AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(RM)
PRELIMINARIES
D PROJECT COMMISSIONING
Submit requeired documentation such as statutory
documentations, warranties, certificate of approval or
acceptance from regulatory bodies, maintenance manual
contents (operation, maintenance instructions, records,
drawings, spare parts, materials) for completeness. Attend
'end of work' testing and break in or start up demonstrations. L/S 1
E AS BUILT DRAWINGS
The Contractor to submit all related as built drawings
endorsed by Professional Engineer L/S 1
TO COLLECTION
PRELIMINARIES/1
DEVELOPMENT OF 3.5MW SMALL HYDROPOWER AT SUNGAI SUIH, JELI, KELANTAN
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(RM)
PRELIMINARIES (Cont'd)
TO COLLECTION
PRELIMINARIES/2
DEVELOPMENT OF 3.5MW SMALL HYDROPOWER AT SUNGAI SUIH, JELI, KELANTAN
AMOUNT
ITEM DESCRIPTION UNIT QUANTITY RATE
(RM)
COLLECTION
PRELIMINARIES/3