Instant Download PDF Successful Project Management 6th Edition Gido Test Bank Full Chapter
Instant Download PDF Successful Project Management 6th Edition Gido Test Bank Full Chapter
https://testbankfan.com/product/successful-project-
management-6th-edition-gido-solutions-manual/
https://testbankfan.com/product/successful-project-
management-7th-edition-gido-test-bank/
https://testbankfan.com/product/successful-project-
management-7th-edition-gido-solutions-manual/
https://testbankfan.com/product/project-management-in-
practice-6th-edition-meredith-test-bank/
Project Management The Managerial Process 6th Edition
Larson Test Bank
https://testbankfan.com/product/project-management-the-
managerial-process-6th-edition-larson-test-bank/
https://testbankfan.com/product/information-technology-project-
management-revised-6th-edition-schwalbe-test-bank/
https://testbankfan.com/product/project-management-in-
practice-6th-edition-meredith-solutions-manual/
https://testbankfan.com/product/project-management-the-
managerial-process-6th-edition-larson-solutions-manual/
https://testbankfan.com/product/contemporary-project-
management-4th-edition-kloppenborg-test-bank/
CHAPTER 6: RESOURCE UTILIZATION
1. Resource-limited scheduling will not extend the project completion time if necessary in order to keep within
the resource limits.
a. True
b. False
ANSWER: False
FEEDBACK: Correct Resource-limited scheduling will extend the project completion time if necessary
in order to keep within the resource limits.
Incorrect Resource-limited scheduling will extend the project completion time if necessary
in order to keep within the resource limits.
2. The statement, "Network diagrams illustrate the technical constraints among activities," means the activities
are constrained because
a. each of the activities are independent from the other activities.
b. one activity cannot be started until the predecessors are finished.
c. the activities use different resources to be completed.
d. some activities use the same resources that may not be available.
ANSWER: b
FEEDBACK: a. Network diagrams illustrate the technical constraints among activities because one
activity cannot be started until the predecessors are finished.
b. Network diagrams illustrate the technical constraints among activities because one
activity cannot be started until the predecessors are finished.
c. Network diagrams illustrate the technical constraints among activities because one
activity cannot be started until the predecessors are finished.
d. Network diagrams illustrate the technical constraints among activities because one
activity cannot be started until the predecessors are finished.
ANSWER: c
FEEDBACK: a. Activities are drawn in a serial relationship because, from a technical standpoint, they must
be performed in that sequence.
b. Activities are drawn in a serial relationship because, from a technical standpoint, they must
be performed in that sequence.
c. Activities are drawn in a serial relationship because, from a technical standpoint, they must
be performed in that sequence.
d. Activities are drawn in a serial relationship because, from a technical standpoint, they must
be performed in that sequence.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
4. In addition to showing the technical constraints among activities, how does the network logic also take into
account resource constraints?
a. Activities that use the same resource may not be able to occur in parallel to each other.
b. Activities that use different resources may be shown in a serial relationship.
c. The activities could be shown in a loop relationship.
d. Resources that are unlimited are not shown in a resource assignment.
ANSWER: a
FEEDBACK: a. In addition to showing the technical constraints among activities, the network logic can also
take into account resource constraints. Activities that use the same resource may not be able
to occur in parallel to each other.
b. In addition to showing the technical constraints among activities, the network logic can also
take into account resource constraints. Activities that use the same resource may not be able
to occur in parallel to each other.
c. In addition to showing the technical constraints among activities, the network logic can also
take into account resource constraints. Activities that use the same resource may not be able
to occur in parallel to each other.
d. In addition to showing the technical constraints among activities, the network logic can also
take into account resource constraints. Activities that use the same resource may not be able
to occur in parallel to each other.
5. Select which of the following does not describe how the sequence of activities can be drawn to reflect
the availability of a limited quantity of resources.
a. The activities using the limited resources are shown in a ladder relationship as they are available.
b. The activities using the limited resources are shown in a loop relationship as they are available.
c. The activities requiring the limited resource are assigned at different times.
d. If there is no technical constraint for the activities, the activities could be arranged serially by the availability
of the resources.
