DSR-2021 ITEMS

Name of the work : DSR-2021


I.No. Description of Item Quantity Rate (Rs) Unit Amount(Rs)
Sub-Head : Earth Work
2.1 Earth work in surface excavation not exceeding 30 cm in depth but
exceeding 1.5 m in width as well as 10 sqm on plan including getting
out and disposal of excavated earth upto 50 m and lift up to 1.5 m, as
directed by Engineer-in-Charge:
Earth work in surface excav
2.1.1 All kinds of soil 1.00 Sqm 107.00 1.00 One Square 107.00
Metre All kinds of soil.
2.2 Earth work in rough excavation, banking excavated earth in layers
not exceeding 20 cm in depth, breaking clods, watering, rolling each
layer with ½ tonne roller or wooden or steel rammers, and rolling
every 3rd and top-most layer with power roller of minimum 8 tonnes
and dressing up in embankments for roads, flood banks, marginal
banks and guide banks or filling up ground depressions, lead up to 50
m and lift up to 1.5 m :
Earth work in rough excava
2.2.1 All kinds of soil 1.00 Cum 862.70 1.00 One Cubic 863.00
Metre All kinds of soil.
2.3 Banking excavated earth in layers not exceeding 20 cm in depth,
breaking clods, watering, rolling each layer with ½ tonne roller, or
wooden or steel rammers, and rolling every 3rd and top-most layer
with power roller of minimum 8 tonnes and dressing up, in
embankments for roads, flood banks, marginal banks, and guide
banks etc., lead up to 50 m and lift up to 1.5 m :

Banking excavated earth in


2.3.1 All kinds of soil 1.00 Cum 543.40 1.00 One Cubic 543.00
Metre All kinds of soil.
2.4 Deduct for not rolling with power roller of minimum 8 tonnes for 1.00 Cum -4.40 1.00 One Cubic -4.00
banking excavated earth in layers not exceeding 20 cm in depth. Metre
Deduct for not rolling with
2.5 Deduct for not watering the excavated earth for banking 1.00 Cum -38.20 1.00 One Cubic -38.00
Metre Deduct for not watering the
2.6 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30cm in depth,
1.5m in width as well as 10 sqm on plan) including getting out and
disposal of excavated earth, lead up to 50m and lift up to 1.5m,as
directed by Engineer-in-Charge.
Earth work in excavation ov
2.6.1 All kinds of soil 1.00 Cum 205.45 1.00 One Cubic 205.00
Metre All kinds of soil .
2.7 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means over areas (exceeding 30 cm in depth,
1.5m in width as well as 10 sqm on plan) including getting out and
disposal of excavated earth, lead up to 50 m and lift up to 1.5m, as
directed by Engineer-in-Charge.
Earth work in excavation ov
2.7.1 Ordinary rock 1.00 Cum 412.95 1.00 One Cubic 413.00
Metre Ordinary rock.
2.7.2 Hard rock (requiring blasting) 1.00 Cum 711.35 1.00 One Cubic 711.00
Metre Hard rock (requ blasting).
2.7.3 Hard rock (blasting prohibited) 1.00 Cum 1184.30 1.00 One Cubic 1184.00
Metre Hard rock (blasting prohi).
2.8 Earth work in excavation by mechanical means (Hydraulic
excavator) / manual means in foundation trenches or drains (not
exceeding 1.5 m in width or 10 sqm on plan) including dressing of
sides and ramming of bottoms, lift up to 1.5 m, including getting out
the excavated soil and disposal of surplus excavated soil as directed,
within a lead of 50 m.
E/W in excavation in found
2.8.1 All kinds of soil. 1.00 Cum 286.85 1.00 One Cubic 287.00
Metre All kinds of soil.
2.9 Excavation work by mechanical means (Hydraulic excavator)/
manual means in foundation trenches or drains (not exceeding 1.5m
in width or 10 sqm on plan) including dressing of sides and ramming
of bottoms, lift up to 1.5 m, including getting out the excavated soil
and disposal of surplus excavated soils as directed, within a lead of
50m.
Excavation work in foundat
2.9.1 Ordinary rock 1.00 Cum 523.50 1.00 One Cubic 524.00
Metre Ordinary rock.
2.9.2 Hard rock (requiring blasting) 1.00 Cum 846.25 1.00 One Cubic 846.00
Metre Hard rock (requ blasting).
2.9.3 Hard rock (blasting prohibited) 1.00 Cum 1258.60 1.00 One Cubic 1259.00
Metre Hard rock (blasting probi).
2.10 Excavating trenches of required width for pipes, cables, etc including
excavation for sockets, and dressing of sides, ramming of bottoms,
depth up to 1.5 m, including getting out the excavated soil, and then
returning the soil as required, in layers not exceeding 20 cm in depth,
including consolidating each deposited layer by ramming, watering,
etc. and disposing of surplus excavated soil as directed, within a lead
of 50 m :
Excavating trenches for pip
2.10.1 All kinds of soil All kinds of soil
2.10.1.1 Pipes, cables etc, not exceeding 80 mm dia. 1.00 m 255.55 1.00 One Metre 256.00 Pipes upto 80 mm dia.
2.10.1.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm 1.00 m 417.35 1.00 One Metre 417.00
dia Pipes, cables etc. exceeding
2.10.1.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600 mm. 1.00 m 651.55 1.00 One Metre 652.00
Pipes , cables 300 to 600 mm
2.11 Extra for excavating trenches for pipes, cables etc. in all kinds of 1.00 m 127.00 1.00 One Metre 127.00
soils for depth exceeding 1.5m, but not exceeding 3m.(Rate is over
corresponding basic item for depth upto 1.5 metre).
2.12 Extra for excavating trenches for pipes, cables etc. in all kinds of 1.00 m 314.95 1.00 One Metre 315.00
soils for depth exceeding 3m in depth, but not exceeding 4.5m.(Rate
is over corresponding basic item for depth upto 1.5 metre).

