TEST REPORT PLASTICITY INDEX OF SOIL, LIQUID LIMIT & PLASTIC LIMIT (ASTM D4318-17)

CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. REPORTING DATE 14-May-2024

PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLED 8-May-2024

CONSULTANT Aecom DATE SAMPLE RECEIVED 8-May-2024


CLIENT Neom DATE TEST STARTED 8-May-2024
SOURCE Soil Sample ABC Material ( Road Works) DATE TEST COMPLETED 9-May-2024
SAMPLE LOCATION Stockpile Near Wearhouse SAMPLED BY SHAABAN TAHA

ORDER NO NE-QC-O-24-00965 TESTED BY Ahmed Al Far

TEST METHOD ASTM -D 4318 REPORT NO. NE-QC-R-24-04978


WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 SAMPLE NO. NE-QC-S-24-02072

SAMPLE NO BY CLIENT 1

TEST LIQUID LIMIT PLASTIC LIMIT


NO. OF BLOWS 24
A CONTAINER NO. 1 2
A
B
CONTAINER WEIGHT
MASS OF WET SOIL+TARE g
Plastic
15.5
50.6
Limit can not be35.9
determined/ 13.1

C MASS OF DRY SOIL+TARE g 45.2 Non Plastic32.9


MOISTURE CONTENT % (B-C)/(C-A)*100 18.2 15.3
LIMITS LIQUID (L.L) 18 PLASTIC (PL) 15

BLOWS V M.C. General Information


22.00 Test Method Used for LL Single point
Material Used Passing Sieve #40
20.00
Apparatus used for Plastic limit Hand rolled Proc-1
MOISTURE CONTENT %

18.00 Apparatus used for Liquid limit Mechanical


16.00 Moisture content as received (%) 1.9
14.00 Retain% on sieve No.40 73.0
Specimen Preparation Oven Dried
12.00
Type of sample Disturbed
10.00 Grooving tool used Flat & Metallic
8.00 Temperature 23oc
1 10 100
Source of Sample (Bore hole no.) -
NO. OF BLOWS
Depth (m) -

LIQUID LIMIT - PLASTIC LIMIT - PLASTICITY INDEX NP

EQUIPMENT ID EQP-71 SERIAL NUMBER 13/053/26 CALIBRATION DUE DATE 13/07/2024


These results relate only to the samples tested. This report shall not be reproduced except in full, without written approval of Applus Safco.
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3
NEOM LB05-QSP-17-LIMS-F05,Rev.00, Date: 01/11/2022

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 1 of 10
TEST REPORT FOR PARTICLE SIZE DISTRIBUTION (GRADATION) OF SOILS USING SIEVE ANALYSIS
(ASTM D6913M-17)
CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. REPORTING DATE 14-May-2024

PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLED 8-May-2024
CONSULTANT Aecom DATE RECEIVED 8-May-2024
CLIENT Neom DATE STARTED 8-May-2024
SOURCE OF SAMPLE Soil Sample ABC Material ( Road Works) DATE COMPLETED 9-May-2024
SAMPLE LOCATION Stockpile Near Wearhouse SAMPLED BY SHAABAN TAHA

ORDER NUMBER NE-QC-O-24-00965 TESTED BY Yasir Khan

CLASSIFICATION REF. ASTM D2487, ASTM D3282/AASHTO M145 Report No. NE-QC-R-24-04978

WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 SAMPLE NO BY CLIENT 1

M1- Initial Weight (gm) 12589 Calculated dry weight (gm) 12358
100

Description/Sieve Sizes Retain Wt. Cumulative Specification 90


Passing % Passing % Passing Percent 80
(Inch) (mm) (gm) 70
60
3.0 76.20 0 100 100
50
40
2.0 50.80 0 100 100
30
1.5 37.50 0 100 95 - 100 20
10
1.0 25.40 1607 87 70 - 95
0
100 10 1 0.1 0.01 0.001
3/4 19.05 2719 78 55 - 85 Grain size (mm)

