Risk Assessment

LIBYA FAST TRACK POWER PLANT PJ


Project Title: TEMPORARY OFFICE CONSTRUCTION FACILITIES Project No: OD23116

Risk Assessment RISK ASSESSMENT FOR SCAFFOLDING ERECTION AND Risk Assessment INT/DEC-MIS/ADD/
DISMANTLING
Revision: 00
Title : Number: OD23116/OPS-008-03
Work Location: MISURATA SITE Company: INTECH

Prepared By Reviewed By Approved By


Name Signature Date Name Signature Date Name Signature Date
Mukesh Sharma 04/09/2023

Risk Assessment Matrix:

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 1 of 6
Risk Assessment

Potential Risk
(With no controls in place) Residual
Risk
Hazard

Probability
Sequence of Legal

(1,2,3,4,5)

(1,2,3,4,5)
Hazards Control Measures

Severity
Effects / Risk

Rating
Sr. No Tasks / Job Requirements Recovery

Risk
Steps (Potential to cause harm Consequences (If Any) Ranking
(Health, Injury, Property (with controls Measures
damage, environment etc.) (The harm which could in place)
possibly occur).

 Fall of lifted
object.
 Lack of 
 PTW Get authorization for
communicatio Permit to work.
Major injury-  Training
Pre-work n  First Aid
Fatality,  Competency  Conduct Toolbox Talk
arrangements  Striking with  Medical
1 adjacent Equipment 2 2 4  Erection/Dismantling 1 Treatment
structure. and Asset by Trained and
 Weather damage competent Person
condition.

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 2 of 6
Risk Assessment

2 . Erection of  Fall of objects / Major injury- 3 3 9  PTW 1  First Aid


the Tools Fatality,  Training  Ensure PTW,  Medical
Scaffolding  Accidental Fall Equipment Competency  RA are relevant to the Treatment
of Person damage task being performed.
 Unstable
Scaffold  Site should have zero
 Damaged tolerance for taking
Scaffold short cuts and should
 Modified have a system in place
Scaffold to identify those who
 Improperly do so and apply
Supported consequences
Scaffold management
 Incomplete accordingly.
Scaffold
 Recognition for
workers/supervisor
adopting correct and
safe system of work.

 A pre-task meeting
shall be held with all
personnel involved in
the activity to ensure
that all are aware &
understand the
contents of the R.A.
the PTW, including
actions to be taken in
the event of an
emergency.

 Supervisor shall
ensure that all
personnel understand
their duties and
responsibilities.

 Workforce shall be

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 3 of 6
Risk Assessment
aware of Emergency
Response Plan ERP
(raised in TBT).
 Competent certifies
personnel shall
allowed to eret the
scaffold
 The inspection of the
scaffold shall be done
by a scaffolding
supervisor
 The Scaffolding
equipment’s shall be
certified approved
 The ground condition
shall be consider prior
to erect.
 Make sure the
scaffolding parts are
clear from the valve
and pipe utilities
 Tag system shall be
followed
 The tools and
equipment shall be
secured and properly
tied off
 The fall protection
shall be made
 Fall prevention shall,
be confirmed
 The fall protection
shall be inspected and
safe to use
 Make sure the proper
 PPes
 The area shall be

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 4 of 6
Risk Assessment
barricaded with
signages
 The materials shall not
be throwed from the
work height
 The leather bags shall
be used for
lifting/shifting
 Use the gin wheel if
applicable
 Make sure the Pinch
points
 Ladder shall be raised
at last 1 m above from
the landing platform
 The loose materials
shall not be kept at
the working platform
 Do not carry tools
while climbing
3 Dismantling of  Fall of objects / Major injury- 3 3 9  PTW  Take proper care while 1 First Aid
Scaffold Tools. Fatality,  Training dismantling the  Medical
 Accidental Fall
Equipment, Competency scaffold to prevent fall Treatme
of Person
Assets damage of scaffold parts. nt
 Unstable
Scaffold  Hand tools to be tied
 Damaged with permanent
Scaffold structure or person.
 Loaded  Use proper PPE
Scaffolding during dismantle of
 Exposure of scaffold.
worker to line  If required barricade
of fire the area during
dismantle work.
 The Scaffolder must
use Safety Harness to
prevent accidental fall.
 Inspect the scaffold for

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 5 of 6
Risk Assessment
its stability & support
before dismantle in
sequence. While
removal red color scaff
tag must be present to
ensure no body uses
the scaffold.
 The scaffolding is to
be inspected for any
damage after erection
and before
dismantling.
 Take extreme care
while removing a loose
part / attachment from
the scaffold.
 Remove safely the
load / equipment /
plant from the scaffold
before dismantling the
scaffold
 Arrange the
dismantled parts of the
scaffold and stack
properly. First Aid
 PTW  Segregate different  Medical
4 Scattered Materials 3 2 6 1 Treatme
Housekeeping Training parts of scaffold and
Defective Part nt
Competency store it separately.
 Remove and discard
the defective parts /
attachment from the
scaffold storage.

INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 6 of 6