 86.60 20.79 24.01


Project: ETAP Page: 185

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

27-PC-324 Cable 86.60 20.98 24.23

27-PC-325 Cable 86.60 5.62 6.49

27-PC-330 Cable 156.00 91.28 58.51

27-PC-331 Cable 86.60 20.79 24.00

27-PC-332 Cable 86.60 22.78 26.31

27-PC-333 Cable 86.60 20.84 24.06

27-PC-334 Cable 86.60 21.03 24.28

27-PC-335 Cable 86.60 5.64 6.51

27-PC-400 Cable 406.00 271.21 66.80

27-PC-410 Cable 156.00 90.92 58.28

27-PC-411 Cable 86.60 20.70 23.90

27-PC-412 Cable 86.60 22.70 26.21

27-PC-413 Cable 86.60 20.76 23.97

27-PC-414 Cable 86.60 20.96 24.21

27-PC-415 Cable 86.60 5.61 6.48

27-PC-420 Cable 156.00 90.72 58.15

27-PC-421 Cable 86.60 20.67 23.86

27-PC-422 Cable 86.60 22.66 26.17

27-PC-423 Cable 86.60 20.73 23.93

27-PC-424 Cable 86.60 20.93 24.17

27-PC-425 Cable 86.60 5.60 6.47

27-PC-430 Cable 156.00 90.50 58.02

27-PC-431 Cable 86.60 20.62 23.81

27-PC-432 Cable 86.60 22.61 26.11

27-PC-433 Cable 86.60 20.68 23.88

27-PC-434 Cable 86.60 20.89 24.12

27-PC-435 Cable 86.60 5.58 6.45

27-PC-500 Cable 406.00 213.85 52.67

27-PC -510 Cable 156.00 90.65 58.11

27-PC-510 Cable 156.00 90.26 57.86

27-PC-511 Cable 86.60 20.55 23.73

27-PC-0511 Cable 86.60 20.59 23.77

27-PC-512 Cable 86.60 22.53 26.02

27-PC-0512 Cable 86.60 22.57 26.07

27-PC-513 Cable 86.60 20.61 23.80


Project: ETAP Page: 186

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

27-PC-0513 Cable 86.60 20.59 23.78

27-PC-514 Cable 86.60 20.80 24.02

27-PC-0514 Cable 86.60 20.85 24.07

27-PC-515 Cable 86.60 5.54 6.39

27-PC-0515 Cable 86.60 5.52 6.38

27-PC-520 Cable 156.00 90.47 58.00

27-PC- 520 Cable 156.00 90.23 57.84

27-PC-521 Cable 86.60 20.58 23.76

27-PC-0521 Cable 86.60 20.53 23.71

27-PC-522 Cable 86.60 22.56 26.05

27-PC-0522 Cable 86.60 22.52 26.00

27-PC-523 Cable 86.60 20.64 23.83

27-PC-0523 Cable 86.60 20.53 23.71

27-PC-524 Cable 86.60 20.83 24.05

27-PC-0524 Cable 86.60 20.80 24.02

27-PC-525 Cable 86.60 5.55 6.41

27-PC-0525 Cable 86.60 5.50 6.35

27-PC-530 Cable 106.80 34.44 32.25

27-PC- 530 Cable 106.80 0.36 0.34

27-PC-600 Cable 406.00 179.60 44.24

27-PC-700 Cable 404.60 114.92 28.40

27-PC-710 Cable 108.60 35.33 32.53

27-PC-720 Cable 106.80 32.92 30.83

27-PC-730 Cable 106.80 46.75 43.77

Cable2 Cable 156.00 44.42 28.47

Cable3 Cable 156.00 48.00 30.77

Cable4 Cable 156.00 41.13 26.36

Cable5 Cable 156.00 34.27 21.97

Cable7 Cable 156.00 37.99 24.35

Cable12 Cable 156.00 47.87 30.69

Cable13 Cable 156.00 47.28 30.31

Cable16 Cable 156.00 48.17 30.88

Cable17 Cable 156.00 43.15 27.66

Cable18 Cable 156.00 39.09 25.06

Cable19 Cable 156.00 47.13 30.21


Project: ETAP Page: 187

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable20 Cable 156.00 34.28 21.98

Cable21 Cable 156.00 31.75 20.35

Cable22 Cable 156.00 47.12 30.20

PC-1 Cable 496.90 300.96 60.57

PC-13 Cable 496.90 290.69 58.50

PC-161 Cable 334.00 113.39 33.95

1S/S1-TR Transformer 1.500 1.147 76.5 1.105 73.7

1S/S2-TR Transformer 1.500 1.133 75.5 1.092 72.8

1S/S3-TR Transformer 1.350 1.064 78.8 1.028 76.1

1S/S4-TR Transformer 1.500 1.147 76.5 1.105 73.7

1S/S05--TR Transformer 1.350 0.819 60.7 0.798 59.1

1S/S06--TR Transformer 1.350 0.908 67.3 0.882 65.3

1S/S07--TR Transformer 1.500 0.985 65.7 0.954 63.6

2S/S1-TR Transformer 1.500 1.129 75.3 1.088 72.6

2S/S2-TR Transformer 1.500 0.937 62.4 0.908 60.6

2S/S3-TR Transformer 1.500 1.034 68.9 0.999 66.6

2S/S4-TR Transformer 1.500 1.151 76.8 1.109 73.9

2S/S05--TR Transformer 1.500 0.819 54.6 0.798 53.2

2S/S06--TR Transformer 1.500 0.759 50.6 0.740 49.4

2S/S07--TR Transformer 1.500 1.129 75.3 1.088 72.5

* Indicates a branch with operating load exceeding the branch capability.


Project: ETAP Page: 188

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

11-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.7 98.4 0.38

11-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.2 0.13

11-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32

11-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20

11-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37

11-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.25

11-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03

11-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.0 0.31

11-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.32

11-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.19

11-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.0 0.37

11-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.25

11-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.0 0.03

11-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32

11-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

11-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

11-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25

11-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03

11-PC-20 0.056 0.027 -0.055 -0.027 0.3 0.1 98.4 97.9 0.50

11-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.7 98.0 0.71

11-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.0 97.5 0.50

11-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.5 0.32

11-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.5 0.19

11-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.5 0.37

11-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.5 0.25

11-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.5 0.03

11-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.0 97.7 0.30

11-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

11-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19

11-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37

11-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.25

11-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

11-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.0 97.9 0.17

11-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32
Project: ETAP Page: 189

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

11-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

11-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

11-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25

11-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03

11-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.0 98.0 0.03

11-PC-300 0.167 0.082 -0.166 -0.081 0.8 0.9 98.7 98.2 0.58

11-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.6 0.52

11-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.6 0.13

11-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19

11-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.27

11-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

11-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.6 0.10

11-PC-320 0.056 0.027 -0.055 -0.027 0.2 0.1 98.2 97.8 0.33

11-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.13

11-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19

11-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.27

11-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32

11-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10

11-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.0 0.13

11-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.0 0.14

11-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.19

11-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.27

11-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.32

11-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.10

11-PC-400 0.166 0.082 -0.165 -0.081 1.2 1.3 98.7 97.8 0.89

11-PC-410 0.055 0.027 -0.055 -0.027 0.1 0.0 97.8 97.7 0.16

11-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.37

11-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.27

11-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

11-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18

11-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

11-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.8 97.5 0.30

11-PC-421 -0.012 -0.006 0.013 0.006 0.1 0.0 97.2 97.5 0.37

11-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.5 0.27

11-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.5 0.32

11-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.5 0.18

11-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.5 0.03
Project: ETAP Page: 190

