CHECKLIST FOR INSTALLATION OF TRANSFER PUMPS Location / Area : Date : Drawing No : Name Plate Details Pump Make: Pump Model: Serial No.: Motor Make: Motor Model: Serial No.: SR Verified Activities / Items to be inspected NO. Yes/ No N/A Remarks
1 The pumps installed are as per the approved TDS
2 The shop drawings are approved
3 Name plate details checked and recorded
4 The foundation is checked for proper level
Check the space around the pump is accessible
5 maintenance, service and inspection Neoprene Vibration isolation pads are provided between 6 the pump base and foudation as recommended by manufacturer
7 Check the orientation of the pump is correct
The pump is properly bolted and levelled on the
8 foundation The piping connection to suction and delivery sides with 9 valves and accessories are installed as per approved shop drawing
10 The flange joint bolts are properly tightened to avoid leak
The power cable are terminted to the motor terminals and
11 properly tightened.
12 The motor body is earthed as per recommendations