RUMAILA OPERATING ORGANISATION

FLANGE MANAGEMENT PROCEDURE

3.4 Order of Precedence

The following hierarchy shall apply to the WORK

1. Statutory Iraqi Laws and Regulations


2. CONTRACT terms and conditions
3. The Material Requisition
4. This PROJECT Specification
5. Other Industry codes and standards
6. Recognised Contractor, Manufactures and Technology specifications

In the event of ambiguity or contradiction between the above, precedence shall be given in the order
listed above. In the event of ambiguity or contradiction within the SPECIFICATION, CONTRACTOR
shall apply the most onerous requirement. In all cases, CONTRACTOR shall seek APPROVAL via an
Engineering or Technical Query before proceeding.

For the avoidance of doubt, hierarchy stipulations in any other document within the SPECIFICATION
are superseded by the above hierarchy.

International codes and standards shall be the latest edition and latest addenda at the time of
CONTRACT award.