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

11-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.8 97.3 0.49

11-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.3 0.37

11-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.3 0.27

11-PC-433 -0.012 -0.006 0.013 0.006 0.0 0.0 97.0 97.3 0.32

11-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.3 0.18

11-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.3 0.03

11-PC-500 0.131 0.065 -0.129 -0.063 1.5 1.7 98.7 97.3 1.41

11-PC-510 0.055 0.027 -0.055 -0.026 0.2 0.0 97.3 97.1 0.26

11-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.7 97.1 0.37

11-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.8 97.1 0.27

11-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32

11-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18

11-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.1 0.03

11-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.3 97.2 0.14

11-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.37

11-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.2 0.27

11-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32

11-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.18

11-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03

11-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.3 96.8 0.55

11-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.7 97.4 1.30

11-PC-610 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.3 0.12

11-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.3 0.18

11-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.3 0.35

11-PC-613 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.11

11-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.3 0.25

11-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.10

11-PC-620 0.055 0.027 -0.055 -0.027 0.2 0.1 97.4 97.1 0.32

11-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.1 0.18

11-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 96.8 97.1 0.35

11-PC-623 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.1 0.11

11-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.25

11-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.1 0.10

11-PC-630 0.000 0.000 0.000 0.000 0.0 0.0 97.4 97.4 0.03

11-PC-700 0.087 0.042 -0.087 -0.042 0.4 0.4 98.7 98.2 0.55

11-PC-710 0.009 0.004 -0.009 -0.004 0.0 0.0 98.2 97.8 0.39

11-PC-720 0.043 0.021 -0.042 -0.021 0.4 0.1 98.2 97.3 0.90
Project: ETAP Page: 191

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

11-PC-721 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.10

11-PC-722 -0.027 -0.013 0.027 0.013 0.1 0.0 97.1 97.3 0.18

11-PC-723 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.12

11-PC-730 0.036 0.017 -0.035 -0.017 0.5 0.1 98.2 96.9 1.24

12-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38

12-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13

12-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.3 0.32

12-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20

12-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37

12-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25

12-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03

12-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.31

12-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

12-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20

12-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37

12-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25

12-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03

12-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50

12-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

12-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

12-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

12-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25

12-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

12-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71

12-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50

12-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

12-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19

12-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

12-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25

12-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.5 97.6 0.03

12-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30

12-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.8 0.32

12-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19

12-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37

12-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25

12-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03

12-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17
Project: ETAP Page: 192

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

12-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

12-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

12-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

12-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.25

12-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

12-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03

12-PC-300 0.115 0.056 -0.114 -0.056 0.4 0.4 98.8 98.4 0.40

12-PC-310 0.038 0.019 -0.038 -0.018 0.2 0.0 98.4 97.9 0.50

12-PC-311 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18

12-PC-312 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 97.9 0.11

12-PC-313 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.23

12-PC-314 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 97.9 0.13

12-PC-320 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.1 0.31

12-PC-321 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.1 0.18

12-PC-322 -0.010 -0.005 0.010 0.005 0.0 0.0 98.0 98.1 0.11

12-PC-323 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.1 0.23

12-PC-324 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.1 0.13

12-PC-330 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.3 0.13

12-PC-331 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18

12-PC-332 -0.010 -0.005 0.010 0.005 0.0 0.0 98.2 98.3 0.11

12-PC-333 -0.009 -0.004 0.009 0.005 0.0 0.0 98.0 98.3 0.23

12-PC-334 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.13

12-PC-400 0.114 0.056 -0.114 -0.056 0.6 0.6 98.8 98.2 0.61

12-PC-410 0.038 0.018 -0.038 -0.018 0.1 0.0 98.2 98.0 0.15

12-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13

12-PC-412 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26

12-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09

12-PC-414 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18

12-PC-420 0.038 0.018 -0.038 -0.018 0.1 0.0 98.2 97.9 0.29

12-PC-421 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 97.9 0.13

12-PC-422 -0.010 -0.005 0.010 0.005 0.0 0.0 97.6 97.9 0.26

12-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.09

12-PC-424 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18

12-PC-430 0.038 0.018 -0.038 -0.018 0.2 0.0 98.2 97.7 0.47

12-PC-431 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.13

12-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.7 0.26

12-PC-433 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.09
Project: ETAP Page: 193

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

12-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.7 0.18

12-PC-50 -0.012 -0.006 0.012 0.006 0.1 0.0 96.7 97.0 0.37

12-PC-500 0.136 0.068 -0.134 -0.066 1.6 1.8 98.8 97.3 1.46

12-PC-51 -0.014 -0.007 0.014 0.007 0.0 0.0 96.8 97.0 0.27

12-PC-510 0.055 0.027 -0.055 -0.026 0.2 0.0 97.3 97.0 0.29

12-PC-52 -0.012 -0.006 0.012 0.006 0.0 0.0 96.7 97.0 0.32

12-PC-520 0.055 0.027 -0.055 -0.026 0.1 0.0 97.3 97.2 0.14

12-PC-53 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.0 0.18

12-PC-530 0.021 0.010 -0.021 -0.010 0.2 0.0 97.3 96.6 0.73

12-PC-54 -0.003 -0.002 0.003 0.002 0.0 0.0 97.0 97.0 0.03

12-PC-540 0.005 0.002 -0.005 -0.002 0.0 0.0 97.3 96.6 0.70

12-PC-56 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.37

12-PC-57 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.2 0.27

12-PC-58 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32

12-PC-59 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.18

12-PC-60 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03

12-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.8 97.5 1.31

12-PC-610 0.055 0.027 -0.055 -0.027 0.2 0.0 97.5 97.2 0.26

12-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.2 0.18

12-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 96.9 97.2 0.35

12-PC-613 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.2 0.11

12-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.0 97.2 0.25

12-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.10

12-PC-620 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.3 0.13

12-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.18

12-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.3 0.35

12-PC-623 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.3 0.11

12-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.3 0.25

12-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.3 0.10

12-PC-700 0.173 0.086 -0.172 -0.084 1.7 2.0 98.8 97.5 1.24

12-PC-710 0.102 0.051 -0.102 -0.050 0.6 0.6 97.5 96.9 0.65

12-PC-710-A 0.001 0.000 -0.001 0.000 0.0 0.0 96.9 96.9 0.00

12-PC-711 -0.022 -0.011 0.022 0.011 0.0 0.0 96.7 96.9 0.15

12-PC-712 -0.020 -0.010 0.020 0.010 0.0 0.0 96.8 96.9 0.13

12-PC-713 -0.018 -0.009 0.018 0.009 0.0 0.0 96.8 96.9 0.12

12-PC-714 -0.041 -0.020 0.041 0.020 0.1 0.0 96.7 96.9 0.15

12-PC-720 0.023 0.011 -0.023 -0.011 0.0 0.0 97.5 97.4 0.14
Project: ETAP Page: 194

