Professional Documents
Culture Documents
LS Ir 01 04 201
LS Ir 01 04 201
Bus
Stop
Stop
Bus
Stop
Bus
Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
Stop
Bus
007 008 009 010 011 012 Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
Bus
Stop
Stop
Bus
Bus
Stop
Stop
Bus
Stop
Bus
013 014 015 016 017 018
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
Stop
Bus
AL REEM ISLAND
19
18
17
16
20
15
14
21
13
12
22
11
10
23
9
24
6
25
4
3
2
1
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
L.O.C
0+178.277
ROAD-A
KEY PLAN
LEGEND
PROPOSED 225 mm HDPE FOR TSE WATER
END CAP 180Ø
IL=1.023 PROPOSED 160 mm HDPE FOR TSE WATER
CH:0+796.63 PROPOSED 110 mm HDPE FOR TSE WATER
E 235871.511
N 2712040.944 EXISTING IRRIGATION NETWORK
ISOLATION VALVE
AIR VALVE
1w x 300Ø
PROPOSED CROSSING
2w x 150Ø
WO
WASH OUT VALVE
RT4-C6
_C7_C8
CONSTRUCTION DOCUMENT
_C9
REV. DATE DESCRIPTION APPR'D
Client
Consultant
Project / Contract
STOP
BUS CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE
WORKS FOR PACKAGE II (A) (REGIONAL
INFRASTRUCTURE) AND PACKAGE II (B)
(SEA BRIDGE) REEM ISLAND, ABU DHABI
BUS
ENDCAP 180Ø Drawing Title
STOP CH:0+049.44
IL=2.668
AUTO IRRIGATION
Line-K2 (END) DISTRIBUTION LAYOUT
E 236038.213
N 2712014.804
SHEET 01 OF 18
CONTRACT No: JOB No:
DRAWN DESIGNED CHECKED APPROVED
MTA HR OS OS
DATE APRIL 2021 ACTUAL SIZE A1
Drawing Scale.
L.O.C 1:500 @ A1, 1:1000 @ A3
Drawing No.
MATCHLINE SEE DWG. NO. LS-IR-01-04-207 LS-IR-01-04-201 C0
C:\pw_working\auh\client\p0090252\d0125556\LS-IR-01-04-200 TO 218 Distribution_Bunya.dwg
Last Saved By: P0090252 Last Saved Date: 8/8/2022 7:36 PM Printed Date: 8/8/2022 7:41 PM Printed By: Varghese, Sinu [NN-AE]