ANSWER: b
FEEDBACK: a. The sequence of activities can be drawn to reflect the availability of a limited quantity
of resources.
b. The sequence of activities can be drawn to reflect the availability of a limited quantity
of resources.
c. The sequence of activities can be drawn to reflect the availability of a limited quantity
of resources.
d. The sequence of activities can be drawn to reflect the availability of a limited quantity
of resources.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
ANSWER: c
FEEDBACK: a. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
b. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
c. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
d. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
ANSWER: d
FEEDBACK: a. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
b. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
c. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
d. If resources are to be considered in planning, it’s necessary to indicate the amounts and types
of resources needed to perform each activity.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
8. Resource utilization charts based on each activity’s earliest start time are said to be based
a. on availability times.
b. an as-late-as-possible (ALAP) schedule.
c. on an as-soon-as-possible (ASAP) schedule.
d. on a limited schedule plan.
ANSWER: c
FEEDBACK: a. Resource utilization charts based on each activity’s earliest start time are said to be based on
an as-soon-as-possible (ASAP) schedule.
b. Resource utilization charts based on each activity’s earliest start time are said to be based on
an as-soon-as-possible (ASAP) schedule.
c. Resource utilization charts based on each activity’s earliest start time are said to be based on
an as-soon-as-possible (ASAP) schedule.
d. Resource utilization charts based on each activity’s earliest start time are said to be based on
an as-soon-as-possible (ASAP) schedule.
9. Resource utilization charts based on each activity’s latest start time are said to be based
a. on availability times.
b. an as-late-as-possible (ALAP) schedule.
c. on an as-soon-as-possible (ASAP) schedule.
d. on a limited schedule plan.
ANSWER: b
FEEDBACK: a. Resource utilization charts based on each activity’s latest start time are said to be based on an
as-late-as-possible (ALAP) schedule.
b. Resource utilization charts based on each activity’s latest start time are said to be based on an
as-late-as-possible (ALAP) schedule.
c. Resource utilization charts based on each activity’s latest start time are said to be based on an
as-late-as-possible (ALAP) schedule.
d. Resource utilization charts based on each activity’s latest start time are said to be based on an
as-late-as-possible (ALAP) schedule.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
10. Given this project and the requirement that the number of resources working on a task cannot be less than the
number assigned to the task, answer the following question. What is the least number of resources that can be
assigned to the project if all five tasks occur in parallel?
a. 24 workers
b. 1.5 workers per day
c. 7 workers
d. 2 workers
ANSWER: c
FEEDBACK: a. Parallel tasks means that all the tasks are assigned at the same time. The total resources
would be the total of all those assigned to the tasks. 2+2+1+1+1=7 workers.
b. Parallel tasks means that all the tasks are assigned at the same time. The total resources
would be the total of all those assigned to the tasks. 2+2+1+1+1=7 workers.
c. Parallel tasks means that all the tasks are assigned at the same time. The total resources
would be the total of all those assigned to the tasks. 2+2+1+1+1=7 workers.
d. Parallel tasks means that all the tasks are assigned at the same time. The total resources
would be the total of all those assigned to the tasks. 2+2+1+1+1=7 workers.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
11. Given this project and the requirement that the number of resources working on a task cannot be less than the
number assigned to the task, answer the following question.
If the tasks were placed in a serial relationship with Task 1 first and the others in numerical order, on what
day would Task 3 be done?
a. day 18
b. day 3
c. day 10
d. day 9
ANSWER: c
FEEDBACK: a. Tasks assigned in serial order are in a list with Task 1 taking days 1 to 5, Task 2 taking days 6 to
8, Task 3 taking days 9 and 10, Task 4 taking days 11 to 14, and Task 5 taking days 15 and 16.
b. Tasks assigned in serial order are in a list with Task 1 taking days 1 to 5, Task 2 taking days 6 to
8, Task 3 taking days 9 and 10, Task 4 taking days 11 to 14, and Task 5 taking days 15 and 16.