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

12-PC-730 0.047 0.023 -0.047 -0.023 0.1 0.0 97.5 97.3 0.26

12-PC-731 -0.026 -0.013 0.026 0.013 0.1 0.0 97.1 97.3 0.23

12-PC-732 -0.010 -0.005 0.011 0.005 0.1 0.0 96.6 97.3 0.64

12-PC-733 -0.010 -0.005 0.011 0.005 0.1 0.0 96.6 97.3 0.64

13-PC-100 0.151 0.074 -0.150 -0.073 0.4 0.5 99.0 98.7 0.34

13-PC-101 0.164 0.080 -0.163 -0.079 0.8 0.9 99.0 98.4 0.58

13-PC-102 0.190 0.094 -0.188 -0.092 1.9 2.2 99.0 97.8 1.24

13-PC-103 0.126 0.062 -0.126 -0.061 0.5 0.6 99.0 98.5 0.54

13-PC-104 0.077 0.038 -0.076 -0.037 0.4 0.5 99.0 98.3 0.66

13-PC-105 0.114 0.056 -0.113 -0.055 0.9 1.0 99.0 98.0 1.01

13-PC-106 0.104 0.051 -0.103 -0.050 1.1 1.3 99.0 97.6 1.37

13-PC-110 0.067 0.032 -0.066 -0.032 0.1 0.1 98.7 98.5 0.19

13-PC-111 -0.016 -0.008 0.016 0.008 0.0 0.0 98.2 98.5 0.25

13-PC-112 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.5 0.13

13-PC-113 -0.016 -0.008 0.016 0.008 0.1 0.0 98.1 98.5 0.41

13-PC-114 -0.018 -0.009 0.018 0.009 0.0 0.0 98.3 98.5 0.19

13-PC-120 0.067 0.032 -0.067 -0.032 0.1 0.0 98.7 98.6 0.11

13-PC-121 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.6 0.25

13-PC-122 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.6 0.13

13-PC-123 -0.016 -0.008 0.016 0.008 0.1 0.0 98.2 98.6 0.41

13-PC-124 -0.018 -0.009 0.018 0.009 0.0 0.0 98.4 98.6 0.19

13-PC-130 0.018 0.009 -0.018 -0.009 0.0 0.0 98.7 98.4 0.22

13-PC-210 0.082 0.040 -0.082 -0.039 0.2 0.1 98.4 98.2 0.26

13-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.41

13-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.2 0.28

13-PC-213 -0.012 -0.006 0.012 0.006 0.0 0.0 98.0 98.2 0.16

13-PC-214 -0.014 -0.007 0.014 0.007 0.1 0.0 97.7 98.2 0.46

13-PC-215 -0.013 -0.006 0.013 0.007 0.0 0.0 98.0 98.2 0.21

13-PC-216 -0.015 -0.007 0.015 0.007 0.0 0.0 98.0 98.2 0.15

13-PC-220 0.082 0.040 -0.082 -0.040 0.1 0.1 98.4 98.3 0.11

13-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.41

13-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.3 0.28

13-PC-223 -0.012 -0.006 0.012 0.006 0.0 0.0 98.2 98.3 0.16

13-PC-224 -0.014 -0.007 0.014 0.007 0.1 0.0 97.9 98.3 0.46

13-PC-225 -0.013 -0.007 0.013 0.007 0.0 0.0 98.1 98.3 0.21

13-PC-226 -0.015 -0.007 0.015 0.007 0.0 0.0 98.2 98.3 0.15

13-PC-310 0.081 0.039 -0.081 -0.039 0.1 0.1 97.8 97.6 0.18
Project: ETAP Page: 195

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

13-PC-311 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.41

13-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.28

13-PC-313 -0.011 -0.006 0.012 0.006 0.0 0.0 97.4 97.6 0.16

13-PC-314 -0.014 -0.007 0.014 0.007 0.1 0.0 97.1 97.6 0.45

13-PC-315 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.21

13-PC-316 -0.014 -0.007 0.015 0.007 0.0 0.0 97.4 97.6 0.15

13-PC-320 0.081 0.039 -0.081 -0.039 0.1 0.0 97.8 97.7 0.09

13-PC-321 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.41

13-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.28

13-PC-323 -0.012 -0.006 0.012 0.006 0.0 0.0 97.5 97.7 0.16

13-PC-324 -0.014 -0.007 0.014 0.007 0.1 0.0 97.2 97.7 0.45

13-PC-325 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.21

13-PC-326 -0.015 -0.007 0.015 0.007 0.0 0.0 97.5 97.7 0.15

13-PC-330 0.028 0.014 -0.028 -0.014 0.1 0.0 97.8 97.4 0.39

13-PC-410 0.038 0.019 -0.038 -0.019 0.0 0.0 98.5 98.4 0.11

13-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.4 0.13

13-PC-412 -0.010 -0.005 0.011 0.005 0.0 0.0 98.1 98.4 0.26

13-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.4 0.09

13-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.4 0.18

13-PC-420 0.038 0.019 -0.038 -0.019 0.1 0.0 98.5 98.2 0.31

13-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.13

13-PC-422 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.2 0.26

13-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.09

13-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.18

13-PC-430 0.038 0.019 -0.038 -0.018 0.2 0.0 98.5 98.0 0.50

13-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 98.0 0.13

13-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26

13-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09

13-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18

13-PC-440 0.011 0.005 -0.011 -0.005 0.1 0.0 98.5 98.0 0.47

13-PC-450 0.000 0.000 0.000 0.000 0.0 0.0 98.5 98.5 0.02

13-PC-510 0.038 0.019 -0.038 -0.019 0.1 0.0 98.3 98.2 0.16

13-PC-511 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.13

13-PC-512 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.2 0.26

13-PC-513 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.2 0.09

13-PC-514 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.2 0.18

13-PC-520 0.038 0.019 -0.038 -0.019 0.1 0.0 98.3 98.0 0.31
Project: ETAP Page: 196

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

13-PC-521 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13

13-PC-522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26

13-PC-523 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09

13-PC-524 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.0 0.18

13-PC-610 0.038 0.018 -0.038 -0.018 0.0 0.0 98.0 97.9 0.11

13-PC-611 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.13

13-PC-612 -0.010 -0.005 0.010 0.005 0.0 0.0 97.6 97.9 0.26

13-PC-613 -0.009 -0.005 0.009 0.005 0.0 0.0 97.8 97.9 0.09

13-PC-614 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.9 0.18

13-PC-620 0.038 0.018 -0.038 -0.018 0.1 0.0 98.0 97.7 0.30

13-PC-621 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.7 0.13

13-PC-622 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.7 0.26

13-PC-623 -0.009 -0.005 0.009 0.005 0.0 0.0 97.6 97.7 0.09

13-PC-624 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.7 0.18

13-PC-630 0.038 0.018 -0.038 -0.018 0.2 0.0 98.0 97.5 0.47

13-PC-631 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.13

13-PC-632 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.5 0.26

13-PC-633 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.09

13-PC-634 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.18

13-PC-710 0.038 0.018 -0.038 -0.018 0.0 0.0 97.6 97.6 0.06

13-PC-711 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.6 0.13

13-PC-712 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.6 0.26

13-PC-713 -0.009 -0.005 0.009 0.005 0.0 0.0 97.5 97.6 0.09

13-PC-714 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.6 0.18

13-PC-720 0.038 0.018 -0.038 -0.018 0.0 0.0 97.6 97.5 0.10

13-PC-721 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.13

13-PC-722 -0.010 -0.005 0.010 0.005 0.0 0.0 97.3 97.5 0.26

13-PC-723 -0.009 -0.005 0.009 0.005 0.0 0.0 97.4 97.5 0.09

13-PC-724 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.5 0.18

13-PC-730 0.028 0.013 -0.028 -0.013 0.4 0.1 97.6 96.3 1.35

14-PC-100 0.161 0.079 -0.160 -0.077 1.6 1.8 98.7 97.5 1.19

14-PC-110 0.024 0.011 -0.023 -0.011 0.3 0.0 97.5 96.5 0.98

14-PC-120 0.032 0.015 -0.032 -0.015 0.1 0.0 97.5 97.3 0.21

14-PC-130 0.032 0.015 -0.032 -0.015 0.4 0.1 97.5 96.5 1.05

14-PC-140 0.009 0.005 -0.009 -0.005 0.0 0.0 97.5 97.3 0.20

14-PC-150 0.012 0.006 -0.011 -0.006 0.0 0.0 97.5 97.2 0.35

14-PC-160 0.001 0.001 -0.001 -0.001 0.0 0.0 97.5 97.4 0.11
Project: ETAP Page: 197

