WATER MANAGEMENT DEPARTMENT

BHILAI STEEL PLANT

PROTOCOL FOR EARTHWORK EXCAVATION BETWEEN TRACK


# 451 & 452 NEAR SMS-2 SCRAP YARD FOR REPAIR OF DIA.
300 MM UNDER GROUND PIPELINE OF RHD-1 PUMP HOUSE.

Date- . 01 .2019 Duration: 09:00 AM to 05:30 PM

S.N. Preparatory Jobs Responsibility


1. Shifting of dewatering pumps near site. AGM (WMD)
2. Ensuring availability of Welding machine and cutting DGM (Mech.) SMS-2
set.
3. Arrangement for red flag & barricading tape. DGM (Mech.) SMS-2
4. Ensuring slow movement of loco on track # 451 &
452.

Execution of Job
S.N Activities Duration Responsibility
1. Clearance from Raw Material 09:00 AM AGM (WMD)
Station/P-Way for starting AGM (P. Way)
excavation work.
2. Excavation near track. 9.15AM to 12:00 PM AGM (WMD)
3. Repair work of pipeline 12:00 PM – 04:00 PM DGM(Mech.)SMS-2
4. Back filling and soiling of area. 04:00 PM-05:00 PM DGM(Mech.)SMS-2
5. Clearance to P way for normal 05:30 PM DGM(Mech.)SMS-2
movement on the track. AGM (WMD)
SAFETY PRECAUTIONS
S.N. Safety precautions Responsibility
1. All safety precautions will be taken in welding, cutting, DGM (Mech.) SMS-2
& pipe handling.
2. Double earthing should be ensured for welding DGM (Mech.) SMS-2
machine, if required.
3. Display of RED banner at both ends of affected area . DGM (Mech.) SMS-2
4. Keen supervision of job will be done. DGM (Mech.) SMS-2
5. Every person working in the vicinity of track will stay DGM (Mech.) SMS-2
around 3.0 Mtrs. Away from moving train whenever
they will be alerted by the supervisor.
6. All the equipments involved for carrying out the job DGM (Mech.) SMS-2
will be moved away at safe distance from the moving
train.

Contd…
-2-

S.N. Safety precautions Responsibility


7. Ensuring slow loco movement on the tracks from the DGM (Mech.) SMS-2
Traffic Department.
8. Before commencing the work, intimation will be given DGM (Mech.) SMS-2
to the concerned area in-charge of signaling and PWI
(T&D).
9. After completion of job, intimation will be given to all DGM (Mech.) SMS-2
the concerned area in-charge of the section (T&D).
10. Housekeeping of the area after the completion of work DGM (Mech.) SMS-2
will be maintained.
11. At the start of job safety talk will be given to all the DGM (Mech.) SMS-2
persons involved in the job.
12. Manual digging will be done wherever signal cable will DGM (Mech.) SMS-2
pass.

Sr. Mgr. AGM (Signaling) AGM (Safety)


RM Station T&D T&D

AGM (PLM-II) DGM (Traffic) DGM (P-Way)


WMD T&D T &D

DGM &DSO DGM (P-Way) DGM I/c


WMD T&D T&D

DGM I/c (Mech.) DGM I/c DGM I/c


SMS-2 RMD WMD
WATER MANAGEMENT DEPARTMENT
BHILAI STEEL PLANT

PROTOCOL FOR SHUTDOWN OF TRACK # 452 NEAR SMS-2


SCRAP YARD FOR LAYING OF DIA. 300 MM PIPELINE UNDER
THE TRACK FOR RHD-1 PUMP HOUSE.

Date- 28 .11.2018 Duration : 09:00 AM to 05:30 PM

S.N. Preparatory Jobs Responsibility


1. Shifting of pipes near site. DGM (Mech.) SMS-2
2. Ensuring availability of Welding machine and cutting DGM (Mech.) SMS-2
set.
3. Arrangement for red flag & barricading tape. DGM (Mech.) SMS-2

