Download as pdf or txt
Download as pdf or txt
You are on page 1of 8

Group # 06

Online Printing
Of Ampoules
Group Members

Syed Bilal Abdul Iqra


Ahmed Fahad Rafique
(QA) (Sterile) (QC)

Ayesha Sumaira Sidra


Ibrahim Abiden Sheikh
(QA) (NPD) (QC)
Introduction
Our goal is to Additional aim is to
improve the process reduce labour hours
of ampoules printing and process hours
in order to utilize this will help to
unprinted ampoules overcome the cost of
that are already product and give us
present in inventory. financial benefit.
Printed vs Unprinted
Ampoules
Printing Process Hour

• Process Hours = • Process Hours =


• Head Count = • Head Count =
• Labour Hour = 3ml Ampoule • Labour Hour =
Vomitron Injection

1ml Ampoule
Titlac Injection, Doris Injection, 5ml Ampoule
Mether Injection 40mg/ml, • Process Hours = Eplipsa Injection, Brivera
Mether Injection 80mg/ml • Head Count = Injection, Ironal S
• Labour Hour = Injection
1ml Injection Filling
Machine
1ml Injection Filling
Machine
1ml Injection Filling After
Washing and
Machine Cleaning

You might also like