Doc No.

ELE-VKBS-CZ-CH-10

Revision no : 00 Date:

MSB IT/ITES BUILDING, PALLIKARANAI, CHENNAI


Installation of Raceways
Location / Area : Date :

Drawing No :

Verified
SR
Activities / Items to be inspected
NO. Yes/ No N/A Remarks

1 Ensure the raceway materials used are as per approved TDS

2 The Shop drawings used for installation are approved and latest

3 The Dimension of raceways are as per approved shop drawings

4 The routing of the raceways are as per approved shop drawing

5 The position of junction box are as per approved shop drawing

6 The raceways and junction box are fixed firmly to the floor

7 The raceway and junction box covers are fixed

Comments / Remarks :