Experienced Structural engineer, who is primarily concerned with designing and constructing buildings and structures that are
safe and capable of withstanding the elements to which they are exposed and also to create simpler tools and methodology to
accurately estimate the seismic demand on Structures, who is also well versed with variety of codes which includes IS 800:2007,
IS 456:2000, IS 1343:2012, IS 1893:2016, IS13920:2016, IS16700:2017, IS 875:2015, ASCE 7-16, ACI 318-14, AISC 360-16,
BS 8110:1997, BS 5950:2000.

Education
• Master of Engineering / Master of Technology, Structural Dynamics
Indian Institute of Technology Roorkee Post Graduated, June 2021
Roorkee, Uttarakhand Marks 8.318 [CGPA]

• Bachelor of Engineering / Bachelor of Technology, Civil Engineering


College of Technology Pantnagar Graduated, June 2018
Pantnagar, Uttarakhand Marks 7.461 [CGPA]

• Intermediate, Science (12th)


Completed, May 2014
Rainbow Public School Rudrapur
Marks 91 %
CBSE
Rudrapur, Uttarakhand

• High School (10th) Completed, May 2012


Rainbow Public School Rudrapur Marks 10.0 [CGPA]

CBSE
Rudrapur, Uttarakhand

Work Experience
A) ELEMATIC INDIA PVT. LTD.
Structural Engineer (Jan 2023-Present): Gurugram (Haryana)
Roles & Responsibilities:
1 ) Design of Warehouse consisting of 20 Ton Gantry Girder located in Halol Gujarat:-

a) Prepared its ETABS Model according to Structural & Architectural requirements considering all types of loadings.
b) Designed its Plinth beam and Plinth Walls for their depth requirements according to FRL, NGL and FFL levels
c) Designed its Isolated Tapered Footings.
d) Designed all components of this Warehouse Pedestral, Plinth beam, Plinth wall, Corbels, Columns, Tie beam, Gantry Beam,
Mezzanine floor slab, Mezzanine Beams, Staircase, Façade wall.
e) Designed the boundary (Compound) wall for section sizes and Reinforcements for its Wall, Column and Footings, Guided
draftsman for Preparation of GA plan and elevation drawings of the boundary wall and the Shop Drawings according to the
Architectural and Structural requirements.
.
f) Prepared its Design Basis Report (DBR) & its loading file.
h) Co-ordinating with Architect, Peer Reviewer, Client, attended Weekly Design Review Meeting, understanding their
requirements & then incorporating the same in Design and Drawings.
h) Co-ordinating with Draftsman for Preparing of Tekla LOD350 and LOD400 Model with preparation of GA Drawing and Shop
Drawings, Resolving their Daily Queries.
i) QA/QC work of Drawings made by draftsman, Preparation of deliverables schedule, allocation of required work to resources.
j) Design of 3 different types of Dock Otta which is used for Goods Loading and Unloading for the Warehouse which consists of
Beam-Column and Slab framing.
k) Prepared the Reinforcement Coefficient (kg/m3) file for all the elements of this warehouse, in order to deliver the design
as optimized as possible.
2) Design of G+4 Storey Residential Apartment Building (15.8 m High) Located in Mauritious as per BS:8110:1997:-