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

14-PC-170 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 96.9 0.60

14-PC-180 0.028 0.013 -0.028 -0.013 0.4 0.1 97.5 96.2 1.29

14-PC-190 0.011 0.005 -0.010 -0.005 0.2 0.0 97.5 95.8 1.68

14-PC-200 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

14-PC-300 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

14-PC-400 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

14-PC-500 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

14-PC-600 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71

14-PC-700 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71

15-PC-100 0.716 0.351 -0.714 -0.346 2.2 5.4 99.8 99.3 0.55

16-PC-100 0.659 0.323 -0.658 -0.319 1.7 4.0 99.5 99.1 0.44

16-PC-200 0.133 0.065 -0.132 -0.063 1.8 2.0 99.5 97.9 1.66

16-PC-210 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.26

16-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

16-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27

16-PC-213 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

16-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18

16-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03

16-PC-220 0.055 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.14

16-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.37

16-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.27

16-PC-223 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

16-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18

16-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

16-PC-230 0.021 0.010 -0.021 -0.010 0.2 0.0 97.9 97.2 0.64

17-PC-100 0.170 0.083 -0.169 -0.082 0.5 0.6 99.3 98.9 0.38

17-PC-110 0.057 0.027 -0.057 -0.027 0.1 0.0 98.9 98.8 0.13

17-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.8 0.32

17-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.6 98.8 0.20

17-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 98.4 98.8 0.37

17-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.5 98.8 0.25

17-PC-115 -0.004 -0.002 0.004 0.002 0.0 0.0 98.7 98.8 0.04

17-PC-120 0.057 0.027 -0.056 -0.027 0.2 0.1 98.9 98.6 0.33

17-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.6 0.32

17-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 98.4 98.6 0.20

17-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.6 0.37

17-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.6 0.25
Project: ETAP Page: 198

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

17-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.6 0.04

17-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.9 98.4 0.50

17-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.32

17-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20

17-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.37

17-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.25

17-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 98.4 98.4 0.03

17-PC-200 0.169 0.082 -0.168 -0.081 1.0 1.1 99.3 98.6 0.71

17-PC-210 0.056 0.027 -0.056 -0.027 0.2 0.1 98.6 98.2 0.39

17-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32

17-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20

17-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37

17-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.25

17-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.03

17-PC-220 0.056 0.027 -0.056 -0.027 0.2 0.1 98.6 98.2 0.39

17-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32

17-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20

17-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37

17-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.25

17-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.03

17-PC-230 0.056 0.027 -0.056 -0.027 0.4 0.1 98.6 98.0 0.59

17-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 98.0 0.32

17-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.0 0.20

17-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.6 98.0 0.37

17-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.25

17-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.03

17-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.6 98.5 0.04

17-PC-300 0.169 0.083 -0.169 -0.082 0.8 0.9 99.3 98.7 0.58

17-PC-310 0.056 0.027 -0.056 -0.027 0.3 0.1 98.7 98.2 0.53

17-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.14

17-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20

17-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.27

17-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.2 0.32

17-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.2 0.10

17-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.7 98.4 0.33

17-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.4 0.14

17-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20
Project: ETAP Page: 199

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

17-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.27

17-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.4 0.33

17-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 98.3 98.4 0.10

17-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.7 98.6 0.13

17-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.6 0.14

17-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 98.4 98.6 0.20

17-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.6 0.27

17-PC-334 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.6 0.33

17-PC-335 -0.003 -0.002 0.004 0.002 0.0 0.0 98.5 98.6 0.10

17-PC-400 0.169 0.083 -0.167 -0.081 1.2 1.4 99.3 98.4 0.90

17-PC-410 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.2 0.16

17-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37

17-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.2 0.27

17-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32

17-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.18

17-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03

17-PC-420 0.056 0.027 -0.056 -0.027 0.2 0.0 98.4 98.1 0.30

17-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37

17-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.8 98.1 0.27

17-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

17-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.18

17-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03

17-PC-430 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50

17-PC-431 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

17-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.9 0.27

17-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

17-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.18

17-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03

17-PC-500 0.112 0.055 -0.111 -0.054 1.2 1.3 99.3 97.9 1.32

17-PC-510 0.056 0.027 -0.056 -0.027 0.1 0.0 97.9 97.8 0.13

17-PC-511 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.18

17-PC-512 -0.014 -0.007 0.014 0.007 0.1 0.0 97.5 97.8 0.35

17-PC-513 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.11

17-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.25

17-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10

17-PC-520 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.7 0.26

17-PC-521 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18
Project: ETAP Page: 200

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

17-PC-522 -0.014 -0.007 0.014 0.007 0.1 0.0 97.3 97.7 0.35

17-PC-523 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.11

17-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.25

17-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.7 0.10

17-PC-530 0.000 0.000 0.000 0.000 0.0 0.0 97.9 97.9 0.01

17-PC-600 0.072 0.035 -0.071 -0.034 0.3 0.3 99.3 98.8 0.46

17-PC-610 0.022 0.011 -0.022 -0.011 0.0 0.0 98.8 98.7 0.12

17-PC-620 0.020 0.010 -0.020 -0.010 0.1 0.0 98.8 98.4 0.42

17-PC-630 0.029 0.014 -0.029 -0.014 0.3 0.0 98.8 98.0 0.81

17-PC-700 0.000 0.000 0.000 0.000 0.0 0.0 99.3 99.3 0.00

1-PC-001 -3.985 -2.054 3.985 2.054 0.0 0.0 100.0 100.0 0.00

1-PC-002 2.967 1.533 -2.967 -1.533 0.0 0.0 100.0 100.0 0.00

1-PC-003 1.961 1.017 -1.961 -1.017 0.0 0.0 100.0 100.0 0.00

1-PC-004 1.016 0.534 -1.016 -0.534 0.0 0.0 100.0 100.0 0.00

1-PC-006 -0.728 -0.375 0.728 0.375 0.0 0.0 100.0 100.0 0.00

1-PC-007 -1.535 -0.792 1.535 0.792 0.0 0.0 100.0 100.0 0.00

1S/S05--TR -0.716 -0.351 0.728 0.375 12.0 24.0 99.8 100.0 0.19

1S/S06--TR -0.792 -0.387 0.807 0.417 14.8 29.5 99.5 100.0 0.48

1S/S07--TR -0.859 -0.416 0.876 0.450 17.4 34.7 99.3 100.0 0.73

1S/S1-TR -0.994 -0.482 1.018 0.529 23.5 47.1 98.7 100.0 1.27

1S/S2-TR -0.982 -0.477 1.005 0.522 23.0 45.9 98.8 100.0 1.22

1S/S3-TR -0.925 -0.449 0.945 0.489 20.2 40.5 99.0 100.0 0.99

1S/S4-TR -0.992 -0.487 1.015 0.534 23.5 47.1 98.7 100.0 1.28

21-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38

21-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13

21-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.32

21-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20

21-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37

21-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25

21-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03

21-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.32

21-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

21-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20

21-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37

21-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25

21-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.1 0.03

21-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50
Project: ETAP Page: 201

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

21-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

21-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

21-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

21-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25

21-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

21-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71

21-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50

21-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

21-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19

21-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

21-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25

21-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03

21-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30

21-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32

21-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19

21-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37

21-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25

21-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03

21-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17

21-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

21-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

21-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

21-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25

21-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

21-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03

21-PC-300 0.167 0.082 -0.167 -0.081 0.8 0.9 98.8 98.2 0.58

21-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.7 0.52

21-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.13

21-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19

21-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.27

21-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

21-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.7 0.10

21-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.2 97.9 0.33

21-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 97.9 0.13

21-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

21-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.27

21-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32
Project: ETAP Page: 202

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

21-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.10

21-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.1 0.13

21-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.14

21-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20

21-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.27

21-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

21-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.10

21-PC-400 0.167 0.082 -0.165 -0.081 1.2 1.3 98.8 97.9 0.89

21-PC-410 0.056 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.16

21-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37

21-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27

21-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

21-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.18

21-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

21-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.30

21-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

21-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27

21-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

21-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18

21-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03

21-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.9 97.4 0.49

21-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.37

21-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.4 0.27

21-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.32

21-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.4 0.18

21-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.4 97.4 0.03

21-PC-500 0.131 0.065 -0.130 -0.063 1.5 1.7 98.8 97.4 1.41

21-PC-510 0.055 0.027 -0.055 -0.027 0.2 0.0 97.4 97.1 0.26

21-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.1 0.37

21-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.1 0.27

21-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32

21-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18

21-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.1 0.03

21-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.2 0.14

21-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.9 97.2 0.37

21-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.27

21-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32
Project: ETAP Page: 203

