CROSS SECTION DETAILS SHEET NO -01

APPROVED IN PRINCIPLE REN - KHEDULI (KM 505 - 508)


IRCON INTERNATIONAL LIMITED SECTION L.C. NO. :- 88
(A Govt. of India Undertaking) DRG.NO. IRCON/5033/RE/FL-RKB/CSD-01
C-4, DISTRICT CENTER, SAKET,
NEW DELHI-110017 CHAINAGE 505/394.60
PROOF CONSULTANT/TPL AM/DRAWING/IRCON AM/E/IRCON DGM/E/IRCON PROOF CHECKER/IRCON GM/E/PH/IRCON WIND PRESSURE-155kgf/m²
LOC.NO 505/11-T
MAST TYPE T-150
AT

0.035
MAST LENGTH 9.30
01
REV.DEF. 0

RKB
NATURE OF SOIL NORMAL SOIL
SOIL PRESSURE 11,000kgf/m2

MAST
FOUNDATION REF. ATF-01
CATENARY WIRE
ANCHOR BLOCK -
ED/SB -
0.525

SUPER MAST -
CONTACT WIRE RC/FEEDER HT. -
CATENARY HT. -
CONTACT HT. -
SPAN
TAN
7.315

RADIUS/VERSINE

7.20
0.75
0.40
0.300 i=3.74
5.25

0.45
ANTICLIMBING
DEVICE
3.50

0.63
2.43

2.00

RAIL LEVEL

G.L 0.40

℄ OF
1.45

2.50
1.60

3.00 LINE-1

4.00
NOTE-
ALL DIMENSION ARE IN M.
SOIL PRESSURE TO BE ASCERTAINED AT SITE AND FOUNDATION TO BE CAST ACCORDINGLY.
FOUNDATION SHOULD PROJECT 50 TO 100 MM ABOVE GL.
EXTRA DEPTH SHALL BE CHANGE AT SITE BASED ON AVAILABLE
CESS LEVELS DURING THE COST OF FOUNDATION

STAY INSULATOR BKT. INSULATOR 9-T INSULATOR S.S WIRE ROPE CONTACT WIRE CATENARY WIRE