a) Prepared its Preliminary ETABS Model for Both L Type and F Type of Building Plan.
b) Designed its Transfer Beam in the Ground Level for Supporting Parking Way
c) Designed its Beams and Columns at G+1 Level for Supporting Shear Walls in the buildings above.
d) Designed its Pre -Cast Slabs (Both 1 way and 2 way) for all Floor Areas.
e) Designed its Isolated Footings for Columns and Shear walls using Excel and Raft footing in SAFE for Core Lift area.
f) Designed Raft Footing in SAFE for Complete Plan area of building.
3) Design of G+13 storey buliding located in Angul Odissa for bidding project for 2 cases:-
a) when building have Beams Column Structural framing with Partition walls.
b) when building have all Structural wall 230 mm thick.
4) Design of G+4 Diesel generator (DG) building in ETABS:-
a) Designed its Foundation in SAFE and excel spreadsheet, both Isolated footing and Combined Footing.
b) Designed its vertical members Columns and Shear Walls for reinforcements.
c) Designed its Prestressed beams (rectangle, T & L beam) and Prestressed one way slab in Concise beam.
5) Design of circular overhead water tank with Beam-Column Staging :-
a) Prepared Water Tanks ETABS model according to structural requirements.
b) Calculated various forces and moments as per IS 1893 Part-2.
c) Designed its Top slab and Bottom slab in SAFE for reinforcements
6) Design of feature tower (G+12) type framing which is used for Planting trees as per IS 800:2007:-
a) Prepared its ETABS model with Optimizing its section sizes according to Demand/Capacity Ratios.
b) Co-ordinating with Draftsman, with Generating IFC’s and guiding in Preparation of its TEKLA model.
c) Prepared its BOQ for submissions.
7) Design and analysis (G+3) Steel Pavillion building (non residential), 17.35 m high as per IS 800:2007:-
a) Prepared its ETABS model with Optimizing its section sizes according to Demand/Capacity Ratios.
b) Co-ordinating with Draftsman, with Generating IFC’s and guiding in Preparation of its TEKLA model.
c) Prepared its BOQ for submissions.
d) Prepared its loading file for Dead load, glass load, Sunshade load, live load and wind load.
8) Design and analysis of Pile caps in SAFE located in Corsicana (U.S) :-
a) for precast factory, calculated pile caps size, its depth required, calculated pile capacity according to soil investigation report
and analysed reinforcements in pile caps, decided numbers of piles required and with placements in pile caps.
b) for batching mixing plant, calculated pile caps size, its depth required, calculated pile capacity according to soil investigation
report and analysed reinforcements in pile caps, decided number of piles required and with placements in pile caps.
9) Design and analysis of various Connections/Elements in Steel HCS factory located in Medinah (Saudi Arabia) as per
AISC 360:16 :-
a) Prepared its Factory ETABS model.
b) Steel Corbel Design
c) Rafter to Column connections
d) Rafter to Rafter connections
e) Column Base plate connection
f) Design of Gantry Girder
g) Design of Steel I Section columns
h) Prepared its Design basis report (DBR) for submission
i) Design of Rafters: I Rafters, Central Crown Rafters and Haunch Rafters.
j) Design of its Foundation in SAFE
k) Design of Concrete Pedestrals
l) Designed its HCS Abutment, both active and passive End
10) Design and Optimisation of Canopy Roof structure and designed and analysed its connections by welding.
11) Design of retaining wall 4 cases, to find out which is more critical:-
a) Cantilever slab only water filled
b) Prop cantilever only water filled
c) Cantilever only soil with no water filled
d) Prop Cantilever with only soil

12) Design of Abutments, for hollow core slab production both its active end and passive end with its servicebility check for
Overturning, sliding, Bearing pressure and its reinforcement design for Ultimate loads according to ACI code.
13) Design and Analysed Raised Walkway which is composed of Steel and Concrete portion.
a) Prepared its ETABS model, according to structural requirements.
b) Designed its Concrete columns for reinforcements, and optimized steel columns according to its Demand/Capacity Ratios.
c) Designed its Precast Beam size 300X450 mm and Precast one way Slab 150 mm thick in concise beam.
d) Designed its 7.2 m long Slab in SAFE, while incorporating temperature load, live load and SIDL.

