BOQ Material Material Transport

S.No Item Description Qty Uom Final Rate Amount Rate Amount Rate
1 Excavation 30 Cu M 75 2250
2 Transportation 28 Cu M 14 392
3 Backfilling 12 Cu M 62 744
4 PCC 1.2 Cu M 2200 2640 75
5 RCC 4.5 Cu M 2400 10800 75
6 Shuttering 26 Sq M 700 18200 204
7 Steel Fix & Fab 1 MT 10500 10500 740 100

Billing Amount 45526


Material Transport Labour PC Sub-contractor Mach. Depreciation Mach. Operating Cost
Amount Rate Amount Rate Amount Rate Amount Rate Amount
3.1 93 65 1950
10 280
3 36 55 660
400 163
400 163
250
4000 150
Stagging PPR L+M
Rate Amount
68.1 2043
10 280
58 696
125 763 915.6
125 763 3433.5
45 499 12974
4990 4990

Expenditure cost 25332.1