1/2 12.70 3831 69

3/8 9.52 4573 63

#4 4.75 5932 52 30 - 60

#10 2.00 7044 43

#30 0.600 9021 27 12 - 30

#100 0.150 10134 18

#200 0.075 10875 12 0 - 8

Gravel % 48 Sand % 40 Silt & Clay % 12 Moisture Content % 1.9

Specification: The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

These results relate only to the samples tested. This report shall not be reproduced except in full, without written approval of Applus Safco.
Teste method used A Sample Preparation Moist Separating sieves used 3/4 inch & #4
Equipment Id Sieve Shaker Serial Number 15/027/04 Calibration Due Date 13/07/2024

NEOM LB05-QSP-17-LIMS-F09,Rev.00, Date: 01/11/2022

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 2 of 10
Test Report For Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-
lbf/ft3 (2,700 kN-m/m3) (ASTM D 1557-12R21)
CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. REPORTING DATE 14-May-2024

PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLING 8-May-2024
CONSULTANT Aecom DATE SAMPLE RECEIVED 8-May-2024
TITLE NAME/CLIENT Neom DATE TEST STARTED 8-May-2024
SOURCE OF SAMPLE Soil Sample ABC Material ( Road Works) DATE TEST COMPLETED 9-May-2024
SAMPLE LOCATION Stockpile Near Wearhouse SAMPLED BY SHAABAN TAHA

ORDER NUMBER NE-QC-O-24-00965 TESTED BY Ahmed Al Far

TEST METHOD ASTM D1557 REPORT NUMBER NE-QC-R-24-04978


WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 SAMPLE NUMBER NE-QC-S-24-02072
SAMPLE NO BY CLIENT 1
SOIL SIEVE DATA TEST PROCEDURE
Sieve Size % Retained Mold Type Diameter (inch) 6
3/4" (19.05 mm) 22 Rammer used Mechanical, Weight 10 lbs, Free fall 18"
3/8" (9.5 mm) 37 No. of Layer 5
#4 (4.75 mm) 48 Prep. method Moist
Test Method C
MOISTURE CONTENT DETERMINATION
CONTAINER NUMBER 1 2 3 4 5
A MASS WET SOIL & TARE , gms. 3844.5 3998.2 4025.9 4066.0 4094.3
B MASS DRY SOIL & TARE gms. 3751.4 3831.9 3806.4 3795.8 3779.2
C TARE MASS gms. 425.6 437.9 429.6 418.4 427.0
D MASS OF WATER gms. A-B 93.1 166.3 219.5 270.2 315.1
E MASS OF DRY SOIL gms. B-C 3325.8 3394.0 3376.8 3377.4 3352.2
F MOISTURE CONTENT % D
/E X 100 2.8 4.9 6.5 8.0 9.4
DRY DENSITY
TRIAL NUMBER 1 2 3 4 5
G MASS OF OF MOLD & WET SOIL
gms. 9565 9872 10028 9978 9901
H MASS OF MOLD gms. 5126 5126 5126 5126 5126
I MASS OF WET SOIL gms. G-H 4439 4746 4902 4852 4775
J VOLUME OF MOLD cm3. 2123 2123 2123 2123 2123
I
K WET DENSITY g/cm3 /J 2.091 2.235 2.309 2.285 2.249
L DRY DENSITY g/cm 3
2.034 2.131 2.168 2.116 2.056
At 100% Saturation: Water Content (Wsat) = (Yw)(Gs)-Yd/(Yd)(Gs)*100 Where, (Gs. = Specific Gravity & Wsat = Moisture Content at 100% saturation (Zero Air Voids)
A WATER CONTENT (%) 8.1 9.2 10.6 үDT = 100 γDFGMγω / (γDFPC+GMγωPF) (ASTM D4718)
B DRY DENSITY (g/cm3) 2.168 2.116 2.056 WT = WFPF + WCPC) (ASTM D4718)