2.13 Excavating trenches of required width for pipes, cables, etc,


including excavation for sockets, depth up to 1.5 m, including getting
out the excavated materials, returning the soil as required in layers
not exceeding 20 cm in depth, including consolidating each deposited
layers by ramming, watering etc., stacking serviceable material for
measurements and disposal of unserviceable material as directed,
within a lead of 50m :
Excavating trenches for pip
2.13.1 Ordinary rock : Ordinary rocks :
2.13.1.1 Pipes, cables etc. not exceeding 80 mm dia. 1.00 m 376.95 1.00 One Metre 377.00 Pipes, upto 80 mm dia.
2.13.1.2 Pipes, cables etc. exceeding 80 mm dia but not exceeding 300 mm 1.00 m 933.35 1.00 One Metre 933.00
dia. Pipes, 80 mm to 300 mm di
2.13.1.3 Pipes, cables exceeding 300 mm dia but not exceeding 600mm dia 1.00 m 1074.00 1.00 One Metre 1074.00
Pipes 300 to 600 mm. dia
2.13.2 Hard rock (requiring blasting) Hard rock (requi blasting) :
2.13.2.1 Pipes, cables etc. not exceeding 80 mm dia. 1.00 m 531.85 1.00 One Metre 532.00 Pipes, upto 80 mm dia.
2.13.2.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm 1.00 m 1316.90 1.00 One Metre 1317.00
dia. Pipes 80 mm to 300 mm dia
2.13.2.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600mm 1.00 m 1515.20 1.00 One Metre 1515.00
dia Pipes 300 to 600 mm.
2.13.3 Hard rock (blasting prohibited) Hard rock (blasting prohi) :
2.13.3.1 Pipes, cables etc. not exceeding 80 mm dia. 1.00 m 726.65 1.00 One Metre 727.00 Pipes upto 80 mm dia.
2.13.3.2 Pipes, cables etc. exceeding 80 mm dia. but not exceeding 300 mm 1.00 m 1799.35 1.00 One Metre 1799.00
dia. Pipes 80 mm to 300 mm dia
2.13.3.3 Pipes, cables etc. exceeding 300 mm dia but not exceeding 600mm 1.00 m 2070.50 1.00 One Metre 2071.00
dia. Pipes 300 to 600 mm.
2.14 Extra for excavating trenches for pipes, cables etc. in ordinary / hard 1.00 m 103.75 1.00 One Metre 104.00
rock exceeding 1.5m in depth but not exceeding 3m.(Rate is over
corresponding basic item for depth upto 1.5 metre).
2.15 Extra for excavating trenches for pipes, cables etc. in ordinary / hard 1.00 m 256.15 1.00 One Metre 256.00
rock exceeding 3m in depth, but not exceeding 4.5m.(Rate is over
corresponding basic item for depth upto 1.5 metre).
2.16 Close timbering in trenches including strutting, shoring and packing
cavities (wherever required) complete. (Measurements to be taken of
the face area timbered).
Close timbering in trenches
2.16.1 Depth not exceeding 1.5 m. 1.00 Sqm 132.90 1.00 One Square 133.00
Metre Depth not exceeding 1.5 mt
2.16.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 145.55 1.00 One Square 146.00
Metre Depth from 1.5 to 3 mtr.
2.16.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 174.00 1.00 One Square 174.00
Metre Depth from 3 to 4.5 mtr.
2.17 Close timbering in case of shafts, wells, cesspits, manholes and the
like including strutting, shoring and packing cavities (wherever
required) etc. complete.(Measurements to be taken of the face area
timbered).
Close timbering in case of s
2.17.1 Depth not exceeding 1.5 m. 1.00 Sqm 142.50 1.00 One Square 143.00
Metre Depth not exceeding 1.5 mt
2.17.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 169.35 1.00 One Square 169.00
Metre Depth from 3 to 4.5 mtr.
