3.risk Assessment For Scaffolding Erection and Dismantling
3.risk Assessment For Scaffolding Erection and Dismantling
3.risk Assessment For Scaffolding Erection and Dismantling
Risk Assessment RISK ASSESSMENT FOR SCAFFOLDING ERECTION AND Risk Assessment INT/DEC-MIS/ADD/
DISMANTLING
Revision: 00
Title : Number: OD23116/OPS-008-03
Work Location: MISURATA SITE Company: INTECH
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 1 of 6
Risk Assessment
Potential Risk
(With no controls in place) Residual
Risk
Hazard
Probability
Sequence of Legal
(1,2,3,4,5)
(1,2,3,4,5)
Hazards Control Measures
Severity
Effects / Risk
Rating
Sr. No Tasks / Job Requirements Recovery
Risk
Steps (Potential to cause harm Consequences (If Any) Ranking
(Health, Injury, Property (with controls Measures
damage, environment etc.) (The harm which could in place)
possibly occur).
Fall of lifted
object.
Lack of
PTW Get authorization for
communicatio Permit to work.
Major injury- Training
Pre-work n First Aid
Fatality, Competency Conduct Toolbox Talk
arrangements Striking with Medical
1 adjacent Equipment 2 2 4 Erection/Dismantling 1 Treatment
structure. and Asset by Trained and
Weather damage competent Person
condition.
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 2 of 6
Risk Assessment
A pre-task meeting
shall be held with all
personnel involved in
the activity to ensure
that all are aware &
understand the
contents of the R.A.
the PTW, including
actions to be taken in
the event of an
emergency.
Supervisor shall
ensure that all
personnel understand
their duties and
responsibilities.
Workforce shall be
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 3 of 6
Risk Assessment
aware of Emergency
Response Plan ERP
(raised in TBT).
Competent certifies
personnel shall
allowed to eret the
scaffold
The inspection of the
scaffold shall be done
by a scaffolding
supervisor
The Scaffolding
equipment’s shall be
certified approved
The ground condition
shall be consider prior
to erect.
Make sure the
scaffolding parts are
clear from the valve
and pipe utilities
Tag system shall be
followed
The tools and
equipment shall be
secured and properly
tied off
The fall protection
shall be made
Fall prevention shall,
be confirmed
The fall protection
shall be inspected and
safe to use
Make sure the proper
PPes
The area shall be
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 4 of 6
Risk Assessment
barricaded with
signages
The materials shall not
be throwed from the
work height
The leather bags shall
be used for
lifting/shifting
Use the gin wheel if
applicable
Make sure the Pinch
points
Ladder shall be raised
at last 1 m above from
the landing platform
The loose materials
shall not be kept at
the working platform
Do not carry tools
while climbing
3 Dismantling of Fall of objects / Major injury- 3 3 9 PTW Take proper care while 1 First Aid
Scaffold Tools. Fatality, Training dismantling the Medical
Accidental Fall
Equipment, Competency scaffold to prevent fall Treatme
of Person
Assets damage of scaffold parts. nt
Unstable
Scaffold Hand tools to be tied
Damaged with permanent
Scaffold structure or person.
Loaded Use proper PPE
Scaffolding during dismantle of
Exposure of scaffold.
worker to line If required barricade
of fire the area during
dismantle work.
The Scaffolder must
use Safety Harness to
prevent accidental fall.
Inspect the scaffold for
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 5 of 6
Risk Assessment
its stability & support
before dismantle in
sequence. While
removal red color scaff
tag must be present to
ensure no body uses
the scaffold.
The scaffolding is to
be inspected for any
damage after erection
and before
dismantling.
Take extreme care
while removing a loose
part / attachment from
the scaffold.
Remove safely the
load / equipment /
plant from the scaffold
before dismantling the
scaffold
Arrange the
dismantled parts of the
scaffold and stack
properly. First Aid
PTW Segregate different Medical
4 Scattered Materials 3 2 6 1 Treatme
Housekeeping Training parts of scaffold and
Defective Part nt
Competency store it separately.
Remove and discard
the defective parts /
attachment from the
scaffold storage.
INT/DEC-MIS/ADD/OD23116/OPS-008-03 Page 6 of 6