C5 NOTES :

B4 B5
C4 C6 1. Contractor to check all the
B3 4.13 4.13 B6
C3 C7 dimensions on site.
C2 B2 B7 C8
4.40 4.40
2. Any discrepencey in drg or on the

0.30

0.30
0.30
B 99.60 FL B1 0.30
C1 4.40 4.40 T8@200
C9 site should be brought to the notice

1.60
C/C

C/C

0.30
0.30

C/C
5.70
of Structural Engineer & Architect

T8@175
0C /C
T8@20

2.10

T8@175
5.70

5C/C
B93
S3 immediately.

6.06
S

/C
S3 S

5C
5C/C

T10@17
T8@175C/C T8@175C/C

B95
2.10

B89
3. Do not scale the drawing follow

6.00
S3

6.00

T10@17
S3

6.00

5C/C
B9 B10

T10@17

B95A
C10 written dimensions.

5C/C
C11

B81A
6.00
B8 S3 B11

T10@17

6.00

/C
S3 3.70

B103
4. Grade of concrete : M25

T10@17
3.70

B81

5C
1.80

6.00

T10@17
1.80
T10@15
0C /C T10@15
0C/C Grade of steel : Fe550
B76

S1 C16 S1

C/C
5. Cover for beams : 25MM
2.40
/C

B108
0C T10@150
T10@15

/C
C/C
S2 S2

4.10
C15

T8@150

T8@150C
B17 B18 C17 Cover for slab : 20MM
B78

B104
1.20

4.10
0C/C T10@150
T10@15 T8@200 C/C
B12 B16 C/C B19 B13 6. Design of centering,shuttering &
C14 T8@15
C/C C18 0C/C
T8@150 3.24 1.80
concrete mix is the responsibility

B92
3.22
C13 B15 B20 C19 S1
S1
1.50

4.40 4.40
of contractor.

C/C
S
C12 B14 B21
7. Span steel curtailed at 0.15L

T8@175
S C26 4.40 C20
4.24
B26 B27
C25 Tension steel is for 0.25L.
C/C
C27 3.70
C/C B28
T8@200 3.70 C24 B25

T8@175
S T8@175C/C
2.70 2.70 C28 1.80 8. Before pouring the concrete for any
1.80 S B24 B29

B107
C23 2.40 2.40
B75

C29 structural elements, it should be

2.40
T8@175C/C
C22 B23 B30
checked by competent authority &

RAMP
0.30

0.30
C30
B22 B31

RAMP
C21 12
it should be certified.

)
d Beam)
C31

ned Beam
11 13

am)
ed Beam)
10 14

0.30
0.30

9 15

clined Be
0.30 8 16 0.30 NOTE :

B88 (Incline
6.00
7 17 S

B94 (Incli
S C -- COLUMN

6.00
B87 (Inclin
6 18
S -- SLAB

B101 (In
5 19
4 20
3 21 B -- BEAM
2 22
1 23
24 N
C37 UP C38 2.40
B38 B39
4.91
C36 B37 4.04

B36 T12@130C/C
B40
3.79
4.65 C35 STAIR BARS C39 T8@200C/C

B91
TO BE LEFT
S B41 0.30
B35

B9100
S 3.82
4.58 STRUCTURAL CONSULTANT

C/C
C34 C40

B86
B42 C42
0.30

0.30
T8@175
3.80 C33 C48
B34 4.05 4.06
S C41 B33
0.30 GURURAJ A. YADAWAD
0.30 B32 S B47 B48 C43

0.30
0.30

C32 C47 C49 6.00 B.E.(CIVIL), M.TECH(STR)


0C/C

T8@200C/C
C/C

S
B46 B49

T8@150C/C

T8@150C/C
S
T8@175
T18@15

T8@200
3.55 C/C
C50
B74

S2 C46
2.40

6.10

3.79

B106
C45 B45 3.55 S2 S2 B50 S3

B90

5C/C
2.80

4.43
5C/C
2.90 T8@200
C/C C/C
T8@150 SANDEEP HULKOTI ARCHITECTS

2.90
B44

T10@17
C44 3.20 6.10

B110
T10@17
S4
B71

B43 S1 T8@150C/C T8@150C/C


#8, Aum shree apartment, IV phase,

5C/C
B99

2.90
1.80

T10@150
B53 C/C behind chetan college, Vidyanagar, HUBBALLI-

T10@17
6.10 S4
B85

B51
5C/C

B102
B55 C52 580030.
0C/C

S3

2.90
5C/C

T8@150C/C
3.64 T8@200
S3 B52
T10@17

3.20 C/C

T8@150C/C
B80A

6.10
M: 9739317741
T18@15

T10@17

C51 S2 S1 B56 C53


B80

B90A
S2 S2 E-mail: sandeephulkotiarchitects@gmail.com
1.70

6.00

5C/C
T8@200
3.40

B77

2.90

2.90
2.87
C/C

2.90
5C/C

S3 S4 6.10
B58

T10@17
B73
6.00

C/C C/C T8@150C/C T8@150C/C


T10@17

T8@150 T10@150

5C/C
1.50

B105
C58 C59

2.90

5C/C
1.50 0C /C 3.22
B57 T10@15 B63

4.37
S3

T10@17
3.22 6.10
S1 S4
B79

T10@17
2.10

S1 B62 T8@200C/C B64


B70

6.58 C60

B109
T8@175C/C

T10@15
0C /C C57

B98
B84

S1
100.10 FL
1.99

1.97
S B65 T10@15
B72

C56 B61
2.40

S1 4.00
0C/C
C61 KARNATAKA HOUSING BOARD
2.41

C55 B60 6.01


0.30

C63 C64

0.30
1.50 B67 B66
C54 2.10 B59 BEAM (B82) C62
5.95

0.30
1.63
0.30

B97
B83

0.30 0.30
SCHEDULE OF SLABS B68
SHORT SPAN C66 GL
150
C65
SLAB THK LONG SPAN REMARKS
MARK OF REINFORCEMENT REINFORCEMENT BASEMENT FLOOR SLAB
SLAB @ mid span @ support @ mid span @ support UP LAYOUT
S 150 T8@175C/C T8@350C/C T8@200C/C ----- ONE WAY
ONE LAYER GOOD FOR
6.72
6.72

S1 150 T8@175C/C TWO WAY


B82

B96

T8@350C/C T8@175C/C T8@350C/C SECTION AT A-A


A A
BRICK IN CM 1:6 CONSTRUCTION
S2 150 T8@150C/C T8@300C/C T8@150C/C T8@300C/C TWO WAY

S3 150 T10@150C/C T10@300C/C T10@175C/C T10@350C/C TWO WAY


SCALE : DATE :
STRUCTURAL LAYOUT OF BASEMENT FLOOR
S4 150 T10@175C/C T10@350C/C T8@200C/C ----- ONE WAY C67
5.94
C68 1:100 24
B69 SLAB & BEAM
FEB
DRAWN BY:
2023

AEF CONTRACTOR STRUCTURAL CONSULTANT PROOF CHECK JE/AE, GADAG AEE, GADAG EE, GADAG EE, BENGALURU SE, BENGALURU CHIEF ENGINEER, BENGALURU DWG No.:
MDRS/HRT/AB/STR-07
PROPOSED CONSTRUCTION OF ACADAMIC BLOCK FOR MORARJI DESAI RESIDENTIAL SCHOOL AT HARTI, GADAG.