Execution of Job
S.N Activities Duration Responsibility
1. Clearance from Raw Material 09:00 AM AGM (WMD)
Station/P-Way for track AGM (P. Way)
shutdown.
2. Excavation under the track. 9.15AM to 01:00 PM DGM (Mech.)SMS-2
3. Laying and alignment of pipeline 01:00 PM – 03:00 PM DGM(Mech.)SMS-2
4. Back filling and soiling of area 03:00 PM-05:00 PM DGM(Mech.)SMS-2
under the track
5. Clearance to P way for removal 05:30 PM DGM(Mech.)SMS-2
of block on the track AGM (WMD)

SAFETY PRECAUTIONS
S.N. Safety precautions Responsibility
1. All safety precautions will be taken in welding, cutting, DGM (Mech.) SMS-2
& pipe handling.
2. Double earthing should be ensured for welding DGM (Mech.) SMS-2
machine, if required.
3. Display of RED banner at both ends affected area DGM (Mech.) SMS-2
across the track.
4. Keen supervision of job will be done. DGM (Mech.) SMS-2
5. Every person working in the vicinity of track will stay DGM (Mech.) SMS-2
around 3.0 Mtrs. Away from moving train whenever
they will be alerted by the supervisor.
6. All the equipments involved for carrying out the job DGM (Mech.) SMS-2
will be moved away at safe distance from the moving
train.

Contd…
-2-

S.N. Safety precautions Responsibility


7. Line block will be taken from the Traffic Department. DGM (Mech.) SMS-2
8. Before commencing the work, intimation will be given DGM (Mech.) SMS-2
to the concerned area in-charge of signaling and PWI
(T&D).
9. After completion of job, intimation will be given to all DGM (Mech.) SMS-2
the concerned area in-charge of the section (T&D).
10. Housekeeping of the area after the completion of work DGM (Mech.) SMS-2
will be maintained.
11. At the start of job safety talk will be given to all the DGM (Mech.) SMS-2
persons involved in the job.
12. Manual digging will be done wherever signal cable will DGM (Mech.) SMS-2
pass.

Sr. Mgr. AGM (Safety)


RM Station T&D

AGM (Signaling) AGM (PLM-II) DGM (Traffic)


T&D WMD T&D

DGM &DSO DGM (PLM) DGM (P-Way)


WMD WMD T&D

DGM I/c (Mech.) DGM I/c DGM I/c


SMS-2 T&D WMD
WATER MANAGEMENT DEPARTMENT
BHILAI STEEL PLANT

PROTOCOL FOR SHUTDOWN OF TRACK # 451 NEAR SMS-2


SCRAP YARD FOR LAYING OF DIA. 300 MM PIPELINE UNDER
THE TRACK FOR RHD-1 PUMP HOUSE.

Date- .11.2018 Duration : 09:00 AM to 05:30 PM

S.N. Preparatory Jobs Responsibility


1. Shifting of pipes near site. DGM (Mech.) SMS-2
2. Ensuring availability of Welding machine and cutting DGM (Mech.) SMS-2
set.
3. Arrangement for red flag & barricading tape. DGM (Mech.) SMS-2

Execution of Job
S.N Activities Duration Responsibility
1. Clearance of In-charge shipping 09:00 AM DGM (P.Mill)
area Plate Mill/P Way for track AGM (P. Way)
shutdown.
2. Excavation under the track. 9.15AM to 01:00 PM DGM (Mech.)SMS-2
3. Laying and alignment of pipeline 01:00 PM – 03:00 PM DGM(Mech.)SMS-2
4. Back filling and soiling of area 03:00 PM-05:00 PM DGM(Mech.)SMS-2
under the track
5. Clearance to P way for removal 05:30 PM DGM(Mech.)SMS-2
of block on the track AGM (WMD)

SAFETY PRECAUTIONS
S.N. Safety precautions Responsibility
1. All safety precautions will be taken in welding, cutting, DGM (Mech.) SMS-2
& pipe handling.
2. Double earthing should be ensured for welding DGM (Mech.) SMS-2
machine, if required.
3. Display of RED banner at both ends affected area DGM (Mech.) SMS-2
across the track.
4. Keen supervision of job will be done. DGM (Mech.) SMS-2
5. Every person working in the vicinity of track will stay DGM (Mech.) SMS-2
around 3.0 Mtrs. Away from moving train whenever
they will be alerted by the supervisor.
6. All the equipments involved for carrying out the job DGM (Mech.) SMS-2
will be moved away at safe distance from the moving
train.