c. Tasks assigned in serial order are in a list with Task 1 taking days 1 to 5, Task 2 taking days 6 to
8, Task 3 taking days 9 and 10, Task 4 taking days 11 to 14, and Task 5 taking days 15 and 16.
d. Tasks assigned in serial order are in a list with Task 1 taking days 1 to 5, Task 2 taking days 6 to
8, Task 3 taking days 9 and 10, Task 4 taking days 11 to 14, and Task 5 taking days 15 and 16.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
ANSWER: a
FEEDBACK: a. Resource leveling, or smoothing, is a method for developing a schedule that attempts to
minimize the fluctuations in requirements for resources.
b. Resource leveling, or smoothing, is a method for developing a schedule that attempts to
minimize the fluctuations in requirements for resources.
c. Resource leveling, or smoothing, is a method for developing a schedule that attempts to
minimize the fluctuations in requirements for resources.
d. Resource leveling, or smoothing, is a method for developing a schedule that attempts to
minimize the fluctuations in requirements for resources.
ANSWER: c
FEEDBACK: a. Resource leveling, or smoothing, levels the resources so that they are applied as uniformly as
possible without extending the project schedule beyond the required completion time.
b. Resource leveling, or smoothing, levels the resources so that they are applied as uniformly as
possible without extending the project schedule beyond the required completion time.
c. Resource leveling, or smoothing, levels the resources so that they are applied as uniformly as
possible without extending the project schedule beyond the required completion time.
d. Resource leveling, or smoothing, levels the resources so that they are applied as uniformly as
possible without extending the project schedule beyond the required completion time.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
14. The start of noncritical activities are delayed beyond their earliest start times (but not beyond their latest start times)
in order to
a. schedule with a technical constraint.
b. schedule with a resource constraint.
c. level the costs of the project.
d. maintain a uniform level of required resources.
ANSWER: d
FEEDBACK: a. The start of noncritical activities are delayed beyond their earliest start times (but not beyond
their latest start times) in order to maintain a uniform level of required resources.
b. The start of noncritical activities are delayed beyond their earliest start times (but not beyond
their latest start times) in order to maintain a uniform level of required resources.
c. The start of noncritical activities are delayed beyond their earliest start times (but not beyond
their latest start times) in order to maintain a uniform level of required resources.
d. The start of noncritical activities are delayed beyond their earliest start times (but not beyond
their latest start times) in order to maintain a uniform level of required resources.
15. Activities can be delayed only to the point where all their positive slack is used up, as any further delays would cause
the project to
a. increase costs of all the activities in the project.
b. extend beyond the project completion time.
c. be completed ahead of schedule.
d. increase its requirements for additional resources for all activities.
ANSWER: b
FEEDBACK: a. Activities can be delayed only to the point where all their positive slack is used up, as any
further delays would cause the project to extend beyond the project completion time.
b. Activities can be delayed only to the point where all their positive slack is used up, as any
further delays would cause the project to extend beyond the project completion time.
c. Activities can be delayed only to the point where all their positive slack is used up, as any
further delays would cause the project to extend beyond the project completion time.
d. Activities can be delayed only to the point where all their positive slack is used up, as any
further delays would cause the project to extend beyond the project completion time.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
16. assist with the complexity of generating a resource-leveled schedule and resource requirements graphs and
tables.
a. Project management information systems
b. Formulas and techniques
c. Trial and error techniques
d. Calendaring systems
ANSWER: a
FEEDBACK: a. Project management information systems assist with the complexity of generating a resource-
leveled schedule and resource requirements graphs and tables.
b. Project management information systems assist with the complexity of generating a resource-
leveled schedule and resource requirements graphs and tables.
c. Project management information systems assist with the complexity of generating a resource-
leveled schedule and resource requirements graphs and tables.
d. Project management information systems assist with the complexity of generating a resource-
leveled schedule and resource requirements graphs and tables.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
17. Given this project and the requirement that the number of resources working on a task cannot be less than the number
assigned to the task, answer the following question.