2.180 Moisture content as received (%) 2


2.160 Moisture content of Coarse fraction(%) 0.8
Dry Density (gm/cm3)

2.140 Unit Weight of Water γω (g/cm3) 1.0


2.120 Fine fraction, PF (%) 78
2.100
Coarse fraction, Pc (%) 22
Bulk Specific Gravity (ASTM C-127) 2.63
2.080
Maximum Dry Density g/cm3 2.168
2.060
Optimum Moisture content % 6.5
2.040
Corrected MDD g/cm3 2.255
2.020
0.0 2.0 4.0 6.0 8.0 10.0 12.0
Corrected OMC % 5.2
Maximum Unit Weight (kN/m3) 22.12
Moisture Content (%)
EQUIPMENT ID BALANCE SERIAL NUNBER 8334350366 CALIBRATION DUE DATE 13/07/2024
These results relate only to the samples tested. This report shall not be reproduced except in full, without written approval of Applus Safco.
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3
NEOM LB05-QSP-17-LIMS-F04,Rev.00, Date: 01/11/2022
Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 3 of 10
Test Report For California Bearing Ratio (CBR) of Laboratory-Compacted Soils (AASHTO T193)

CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. REPORTING DATE 14-May-2024

PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLE 8-May-2024

CONSULTANT Aecom DATE TEST RECEIVED 8-May-2024


CLIENT Neom DATE TEST STARTED 9-May-2024
SOURCE Soil Sample ABC Material ( Road Works) DATE TEST COMPLETED 13-May-2024
SAMPLE LOCATION Stockpile Near Wearhouse TESTED BY M. Noor

Order NO. NE-QC-O-24-00965 REPORT NUMBER NE-QC-R-24-04978

TEST METHOD AASHTO T193 SAMPLE NUMBER NE-QC-S-24-02072

WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 SAMPLE NO BY CLIENT 1

No. of Blows 10 30 65
Dry Density g/c.c. 2.087 2.170 2.274
C.B.R. at 0.1" 30.8 66.4 107.5
C.B.R. at 0.2" 27.9 58.8 91.9

Max. Dry Density= 2.255 g/cc Optimum Moisture Content= 5.2 %

120.0
General Information
100.0 M.C % as received 1.9
o
80.0 Temperature C 23.0
C.B.R. at 0.1"

Plasticity Index Non plastic


60.0
Retained % on 3/4 inch 22.0
40.0
Method used in proctor test ASTM D1557

20.0 Sample Condition Soaked

0.0 Surcharge Weights 4.5 kg


2.050 2.100 2.150 2.200 2.250 2.300
Immersion period 96 Hours
Dry Density g/c.c.
3
C.B.R. at 100% of MDD 2.255 gm/cm 100.2 %

Equipment ID CBR MACH. Serial number 7691F-2765 Calibration Due Date 13/07/2024
These results relate only to the samples tested. This report shall not be reproduced except in full, without written approval of Applus Safco.
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3
NEOM LB05-QSP-17-LIMS-F03,Rev.00, Date: 01/11/2022

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 4 of 10
Test Report For California Bearing Ratio (CBR) of Laboratory-Compacted Soils (AASHTO T193)

CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. REPORTING DATE


14-May-2024

PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLED 8-May-2024

CONSULTANT Aecom DATE SAMPLE RECEIVED 8-May-2024

CLIENT Neom DATE TEST STARTED 9-May-2024

SOURCE Soil Sample ABC Material ( Road Works) DATE TEST COMPLETED 13-May-2024

SAMPLE LOCATION Stockpile Near Wearhouse SAMPLED BY SHAABAN TAHA

Order NO. NE-QC-O-24-00965 TESTED BY M. Noor

TEST METHOD AASHTO T193 REPORT NUMBER NE-QC-R-24-04978

WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 SAMPLR NUMBER NE-QC-S-24-02072

SAMPLE NO BY CLIENT 1

Molding Moisture Content Density Determination


Test No. 1 2 3 Test No. 1 2 3
Can No. 1 2 3 Mold Volume cm3 2108 2115 2119
A Mass, Wet Soil + Can g 3885.3 3777.7 3822.2 Mass Sample + Mold g 12977.4 13209.1 13399.1
B Mass, Dry Soil + Can g 3719.8 3613.1 3663.9 Mass Mold g 8351 8375 8339
C Mass, Moisture (A - B) g 165.5 164.6 158.3 Mass Sample g 4626 4834 5060
D Mass, Can g 512.6 524.3 504.7 Unit Wet Mass g 2.195 2.286 2.388
E Mass, Dry Soil (B - D) g 3207.2 3088.8 3159.2 Percent Moisture % 5.16 5.33 5.01
F % Moisture (C / E) x 100 % 5.2 5.3 5.0 Unit Dry Mass cm3 2.087 2.170 2.274
Cross sectional area of plunger= 19.355 cm2
Test No. 1 Test No. 2 Test No. 3
Penetration