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

21-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.2 0.18

21-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03

21-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.4 96.8 0.55

21-PC-600 0.110 0.055 -0.109 -0.053 1.2 1.3 98.8 97.5 1.30

21-PC-610 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.4 0.12

21-PC-611 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.4 0.32

21-PC-612 -0.014 -0.007 0.014 0.007 0.0 0.0 97.2 97.4 0.19

21-PC-613 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.41

21-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.27

21-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.4 0.03

21-PC-620 0.055 0.027 -0.055 -0.027 0.2 0.1 97.5 97.2 0.32

21-PC-621 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.2 0.32

21-PC-622 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.19

21-PC-623 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.2 0.41

21-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.2 0.27

21-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03

21-PC-700 0.071 0.034 -0.071 -0.034 0.3 0.3 98.8 98.3 0.45

21-PC-710 0.009 0.004 -0.009 -0.004 0.0 0.0 98.3 98.0 0.39

21-PC-720 0.013 0.006 -0.013 -0.006 0.0 0.0 98.3 98.0 0.31

21-PC-730 0.014 0.007 -0.014 -0.007 0.0 0.0 98.3 98.0 0.30

21-PC-740 0.036 0.017 -0.035 -0.017 0.5 0.1 98.3 97.1 1.24

22-PC-100 0.171 0.083 -0.170 -0.082 0.5 0.6 99.4 99.0 0.38

22-PC-110 0.057 0.027 -0.057 -0.027 0.1 0.0 99.0 98.9 0.13

22-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.6 98.9 0.32

22-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.7 98.9 0.20

22-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 98.5 98.9 0.37

22-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.7 98.9 0.25

22-PC-115 -0.004 -0.002 0.004 0.002 0.0 0.0 98.9 98.9 0.04

22-PC-120 0.057 0.027 -0.057 -0.027 0.2 0.1 99.0 98.7 0.32

22-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 98.4 98.7 0.32

22-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 98.5 98.7 0.20

22-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 98.4 98.7 0.37

22-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 98.5 98.7 0.25

22-PC-125 -0.004 -0.002 0.004 0.002 0.0 0.0 98.7 98.7 0.04

22-PC-130 0.057 0.027 -0.056 -0.027 0.3 0.1 99.0 98.5 0.50

22-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.5 0.32

22-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 98.3 98.5 0.20
Project: ETAP Page: 204

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

22-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.5 0.37

22-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.5 0.25

22-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.5 0.04

22-PC-200 0.170 0.083 -0.169 -0.082 1.0 1.1 99.4 98.7 0.72

22-PC-210 0.056 0.027 -0.056 -0.027 0.3 0.1 98.7 98.2 0.50

22-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.2 0.32

22-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.2 0.20

22-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.8 98.2 0.37

22-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.2 0.25

22-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.2 0.03

22-PC-220 0.056 0.027 -0.056 -0.027 0.2 0.0 98.7 98.4 0.30

22-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 98.1 98.4 0.32

22-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.2 98.4 0.20

22-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.37

22-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.4 0.25

22-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 98.4 98.4 0.04

22-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.7 98.5 0.17

22-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 98.2 98.5 0.32

22-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 98.3 98.5 0.20

22-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 98.2 98.5 0.37

22-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 98.3 98.5 0.25

22-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 98.5 98.5 0.04

22-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.7 98.7 0.03

22-PC-300 0.117 0.057 -0.116 -0.056 0.4 0.4 99.4 99.0 0.40

22-PC-310 0.039 0.019 -0.039 -0.019 0.2 0.0 99.0 98.5 0.50

22-PC-311 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18

22-PC-312 -0.011 -0.005 0.011 0.005 0.0 0.0 98.4 98.5 0.11

22-PC-313 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.23

22-PC-314 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.13

22-PC-320 0.039 0.019 -0.039 -0.019 0.1 0.0 99.0 98.7 0.31

22-PC-321 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.18

22-PC-322 -0.011 -0.005 0.011 0.005 0.0 0.0 98.6 98.7 0.11

22-PC-323 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.23

22-PC-324 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.7 0.13

22-PC-330 0.039 0.019 -0.039 -0.019 0.1 0.0 99.0 98.9 0.13

22-PC-331 -0.009 -0.005 0.009 0.005 0.0 0.0 98.7 98.9 0.18

22-PC-332 -0.011 -0.005 0.011 0.005 0.0 0.0 98.8 98.9 0.12
Project: ETAP Page: 205

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

22-PC-333 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.9 0.26

22-PC-334 -0.009 -0.005 0.009 0.005 0.0 0.0 98.7 98.9 0.18

22-PC-4 0.021 0.010 -0.021 -0.010 0.2 0.0 98.0 97.3 0.74

22-PC-400 0.116 0.057 -0.116 -0.056 0.6 0.6 99.4 98.8 0.62

22-PC-410 0.039 0.019 -0.039 -0.019 0.1 0.0 98.8 98.7 0.15

22-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.13

22-PC-412 -0.011 -0.005 0.011 0.005 0.0 0.0 98.4 98.7 0.27

22-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.6 98.7 0.09

22-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.5 98.7 0.18

22-PC-420 0.039 0.019 -0.039 -0.019 0.1 0.0 98.8 98.5 0.29

22-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.13

22-PC-422 -0.011 -0.005 0.011 0.005 0.0 0.0 98.3 98.5 0.27

22-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.09

22-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18

22-PC-430 0.039 0.019 -0.038 -0.019 0.2 0.0 98.8 98.3 0.48

22-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.13

22-PC-432 -0.010 -0.005 0.011 0.005 0.0 0.0 98.1 98.3 0.26

22-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09

22-PC-434 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.18

22-PC-500 0.133 0.066 -0.132 -0.064 1.5 1.7 99.4 98.0 1.42

22-PC-510 0.056 0.027 -0.055 -0.027 0.2 0.0 98.0 97.7 0.29

22-PC-511 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37

22-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27

22-PC-513 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

22-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.18

22-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

22-PC-520 0.056 0.027 -0.056 -0.027 0.1 0.0 98.0 97.9 0.14

22-PC-521 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

22-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.9 0.27

22-PC-523 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.9 0.32

22-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.18

22-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.8 97.9 0.03

22-PC-600 0.112 0.055 -0.111 -0.054 1.2 1.3 99.4 98.1 1.32

22-PC-610 0.056 0.027 -0.056 -0.027 0.2 0.0 98.1 97.8 0.26

22-PC-611 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.18

22-PC-612 -0.014 -0.007 0.014 0.007 0.1 0.0 97.5 97.8 0.35

22-PC-613 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.8 0.11
Project: ETAP Page: 206

