Professional Documents
Culture Documents
Trading Plan
Trading Plan
Discipline Yourself.
Never go off the top of your Head, CHECK YOU RULES.
1. Clear your mind, Remove an Emotions (internal or external). You want to be logical, if
you’re emotional, DONT TRADE.
(Minimum 10:1)
POI’s:
Point of interest are only areas of demand or supply (Wyckoff). Somewhere In the
market you can see that institutions got into the markets.
- Manipulations (Take of liquidity of a certain area, leaving a sponsor candle)
1AM-3AM-5AM-7AM-9AM... (SC TIMES)
- Accumulation or Distribution is a certain area (Orders being built up)
- An area that filled a purpose, whether it be filling imbalance, taking
liquidity, etc.
Always look for Confirmations Entries inside decisional POIs (No Exceptions)
- This could be a POI that you’re not too sure about, or there's another POI
below or above it.
- Decisional POIs are typically SC (Slingshot Candles), so not the POI that it
around structure, but the move that caused the break of structure (Most of
the time Re-accumulations or Re-Distributions)
WYCKOFF:
Accumulations and Distribution-
- Only focus on accumulation or distribution when we’re in a demand or
supply area (POI) Other than that, it’s not for certain that the schematic will
play out in your favor.
- The Pullback of the STB or UT MUST REACH 50% the trading range of your
schematic (BC to AR/ SC to AR)
- You must see SOS/ SOW out of the trading range from SPRING or UTAD
before taking entries on a schematic. Some type of Intent is required
(Whether it be breaking minor structure)
- The BEST Entries to take out of a Schematic is the “TEST” and the “FIRST
LPS” - other than that it’s not guaranteed that you’ll get the other entries.
- DO NOT TAKE SCHEMATICS that Primarily Happened in ASIAN. (London
likes to take Asian Highs and Lows), don’t look to trade during Asian
Session.
- When a Schematic is Completed (TEST-LPS-BU/LPS) and GONE, IT IS NOT
ELIGIBLE FOR LIMIT ENTRIES ANYMORE.
Re- Accumulation or Re-distribution are only confirmed when we break the
“Creek” or “ICE”
TYPE 2 Schematics: Accumulation or Distribution
- Wait for the UT/STB to break mSOW/ or UA forming a MSOW or SOS before
looking for entries
- If the schematic does not show you a Previous mSOW/ or UA, it’s best to
wait for the first LPS to form, then take entries after that.