Molded A Tested Molded B Tested Molded C Tested


mm

Total Unit Corr. % Total Unit Corr. % Total Unit Corr. %


Reading Load Load Load Reading Load Load Load Reading Load Load Load
CBR CBR CBR
(kN) kg kg/cm2 kg/cm2 (kN) kg kg/cm2 kg/cm2 (kN) kg kg/cm2 kg/cm2
0 0.00 0.0 0.00 0.00 0.0 0.00 0.00 0.0 0.00
0.64 1.10 112.7 5.82 2.51 255.6 13.21 3.91 398.4 20.58
1.27 2.21 225.3 11.64 5.19 529.5 27.36 7.81 796.8 41.17
1.90 3.26 332.6 17.19 7.58 773.0 39.94 11.29 1150.9 59.46
2.54 4.10 418.6 21.63 30.8 8.86 903.1 46.66 66.4 14.35 1462.8 75.58 107.5
3.18 4.82 491.0 25.37 10.05 1024.8 52.95 16.05 1637.0 84.58
3.81 5.19 529.1 27.34 10.79 1099.8 56.82 17.11 1745.0 90.16
4.45 5.43 553.3 28.59 11.41 1163.1 60.09 17.92 1827.5 94.42
5.08 5.58 568.9 29.39 27.9 11.78 1201.6 62.08 58.8 18.40 1876.1 96.93 91.9
6.35 5.71 581.9 30.07 12.10 1233.7 63.74 18.95 1932.7 99.85
7.62 5.84 596.0 30.79 12.43 1267.8 65.50 19.38 1976.2 102.10
10.00 5.92 604.1 31.21 12.58 1283.1 66.29 19.51 1989.5 102.79
13.00 6.06 618.4 31.95 12.78 1303.5 67.35 19.61 1999.7 103.31
120.0
Test No. 1 2 3
100.0
Blows Per Lift 10 30 65
Final Reading mm 117.18 117.16 117.14 80.0
Unit Load (Kg/cm2)

Initial Reading mm 117.10 117.10 117.10 60.0


Difference mm 0.08 0.06 0.04 40.0
Sample Length mm 117.0 117.0 117.0 20.0
Percent Swell % 0.1 0.1 0.0 10 Blows
0.0
30 Blows
0.00 3.00 6.00 9.00 12.00 15.00
Penteration(mm) 65 Blows

EQUIPMENT ID CBR MACHINE SERIAL # 7691F-2765 CALIBRATION DUE DATE 13/07/2024


NEOM LB05-QSP-17-LIMS-F03,Rev.00, Date: 01/11/2022

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 5 of 10
Test Report For Sand Equivalent Value of Soils and Fine Aggregate ASTM D2419-22

Contractor HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD.