14) Design of Warehouse located in Panoli Gujarat in Seismic Zone III

a) Prepared its ETABS Model according to Structural requirements.


b) Designed its Plinth beam and Plinth Walls according to FRL, NGL and FFL levels.
c) Prepared its SAFE Model for Isolated footings.
d) Designed its Precast Concrete boundary wall, with its precast column and precast foundation design with their pullout and
stripping check according to PCI Design Handbook.
15) Design and analysis of G+1 Storey office building located in Ahmedabad Gujarat:-
a) Prepared its ETABS model according to its Precast Design Solution .
b) Designed its Presstressed beams, Slabs, Corbels, Ledge in Concise beam.
c) Designed its Isolated Footings for Shear Walls and columns in excel Spreadsheet.
16) Design of Solar Panel Structural Framing at the Terrace of the 35 Storey Building located in Hyderabad for 2 cases in ETABS:-
a) When Framing consists of Steel Truss.
b) When Framing Consists of I Sections Steel Beams and Columns.
c) Preparation of both models BOQ.
d) Co-ordinating with Draftsman, Generating IFC’s and guiding in Preparation of its TEKLA Model.

B) L&T CONSTRUCTIONS (HCI-I.C)


Senior Design Engineer (Aug 2021 - Jan 2023): Faridabad (Haryana)

Roles & Responsibilities:


1) Design of Pressure liner for calculating Shell Thickness

2) Preparing of BOQ for Pressure liner.

3) Review of the Design of Roof Truss as per Wind load Conditions.

4) Review of the Design of Anchor block.

5) Review of the Design and Drawings of Surge Tank under various Load conditions in STAAD.Pro.

6) Facilitate on-time delivery of designs by seamlessly coordinating with construction site to promptly address and resolve queries.
7) Design and Analysis of STP & WTP walls using STAAD.Pro, with its checks involved like Crack Width etc.
8) Design and Analysis of Staircase of the Metro Station using STAAD.Pro.

Internship
May 2017 - June 2017

Intern
Public Works Department
Rudrapur (Uttarakhand)
> Understanding the construction of roads, its various steps involved like Levelling, Lubricants spraying etc.
> Learned about planning and execution of works and quality control at site .

Projects
Project 1 Non-Linear Seismic Evaluation of Composite Structures (RCS System)
Period: January 2020 - June 2021
Project Type: Dissertation for Completion of Master’s degree.
Software used: ETABS

Project 2 Analysis and Design of Industrial Roof Truss


Period: August 2017 - June 2018
Project Type: Major Project for Completion of Bachelor’s degree.
Software used: STAAD.Pro

Awards & Honors


1) Secured State Rank 1 in International Olympiad of Mathematics 2013 in Class 12th with Olympiad Rank 48.
2) Secured State Rank 1 in International Olympiad of Mathematics 2012 in Class 11th with Olympiad Rank 182.
3) Cleared GATE 2019 with 457 Rank out of 145064 Candidates & Gate Score of 782/1000 in Civil Engineering Subject with
99.7 Percentile.
4) Certificate of Merit in Class 10th (2012).
5) Achieved 29 State Rank in Uttarakhand Polytechnic Exam 2012.
6) Foundation For Excellence (FFE) Scholar: Received Total Scholarship amount of 1.6 Lakhs Rupees over a period of 4 years in
B.Tech, (2014-2018) with a Dell Laptop being its Scholar.
7) Won First prize in Chess competition in Sports festival of College in 2017.
8) Co-Coordinator of I (Innovative) Bridge competition in Technical festival of College in 2017.
9) Studied French Language in Liberal Education Programme of the college in II Semester 2015-2016 Session.

Computer Proficiency
Operating Systems Software
• MS Excel • ETABS
• MS Word • STAAD.Pro
• SAP
• SAFE
• AdSec
• Concise Beam
• AutoCAD
• GNU Octave
• SAP
Personal Details
DOB: • 21/11/1996 Marital Status: • Unmarried
Gender: • Male Nationality: • India

Declaration
I, Daksh Adlakha, hereby declare that the information contained herein is true & correct to the best of my knowledge and belief.

Gurugram, Haryana
Daksh Adlakha 06/04/2024

You might also like