INSPECTION & TEST PLAN

Project

Point of Acceptance Criteria & Action By (I/J/N/A/F/CC)


No. Inspection/ Test Activity Responsibility Verifying Document
Inspection/Test Frequency MAA CON Client

1.0 MATERIALS

2.0 STRUCTURAL WORKS

3.0 INFRASTRUCTURE WORKS

4.0 FINAL INSPECTION

Prepared by : Check by : Approve:

Signature : _________________ Signature : _________________ Signature : _________________

Name : __________________ Name : __________________ Name : __________________

Date : ______ Time : ______ (am/pm) Date : _____ Time : ______ (am/pm) Date : _____ Time : ______ (am/pm)

I - Implement J – Joint Inspection N - Notify A – Obtain Approval F - File CC - Copy

MAA/QESH-MS/FORM/QP-05/01/02 Issue Date: 28 March 2012 Page 1 of 1