Project Outer Region - Neom Community 1 Expansion - Utilities

Consultant Aecom Date Report 14-May-2024

Client NEOM Date of Sampling 8-May-2024

Sampling Method ASTM D75 Sample Received 8-May-2024

Source Soil Sample ABC Material ( Road Works) Date Test Started 9-May-2024

Job Order No. NE-QC-O-24-00965 Date Completed 9-May-2024

Report Number NE-QC-S-24-02072 Sampled By SHAABAN TAHA

WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 Tested By M. Asif


Sample No. By Client 1

RESULTS

TRIAL NO.1 TRIAL NO. 2 TRIAL NO.3 REMARKS

CLAY READING 5.5 5.8 5.6

SAND READING 2.9 3.1 2.9

SAND EQUIVALENT 52.7 53.4 51.8

CORRECTED S.E READINGS 53 54 52

Average Sand Equivalent 53.0

Corrected Sand Equivalent 53

SPECIFICATIONS: Minimum 30%


The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 6 of 10
Test Report For Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate (ASTM
C88-24)
CONTRACTOR HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. DATE REPORT 14-May-2024
PROJECT Outer Region - Neom Community 1 Expansion - Utilities DATE SAMPLING 8-May-2024
CONSULTANT Aecom DATE SAMPLE RECEIVED 8-May-2024
CLIENT Neom DATE TEST STARTED 8-May-2024
SAMPLING METHOD ASTM-D75 DATE TEST COMPLETED 14-May-2024
SOURCE Soil Sample ABC Material ( Road Works) SAMPLED BY SHAABAN TAHA
SAMPLE LOCATION Stockpile Near Wearhouse TESTED BY M. Asif
Order NO NE-QC-O-24-00965 CLIENT REF. NO 1
WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530

% Retained Weight of sample Loss in wt. % Loss Corr. Avg.


A S T M SIEVE SIZE of original Before After After Test After Test % loss
sample grams grams grams gram
Passing Retained A B C D E F
Fine Fraction
No.50 300 µm 20 - - - - -
No. 30 600 µm No. 50 300 µm 7 100.0 84.2 15.8 15.8 1.1
No. 16 1.18 mm No. 30 600 µm 6 100.0 80.3 19.7 19.7 1.2
No. 8 2.36 mm No. 16 1.18 mm 13 100.0 80.3 19.7 19.7 2.5
No. 4 4.75 mm No. 8 2.36 mm 6 100.0 82.4 17.6 17.6 1.1
No. 4 4.75 mm 48
TOTAL 100.0 6
Passing Retained Coarse Fraction
NO.4 4.75 mm 52
3/8" 9.50 mm No. 4 4.75 mm 11 301.2 255.6 45.6 15.1 1.7
3/4" 19.0 mm 3/8" 9.50 mm 15 1003.2 845.6 157.6 15.7 2.4
1 1/2" 37.5 mm 3/4" 19.0 mm 22 1515.6 1302.5 213.1 14.1 3.1
2 1/2" 63.0 mm 1 1/2" 37.5 mm 0
TOTAL 100.0 7
Note: 100 gm Sieve #4 to sieve #50

300±5 gm 3/8" to #4

D=B-C 1000±10 gm 3/4" to 3/8" =consist of 67% from 3/4" - 1/2" and 33% from 1/2" - 3/8".
E = (D/B) * 100 1500±50 gm 1 1/2" to 3/4" =consist of 67% from 1 1/2" -1.0" and 33% from 1 - 3/4".
F = (A*E) / 100 5000±300 gm 1 1/2" to 2 1/2"= consist of 60% 2 1/2" - 2.0" and 40% 1 1/ 2- 2".
Comments on Test Results:
2. Sample Tested with = Sodium Sulfate
3. Maximum allowed loss as per specifications = 12%
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3
Equipment id EQP 163 Serial number W1205619 Calibration Due Date 13/07/2024
These results relate only to the samples tested. This report shall not be reproduced except in full, without written approval of Applus Safco.
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 7 of 10
Test Report For Resistance to Degradation of Small-Size Coarse Aggregate by
Abrasion and Impact in the Los Angeles Machine (ASTM C131-20)
Contractor HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD.
Project Outer Region - Neom Community 1 Expansion - Utilities
Consultant Aecom Date Report 14-May-2024
Client NEOM Date of Sampling 8-May-2024
Sampling Method ASTM D75 Sample Received 8-May-2024
Source Soil Sample ABC Material ( Road Works) Date Test Started 11-May-2024
Sample Location Stockpile Near Wearhouse Date Completed 11-May-2024
Sample No. NE-QC-S-24-02072 Sampled By SHAABAN TAHA
WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 Tested By M. Asif
Job Order No. NE-QC-O-24-00965 Sample # by Client 1
SEIVES (SQUARE OPENING) WEIGHT OF INDICATED SIZES (gm)
GRADING
PASSING RETAINED A B C D
1.5" 1" 1250±25
1" 3/4" 1250±25
3/4" 1/2" 1250±25 2500±10
1/2" 3/8" 1250±25 2500±10
3/8" 1/4" 2500±10
1/4" #4 2500±10
#4 #8 5000±10
TOTAL SAMPLE (gm) 5000±10 5000±10 5000±10 5000±10
NO. OF SPHERE USED 12 11 8 6
A. Weight of sample before test 5006.5
B. Weight of sample after test (Retained on sieve No.12) 3497.8
C. Grading Used A
D.Number of Sphere used 12.0
E. Percentage of wear 30
E. Maximum allowable loss 40%
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