What is the least amount of time that the project can be completed and how many resources are required to
complete the work?
a. 16 days, 7 workers
b. 7 days, 5 workers
c. 5 days, 7 workers
d. 8 days, 3 workers
ANSWER: c
FEEDBACK: a. The least amount of time is if all the tasks start on the same day. The longest duration task would
be shortest time the project could be finished. The sum of the number of workers necessary for all
the tasks to be completed in parallel is the least number of workers required.
b. The least amount of time is if all the tasks start on the same day. The longest duration task would
be shortest time the project could be finished. The sum of the number of workers necessary for all
the tasks to be completed in parallel is the least number of workers required.
c. The least amount of time is if all the tasks start on the same day. The longest duration task would
be shortest time the project could be finished. The sum of the number of workers necessary for all
the tasks to be completed in parallel is the least number of workers required.
d. The least amount of time is if all the tasks start on the same day. The longest duration task would
be shortest time the project could be finished. The sum of the number of workers necessary for all
the tasks to be completed in parallel is the least number of workers required.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
18. Which of following would allow for level resources on the project?
a.
b.
c.
d.
ANSWER: c
FEEDBACK: a. The project requires 24 worker-days to complete the project. Three workers working for eight days
totals 24 worker days. This makes the number of resources level. There are no combinations to
have four resources for six says nor for six resources for four days.
b. The project requires 24 worker-days to complete the project. Three workers working for eight
days totals 24 worker days. This makes the number of resources level. There are no combinations
to have four resources for six says nor for six resources for four days.
c. The project requires 24 worker-days to complete the project. Three workers working for eight
days totals 24 worker days. This makes the number of resources level. There are no combinations
to have four resources for six says nor for six resources for four days.
d. The project requires 24 worker-days to complete the project. Three workers working for eight
days totals 24 worker days. This makes the number of resources level. There are no combinations
to have four resources for six says nor for six resources for four days.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
ANSWER: d
FEEDBACK: a. Resource-limited scheduling is a method for developing the shortest schedule when the number or
amount of available resources is fixed and cannot be exceeded.
b. Resource-limited scheduling is a method for developing the shortest schedule when the number or
amount of available resources is fixed and cannot be exceeded.
c. Resource-limited scheduling is a method for developing the shortest schedule when the number or
amount of available resources is fixed and cannot be exceeded.
d. Resource-limited scheduling is a method for developing the shortest schedule when the number or
amount of available resources is fixed and cannot be exceeded.
20. When several activities need the same limited resource at the same time, the activities with
a. the least slack have first priority.
b. the longest duration have first priority.
c. the near term have first priority.
d. use the most resources have first priority.
ANSWER: a
FEEDBACK: a. When several activities need the same limited resource at the same time, the activities with the
least slack have first priority.
b. When several activities need the same limited resource at the same time, the activities with the
least slack have first priority.
c. When several activities need the same limited resource at the same time, the activities with the
least slack have first priority.
d. When several activities need the same limited resource at the same time, the activities with the
least slack have first priority.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 6: Resource Utilization
21. In resource-limited scheduling, the lower priority activities get delayed. How does the delaying of activities affect the
project?
a. The delaying of activities increases the costs of the project.
b. The delaying of activities decreases the acceptance of the project deliverable.
c. The delaying of activities may delay the project.
d. The delaying of activities helps give others more time on their tasks because they won't affect the project
schedule.
ANSWER: c
FEEDBACK: a. In resource-limited scheduling, the lower priority activities get delayed. The delaying of
activities may delay the project.
b. In resource-limited scheduling, the lower priority activities get delayed. The delaying of
activities may delay the project.
c. In resource-limited scheduling, the lower priority activities get delayed. The delaying of
activities may delay the project.
d. In resource-limited scheduling, the lower priority activities get delayed. The delaying of
activities may delay the project.
22. This example has level resources of three resources for eight days. If the project is limited to two resources, how
should the project be organized to meet the resource constraint and finish the project as early as possible? The tasks
with the least slack have the lower number.