2.17.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 197.60 1.00 One Square 198.00
Metre Depth exceeding 3 m to 4.5
2.18 Close timbering over areas including strutting, shoring and packing
cavities (wherever required) etc. complete. (Measurements to be
taken of the face area timbered) :
Close timbering over areas
2.18.1 Depth not exceeding 1.5 m. 1.00 Sqm 119.10 1.00 One Square 119.00
Metre Depth not exceeding 1.5 mt
2.18.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 134.20 1.00 One Square 134.00
Metre Depth from 1.5 to 3 mtr.
2.18.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 149.95 1.00 One Square 150.00
Metre Depth from 3 to 4.5 mtr.
2.19 Extra for planking, strutting and packing materials for cavities (in 1.00 Sqm 1596.50 1.00 One Square 1597.00
close timbering) if required to be left permanently in position. (Face Metre
area of timber permanently left to be measured).
Extra for planking, strutting
2.20 Open timbering in trenches including strutting and shoring complete
(measurements to be taken of the face area timbered):
Open timbering in trenches
2.20.1 Depth not exceeding 1.5 m. 1.00 Sqm 68.55 1.00 One Square 69.00
Metre Depth not exceeding 1.5 m.
2.20.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 76.40 1.00 One Square 76.00
Metre Depth from 1.5 to 3 mtr.
2.20.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 89.35 1.00 One Square 89.00
Metre Depth from 3 to 4.5 mtr.
2.21 Open timbering in case of shafts, wells, cesspits, manholes and the
like including strutting and shoring complete (Measurements to be
taken of the face area timbered):
Open timbering in case of s
2.21.1 Depth not exceeding 1.5 m. 1.00 Sqm 62.35 1.00 One Square 62.00
Metre Depth not exceeding 1.5 m.
2.21.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 74.95 1.00 One Square 75.00
Metre Depth from 1.5 to 3 mtr.
2.21.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 91.60 1.00 One Square 92.00
Metre Depth from 3 to 4.5 mtr.
2.22 Open timbering over areas including strutting, shoring etc. complete.
(Measurements to be taken of the face area timbered):
Open timbering over areas
2.22.1 Depth not exceeding 1.5 m. 1.00 Sqm 42.40 1.00 One Square 42.00
Metre Depth not exceeding 1.5 m.
2.22.2 Depth exceeding 1.5 m but not exceeding 3 m. 1.00 Sqm 50.80 1.00 One Square 51.00
Metre Depth from 1.5 to 3 mtr.
2.22.3 Depth exceeding 3 m but not exceeding 4.5 m. 1.00 Sqm 64.30 1.00 One Square 64.00
Metre Depth from 3 to 4.5 mtr.
2.23 Extra for planking and strutting in open timbering if required to be 1.00 Sqm 822.05 1.00 One Square 822.00
left permanently in position. (Face area of the timber permanently Metre
left to be measured).
Extra for planking and strut
2.25 Filling available excavated earth (excluding rock) in trenches, plinth, 1.00 Cum 253.95 1.00 One Cubic 254.00
sides of foundations etc. in layers not exceeding 20cm in depth, Metre
consolidating each deposited layer by ramming and watering, lead up
to 50 m and lift up to 1.5 m.
Filling available earth in tre
2.25A Excavating, supplying and filling of local earth (including royalty) by 1.00 Cum 368.65 1.00 One Cubic 369.00
mechanical transport up to a lead of 5 km, also including ramming Metre
and watering of the earth in layers not exceeding 20 cm in trenches,
plinth, sides of foundation etc., complete.

