MPES SULUT-1 Doc-xx-xx-F01 UNIT 1&2

STATION LOG

Log Number
Shift Date
Shift Period
Shift Leader In-
Charge
Received Shift
Leader

CCR

FO
MHO
Shift Personnel
Ash H & Dust
Removal
BOP
U1
Plant Status
U2
PERFORMANCE & AVAILABILITY
Unit 1 2 Remarks
Schedule-neat energy Fuel oil tank level
dispatched (MWh) A/B (%)
Net Capacity Factor (%)
Limestone level (m)
(/day)
Actual-net output Demin tank A/ B
production (MWh) level (m)
Actual dispatched
Raw Water tank
energy deviation
A/B level (m)
(MWh)
Gross energy Permeate Tank
generated (MWh) level
Coal consumption (t) Fire Tank level
Specific coal consumed Hydrazine level
(t/MWh) tank
Boiler Calculation
Ammonia level
Heating Value (kJ/kg)
tank (cm)
(max/min)
Coal delivery to bunker Phospate level
(t) tank(cm)
Ammonia For
Fuel oil consumption (t)
SNCR Boiler Level
Fuel Oil HSD
Main Steam SiO₂ (ppb)
Tank Level
Boiler Water PH
Coal Silo A B (%)
Bottom Ash Silo Level
Limestone Silo Boiler
Level
CBD Isolation Valve
(%)
Summary
Coal Unloading Status
Totalizer (ton)
Demin Stock Level Tank A (m)
Level Tank B (m)
Raw Water Stock Level Tank A (m)
Level Tank B (m)
Fuel Oil Stock Level Tank A (%)
Level Tank B (%)
Deaerator Level Unit #1 (%)
Level Unit #2 (%)
Hydrazine Level Tank (cm)
Ammonia Level Tank (cm)
Phosphate Level Tank (cm)
Equipment In-Service Unit #1 CWP Pump (A/B)
ACWP Pump (A/B)
CCWP Pump (A/B)
Unit#2 CWP Pump (A/B)
ACWP Pump (A/B)
CCWP Pump (A/B)
BOP Service Water Pump Pump (A/B)
Instrument Air
IAC (A/B/C) Dryer (A/B)
Compressor
Service-Transport
SATA (A/B/C) Dryer (A/B)
Air Compressor