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

22-PC-614 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.25

22-PC-615 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.10

22-PC-620 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 98.0 0.13

22-PC-621 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.0 0.18

22-PC-622 -0.014 -0.007 0.014 0.007 0.1 0.0 97.6 98.0 0.35

22-PC-623 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.0 0.11

22-PC-624 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 98.0 0.25

22-PC-625 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 98.0 0.10

23-PC-0511 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13

23-PC-0512 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26

23-PC-0513 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09

23-PC-0514 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18

23-PC-0521 -0.009 -0.004 0.009 0.004 0.0 0.0 97.7 97.8 0.13

23-PC-0522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.5 97.8 0.26

23-PC-0523 -0.009 -0.005 0.009 0.005 0.0 0.0 97.7 97.8 0.09

23-PC-0524 -0.009 -0.004 0.009 0.004 0.0 0.0 97.6 97.8 0.18

23-PC-100 0.151 0.074 -0.151 -0.073 0.4 0.5 99.1 98.8 0.34

23-PC-110 0.067 0.032 -0.067 -0.032 0.1 0.1 98.8 98.6 0.19

23-PC-111 -0.016 -0.008 0.016 0.008 0.0 0.0 98.3 98.6 0.25

23-PC-112 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.6 0.13

23-PC-113 -0.016 -0.008 0.016 0.008 0.1 0.0 98.2 98.6 0.41

23-PC-114 -0.018 -0.009 0.018 0.009 0.0 0.0 98.4 98.6 0.19

23-PC-120 0.067 0.032 -0.067 -0.032 0.1 0.0 98.8 98.7 0.11

23-PC-121 -0.016 -0.008 0.016 0.008 0.0 0.0 98.4 98.7 0.25

23-PC-122 -0.016 -0.008 0.016 0.008 0.0 0.0 98.5 98.7 0.13

23-PC-123 -0.016 -0.008 0.016 0.008 0.1 0.0 98.3 98.7 0.41

23-PC-124 -0.018 -0.009 0.018 0.009 0.0 0.0 98.5 98.7 0.19

23-PC-130 0.018 0.009 -0.018 -0.009 0.0 0.0 98.8 98.5 0.22

23-PC-200 0.164 0.080 -0.163 -0.079 0.8 0.9 99.1 98.5 0.58

23-PC-210 0.082 0.040 -0.082 -0.040 0.2 0.1 98.5 98.3 0.26

23-PC-211 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.41

23-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 98.0 98.3 0.28

23-PC-213 -0.012 -0.006 0.012 0.006 0.0 0.0 98.1 98.3 0.16

23-PC-214 -0.014 -0.007 0.014 0.007 0.1 0.0 97.8 98.3 0.46

23-PC-215 -0.013 -0.007 0.013 0.007 0.0 0.0 98.1 98.3 0.21

23-PC-216 -0.015 -0.007 0.015 0.007 0.0 0.0 98.1 98.3 0.15

23-PC-220 0.082 0.040 -0.082 -0.040 0.1 0.1 98.5 98.4 0.11
Project: ETAP Page: 207

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

23-PC-221 -0.013 -0.006 0.013 0.006 0.1 0.0 98.0 98.4 0.41

23-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.4 0.28

23-PC-223 -0.012 -0.006 0.012 0.006 0.0 0.0 98.3 98.4 0.16

23-PC-224 -0.014 -0.007 0.014 0.007 0.1 0.0 98.0 98.4 0.46

23-PC-225 -0.013 -0.007 0.013 0.007 0.0 0.0 98.2 98.4 0.21

23-PC-226 -0.015 -0.007 0.015 0.007 0.0 0.0 98.3 98.4 0.15

23-PC-300 0.191 0.094 -0.189 -0.092 1.9 2.2 99.1 97.9 1.25

23-PC-310 0.081 0.039 -0.081 -0.039 0.1 0.1 97.9 97.7 0.18

23-PC-311 -0.013 -0.006 0.013 0.006 0.1 0.0 97.3 97.7 0.41

23-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.7 0.28

23-PC-313 -0.012 -0.006 0.012 0.006 0.0 0.0 97.5 97.7 0.16

23-PC-314 -0.014 -0.007 0.014 0.007 0.1 0.0 97.2 97.7 0.45

23-PC-315 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.7 0.21

23-PC-316 -0.015 -0.007 0.015 0.007 0.0 0.0 97.5 97.7 0.15

23-PC-320 0.081 0.039 -0.081 -0.039 0.1 0.0 97.9 97.8 0.09

23-PC-321 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.41

23-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.8 0.28

23-PC-323 -0.012 -0.006 0.012 0.006 0.0 0.0 97.6 97.8 0.16

23-PC-324 -0.014 -0.007 0.014 0.007 0.1 0.0 97.3 97.8 0.45

23-PC-325 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.8 0.21

23-PC-326 -0.015 -0.007 0.015 0.007 0.0 0.0 97.6 97.8 0.15

23-PC-330 0.029 0.014 -0.028 -0.014 0.1 0.0 97.9 97.5 0.39

23-PC-400 0.127 0.062 -0.126 -0.061 0.5 0.6 99.1 98.6 0.54

23-PC-410 0.039 0.019 -0.039 -0.019 0.1 0.0 98.6 98.5 0.11

23-PC-411 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.13

23-PC-412 -0.011 -0.005 0.011 0.005 0.0 0.0 98.2 98.5 0.27

23-PC-413 -0.009 -0.005 0.009 0.005 0.0 0.0 98.4 98.5 0.09

23-PC-414 -0.009 -0.005 0.009 0.005 0.0 0.0 98.3 98.5 0.18

23-PC-420 0.038 0.019 -0.038 -0.019 0.1 0.0 98.6 98.3 0.31

23-PC-421 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.13

23-PC-422 -0.010 -0.005 0.011 0.005 0.0 0.0 98.0 98.3 0.26

23-PC-423 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09

23-PC-424 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18

23-PC-430 0.038 0.019 -0.038 -0.019 0.2 0.0 98.6 98.1 0.50

23-PC-431 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.1 0.13

23-PC-432 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.1 0.26

23-PC-433 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.09
Project: ETAP Page: 208

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

23-PC-434 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.1 0.18

23-PC-440 0.011 0.005 -0.011 -0.005 0.1 0.0 98.6 98.1 0.47

23-PC-450 0.000 0.000 0.000 0.000 0.0 0.0 98.6 98.6 0.02

23-PC-500 0.077 0.038 -0.076 -0.037 0.4 0.5 99.1 98.4 0.66

23-PC-510 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.3 0.16

23-PC-511 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.13

23-PC-512 -0.010 -0.005 0.011 0.005 0.0 0.0 98.0 98.3 0.26

23-PC-513 -0.009 -0.005 0.009 0.005 0.0 0.0 98.2 98.3 0.09

23-PC-514 -0.009 -0.005 0.009 0.005 0.0 0.0 98.1 98.3 0.18

23-PC-520 0.038 0.019 -0.038 -0.019 0.1 0.0 98.4 98.1 0.31

23-PC-521 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.13

23-PC-522 -0.010 -0.005 0.010 0.005 0.0 0.0 97.9 98.1 0.26

23-PC-523 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.1 0.09

23-PC-524 -0.009 -0.004 0.009 0.005 0.0 0.0 98.0 98.1 0.18

23-PC-600 0.115 0.057 -0.114 -0.055 0.9 1.0 99.1 98.1 1.01

23-PC-610 0.038 0.018 -0.038 -0.018 0.0 0.0 98.1 98.0 0.11

23-PC-620 0.038 0.018 -0.038 -0.018 0.1 0.0 98.1 97.8 0.30

23-PC-630 0.038 0.018 -0.038 -0.018 0.2 0.0 98.1 97.6 0.47

23-PC-631 -0.009 -0.004 0.009 0.004 0.0 0.0 97.5 97.6 0.13

23-PC-632 -0.010 -0.005 0.010 0.005 0.0 0.0 97.4 97.6 0.26

23-PC-633 -0.009 -0.004 0.009 0.005 0.0 0.0 97.5 97.6 0.09

23-PC-634 -0.009 -0.004 0.009 0.004 0.0 0.0 97.4 97.6 0.18

23-PC-700 0.076 0.038 -0.075 -0.037 0.6 0.7 99.1 98.1 1.00

23-PC-710 0.038 0.019 -0.038 -0.019 0.0 0.0 98.1 98.0 0.06

23-PC-711 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13

23-PC-712 -0.010 -0.005 0.010 0.005 0.0 0.0 97.8 98.0 0.26

23-PC-713 -0.009 -0.005 0.009 0.005 0.0 0.0 98.0 98.0 0.09

23-PC-714 -0.009 -0.004 0.009 0.004 0.0 0.0 97.9 98.0 0.18

23-PC-720 0.038 0.019 -0.038 -0.019 0.0 0.0 98.1 98.0 0.10

23-PC-721 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.13

23-PC-722 -0.010 -0.005 0.010 0.005 0.0 0.0 97.7 98.0 0.26

23-PC-723 -0.009 -0.005 0.009 0.005 0.0 0.0 97.9 98.0 0.09

23-PC-724 -0.009 -0.004 0.009 0.004 0.0 0.0 97.8 98.0 0.18

24-PC-100 0.165 0.080 -0.163 -0.078 1.6 1.8 98.7 97.5 1.22

24-PC-110 0.032 0.015 -0.032 -0.015 0.1 0.0 97.5 97.3 0.21

24-PC-120 0.032 0.015 -0.032 -0.015 0.4 0.1 97.5 96.4 1.05

24-PC-130 0.009 0.005 -0.009 -0.005 0.0 0.0 97.5 97.3 0.20
Project: ETAP Page: 209

