Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

AL MARAYH ISLAND

001 002 003 004 005 006 Bus


Stop

Bus
Stop

Stop
Bus

Stop
Bus

Stop
Bus

Bus
Stop
Stop
Bus

Stop
Bus

Stop
Bus
007 008 009 010 011 012 Stop
Bus

Bus
Stop
Stop
Bus
Stop
Bus

Bus
Stop

Stop
Bus
Bus
Stop

Stop
Bus
Stop
Bus
013 014 015 016 017 018

Stop
Bus

Stop
Bus
Stop
Bus

Stop
Bus
Stop
Bus

AL REEM ISLAND

19
18
17
16
20

15
14
21

13
12
22

11
10
23
9

24
6

25

4
3
2
1
L.O.C
L.O.C

L.O.C

L.O.C

L.O.C

L.O.C

L.O.C
L.O.C

L.O.C

L.O.C
0+178.277

ROAD-A
KEY PLAN

LEGEND
PROPOSED 225 mm HDPE FOR TSE WATER
END CAP 180Ø
IL=1.023 PROPOSED 160 mm HDPE FOR TSE WATER
CH:0+796.63 PROPOSED 110 mm HDPE FOR TSE WATER
E 235871.511
N 2712040.944 EXISTING IRRIGATION NETWORK

ISOLATION VALVE

AIR VALVE

1w x 300Ø
PROPOSED CROSSING
2w x 150Ø

IFM FLOW METER

WO
WASH OUT VALVE

POC -IRRIGATION RISER

MATCHLINE SEE DWG. NO. LS-IR-01-04-202


END CAP

LIMIT OF WORK (REGIONAL)


CHLORINATION PLOT

RT4-C6
_C7_C8
CONSTRUCTION DOCUMENT

_C9
REV. DATE DESCRIPTION APPR'D
Client

Consultant

Project / Contract
STOP
BUS CONSTRUCTION OF ESSENTIAL INFRASTRUCTURE
WORKS FOR PACKAGE II (A) (REGIONAL
INFRASTRUCTURE) AND PACKAGE II (B)
(SEA BRIDGE) REEM ISLAND, ABU DHABI
BUS
ENDCAP 180Ø Drawing Title
STOP CH:0+049.44
IL=2.668
AUTO IRRIGATION
Line-K2 (END) DISTRIBUTION LAYOUT
E 236038.213
N 2712014.804
SHEET 01 OF 18
CONTRACT No: JOB No:
DRAWN DESIGNED CHECKED APPROVED

MTA HR OS OS
DATE APRIL 2021 ACTUAL SIZE A1
Drawing Scale.
L.O.C 1:500 @ A1, 1:1000 @ A3

Drawing No.
MATCHLINE SEE DWG. NO. LS-IR-01-04-207 LS-IR-01-04-201 C0
C:\pw_working\auh\client\p0090252\d0125556\LS-IR-01-04-200 TO 218 Distribution_Bunya.dwg
Last Saved By: P0090252 Last Saved Date: 8/8/2022 7:36 PM Printed Date: 8/8/2022 7:41 PM Printed By: Varghese, Sinu [NN-AE]

You might also like