UNIVERSITI TEKNOLOGI MARA (UiTM) SHAH ALAM

COLLEGE OF BUILT ENVIRONMENT (CBE)

PROGRAMME SCIENCE (HONOR) CONSTRUCTION MANAGEMENT


(CFAP246)

SEMESTER II SESSION 2023/2024

Questionnaire Form :

SUSTAINABLE URBAN DRAINAGE SYSTEM (SUDS) PROJECT FOR


TOWNSHIP FLOOD MANAGEMENT

Information to respondent
We are conducting this survey to fulfill our studies of the Soil Mechanics, Earthwork,
and Retaining Structures course (CMA423). The aim is to study the drainage systems
utilized in an urban area to control and manage the municipality during floods. All
information provided will be kept confidential and will only be used for research
purposes.

PART A : RESPONDENT DEMOGRAFIC DATA


Directions : Mark (/) inside the box given.

1) GENRE
Male ( ) Female ( )
2) AGE
Under 18 years old ( ) 19 – 25 years old ( )
26 – 30 years old ( ) 30 years old and above ( )
3) RACE
Melayu ( ) Cina ( )

India ( ) Lain-lain ( )

4) POSITION :

5) CONTRACTOR GRED :
PART B : RESEARCH QUESTION

1) Company Name :

_____________________________________________________________________

2) Location :

______________________________________________________________________

______________________________________________________________________

3) Company Established Date :

______________________________________________________________________

4) Type of Drainage System :

______________________________________________________________________

5) What is the factor build this type of Drainage System in this urban area ? :

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

6) What is the important of this Drainage System to community and environment ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

7) What type of building system (in-situ/precast) that company execute to build Drainage
System ?

______________________________________________________________________
8) Why does the company used that system (in-situ/precast) in this urban area ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

9) Size and Dimension of Drainage System :

Length : _______________________________________________________________

Wide : ________________________________________________________________

Width : _______________________________________________________________

Diameter : _____________________________________________________________

10) How much does it cost to build this Drainage System ? and what type of material,
machines, transportation and instrument that company used ?

1. Material

(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________

2. Machines

(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________

3. Transportation

(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________

4. Instrument

(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________

5. Employer salary : __________________________________________________


Total employer : _____________________________________________________
Overall cost : _______________________________________________________

11) Scope Project : ______________________________________________________

______________________________________________________________________
12) Who are the responsibility (leader) in handling this Drainage System project ?

______________________________________________________________________

13) Who approves the project management plan of Drainage System in this urban area ?

______________________________________________________________________

14) What element that company practices during the process of building Drainage System ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

15) What is the environment issues that company faced during the process to build Drainage
System project ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

16) Apart from preventing floods, what is other objective that company choose in order to
build this type of Drainage System in this area ?

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

You might also like