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

24-PC-140 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 97.1 0.37

24-PC-150 0.001 0.001 -0.001 -0.001 0.0 0.0 97.5 97.4 0.11

24-PC-160 0.012 0.006 -0.011 -0.006 0.1 0.0 97.5 96.9 0.60

24-PC-170 0.028 0.013 -0.028 -0.013 0.4 0.1 97.5 96.2 1.29

24-PC-180 0.027 0.013 -0.026 -0.013 1.5 0.1 97.5 93.1 4.36

24-PC-190 0.010 0.005 -0.010 -0.005 0.3 0.0 97.5 95.5 1.99

24-PC-200 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

24-PC-300 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

24-PC-400 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

24-PC-500 0.153 0.075 -0.152 -0.073 1.6 1.8 98.7 97.4 1.29

24-PC-600 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71

24-PC-700 0.109 0.054 -0.108 -0.052 1.5 1.7 98.7 97.0 1.71

25-PC-100 0.716 0.351 -0.714 -0.346 2.2 5.4 99.8 99.3 0.55

26-PC-100 0.665 0.325 -0.663 -0.321 1.7 4.1 100.0 99.6 0.44

27-PC -510 0.055 0.027 -0.055 -0.027 0.1 0.0 97.5 97.4 0.12

27-PC- 520 0.055 0.027 -0.055 -0.027 0.2 0.1 97.5 97.2 0.32

27-PC- 530 0.000 0.000 0.000 0.000 0.0 0.0 97.5 97.5 0.01

27-PC-0511 -0.012 -0.006 0.012 0.006 0.0 0.0 97.2 97.4 0.18

27-PC-0512 -0.014 -0.007 0.014 0.007 0.1 0.0 97.0 97.4 0.35

27-PC-0513 -0.012 -0.006 0.012 0.006 0.0 0.0 97.3 97.4 0.11

27-PC-0514 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.25

27-PC-0515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.3 97.4 0.03

27-PC-0521 -0.012 -0.006 0.012 0.006 0.0 0.0 97.0 97.2 0.18

27-PC-0522 -0.014 -0.007 0.014 0.007 0.1 0.0 96.8 97.2 0.35

27-PC-0523 -0.012 -0.006 0.012 0.006 0.0 0.0 97.1 97.2 0.11

27-PC-0524 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.2 0.25

27-PC-0525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.2 0.03

27-PC-100 0.168 0.082 -0.167 -0.081 0.5 0.6 98.8 98.4 0.38

27-PC-110 0.056 0.027 -0.056 -0.027 0.1 0.0 98.4 98.3 0.13

27-PC-111 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.32

27-PC-112 -0.014 -0.007 0.014 0.007 0.0 0.0 98.1 98.3 0.20

27-PC-113 -0.013 -0.006 0.013 0.006 0.1 0.0 97.9 98.3 0.37

27-PC-114 -0.013 -0.006 0.013 0.006 0.0 0.0 98.0 98.3 0.25

27-PC-115 -0.003 -0.002 0.003 0.002 0.0 0.0 98.2 98.3 0.03

27-PC-120 0.056 0.027 -0.056 -0.027 0.2 0.1 98.4 98.1 0.32

27-PC-121 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

27-PC-122 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20
Project: ETAP Page: 210

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

27-PC-123 -0.013 -0.006 0.013 0.006 0.1 0.0 97.7 98.1 0.37

27-PC-124 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.25

27-PC-125 -0.003 -0.002 0.003 0.002 0.0 0.0 98.1 98.1 0.03

27-PC-130 0.056 0.027 -0.056 -0.027 0.3 0.1 98.4 97.9 0.50

27-PC-131 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

27-PC-132 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

27-PC-133 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

27-PC-134 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25

27-PC-135 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

27-PC-200 0.167 0.082 -0.166 -0.081 1.0 1.1 98.8 98.1 0.71

27-PC-210 0.055 0.027 -0.055 -0.027 0.3 0.1 98.1 97.6 0.50

27-PC-211 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

27-PC-212 -0.014 -0.007 0.014 0.007 0.0 0.0 97.4 97.6 0.19

27-PC-213 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

27-PC-214 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.25

27-PC-215 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03

27-PC-220 0.056 0.027 -0.055 -0.027 0.2 0.0 98.1 97.8 0.30

27-PC-221 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.32

27-PC-222 -0.014 -0.007 0.014 0.007 0.0 0.0 97.6 97.8 0.19

27-PC-223 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.8 0.37

27-PC-224 -0.013 -0.006 0.013 0.006 0.0 0.0 97.5 97.8 0.25

27-PC-225 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.8 0.03

27-PC-230 0.056 0.027 -0.056 -0.027 0.1 0.0 98.1 97.9 0.17

27-PC-231 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

27-PC-232 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

27-PC-233 -0.013 -0.006 0.013 0.006 0.1 0.0 97.5 97.9 0.37

27-PC-234 -0.013 -0.006 0.013 0.006 0.0 0.0 97.7 97.9 0.25

27-PC-235 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

27-PC-240 0.000 0.000 0.000 0.000 0.0 0.0 98.1 98.0 0.03

27-PC-300 0.167 0.082 -0.166 -0.081 0.8 0.9 98.8 98.2 0.58

27-PC-310 0.056 0.027 -0.055 -0.027 0.3 0.1 98.2 97.7 0.52

27-PC-311 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.13

27-PC-312 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.19

27-PC-313 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.27

27-PC-314 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

27-PC-315 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

27-PC-320 0.056 0.027 -0.056 -0.027 0.2 0.1 98.2 97.9 0.33
Project: ETAP Page: 211

