Professional Documents
Culture Documents
Mainatatin Training Facilites
Mainatatin Training Facilites
Equipment Type
Equipment Code
Location
Operation Procedure:
Template #2
HOUSEKEEPING SCHEDULE
Qualification Station/Bldg Welding (WAF)
Area/Section
In-Charge
Schedule for the 2nd Semester, 2011
ACTIVITIES Responsible Daily Ever Weekly Every Month Remarks
Person y 15th ly
5S other Day
Day
1. Clean and check welding
equipment/ accessories
from dust and oil; dry and
properly laid-out/
secured/stable
2. Clean and free welding /
booths and welding
positioners from
dust/rust /gums, used
Mig wire stubs and
metal
scraps
3. Clean and arrange
working tables according
to floor plan/lay-out;
check stability
4. Clean and check floor, Trainer/
walls, windows, ceilings Trainees
• graffiti/dust/rust
• cobwebs and
outdated/unnecessary
objects/items
• obstructions
• any used
materials/scraps
(slugs, stubs) spilled
liquid
• open cracks (floor)
Clean bulbs/lamps/ceilings/walls
Clean/Wash of windows/glasses/mirrors
Template #4
Qualification
Area/
In-Charge
Section
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
Remarks:
Template #6
WELDING EQUIPMENT MAINTENANCE SCHEDULE*
8 HOURS 50 Hours 100 HOURS
• • •
•
Template #7
EQUIPMENT MAINTENANCE INSPECTION CHECKLIST
Equipment Type :
Property Code/Number :
Location :
YES NO INSPECTION ITEMS
Remarks:
Template #8
Area/Section
In-Charge
Template #8
Template #9
Work Request
Unit Description:
Template #10
Breakdown/Repair Report
Property ID Number MM-01
Findings: Recommendation:
Date: Date:
Date: Date
Template #11
Salvage Report
AREA/SECTION Practical Work Area/Computer Laboratory
Template #12
Tag Out Index Card
Log Serial Date Issued Type Description
(Danger/Caution) (System
component, Test
reference, etc.)
Template #13
Inspection Report A
Property ID Number GMAW- 01 – To 10
Findings: Recommendation:
All equipment are functional All equipment are ready for training
purposes
Date: Date:
Template #15
Inspection Report B
Area/Section Practical Work Area