Download as pdf or txt
Download as pdf or txt
You are on page 1of 16

BUILDING INFORMATION MODELING

(BIM)
From Owner Perspective

To Build Digital Assets


Providing Information in the
first place to empower
excellent Port Services
WHY PELINDO
3 USE
50% Investment Budget is for Infrastructure
McKinsey Global Institut Industry
digitalization Index:
2015 or Latest available data

Construction Industry facing


traditional process produces
inefficiencies.

PELINDO 3 push the AEC industry to


move.
THE URGENCY OF BIM
IMPLEMENTATION IN PELINDO 3
1. Encouraging the AEC Industry to implement
BIM.
2. Improve the planning process.
3. Improve project supervision.
4. Establishement of the company’s digital assets
for operation maintenance purposes.
ON GOING IMPLEMENTATION
IN PELINDO 3

90 % SAVING THE BUDGET


FOR CONSULTANT
IMPLEMENT ON DESIGN
AND BUILD CONTRACT
0.32 % SAVING THE BUDGET
FOR CONSTRUCTION
2. TENDER STAGE AND SUPERVISION PROCESS
IMPLEMENTATION FOR CDE
COLLABORATION TOOLS
FUTURE ADVANCE TOOLS

HOLOLENS FOR PRECONSTRUCTION MEETING AND SUPERVISION


3. OPPORTUNITY OF USING DIGITAL ASSET IN OPERATION
MAINTENANCE
DEVELOPING OF DIGITAL ASSET PELINDO 3

DERMAGA OPEN STORAGE


WAINGAPU WAINGAPU

PELINDO PLACE OFFICE


TOWER

FLYOVER TELUK DERMAGA SAMUDRA


LAMONG
TAKE A NOTE..!

Jakub Wachocki

You might also like