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

27-PC-321 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 97.9 0.13

27-PC-322 -0.014 -0.007 0.014 0.007 0.0 0.0 97.7 97.9 0.19

27-PC-323 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.27

27-PC-324 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.9 0.32

27-PC-325 -0.003 -0.002 0.003 0.002 0.0 0.0 97.9 97.9 0.03

27-PC-330 0.056 0.027 -0.056 -0.027 0.1 0.0 98.2 98.1 0.13

27-PC-331 -0.013 -0.006 0.013 0.006 0.0 0.0 97.9 98.1 0.14

27-PC-332 -0.014 -0.007 0.014 0.007 0.0 0.0 97.9 98.1 0.20

27-PC-333 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.27

27-PC-334 -0.013 -0.006 0.013 0.006 0.0 0.0 97.8 98.1 0.32

27-PC-335 -0.003 -0.002 0.003 0.002 0.0 0.0 98.0 98.1 0.03

27-PC-400 0.167 0.082 -0.165 -0.081 1.2 1.3 98.8 97.9 0.89

27-PC-410 0.056 0.027 -0.055 -0.027 0.1 0.0 97.9 97.7 0.16

27-PC-411 -0.013 -0.006 0.013 0.006 0.1 0.0 97.4 97.7 0.37

27-PC-412 -0.014 -0.007 0.014 0.007 0.0 0.0 97.5 97.7 0.27

27-PC-413 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.7 0.32

27-PC-414 -0.013 -0.006 0.013 0.006 0.0 0.0 97.6 97.7 0.18

27-PC-415 -0.003 -0.002 0.003 0.002 0.0 0.0 97.7 97.7 0.03

27-PC-420 0.055 0.027 -0.055 -0.027 0.2 0.0 97.9 97.6 0.30

27-PC-421 -0.013 -0.006 0.013 0.006 0.1 0.0 97.2 97.6 0.37

27-PC-422 -0.014 -0.007 0.014 0.007 0.0 0.0 97.3 97.6 0.27

27-PC-423 -0.013 -0.006 0.013 0.006 0.0 0.0 97.3 97.6 0.32

27-PC-424 -0.013 -0.006 0.013 0.006 0.0 0.0 97.4 97.6 0.18

27-PC-425 -0.003 -0.002 0.003 0.002 0.0 0.0 97.6 97.6 0.03

27-PC-430 0.055 0.027 -0.055 -0.027 0.3 0.1 97.9 97.4 0.49

27-PC-431 -0.012 -0.006 0.013 0.006 0.1 0.0 97.0 97.4 0.37

27-PC-432 -0.014 -0.007 0.014 0.007 0.0 0.0 97.1 97.4 0.27

27-PC-433 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.4 0.32

27-PC-434 -0.013 -0.006 0.013 0.006 0.0 0.0 97.2 97.4 0.18

27-PC-435 -0.003 -0.002 0.003 0.002 0.0 0.0 97.4 97.4 0.03

27-PC-500 0.131 0.065 -0.130 -0.063 1.5 1.7 98.8 97.4 1.41

27-PC-510 0.055 0.027 -0.055 -0.027 0.2 0.0 97.4 97.1 0.26

27-PC-511 -0.012 -0.006 0.012 0.006 0.1 0.0 96.8 97.1 0.37

27-PC-512 -0.014 -0.007 0.014 0.007 0.0 0.0 96.9 97.1 0.27

27-PC-513 -0.012 -0.006 0.012 0.006 0.0 0.0 96.8 97.1 0.32

27-PC-514 -0.013 -0.006 0.013 0.006 0.0 0.0 96.9 97.1 0.18

27-PC-515 -0.003 -0.002 0.003 0.002 0.0 0.0 97.1 97.1 0.03
Project: ETAP Page: 212

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

27-PC-520 0.055 0.027 -0.055 -0.027 0.1 0.0 97.4 97.2 0.14

27-PC-521 -0.012 -0.006 0.012 0.006 0.1 0.0 96.9 97.2 0.37

27-PC-522 -0.014 -0.007 0.014 0.007 0.0 0.0 97.0 97.2 0.27

27-PC-523 -0.012 -0.006 0.012 0.006 0.0 0.0 96.9 97.2 0.32

27-PC-524 -0.013 -0.006 0.013 0.006 0.0 0.0 97.1 97.2 0.18

27-PC-525 -0.003 -0.002 0.003 0.002 0.0 0.0 97.2 97.2 0.03

27-PC-530 0.021 0.010 -0.021 -0.010 0.1 0.0 97.4 96.8 0.55

27-PC-600 0.110 0.055 -0.109 -0.054 1.2 1.3 98.8 97.5 1.30

27-PC-700 0.071 0.034 -0.070 -0.034 0.3 0.3 98.8 98.3 0.45

27-PC-710 0.022 0.010 -0.022 -0.010 0.0 0.0 98.3 98.2 0.12

27-PC-720 0.020 0.010 -0.020 -0.010 0.2 0.0 98.3 97.7 0.68

27-PC-730 0.029 0.014 -0.028 -0.014 0.3 0.0 98.3 97.5 0.81

2-PC-001 -3.773 -1.942 3.773 1.942 0.0 0.0 100.0 100.0 0.00

2-PC-002 2.771 1.428 -2.771 -1.428 0.0 0.0 100.0 100.0 0.00

2-PC-003 1.938 1.004 -1.938 -1.004 0.0 0.0 100.0 100.0 0.00

2-PC-004 1.019 0.535 -1.019 -0.535 0.0 0.0 100.0 100.0 0.00

2-PC-006 -0.728 -0.375 0.728 0.375 0.0 0.0 100.0 100.0 0.00

2-PC-007 -1.404 -0.721 1.404 0.721 0.0 0.0 100.0 100.0 0.00

2-PC-008 -2.406 -1.235 2.406 1.235 0.0 0.0 100.0 100.0 0.00

2S/S05--TR -0.716 -0.351 0.728 0.375 12.0 24.0 99.8 100.0 0.19

2S/S06--TR -0.665 -0.325 0.675 0.346 10.3 20.6 100.0 100.0 0.01

2S/S07--TR -0.979 -0.474 1.002 0.520 22.8 45.6 98.8 100.0 1.21

2S/S1-TR -0.980 -0.474 1.002 0.520 22.8 45.6 98.8 100.0 1.21

2S/S2-TR -0.818 -0.396 0.833 0.427 15.7 31.4 99.4 100.0 0.57

2S/S3-TR -0.899 -0.436 0.918 0.474 19.1 38.2 99.1 100.0 0.89

2S/S4-TR -0.996 -0.488 1.019 0.536 23.7 47.4 98.7 100.0 1.29

Cable12 1.018 0.522 -1.018 -0.522 0.0 0.0 100.0 100.0 0.00

Cable13 1.006 0.515 -1.006 -0.515 0.0 0.0 100.0 100.0 0.00

Cable16 1.019 0.535 -1.019 -0.535 0.0 0.0 100.0 100.0 0.00

Cable17 0.919 0.469 -0.919 -0.469 0.0 0.0 100.0 100.0 0.00

Cable18 0.833 0.424 -0.833 -0.424 0.0 0.0 100.0 100.0 0.00

Cable19 1.003 0.514 -1.003 -0.514 0.0 0.0 100.0 100.0 0.00

Cable2 0.945 0.483 -0.945 -0.483 0.0 0.0 100.0 100.0 0.00

Cable20 0.728 0.375 -0.728 -0.375 0.0 0.0 100.0 100.0 0.00

Cable21 0.675 0.346 -0.675 -0.346 0.0 0.0 100.0 100.0 0.00

Cable22 1.002 0.513 -1.002 -0.513 0.0 0.0 100.0 100.0 0.00

Cable3 1.016 0.534 -1.016 -0.534 0.0 0.0 100.0 100.0 0.00
Project: ETAP Page: 213

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop

Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable4 0.876 0.447 -0.876 -0.447 0.0 0.0 100.0 100.0 0.00

Cable5 0.728 0.375 -0.728 -0.375 0.0 0.0 100.0 100.0 0.00

Cable7 0.807 0.416 -0.807 -0.416 0.0 0.0 100.0 100.0 0.00

PC-1 6.396 3.292 -6.396 -3.292 0.0 0.0 100.0 100.0 0.00

PC-13 6.180 3.176 -6.180 -3.176 0.0 0.0 100.0 100.0 0.00

PC-161 -2.411 -1.238 2.411 1.238 0.0 0.0 100.0 100.0 0.00

390.5 631.0

* This Transmission Line includes Series Capacitor.


Project: ETAP Page: 214

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

Alert Summary Report

% Alert Settings
Critical
Loading
Bus 100.0

Cable / Busway 100.0

Reactor 100.0

Line 100.0

Transformer 100.0

Panel 100.0

Protective Device 100.0

Generator 100.0

Inverter/Charger 100.0

Bus Voltage
OverVoltage 105.0

UnderVoltage 90.0

Generator Excitation
OverExcited (Q Max.) 100.0

UnderExcited (Q Min.) 100.0


Project: ETAP Page: 215

Location: Saudi Arabia 19.0.1C Date: 28-11-2023

Contract: SN:

Engineer: MHT Revision: Base


Study Case: LF-SEC
Filename: Config.: SEC

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 12.576 6.469 14.142 88.92 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 12.576 6.469 14.142 88.92 Lagging

Total Motor Load: 0.390 0.125 0.410 95.21 Lagging

Total Static Load: 11.795 5.713 13.105 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.390 0.631

System Mismatch: 0.106 0.150

Number of Iterations: 1