Equipment id EQP 039 Serial number 15/091/04 Calibration Due 13/07/2024

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 8 of 10
Test Report Of Flat and Elongated Particles in Coarse Aggregate
ASTM D4791-19
Contractor HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. Date Report 14-May-2024
Project Outer Region - Neom Community 1 Expansion - Utilities Date of Sampling 8-May-2024
Consultant Aecom Date Sample Received 8-May-2024
Client Neom Date Test Started 12-May-2024
Source Soil Sample ABC Material ( Road Works) Date Test Completed 12-May-2024
Sample Location Stockpile Near Wearhouse Sampled By SHAABAN TAHA
Order No. NE-QC-O-24-00965 Tested By M. Asif
Test Method BS 812 Report No. NE-QC-R-24-04978
WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 Sample No NE-QC-S-24-02072
Sample No. By Client 1

SIEVE SIZE (mm) WEIGHTS OF PERCENTAGE PASSING ON


ORIGNAL WEIGHT OF PARTICLES WEIGHT OF AVERAGE
TEST
GRADING FRACTIONS
(Grams) INDIVIDUAL SIEVE CORRECTED %
PASSING RETAINED Percent Grams FLAT ELONGATE FLAT ELONGATE COMBINED

63.0 50.0 0.0 - - - - -

50.0 37.5 0.0 - - - -

37.5 25.0 13.0 10423.40 740.5 758.9 7.1 7.3 1.87

25.0 19.0 9.0

19.0 12.5 9.0

12.5 9.5 6.0

9.5 4.75 11.0 1245.60 90.5 98.7 7.3 7.9 1.67

4.75 52.0

TOTAL 100.0 4

Specification Limit Maximum 5%


Dimension Ratio Used 1:5
Test Result 4
The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)

It is a pdf document that has been generated electronically and is digitally signed, so it does not require manual signing
Page 9 of 10
Test Report For Determining the Percentage of Fractured Particles in Coarse Aggregate(Two
Faces) ASTM D 5821-13R17
Contractor HASSAN ALLAM SAUDI CONSTRUCTION CO.LTD. Date Report 14-May-24

Project Outer Region - Neom Community 1 Expansion - Utilities Date Sampled 08-May-24

Consultant Aecom Date Received 08-May-24

Client Neom Date Satarted 11-May-24

Source Soil Sample ABC Material ( Road Works) Date Completed 11-May-24

Sample Location Stockpile Near Wearhouse Sampled By SHAABAN TAHA

Order No. NE-QC-O-24-00965 Tested By M. Asif

Test Method ASTM -D 4318 Report No. NE-QC-R-24-04978

WIR NO. 14-621830-4800000771-HAC-CIV-WIR-002530 Sampled No. by Client 1

Determination 1 2 3

Aggregate Size 37.5 mm 25.0 mm 9.5 mm

F Mass of fractured particles with at least the specified


number of fractured faces 7345.6 3140.2 250.4

N Mass of particles in the no-fractured category not


meeting the fractured particles criteria 405.6 154.8 19.8

P Percentage of particles with the specified number of


fractured faces 95 95 93

Average two fractured faces 94

*Average Percentage of Fractured Particles = 94 %


*Specification of Base Course Minimum = 90 %
*These results relate only to the samples tested. This report shall not be reproduced except in full, without
written approval From SAFCO.

The tested Soil Sample Comply the Required Agg. Base Course Project Specifications 321100-6 Section 2.3

- End of Report - Checked By: CH.ZUBAIR (LabSupervisor) Approved By: Eng.Miqdad (Lab.Manager)