PSM 1-6-7 Chap21 3
PSM 1-6-7 Chap21 3
PSM 1-6-7
R C CHECK X 500 HOURS
O
U
SYSTEM AND
INSPECTION REQUIREMENT T
ITEM
I D
N or
E A B 1 2 3 4 5 6 7 8 9 10 11 12
Chapter 21 – Air Conditioning
1. Heater Ejector Condition and security. X X X X
(Card 22–11)
3.(1) Ram Air Control Valve Operating mechanism for ease of operation X X X X
PART 1 BASIC INSPECTION - 21
6. X X
Sensor
(Card 25–05)
9.(2) Heating System Hot Operational test, travel time from open to X X X X
Air Valves close. (Power on).
(Card FUN–E3)
11.(2) Cabin Exhaust Outlet Outlet scoop for condition and security. X X
Clean as required.
(Card 31–04)
PSM 1-6-7
Ram Air Inlet
(Pre Mod 6/1070) (Card 22–01)
14.b. Bleed Air Systems Condition and security. Clamps and brackets X X
Nov. 30/18
(Card 32–22)
15.b. Wing De-Vore Bleed Condition and security, bellows (root rib end) X X X X
PSM 1-6-7
18.(2) Cooling and Operational test. (Power on). X X X X
Demisting Fans
(Pre Mod 6/2014)
(SOO 6322) (Card FUN–E1)
PSM 1-6-7
Conditioner System
(Pre Mod 6/2014) (Card FUN–D4)
21.(1) DAU Cooling Fans Condition and security; bonding wires for X X X X X X
condition and security of attachment.
(Mod 6/2049)
(Card 18–23c)
23.(1) STA 111 Cabin Fans Condition and security; standoff mounting X X X X X X X X X X X X
brackets for security.
(SOO 6378)
(Card 11–25)
(Card 30–12)