ANSWER: a
FEEDBACK: a. The total number of worker-days for the project is 24. If the project is limited to 2 workers per
day, then the project must take at least 12 days. There is one combination that gives 12 work
days and 2 workers per day and holds true the constraint of priorities for the project.
b. The total number of worker-days for the project is 24. If the project is limited to 2 workers per
day, then the project must take at least 12 days. There is one combination that gives 12 work
days and 2 workers per day and holds true the constraint of priorities for the project.
c. The total number of worker-days for the project is 24. If the project is limited to 2 workers per
day, then the project must take at least 12 days. There is one combination that gives 12 work
days and 2 workers per day and holds true the constraint of priorities for the project.
d. The total number of worker-days for the project is 24. If the project is limited to 2 workers per
day, then the project must take at least 12 days. There is one combination that gives 12 work
days and 2 workers per day and holds true the constraint of priorities for the project.
© 2015 Cengage Learning. All Rights Reserved. May not be scanned, copied or duplicated, or posted to a publicly accessible website, in whole or in part.
Another random document with
no related content on Scribd:
The Project Gutenberg eBook of Laulu Ihanista
silmistä
This ebook is for the use of anyone anywhere in the United States
and most other parts of the world at no cost and with almost no
restrictions whatsoever. You may copy it, give it away or re-use it
under the terms of the Project Gutenberg License included with this
ebook or online at www.gutenberg.org. If you are not located in the
United States, you will have to check the laws of the country where
you are located before using this eBook.
Language: Finnish
Runoja
Kirj.
SISÄLLYS:
Pieni lyhty
Jumala poppelien alla
Ikkunassa
Nuori tyttö venheessä
Lohikäärmelaivat
Kahden
Odotus
Vihreän lampun kellarissa
Tuulten ja auringon kuninkaat
Tabu
Hämmentyneet jalat
Filmi
Hiirenpoika
Hiljaisuuden akkunat
Serenaadi
Viimeinen nauru
Resignaatio
Totuus
Viattomat kädet
Kaksinaama
Näkki
Viimeinen laulu
Kauhusilmä
Raatihuoneenkellarissa
Epäonnistunut kysymys
Kerjäläinen
Laulu kaipuusta
Uni
Punarintainen lintu
Kehrääjät
Myllyn lakassa
Rauhaton ritari
Lapsenmurha
Pyövelintalo
Leijonankesyttäjä
Yöllinen teloituspaikka
Salomen tanssi
Pyhä Yrjänä
Tyttöäiti
Kuolema
Koiralaulu
Vanhassa huvimajassa
Tuli sirkus kaupunkiin
Kansansatu
Epilogi
1
PIENI LYHTY
IKKUNASSA
KAHDEN
ODOTUS
Ja kadun ihmiset
on avonaisten kirjekoteloin
tai niinkuin kirjain
viaton sisällys, min lukea mä voin.
Ne kaikki odottaa
nyt nauru, nyt taas murhe huulillaan.
Ja katu odottaa
nyt haudanvaiti, nyt taas kumistessa maan.
Sä olet laskenut
sun ikkunoittes kaikki uutimet,
ja lyhty niille luo
sun kaari-ikkunoittes varjot hopeiset.
Nyt portti kilahtaa.
Kuin soittais tiu'ut saranoissa sen.
Nyt portti kilahtaa:
on onni askeleissas suloinen.
Nauroitko?
Kuulin varmasti kolkutusta puoliyön hetkellä,
arkaa, kuin joku ensi kerran
olisi kolkuttanut.
Moni voi sinulle sanoa aivan turhia sanoja. Minä en. Sillä
minä itse kolkutin sydämesi ovella.
TABU
HÄMMENTYNEET JALAT
Käy kellertävä hämärä kuin paksu, synkkä sumu mun silmieni
eteen. Kuin ahdistava vanne ois päällä rintani.
FILMI
HIIRENPOIKA
Nyt on valonheittäjä
nostanut verenhimoisen kitansa
maanpiirin katolle:
se syö sinut!
HILJAISUUDEN AKKUNAT
SERENAADI
RESIGNATIO