2.26 Extra for every additional lift of 1.5 m or part thereof in


excavation /banking excavated or stacked materials. Extra for every addi lift of 1
2.26.1 All kinds of soil. 1.00 Cum 104.50 1.00 One Cubic 105.00
Metre All kinds of soil.
2.26.2 Ordinary or hard rock. 1.00 Cum 187.40 1.00 One Cubic 187.00
Metre Ordinary or hard rock
2.27 Supplying and filling in plinth with sand under floors, including 1.00 Cum 2161.20 1.00 One Cubic 2161.00
watering, ramming, consolidating and dressing complete. Metre Suppl. and filling in plinth l
2.28 Surface dressing of the ground including removing vegetation and
inequalities not exceeding 15 cm deep and disposal of rubbish, lead
up to 50 m and lift upto1.5 m.
Surface dressing of the grou
2.28.1 All kinds of soil. 1.00 Sqm 28.15 1.00 One Square 28.00
Metre All kinds of soil.
2.29 Ploughing the existing ground to a depth of 15 cm to 25 cm and
watering the same. Ploughing the existing grou
2.29.1 All kinds of soil. 1.00 Sqm 28.50 1.00 One Square 29.00
Metre All kinds of soil.
2.30 Excavating holes more than 0.10 cum & up to 0.5 cum including
getting out the excavated soil, then returning the soil as required in
layers not exceeding 20 cm in depth, including consolidating each
deposited layer by ramming, watering etc, disposing of surplus
excavated soil, as directed within a lead of 50 m and lift upto1.5 m.

Excavating holes more than


2.30.1 All kinds of soil. 1.00 No. 89.90 1.00 Each 90.00 All kinds of soil.
2.30.2 Ordinary rock 1.00 No. 160.90 1.00 Each 161.00 Ordinary rock
in surface excavation:

in rough excavation, banking excavated earth :

cavated earth in layers not exceeding 20 cm. in depth, breaking clods :-

not rolling with power roller.

not watering the excavated earth for banking.


in excavation over areas :-

in excavation over areas :-

(requ blasting).

(blasting prohi).

avation in foundation trenches :-

work in foundation, trenches :-

(requ blasting).
(blasting probi).

trenches for pipes , cables

80 mm dia.

es etc. exceeding 80 mm dia. but not exceeding 300 mm dia

es 300 to 600 mm.

trenches for pipes cables

80 mm dia.

mm to 300 mm dia.

o 600 mm. dia


(requi blasting) :
80 mm dia.
m to 300 mm dia.

o 600 mm.
(blasting prohi) :
80 mm dia.

m to 300 mm dia.

o 600 mm.

ering in trenches :-

exceeding 1.5 mtr.

m 1.5 to 3 mtr.

m 3 to 4.5 mtr.

ering in case of shafts,wells,cesspits,manholes

exceeding 1.5 mtr.

m 3 to 4.5 mtr.

eding 3 m to 4.5 m.
ering over areas :-

exceeding 1.5 mtr.

m 1.5 to 3 mtr.

m 3 to 4.5 mtr.

lanking, strutting and packing materials for cavities (in close timbering):

ering in trenches

exceeding 1.5 m.

m 1.5 to 3 mtr.

m 3 to 4.5 mtr.

ering in case of shafts, wells, cesspits, manholes

exceeding 1.5 m.

m 1.5 to 3 mtr.

m 3 to 4.5 mtr.

ering over areas

exceeding 1.5 m.

m 1.5 to 3 mtr.
m 3 to 4.5 mtr.

lanking and strutting in open timbering if required to be left permanently in position.

lable earth in trenches, plinth, side foundation etc.

very addi lift of 1.5 m:

r hard rock

filling in plinth local sand under floor.

ssing of the ground not exceeding 15 cm deep

the existing ground and watering the same.

holes more than 0.10 cum & up to 0.5 cum including getting out the excavated soil, then returning the soil.