Professional Documents
Culture Documents
Borang Soal Selidik Drainage
Borang Soal Selidik Drainage
Questionnaire Form :
Information to respondent
We are conducting this survey to fulfill our studies of the Soil Mechanics, Earthwork,
and Retaining Structures course (CMA423). The aim is to study the drainage systems
utilized in an urban area to control and manage the municipality during floods. All
information provided will be kept confidential and will only be used for research
purposes.
1) GENRE
Male ( ) Female ( )
2) AGE
Under 18 years old ( ) 19 – 25 years old ( )
26 – 30 years old ( ) 30 years old and above ( )
3) RACE
Melayu ( ) Cina ( )
India ( ) Lain-lain ( )
4) POSITION :
5) CONTRACTOR GRED :
PART B : RESEARCH QUESTION
1) Company Name :
_____________________________________________________________________
2) Location :
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
5) What is the factor build this type of Drainage System in this urban area ? :
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
7) What type of building system (in-situ/precast) that company execute to build Drainage
System ?
______________________________________________________________________
8) Why does the company used that system (in-situ/precast) in this urban area ?
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
Length : _______________________________________________________________
Wide : ________________________________________________________________
Width : _______________________________________________________________
Diameter : _____________________________________________________________
10) How much does it cost to build this Drainage System ? and what type of material,
machines, transportation and instrument that company used ?
1. Material
(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________
2. Machines
(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________
3. Transportation
(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________
4. Instrument
(a)
(b)
(c)
(d)
(e)
(f)
(g)
cost : ___________________________________________________________
______________________________________________________________________
12) Who are the responsibility (leader) in handling this Drainage System project ?
______________________________________________________________________
13) Who approves the project management plan of Drainage System in this urban area ?
______________________________________________________________________
14) What element that company practices during the process of building Drainage System ?
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
15) What is the environment issues that company faced during the process to build Drainage
System project ?
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
16) Apart from preventing floods, what is other objective that company choose in order to
build this type of Drainage System in this area ?
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________
______________________________________________________________________