Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GENERAL ABSTRACT

Construction of Spurs on L/S of River Jhelum at RD 108.22 and RD 109.00 KM.


S. No.
TOTAL
Name of the Item Unit Rate Amount
QUANTITY

E/W (Mech) 803.00 Cum ₹ 187.30 ₹ 150,401.90


E/W in or under water 160.60 Cum ₹ 37.46 ₹ 6,016.06
Hand Packing of Stones 388.68 Cum ₹ 371.15 ₹ 144,258.58
Supply of Stones 388.68 Cum ₹ 1,645.00 ₹ 639,378.60
P/L of Wooden Piles 198.60 Cft ₹ 600.00 ₹ 119,160.00
P/L of Earth filled bags 4,236.00 No. ₹ 25.00 ₹ 105,900.00
Supply of B.A Wire Crates 17,233.10 Sqm ₹ 20.00 ₹ 344,662.00
Carriage of Stones 388.68 No. ₹ 806.81 ₹ 313,590.91
GRAND TOTAL ₹ 1,823,368.05

Sd/-
Assistant Executive Engineer Executive Engineer
Flood Control Sub-Division Irrigation and Flood Control
Hajin Division Sumbal

You might also like