Professional Documents
Culture Documents
Report FTE 20230704 124332
Report FTE 20230704 124332
Analisa
Bacaan pH baja. Routine/ Repetitive Task/ Direct Task Must have Yearly 1.00 1min ( 30 contoh) 1.00 0.05%
Analisa baja
Analisa sulfur dalam baja. Routine/ Repetitive Task/ Direct Task Must have Weekly 2.00 1 jam (5 contoh) 104.00 4.74%
Membantu choping buah sawit, meracik, Training/ Briefing Must have Yearly 4.00 4jam/tahun 4.00 0.18%
menimbang, melerai.
Audit tahunan
Membantu mengemaskini dokumen Routine/ Repetitive Task/ Direct Task Must have Yearly 15.00 3jam x 5 hari (Setahun) 15.00 0.68%
teknikal yang diperlukan untuk
persediaan audit ISO
cross check
menjalankan analisa untuk Cross Check Routine/ Repetitive Task/ Direct Task Must have Yearly 10.50 3jam30min X 3x setahun 10.50 0.48%
membersihkan alatan atau keadaan air Routine/ Repetitive Task/ Direct Task Must have Monthly 3.75 45min /60min X 5x setahun 45.00 2.05%
suling.
Keceriaan
1. Keceriaan kawasan luar dan dalam Routine/ Repetitive Task/ Direct Task Must have Monthly 3.00 3 Jam X sebulan sekali 36.00 1.64%
bangunan.
2. Sudut 5S
kemaskini stor
kemas stor, bilik arkib, susun fail rekod Routine/ Repetitive Task/ Direct Task Must have Yearly 49.99 1. 4 jam X 5 hari X 2x setahun = 40 jam 49.99 2.28%
baja, membuang sisa contoh baja. 2. 50 min/60min X 12 bulan = 49.99 jam
Menghantar dan menyusun lebihan
contoh baja ke dalam stor
Full-Time Equivalent (FTE) 7/4/2023 12:43:33 PM
FGV Holdings Berhad
Employee FTE Year
2102458 Mohd Jasmi Bin Julhari 2021
latihan pengungsian bangunan dan Routine/ Repetitive Task/ Direct Task Must have Yearly 4.50 2jam 15min/tahun x 2 kali 4.50 0.21%
memadam api
Latihan HSE
Menghadiri latihan HIRADC & POK, Routine/ Repetitive Task/ Direct Task Must have Monthly 2.00 2 Jam/bulan 24.00 1.09%
SDS, First Aid
pembentangan HIRADC & POK bagi Routine/ Repetitive Task/ Direct Task Must have Yearly 1.00 1jam/tahun 1.00 0.05%
unit baja
Masyuarat
Masyuarat Unit/ Masyuarat Makmal Routine/ Repetitive Task/ Direct Task Must have Yearly 2.00 1 Jam X 2 sebulan sekali 2.00 0.09%
Menyelenggara alat
Diluter, air suling. Routine/ Repetitive Task/ Direct Task Must have Yearly 1.50 45min/60min X 2 kali setahun 1.50 0.07%
Merekod data (tarikh terima, Routine/ Repetitive Task/ Direct Task Must have Weekly 1.00 1 jam (1 jam /20 kod makmal) 52.00 2.37%
penghantar, pembekal, nisbah zat,
nombor KBS) dalam master rekod
Pembersihan
Menyapu, Lap Habuk, Mop lantai, Routine/ Repetitive Task/ Direct Task Must have Daily 0.50 30min/60min 137.00 6.25%
buang sampah
Pembersihan bilik solvent Routine/ Repetitive Task/ Direct Task Must have Daily 0.50 30min/60min 137.00 6.25%
lipat kertas turas, potong plastik Routine/ Repetitive Task/ Direct Task Must have Yearly 6.00 2 jam X 3x setahun 6.00 0.27%
penyimpanan lebihan contoh baja,
timbang dan bungkus plastik baja untuk
dibekalkan kepada pelanggan, cuci tiub
spesimen yang telah digunakan
Penyediaan reagent
1. Std AAS k,mg,te Routine/ Repetitive Task/ Direct Task Must have Monthly 0.33 20min/60min X 1 kali seminggu 3.96 0.18%
2.
Sulfate- boric asid
Full-Time Equivalent (FTE) 7/4/2023 12:43:33 PM
FGV Holdings Berhad
Employee FTE Year
2102458 Mohd Jasmi Bin Julhari 2021
sub-sampel, kisar, timbang, Routine/ Repetitive Task/ Direct Task Must have Weekly 12.00 20MIN/60MIN x 6 SAMPLE/HARI 624.00 28.47%
pencernaan, memindahkan sampel ke
dalam tiub, proses pembersihan alat
Penyediaan sampel Proficiency Testing & Range Standard
Semua parameter untuk baja Routine/ Repetitive Task/ Direct Task Must have Yearly 0.50 30min/60min X 12 parameter 0.50 0.02%
NK,NPK,CA, SOA, ERP, BRP
Program keselamatan
Menyediakan power point untuk latihan Routine/ Repetitive Task/ Direct Task Must have Monthly 1.00 1jam x 8 bulan 12.00 0.55%
Projek ICC
Mesyuarat kumpulan. Routine/ Repetitive Task/ Direct Task Must have Monthly 8.00 1 jam x 8 bulan 96.00 4.38%
QCS/ PT Tahunan
Semua parameter untuk baja Routine/ Repetitive Task/ Direct Task Must have Yearly 5.50 30min/60min 11 PARAMETER 5.50 0.25%
NK,NPK,CAO, TE
Rekod suhu bilik
bilik Solvent Routine/ Repetitive Task/ Direct Task Must have Daily 0.50 15min/60minX 2X 137.00 6.25%
Surat invoice
Membantu menghantar surat invoice ke Routine/ Repetitive Task/ Direct Task Must have Weekly 0.50 30 min/60 min/sebulan 26.00 1.19%
setiap pentadbiran.
Teknikal
Pemeriksaan Jentera (PAM ANGIN) Routine/ Repetitive Task/ Direct Task Must have Monthly 24.00 2JAM x 12 288.00 13.14%
Teknikal/peralatan
Penentuan parameter K2O,MgO dan Routine/ Repetitive Task/ Direct Task Must have Weekly 9.50 4 Jam 45 minit X 240 sample X 2X 494.00 22.54%
Te. seminggu
Tugasan bergilir
bertanggungjawab untuk membuka dan Routine/ Repetitive Task/ Direct Task Must have Yearly 10.00 30min /60 min X 5 hari X 3x setahun 10.00 0.46%
menutup makmal, memastikan semua
suis dan peralatan elektrik ditutup.