Contd…
-2-

S.N. Safety precautions Responsibility


7. Line block will be taken from the Traffic Department. DGM (Mech.) SMS-2
8. Before commencing the work, intimation will be given DGM (Mech.) SMS-2
to the concerned area in-charge of signaling and PWI
(T&D).
9. After completion of job, intimation will be given to all DGM (Mech.) SMS-2
the concerned area in-charge of the section (T&D).
10. Housekeeping of the area after the completion of work DGM (Mech.) SMS-2
will be maintained.
11. At the start of job safety talk will be given to all the DGM (Mech.) SMS-2
persons involved in the job.
12. Manual digging will be done wherever signal cable will DGM (Mech.) SMS-2
pass.

Sr. Mgr. AGM (Safety) AGM (P-Way)


RM Station T&D T&D

AGM (Signaling) AGM (PLM-II) DGM (Traffic)


T&D WMD T&D

DGM &DSODGM (PLM) DGM I/c


WMD WMD WMD

DGM I/c (Mech.) DGM I/c DGM I/c


SMS-2 T&D RMD
WATER MANAGEMENT DEPARTMENT
BHILAI STEEL PLANT

PROTOCOL FOR SHUTDOWN OF TRACK # 426 NEAR SMS-2


SCRAP YARD FOR LAYING OF DIA. 300 MM PIPELINE UNDER
THE TRACK FOR RHD-1 PUMP HOUSE.

Date- .11.2018 Duration : 09:00 AM to 05:30 PM

S.N. Preparatory Jobs Responsibility


1. Shifting of pipes near site. DGM (Mech.) SMS-2
2. Ensuring availability of Welding machine and cutting DGM (Mech.) SMS-2
set.
3. Arrangement for red flag & barricading tape. DGM (Mech.) SMS-2

Execution of Job
S.N Activities Duration Responsibility
1. Clearance of In-charge shipping 09:00 AM DGM (P.Mill)
area Plate Mill/P Way for track AGM (P. Way)
shutdown.
2. Excavation under the track. 9.15AM to 01:00 PM DGM (Mech.)SMS-2
3. Laying and alignment of pipeline 01:00 PM – 03:00 PM DGM(Mech.)SMS-2
4. Back filling and soiling of area 03:00 PM-05:00 PM DGM(Mech.)SMS-2
under the track
5. Clearance to P way for removal 05:30 PM DGM(Mech.)SMS-2
of block on the track AGM (WMD)

SAFETY PRECAUTIONS
S.N. Safety precautions Responsibility
1. All safety precautions will be taken in welding, cutting, DGM (Mech.) SMS-2
& pipe handling.
2. Double earthing should be ensured for welding DGM (Mech.) SMS-2
machine, if required.
3. Display of RED banner at both ends affected area DGM (Mech.) SMS-2
across the track.
4. Keen supervision of job will be done. DGM (Mech.) SMS-2
5. Every person working in the vicinity of track will stay DGM (Mech.) SMS-2
around 3.0 Mtrs. Away from moving train whenever
they will be alerted by the supervisor.
6. All the equipments involved for carrying out the job DGM (Mech.) SMS-2
will be moved away at safe distance from the moving
train.

Contd…
-2-

S.N. Safety precautions Responsibility


7. Line block will be taken from the Traffic Department. DGM (Mech.) SMS-2
8. Before commencing the work, intimation will be given DGM (Mech.) SMS-2
to the concerned area in-charge of signelling and PWI
(T&D).
9. After completion of job, intimation will be given to all DGM (Mech.) SMS-2
the concerned area in-charge of the section (T&D).
10. Housekeeping of the area after the completion of work DGM (Mech.) SMS-2
will be maintained.
11. At the start of job safety talk will be given to all the DGM (Mech.) SMS-2
persons involved in the job.
12. Manual digging will be done wherever signal cable will DGM (Mech.) SMS-2
pass.

Mgr. Sr. Mgr. AGM (Shipping)


(P.Mill Post T&D) RM Station P. Mill

AGM (P-Way) AGM (Signaling) AGM (PLM-II)


T&D T&D WMD

DGM (Traffic) DGM(PLM)


T&D WMD

DGM I/c (Mech.) DGM I/c DGM I/c


SMS-2 T&D WMD

You might also like