Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Doc No.

ELE-VKBS-CZ-CH-02

Revision no : 00 Date:

MSB IT/ITES BUILDING, PALLIKARANAI, CHENNAI

Installation of PVC Conduits

Location / Area : Date :

Drawing No :

Verified
SR
Activities / Items to be inspected
NO. Yes/ No N/A Remarks

Chcek all the installation works need to be carried out as per approved
1
drawing's or not

2 Check Conduit and accessories for material size.

Check installation of conduits and confirm the route is as per approved


3
drawing.
Chcek the spacing between the saddles,junction boxes and pull out boxes
4
should be as per approved drawing.

5 Conduits shall be terminated in the box with adapter.

6 Check all support saddles are tightly secured.

Ensure all cover screw, fastners,nuts etc are tingtened and alinged
7
properply or not.

8 Check all exposed threads are debarred and galvanized painted.

9 Check conduit runs parallel or perpendicular to building structure elements.

Check conduit termination to Trunking / Switch enclosure are done


10
properly.

11 Check all blanks / openings to be closed

12 Check all conduits to be water tight

13 Check conduit solvent is properly applied